Bidding Summary Report
Location: Svay Rieng Budget Year: 2006
| Commune | Contract ID | Bid Date | # Of Bidders | # Valid Bidders | Qty Changed | Award To | Contract Value | Bidding Detail | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Name | Bid Value | Rejected | Note | ||||||||
| District: [2001] Chantrea | |||||||||||
| Bati | 200101/06/01 | 11-May-2006 | 4 | 4 | No | Khuon Soken [ Khuon Soken ] | 71,900,000 | Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 71,899,999 | No | Mr. Yous savong atteded the bidding meetin/ lowest price, win the contract |
| Bati | 200101/06/02 | 11-May-2006 | 3 | 3 | No | Khuon Soken [ Khuon Soken ] | 19,415,800 | Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 19,415,750 | No | |
| Chantrea | 200103/06/01 | 11-May-2006 | 11 | 11 | Yes | Soa Saphun [ Soa Saphun ] | 49,300,000 | Thach Yor [ Thach Yor ] | 36,018,000 | No | lowest price, win the contract |
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 38,000,000 | No | |||||||||
| Pisey Chantha [ Kol Vannak ] | 40,817,998 | No | Mr. Kol Vannak attended the bidding meeting | ||||||||
| Bun Thom Construction [ Bun Thom ] | 41,000,000 | No | |||||||||
| Chup Pring Construction [ Chang Sang ] | 42,228,000 | No | |||||||||
| Kov Sophorndara [ Kov Sophorndara ] | 44,091,000 | No | |||||||||
| Sin Saroath [ Sin Saroath ] | 46,000,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 50,392,908 | No | |||||||||
| Ken kosop [ Ken kosop ] | 50,394,559 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 52,164,000 | No | Mr. Soeun Khaem attended the bidding meting | ||||||||
| Chan Ouk [ Chan Ouk ] | 56,386,800 | No | Mr. Chan Dyna attended the bidding meeting | ||||||||
| Samraong | 200109/06/01 | 11-May-2006 | 11 | 11 | Yes | Keo Kimhong [ Keo Kimhong ] | 53,641,600 | Cheng Sarun Construction Co. [ Cheng Sarun ] | 40,000,000 | No | lowest price, win the contract |
| Chup Pring Construction [ Chang Sang ] | 41,854,000 | No | Mr. Chhang Sang attended the bidding meeting | ||||||||
| Pisey Chantha [ Kol Vannak ] | 42,999,999 | No | Mr. Kol Vannak attended the bidding meeting | ||||||||
| Kov Sophorndara [ Kov Sophorndara ] | 43,981,206 | No | |||||||||
| Chan Ouk [ Chan Ouk ] | 46,999,999 | No | Mr. Chan Dyna attended the bidding meeting | ||||||||
| Heang Lon [ Heang Lon/ Cheab Sae (representative) ] | 48,956,000 | No | Mr. Cheab Sae attended the bidding meeting | ||||||||
| Sin Saroath [ Sin Saroath ] | 49,000,000 | No | |||||||||
| Thach Yor [ Thach Yor ] | 50,840,000 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 52,540,000 | No | Mr. Soeung Khaem attended the bidding meeting | ||||||||
| Sophy Sambath [ Kong Sophy ] | 55,140,000 | No | Mr. Kong sophy attended the bidding meetong | ||||||||
| Chheum Lyhuon [ Chheum Lyhuon ] | 63,969,700 | No | Mr. Chhoeum davin attended the bidding meeting | ||||||||
| Tuol Sdei | 200110/06/01 | 11-May-2006 | 3 | 3 | Yes | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 23,069,000 | Orn Sour [ Orn Sour ] | 17,918,000 | No | Lowest price, win the contract |
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 18,500,000 | No | |||||||||
| Sin Saroath [ Sin Saroath ] | 18,600,000 | No | |||||||||
| District: [2002] Kampong Rou | |||||||||||
| Banteay Krang | 200201/06/01 | 28-Apr-2006 | 4 | 4 | Yes | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 31,182,000 | Orn Sour [ Orn Sour ] | 29,017,500 | No | Lowest price |
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 29,855,000 | No | |||||||||
| Pisey Chantha [ Kol Vannak ] | 30,196,300 | No | Mr. Kol Vannak attended the bidding meeting | ||||||||
| Kim Try Construction [ Kim Try ] | 31,575,000 | No | |||||||||
| Nhor | 200202/06/01 | 28-Apr-2006 | 5 | 5 | No | Kaen Raem [ Kaen Raem ] | 27,987,400 | Chup Pring Construction [ Chang Sang ] | 27,798,440 | No | Mr. Chhang Sang attended the bidding meeting with lowest price and win the contract |
| Nhor | 200202/06/02 | 28-Apr-2006 | 6 | 6 | Yes | Kaen Raem [ Kaen Raem ] | 35,740,000 | Chup Pring Construction [ Chang Sang ] | 33,400,000 | No | Mr. Chhang Sang attended the bidding meeting with lowest price and win the contract |
| Chhun Yeang construction [ Chhun Yeang ] | 34,400,000 | No | |||||||||
| Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 34,439,860 | No | Mr. Yous Savong attended the bidding meeting | ||||||||
| Ken kosop [ Ken kosop ] | 34,447,800 | No | |||||||||
| Meas Pritteka [ Meas Pritteka ] | 34,447,980 | No | |||||||||
| Pisey Chantha [ Kol Vannak ] | 34,447,980 | No | Mr. Kol Vannak attended the bidding meeting | ||||||||
| Prey Thum | 200205/06/01 | 28-Apr-2006 | 4 | 4 | Yes | Kem Sakhey Peap Construction [ Kim Sakeipheap ] | 41,069,200 | Chhun Yeang construction [ Chhun Yeang ] | 39,999,200 | No | lowest price and win the contract |
| Sophy Sambath [ Kong Sophy ] | 40,780,875 | No | Mr. Kong Sophy attended the bidding meeting | ||||||||
| Kim Try Construction [ Kim Try ] | 40,988,220 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 41,001,750 | No | |||||||||
| Samlei | 200207/06/01 | 28-Apr-2006 | 6 | 6 | Yes | Kem Sakhey Peap Construction [ Kim Sakeipheap ] | 36,809,800 | Chhun Yeang construction [ Chhun Yeang ] | 30,000,000 | No | lowest price and win the contract |
| Chup Pring Construction [ Chang Sang ] | 31,785,000 | No | Mr. Chhang Sang attended the bidding meeting | ||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 32,800,000 | No | |||||||||
| Orn Sour [ Orn Sour ] | 32,844,500 | No | |||||||||
| Ken kosop [ Ken kosop ] | 36,023,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 36,023,000 | No | |||||||||
| Svay Toea | 200210/06/01 | 28-Apr-2006 | 6 | 6 | No | Heng Piseth [ Heng Piseth ] | 27,000,000 | Pisey Chantha [ Kol Vannak ] | 25,999,999 | No | Mr. Kol Vannak attended the bidding meeting |
| Svay Toea | 200210/06/02 | 28-Apr-2006 | 7 | 7 | Yes | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 26,307,000 | Orn Sour [ Orn Sour ] | 18,999,500 | No | lowest price and win the contract |
| Chhun Yeang construction [ Chhun Yeang ] | 20,500,000 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 20,800,000 | No | |||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 21,000,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 22,100,000 | No | |||||||||
| Kov Sophorndara [ Kov Sophorndara ] | 22,157,200 | No | |||||||||
| Meas Pritteka [ Meas Pritteka ] | 23,140,000 | No | |||||||||
| Thmei | 200211/06/01 | 28-Apr-2006 | 10 | 10 | Yes | Cheng Sarun [ Cheng Sarun ] | 22,558,200 | Nam Kim [ Nam Kim ] | 19,975,200 | No | lowest price and win the contract |
| Chup Pring Construction [ Chang Sang ] | 19,999,560 | No | Mr. Chang Sang attended the bidding meeting | ||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 20,000,000 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 20,880,000 | No | Mr. Kong Sophy attended the bidding meeting | ||||||||
| Chhun Yeang construction [ Chhun Yeang ] | 20,880,000 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 21,576,000 | No | |||||||||
| Orn Sour [ Orn Sour ] | 21,924,000 | No | |||||||||
| Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 22,949,999 | No | Mr. Yous Savong attended the bidding meeting | ||||||||
| Pisey Chantha [ Kol Vannak ] | 22,999,999 | No | Mr. Kol Vanank attended the bidding meeting | ||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 23,664,000 | No | Mr. Soeung Khaem attended the bidding meeting | ||||||||
| District: [2003] Rumduol | |||||||||||
| Chak | 200303/06/01 | 03-May-2006 | 10 | 10 | Yes | Keo Kimhong [ Keo Kimhong ] | 36,195,250 | Cheng Sarun Construction Co. [ Cheng Sarun ] | 29,900,000 | No | |
| Chea Chu [ Chea Chu ] | 30,324,364 | No | |||||||||
| Nam Kim [ Nam Kim ] | 30,730,000 | No | |||||||||
| Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 31,114,125 | No | |||||||||
| Sin Saroath [ Sin Saroath ] | 31,925,000 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 32,266,500 | No | |||||||||
| Ken kosop [ Ken kosop ] | 33,692,372 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 33,803,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 36,568,700 | No | |||||||||
| Yuos Dara [ Yuos Dara ] | 36,876,000 | No | |||||||||
| Chrung Popel | 200304/06/01 | 03-May-2006 | 13 | 13 | Yes | Keo Kimhong [ Keo Kimhong ] | 37,218,400 | Chhun Yeang construction [ Chhun Yeang ] | 3,222,600 | No | hight price |
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 28,500,000 | No | Mr. Cheng Sarun attended the meeting | ||||||||
| Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 30,323,700 | No | |||||||||
| Nam Kim [ Nam Kim ] | 30,630,000 | No | |||||||||
| Chan Ouk [ Chan Ouk ] | 30,936,300 | No | |||||||||
| Chea Chu [ Chea Chu ] | 31,824,570 | No | |||||||||
| Orn Sour [ Orn Sour ] | 32,997,690 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 33,080,400 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 33,693,000 | No | |||||||||
| Ken kosop [ Ken kosop ] | 34,121,820 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 35,913,700 | No | |||||||||
| Yuos Dara [ Yuos Dara ] | 36,449,700 | No | |||||||||
| Meak Saphan [ Meak Saphan ] | 37,521,750 | No | |||||||||
| Kampong Ampil | 200305/06/01 | 03-May-2006 | 12 | 12 | Yes | Chhaem Thon [ Sar Sophoan ] | 56,498,450 | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 40,553,450 | No | |
| Kov Sophorndara [ Kov Sophorndara ] | 41,305,005 | No | |||||||||
| Chan Ouk [ Chan Ouk ] | 43,791,000 | No | |||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 45,048,500 | No | |||||||||
| Ken kosop [ Ken kosop ] | 45,264,975 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 45,436,650 | No | |||||||||
| Nam Kim [ Nam Kim ] | 45,780,000 | No | |||||||||
| Pisey Chantha [ Kol Vannak ] | 47,485,305 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 47,687,500 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 47,687,500 | No | |||||||||
| Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 47,687,500 | No | |||||||||
| Chhun Yeang construction [ Chhun Yeang ] | 48,090,000 | No | |||||||||
| Pong Tuek | 200307/06/01 | 03-May-2006 | 5 | 5 | Yes | Chhaem Thon [ Sar Sophoan ] | 85,600,000 | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 79,600,000 | No | |
| Chhun Yeang construction [ Chhun Yeang ] | 80,291,150 | No | |||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 80,400,000 | No | |||||||||
| Oeum Phol Development [ Oeum Phol ] | 81,394,300 | No | |||||||||
| Pisey Chantha [ Kol Vannak ] | 81,399,995 | No | |||||||||
| Sangkae | 200308/06/01 | 03-May-2006 | 7 | 7 | Yes | Chhaem Thon [ Sar Sophoan ] | 29,970,000 | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 24,970,000 | No | |
| Chea Chu [ Chea Chu ] | 26,320,000 | No | |||||||||
| Nam Kim [ Nam Kim ] | 26,770,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 27,767,000 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 27,947,300 | No | |||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 28,000,000 | No | |||||||||
| Yuos Dara [ Yuos Dara ] | 29,170,000 | No | |||||||||
| Svay Chek | 200309/06/01 | 03-May-2006 | 10 | 10 | Yes | Haem Sean [ Haem Sean ] | 36,627,200 | Chan Ouk [ Chan Ouk ] | 3,143,700 | No | high price, Mr. Chan Dyna attended the meeting |
| Chea Chu [ Chea Chu ] | 30,137,200 | No | lowest price | ||||||||
| Chhun Yeang construction [ Chhun Yeang ] | 31,645,559 | No | Hight price | ||||||||
| Sin Saroath [ Sin Saroath ] | 31,925,000 | No | hight price | ||||||||
| Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 31,925,000 | No | hight price | ||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 32,000,000 | No | Hight price, Mr. Cheng sarun attended the meeting | ||||||||
| Orn Sour [ Orn Sour ] | 33,457,400 | No | hight price | ||||||||
| Ken kosop [ Ken kosop ] | 33,505,926 | No | hight price | ||||||||
| Pisey Chantha [ Kol Vannak ] | 33,999,999 | No | Hight price, Mr. Kul Vannak attended the meeting | ||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 35,156,000 | No | hight price | ||||||||
| Thna Thnong | 200310/06/01 | 03-May-2006 | 5 | 5 | Yes | Chhaem Thon [ Sar Sophoan ] | 80,250,000 | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 70,970,000 | No | |
| Pisey Chantha [ Kol Vannak ] | 80,600,000 | No | |||||||||
| Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 81,449,998 | No | |||||||||
| Cheng Sarun Construction Co. [ Cheng Sarun ] | 81,467,098 | No | |||||||||
| Chhun Yeang construction [ Chhun Yeang ] | 82,148,000 | No | |||||||||
| District: [2004] Romeas Haek | |||||||||||
| Doung | 200407/06/02 | 10-May-2006 | 4 | 4 | Yes | Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 22,690,000 | Sen Van [ Sen Van ] | 2,137,500 | No | |
| Put Kantha [ Put Kantha ] | 21,340,000 | No | |||||||||
| Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 21,480,000 | No | |||||||||
| Khun Narin [ Khun Narin ] | 21,546,000 | No | |||||||||
| Sambuor | 200413/06/01 | 09-May-2006 | 5 | 5 | No | Chhaem Thon [ Sar Sophoan ] | 72,218,400 | Cheng Sarun Construction Co. [ Cheng Sarun ] | 70,000,000 | No | |
| District: [2005] Svay Chrum | |||||||||||
| Chamlang | 200504/06/02 | 25-May-2006 | 4 | 4 | No | Kov Sophorndara [ Kov Sophorndara ] | 33,142,200 | Kov Sophorndara [ Kov Sophorndara ] | 32,142,244 | No | lowest price and win the contract |
| Ta Suos | 200505/06/01 | 25-May-2006 | 6 | 6 | No | Chreang Sophann Trade [ Chreang Sophann ] | 121,251,400 | Kem Sakhey Peap Construction [ Kim Sakeipheap ] | 12,500,000 | No | |
| Chek | 200506/06/01 | 25-May-2006 | 8 | 8 | Yes | Nam Kim [ Nam Kim ] | 117,142,000 | Pisey Chantha [ Kol Vannak ] | 114,999,999 | No | Mr. Mao Rinn attended the bidding meeting with lowest price and win the contract |
| Kov Sophorndara [ Kov Sophorndara ] | 120,848,600 | No | |||||||||
| Ken kosop [ Ken kosop ] | 124,754,600 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 124,773,800 | No | |||||||||
| Orn Sour [ Orn Sour ] | 124,898,600 | No | |||||||||
| Oeung Hakseng company [ Oeung Hakseng ] | 124,902,300 | No | |||||||||
| Cheng Eng Srun Enterprise [ Cheng Eng Srun ] | 124,910,600 | No | |||||||||
| Kem Sakhey Peap Construction [ Kim Sakeipheap ] | 124,922,600 | No | |||||||||
| Kouk Pring | 200509/06/01 | 26-May-2006 | 4 | 4 | Yes | Sophy Sambath [ Kong Sophy ] | 38,870,000 | Ear Daeun [ Ear Daeun ] | 36,842,000 | No | Invited contractor with lowest price and winthe contract |
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 37,169,000 | No | Mr. Soeung Khaem attended the bidding meeting | ||||||||
| Kim Try Construction [ Kim Try ] | 37,278,000 | No | |||||||||
| Bun Thom Construction [ Bun Thom ] | 37,496,000 | No | |||||||||
| Kraol Kou | 200510/06/01 | 26-May-2006 | 7 | 7 | Yes | Soa Saphun [ Soa Saphun ] | 107,400,000 | Thach Yor [ Thach Yor ] | 88,780,000 | No | lowest price and win the contract |
| Kem Sakhey Peap Construction [ Kim Sakeipheap ] | 100,000,000 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 109,920,000 | No | |||||||||
| Srei Au [ Srei Au ] | 111,675,000 | No | |||||||||
| Chan Ouk [ Chan Ouk ] | 112,249,100 | No | Mr. Chan Dyna attended the bidding meeting | ||||||||
| Sin Saroath [ Sin Saroath ] | 112,500,000 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 113,172,000 | No | Mr. Soeung Khaem attended the bidding meeting | ||||||||
| Pouthi Reach | 200512/06/01 | 26-May-2006 | 12 | 12 | Yes | Keo Kimhong [ Keo Kimhong ] | 97,532,000 | Cheng Sarun Construction Co. [ Cheng Sarun ] | 73,000,000 | No | lowest price and win the contract |
| Sin Saroath [ Sin Saroath ] | 79,922,900 | No | |||||||||
| Kim Try Construction [ Kim Try ] | 80,000,000 | No | |||||||||
| Bun Thom Construction [ Bun Thom ] | 80,403,000 | No | |||||||||
| Nam Kim [ Nam Kim ] | 85,946,000 | No | |||||||||
| Thach Yor [ Thach Yor ] | 90,240,000 | No | |||||||||
| Chroeung Sophoarn [ Chroeung Sophoarn ] | 90,698,400 | No | |||||||||
| Sophy Sambath [ Kong Sophy ] | 92,575,000 | No | |||||||||
| Ken kosop [ Ken kosop ] | 104,766,900 | No | |||||||||
| Moeung Seth Company [ Moeung Seth ] | 106,479,400 | No | |||||||||
| Meas Pritteka [ Meas Pritteka ] | 106,918,400 | No | |||||||||
| Meak Saphan [ Meak Saphan ] | 107,192,700 | No | |||||||||
| Thlok | 200517/06/02 | 26-May-2006 | 5 | 5 | No | Keo Sothea [ Keo Sothea ] | 10,670,100 | Chhoeum Lyhuon Development Company [ Chhoeum Lyhuon ] | 10,350,000 | No | Mr. Hoeung davinn attended the bidding meeting |
| Heang Lon [ Heang Lon/ Cheab Sae (representative) ] | 10,500,000 | No | Mr. Cheab Sae attended the bidding meeting | ||||||||
| District: [2007] Svay Teab | |||||||||||
| Monourom | 200704/06/01 | 27-Apr-2006 | 5 | 5 | Yes | Chem Chola [ Cheum Cholla ] | 42,027,400 | YOCVAC PENICH CO., LTD. [ Tep Savorn ] | 38,999,998 | No | Mr. Teb Savet was invited to attend the bidding meeting with lowest price and win the contract |
| Meas Than Construction Enterprise [ Meas Thann/Yous savong (representative) ] | 39,999,999 | No | Mr. Yous Savong attended the bidding meeting | ||||||||
| Orn Sour [ Orn Sour ] | 40,999,998 | No | |||||||||
| Sin Saroath [ Sin Saroath ] | 42,048,000 | No | Mr. Soeung Khaem attended the meeting | ||||||||
| Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 42,139,980 | No | Mr. Pech Dara attended the meeting | ||||||||
| Sambuor | 200709/06/01 | 27-Apr-2006 | 6 | 6 | No | Mey Li [ Mey Li ] | 61,997,800 | Kov Sophorndara [ Kov Sophorndara ] | 61,997,791 | No | lowest price and win the contract |
| Sangkhoar | 200710/06/01 | 02-Mar-2006 | 8 | 8 | No | Chheum Lyhuon [ Chheum Lyhuon ] | 32,408,500 | Oeung Hakseng company [ Oeung Hakseng ] | 3,337,862 | No | High bid price |
| Svay Rumpea | 200711/06/01 | 27-Apr-2006 | 4 | 4 | No | Sok Kunthea [ Sok Kunthea/ Pech Dara (representative) ] | 71,458,600 | Orn Sour [ Orn Sour ] | 71,458,594 | No | lowest price and win the contract |
# Of Bidders: number of contractor submit their bid for the specific contract.
# Valid Bidders: number of contractor accepted by the bidding committee.
Rejected: Yes if the bidding committee reject contractor bidding request.