Contract Outputs

Location: Banteay Meanchey Budget Year: 2005

Mongkol Borei    Phnum Srok    Preah Netr Preah    Ou Chrov    Serei Saophoan    Thma Puok    Svay Chek    Malai   

Mongkol Borei, Banteay Neang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010201/05/01 TSO Ly Heng Project Type Rural Transport 42,503,520
Ou Snguot 1 203 Gravel road 2.50 [ 2.63 ] Km 16,154,892 4.000 Width (m) 1,579.000 Earth fill m3 42,503,521
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,503,521

Mongkol Borei, Bat Trang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010202/05/01 TSO Ly Heng Project Type Rural Transport 21,957,300
Preaek Chik 1 201 Earth road 0.75 [ 0.75 ] Km 24,609,867 5.000 Width (m) 4,191.000 Earth fill m3 18,457,400
Preaek Chik 2 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 3,499,900 1.000 Diameter (m) 7.000 Length (m) 3,499,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,957,300

Mongkol Borei, Chamnaom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010203/05/01 TSO Ly Heng Project Type Rural Transport 39,953,550
Rongvean Lech 1 201 Earth road 0.50 [ 0.50 ] Km 23,609,200 5.000 Width (m) 1,956.000 Earth fill m3 11,804,600
Pralay Char 2 201 Earth road 0.90 [ 0.95 ] Km 23,630,564 5.000 Width (m) 4,228.000 Earth fill m3 22,354,514
Rongvean Lech 3 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,897,218 0.800 Diameter (m) 7.000 Length (m) 2,897,218
Pralay Char 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,897,218 0.800 Diameter (m) 7.000 Length (m) 2,897,218
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,953,550

Mongkol Borei, Kouk Ballangk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010204/05/01 TSO Ly Heng Project Type Rural Transport 26,192,800
Kouk Ballangk 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,800,000 2.000 Total Span (m) 1.600 Width(m) 8,800,000
Pralay Chrey 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,700,000 2.000 Total Span (m) 1.600 Width(m) 8,700,000
Cheung Chab 3 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,692,782 2.000 Total Span (m) 1.600 Width(m) 8,692,782
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,192,782
Contract ID 010204/05/02 TSO Ly Heng Project Type Rural Transport 27,654,901
Ph'av Thmei 1 203 Gravel road 0.60 [ 0.63 ] Km 34,896,995 4.000 Width (m) 877.000 Earth fill m3 22,054,901
Ph'av Thmei 2 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 5,600,000 6.000 3.280 5,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,654,901

Mongkol Borei, Koy Maeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010205/05/01 TSO Ly Heng Project Type Rural Transport 26,266,801
Ta Nong 1 201 Earth road 0.26 [ 0.26 ] Km 48,158,000 5.000 Width (m) 3,252.000 Earth fill m3 12,521,080
Koy Maeng 2 201 Earth road 0.27 [ 0.29 ] Km 48,146,133 5.000 Width (m) 3,046.000 Earth fill m3 13,745,721
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,266,801

Mongkol Borei, Ou Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010206/05/01 TSO Ly Heng Project Type Irrigation 26,856,942
Chamkar Louk 1 420 Canal 1.35 [ 1.35 ] Km 9,139,340 0.940 Depth (m) 4,164.000 Volume (m3) 12,338,109
Phnum Thum Cheung 2 420 Canal 0.94 [ 0.94 ] Km 15,478,500 1.320 Depth (m) 4,915.000 Volume (m3) 14,518,833
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,856,942

Mongkol Borei, Phnum Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010207/05/01 TSO Ly Heng Project Type Rural Transport 32,533,149
Ou Nhor 1 202 Laterite road 1.82 [ 1.88 ] Km 17,286,477 4.000 Width (m) 1,129.000 Earth fill m3 32,533,150
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,533,150

Mongkol Borei, Rohat Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010208/05/01 TSO Ly Heng Project Type Rural Transport 17,850,000
Preaek Samraong 1 203 Gravel road 0.24 [ 0.24 ] Km 29,024,390 4.000 Width (m) 192.000 Earth fill m3 6,965,854
Pou Pir Daeum 2 203 Gravel road 0.38 [ 0.38 ] Km 29,024,390 4.000 Width (m) 300.000 Earth fill m3 10,884,146
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,850,000

Mongkol Borei, Ruessei Kraok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010209/05/01 TSO Ly Heng Project Type Rural Transport 49,437,550
Luong 1 201 Earth road 0.27 [ 0.27 ] Km 17,000,000 5.000 Width (m) 822.000 Earth fill m3 4,505,000
Neang Ket 2 201 Earth road 0.82 [ 0.85 ] Km 52,614,230 5.000 Width (m) 8,028.000 Earth fill m3 44,932,552
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  49,437,552

Mongkol Borei, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010210/05/01 TSO Ly Heng Project Type Rural Transport 28,802,100
Sambuor 1 201 Earth road 0.53 [ 0.54 ] Km 53,091,428 5.000 Width (m) 7,044.000 Earth fill m3 28,802,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,802,100

Mongkol Borei, Soea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010211/05/01 TSO Ly Heng Project Type Rural Transport 33,293,399
Boeng Touch 1 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 3,892,700 1.000 Diameter (m) 7.000 Length (m) 7,785,400
Boeng Touch 2 201 Earth road 2.10 [ 2.15 ] Km 11,853,159 5.000 Width (m) 6,005.000 Earth fill m3 25,507,998
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,293,398

Mongkol Borei, Srah Reang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010212/05/01 TSO Ly Heng Project Type Rural Transport 8,852,056
Ta In Pir 1 201 Earth road 0.28 [ 0.28 ] Km 31,614,486 5.000 Width (m) 1,362.000 Earth fill m3 8,852,056
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,852,056
Contract ID 010212/05/02 TSO Ly Heng Project Type Rural Transport 16,632,044
Krouch 1 203 Gravel road 0.91 [ 0.95 ] Km 17,544,350 4.000 Width (m) 569.000 Earth fill m3 16,632,044
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,632,044

Mongkol Borei, Ta Lam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010213/05/01 TSO Ly Heng Project Type Rural Transport 13,067,000
Ta Lam Kandal 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 13,067,000 2.000 Total Span (m) 1.700 Width(m) 13,067,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,067,000
Contract ID 010213/05/02 TSO Ly Heng Project Type Rural Transport 13,923,470
Boeng Khleang Lech 1 203 Gravel road 0.61 [ 0.61 ] Km 23,014,000 4.000 Width (m) 484.000 Earth fill m3 13,923,470
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,923,470

Phnum Srok, Nam Tau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010301/05/01 TSO Pen Phal Project Type Rural Transport 29,343,850
Slaeng 1 201 Earth road 0.50 [ 0.53 ] Km 42,954,087 5.000 Width (m) 5,593.000 Earth fill m3 22,593,850
Rongvean 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,750,000 1.000 Diameter (m) 7.000 Length (m) 6,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,343,850

Phnum Srok, Paoy Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010302/05/01 TSO Pen Phal Project Type Rural Transport 21,116,500
Paoy Char 1 202 Laterite road 0.40 [ 0.40 ] Km 22,862,500 4.000 Width (m) 923.000 Earth fill m3 9,145,000
Paoy Ta Ong 2 202 Laterite road 0.48 [ 0.53 ] Km 22,418,539 4.000 Width (m) 1,121.000 Earth fill m3 11,971,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,116,500
Contract ID 010302/05/02 TSO Pen Phal Project Type Rural Transport 10,194,500
Paoy Char 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,907,000 0.600 Diameter (m) 6.000 Length (m) 5,721,000
Paoy Ta Ong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,566,500 0.800 Diameter (m) 6.000 Length (m) 2,566,500
Paoy Ta Ong 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,907,000 0.600 Diameter (m) 6.000 Length (m) 1,907,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,194,500

Phnum Srok, Ponley

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010303/05/01 TSO Pen Phal Project Type Rural Transport 32,993,650
Svay Sa 1 202 Laterite road 2.12 [ 2.18 ] Km 15,148,600 4.000 Width (m) 318.000 Earth fill m3 32,993,651
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,993,651

Phnum Srok, Spean Sraeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010304/05/01 TSO Pen Phal Project Type Rural Transport 21,592,201
Kouk Char 1 202 Laterite road 0.47 [ 0.49 ] Km 29,856,594 4.000 Width (m) 1,632.000 Earth fill m3 14,719,301
Kouk Char 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,872,900 1.000 Diameter (m) 7.000 Length (m) 6,872,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,592,201
Contract ID 010304/05/02 TSO Pen Phal Project Type Rural Transport 1,500,000
Kouk Char 1 201 Earth road 0.30 [ 0.30 ] Km 5,000,000 4.000 Width (m) 372.000 Earth fill m3 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,500,000

Phnum Srok, Srah Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010305/05/01 TSO Pen Phal Project Type Rural Transport 14,877,600
Srah Chhuk Khang Kaeut 1 202 Laterite road 0.82 [ 0.82 ] Km 8,150,000 4.000 Width (m) 111.000 Earth fill m3 6,674,850
Srah Chhuk Khang Lech 2 202 Laterite road 0.93 [ 1.03 ] Km 7,987,098 4.000 Width (m) 124.000 Earth fill m3 8,202,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,877,600
Contract ID 010305/05/02 TSO Pen Phal Project Type Rural Transport 9,266,100
Srah Chhuk Khang Kaeut 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,970,100 0.800 Diameter (m) 7.000 Length (m) 2,970,100
Srah Chhuk Khang Lech 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,178,000 0.600 Diameter (m) 8.000 Length (m) 2,178,000
Srah Chhuk Khang Lech 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,059,000 0.600 Diameter (m) 7.000 Length (m) 4,118,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,266,100

Phnum Srok, Phnum Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010306/05/01 TSO Pen Phal Project Type Rural Transport 28,901,000
Kouk Seh 1 202 Laterite road 1.99 [ 2.13 ] Km 6,655,999 4.000 Width (m) 238.000 Earth fill m3 14,190,590
Bos Sbov 2 202 Laterite road 1.43 [ 1.43 ] Km 10,287,000 4.000 Width (m) 1,890.000 Earth fill m3 14,710,410
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,901,000

Preah Netr Preah, Chhnuor Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010401/05/01 TSO Oeung Vuthy Project Type Irrigation 23,891,526
Thma Koul 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 11,083,644 2.000 Total span (m) 4.000 Width (m) 11,083,644
Bantoat Baoh 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 5,111,505 1.000 Diameter (m) 6.000 Width (m) 5,111,505
Chhnuor 3 251 Drift 1.00 [ 1.00 ] Place 7,696,377 20.000 Length (m) 3.500 Width (m) 7,696,377
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,891,526

Preah Netr Preah, Chob Veari

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010402/05/01 TSO Oeung Vuthy Project Type Irrigation 17,979,413
Chob 1 410 Earth dam 0.35 [ 0.36 ] Km 49,530,063 4.000 Max. height (m) 4,198.000 Volume (m3) 17,979,413
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,979,413
Contract ID 010402/05/02 TSO Oeung Vuthy Project Type Irrigation 14,912,000
Roul Chruk 1 251 Drift 1.00 [ 1.00 ] Place 14,912,000 20.000 Length (m) 4.000 Width (m) 14,912,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,912,000

Preah Netr Preah, Phnum Lieb

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010403/05/01 TSO Oeung Vuthy Project Type Irrigation 28,572,100
Phnum Lieb Kaeut 1 420 Canal 2.46 [ 2.46 ] Km 4,005,000 0.550 Depth (m) 3,188.000 Volume (m3) 9,840,285
Phnum Lieb Kaeut 2 420 Canal 1.05 [ 1.10 ] Km 16,967,224 1.260 Depth (m) 4,561.000 Volume (m3) 18,731,815
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,572,100
Contract ID 010403/05/02 TSO Oeung Vuthy Project Type Irrigation 7,993,000
Phnum Lieb Kaeut 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,109,000 4.000 Diameter (m) 2.000 Width (m) 3,109,000
Phnum Lieb Kaeut 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,884,000 5.000 Diameter (m) 1.400 Width (m) 4,884,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,993,000

Preah Netr Preah, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010404/05/01 TSO Oeung Vuthy Project Type Rural Transport 24,578,950
Prasat 1 202 Laterite road 0.90 [ 0.93 ] Km 26,315,792 4.000 Width (m) 3,027.000 Earth fill m3 24,578,950
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,578,950

Preah Netr Preah, Preah Netr Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010405/05/01 TSO Oeung Vuthy Project Type Rural Transport 30,000,000
Kandal 1 201 Earth road 1.00 [ 1.08 ] Km 27,700,831 5.000 Width (m) 7,579.000 Earth fill m3 30,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,000,000
Contract ID 010405/05/02 TSO Oeung Vuthy Project Type Rural Transport 3,293,000
Post Chas 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,293,000 1.000 Diameter (m) 8.000 Length (m) 3,293,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,293,000

Preah Netr Preah, Rohal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010406/05/01 TSO Oeung Vuthy Project Type Irrigation 24,771,001
Rohal 1 420 Canal 1.20 [ 1.48 ] Km 13,362,018 0.700 Depth (m) 3,987.700 Volume (m3) 19,735,701
Rohal 2 451 Small water gate 1.00 [ 1.00 ] Place 5,035,300 5.500 Length (m) 1.500 Height (m) 5,035,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,771,001
Contract ID 010406/05/02 TSO Oeung Vuthy Project Type Rural Transport 3,631,000
Rohal 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,631,000 0.800 Diameter (m) 6.000 Length (m) 3,631,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,631,000

Preah Netr Preah, Tean Kam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010407/05/01 TSO Oeung Vuthy Project Type Rural Transport 21,361,200
Bantoat Baoh 1 202 Laterite road 2.20 [ 2.27 ] Km 9,418,519 3.500 Width (m) 792.000 Earth fill m3 21,361,201
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,361,201

Preah Netr Preah, Tuek Chour

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010408/05/01 TSO Oeung Vuthy Project Type Rural Transport 23,288,900
Paoy Char 1 242 Concrete bridge with piers 1.00 [ 1.00 ] Place 23,288,900 16.000 Total Span (m) 4.000 Width (m) 23,288,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,288,900
Contract ID 010408/05/02 TSO Oeung Vuthy Project Type Rural Transport 8,999,600
Kouk kei 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,413,400 0.800 Diameter (m) 6.000 Length (m) 2,413,400
Thmei 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 3,293,100 1.000 Diameter (m) 6.000 Length (m) 6,586,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,999,600

Ou Chrov, Changha

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010501/05/01 TSO Uy Phirun Project Type Rural Transport 24,056,549
Chrey 1 201 Earth road 0.32 [ 0.32 ] Km 37,105,000 5.000 Width (m) 2,706.000 Earth fill m3 11,873,600
Chrey 2 201 Earth road 0.46 [ 0.50 ] Km 19,923,338 5.000 Width (m) 2,466.000 Earth fill m3 9,961,669
Chrey 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,221,280 0.600 Diameter (m) 6.000 Length (m) 2,221,280
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,056,549

Ou Chrov, Koub

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010502/05/01 TSO Uy Phirun Project Type Rural Transport 28,552,210
Naka Chhay 1 201 Earth road 0.15 [ 0.15 ] Km 26,375,000 5.000 Width (m) 1,083.000 Earth fill m3 3,956,250
Naka Chhay 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,197,000 0.600 Diameter (m) 6.000 Length (m) 2,197,000
Koub Kaeut 3 201 Earth road 0.15 [ 0.15 ] Km 30,711,000 5.000 Width (m) 1,265.000 Earth fill m3 4,606,650
Koub Cheung 4 201 Earth road 0.10 [ 0.10 ] Km 31,915,500 5.000 Width (m) 869.000 Earth fill m3 3,191,550
Souriya 5 201 Earth road 0.15 [ 0.15 ] Km 30,020,000 5.000 Width (m) 1,236.000 Earth fill m3 4,503,000
Souriya 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,096,600 1.000 Diameter (m) 6.000 Length (m) 3,096,600
Ou Chrov 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,387,000 1.000 Diameter (m) 6.000 Length (m) 5,387,000
Koub Cheung 8 201 Earth road 0.04 [ 0.04 ] Km 40,355,250 5.000 Width (m) 519.000 Earth fill m3 1,614,210
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,552,260

Ou Chrov, Kuttasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010503/05/01 TSO Uy Phirun Project Type Rural Transport 24,990,000
Kaoh Char 1 202 Laterite road 2.10 [ 2.10 ] Km 11,900,000 3.500 Width (m) 84.000 Earth fill m3 24,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,990,000

Ou Chrov, Nimitt

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010504/05/01 TSO Uy Phirun Project Type Rural Transport 44,134,520
Ou Chrov 1 201 Earth road 1.18 [ 1.18 ] Km 29,194,000 5.000 Width (m) 8,752.000 Earth fill m3 34,448,920
Ou Chrov 2 211 Single pipe culvert 3.00 [ 4.00 ] Place 2,421,400 0.800 Diameter (m) 6.000 Length (m) 9,685,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,134,520
Contract ID 010504/05/02 TSO Uy Phirun Project Type Rural Transport 41,786,079
Thma Sen 1 202 Laterite road 0.80 [ 1.09 ] Km 9,812,559 4.000 Width (m) 157.000 Earth fill m3 10,695,689
Nimit Bei 2 202 Laterite road 1.40 [ 1.40 ] Km 8,210,000 3.500 Width (m) 44.000 Earth fill m3 11,494,000
Nimit Bei 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,683,000 0.800 Diameter (m) 6.000 Length (m) 8,049,000
Kun Damrei 4 202 Laterite road 0.30 [ 0.30 ] Km 8,744,000 3.500 Width (m) 19.000 Earth fill m3 2,623,200
Kun Damrei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,683,100 0.800 Diameter (m) 6.000 Length (m) 2,683,100
Nimit Buon 6 202 Laterite road 0.37 [ 0.37 ] Km 8,666,000 3.500 Width (m) 35.000 Earth fill m3 3,163,090
Nimit Pir 7 202 Laterite road 0.36 [ 0.36 ] Km 8,550,000 3.500 Width (m) 23.000 Earth fill m3 3,078,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,786,079
Contract ID 010504/05/03 TSO Uy Phirun Project Type Rural Transport 1,200,000
Kun Damrei 1 202 Laterite road 1.00 [ 1.00 ] Km 1,200,000 3.500 Width (m) 140.000 Earth fill m3 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,200,000

Ou Chrov, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010505/05/01 TSO Uy Phirun Project Type Rural Transport 25,560,200
Thmei 1 201 Earth road 0.90 [ 0.94 ] Km 27,337,112 5.000 Width (m) 6,234.000 Earth fill m3 25,560,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,560,200
Contract ID 010505/05/02 TSO Uy Phirun Project Type Rural Transport 1,500,000
Thmei 1 202 Laterite road 5.00 [ 5.00 ] Km 300,000 4.000 Width (m) 85.000 Earth fill m3 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,500,000

Ou Chrov, Souphi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010506/05/01 TSO Uy Phirun Project Type Rural Transport 22,792,350
Souphi Tboung 1 202 Laterite road 0.89 [ 0.93 ] Km 17,444,069 4.000 Width (m) 81.000 Earth fill m3 16,222,984
Souphi Tboung 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,882,997 0.600 Diameter (m) 6.000 Length (m) 1,882,997
Souphi Cheung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,686,369 1.000 Diameter (m) 6.000 Length (m) 4,686,369
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,792,350

Ou Chrov, Soengh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010507/05/01 TSO Uy Phirun Project Type Rural Transport 25,759,650
Kandal 1 201 Earth road 0.60 [ 0.66 ] Km 25,711,505 5.000 Width (m) 4,135.000 Earth fill m3 16,841,036
Kandal 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 4,459,307 0.800 Diameter (m) 6.000 Length (m) 8,918,614
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,759,650

Ou Chrov, Paoy Paet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010508/05/01 TSO Uy Phirun Project Type Rural Transport 122,705,282
Toul Prasat 1 202 Laterite road 1.60 [ 1.60 ] Km 12,599,820 4.000 Width (m) 828.000 Earth fill m3 20,159,712
Toul Prasat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,875,226 0.800 Diameter (m) 7.000 Length (m) 2,875,226
Prey Kob 3 202 Laterite road 1.04 [ 1.04 ] Km 14,049,700 4.000 Width (m) 871.000 Earth fill m3 14,611,688
Prey Kob 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,675,920 0.800 Diameter (m) 6.000 Length (m) 5,351,840
Ou Neang 5 202 Laterite road 0.75 [ 0.75 ] Km 13,507,600 4.000 Width (m) 478.000 Earth fill m3 10,130,700
Ou Neang 6 211 Single pipe culvert 5.00 [ 5.00 ] Place 2,225,243 0.600 Diameter (m) 6.000 Length (m) 11,126,215
Tuol Pongro 7 202 Laterite road 1.00 [ 1.00 ] Km 14,075,773 4.000 Width (m) 838.000 Earth fill m3 14,075,773
Tuol Pongro 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,875,226 0.800 Diameter (m) 7.000 Length (m) 2,875,226
Stoeng Bat 9 202 Laterite road 2.00 [ 2.00 ] Km 12,986,157 4.000 Width (m) 1,275.000 Earth fill m3 25,972,314
Kilou Lekh Buon 10 202 Laterite road 1.00 [ 1.00 ] Km 13,301,345 4.000 Width (m) 638.000 Earth fill m3 13,301,345
Kilou Lekh Buon 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,225,243 0.600 Diameter (m) 6.000 Length (m) 2,225,243
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  122,705,282

Ou Chrov, Ou Bei Choan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010509/05/01 TSO Uy Phirun Project Type Rural Transport 34,381,200
Seila Khmaer 1 202 Laterite road 2.22 [ 2.38 ] Km 11,686,400 4.000 Width (m) 254.000 Earth fill m3 27,755,200
Seila Khmaer 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,082,000 0.600 Diameter (m) 6.000 Length (m) 2,082,000
Seila Khmaer 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,272,000 6.000 Diameter (m) 7.000 Length (m) 4,544,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,381,200

Serei Saophoan, Bos Sbov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010601/05/01 TSO Leng Heang Project Type Rural Transport 30,588,000
Smach 1 202 Laterite road 1.20 [ 1.20 ] Km 25,490,000 4.000 Width (m) 3,856.000 Earth fill m3 30,588,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,588,000

Serei Saophoan, Kampong Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010602/05/01 TSO Leng Heang Project Type Rural Transport 29,464,000
Kampong Svay 1 201 Earth road 0.60 [ 0.60 ] Km 45,499,200 6.000 Width (m) 6,711.000 Earth fill m3 27,299,520
Kampong Svay 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,164,480 0.800 Diameter (m) 0.700 Length (m) 2,164,480
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,464,000
Contract ID 010602/05/02 TSO Leng Heang Project Type Rural Transport 26,489,400
Phum Pir 1 202 Laterite road 0.80 [ 0.92 ] Km 21,640,984 5.000 Width (m) 1,140.000 Earth fill m3 19,801,500
Phum Pir 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,229,300 0.800 Diameter (m) 0.800 Length (m) 6,687,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,489,400

Serei Saophoan, Kaoh Pong Satv

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010603/05/01 TSO Leng Heang Project Type Rural Transport 22,892,760
Ta Sokh 2 202 Laterite road 0.43 [ 0.43 ] Km 24,430,000 3.000 Width (m) 1,128.000 Earth fill m3 10,553,760
Angkea Bos 2 201 Earth road 0.30 [ 0.30 ] Km 41,130,000 4.000 Width (m) 1,961.000 Earth fill m3 12,339,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,892,760

Serei Saophoan, Mkak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010604/05/01 TSO Leng Heang Project Type Rural Transport 23,085,226
Kbal Spean 1 201 Earth road 0.58 [ 0.58 ] Km 28,549,000 5.000 Width (m) 3,302.000 Earth fill m3 16,558,420
Kbal Spean 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,175,602 0.800 Diameter (m) 7.000 Length (m) 6,526,806
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,085,226
Contract ID 010604/05/02 TSO Leng Heang Project Type Rural Transport 4,994,000
Mkak 1 202 Laterite road 0.70 [ 0.71 ] Km 7,035,000 4.000 Width (m) 852.000 Earth fill m3 4,994,850
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,994,850

Serei Saophoan, Ou Ambel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010605/05/01 TSO Leng Heang Project Type Urban transport 24,800,000
Ou Ambel 1 202 Laterite road 0.88 [ 0.88 ] Km 13,333,333 6.000 Width (m) 1,111.000 Earth fill m3 11,733,333
Prohut 2 202 Laterite road 0.92 [ 0.98 ] Km 13,333,333 6.000 Width (m) 1,795.000 Earth fill m3 13,066,666
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,799,999
Contract ID 010605/05/02 TSO Leng Heang Project Type Rural Transport 15,469,080
Prohut 1 202 Laterite road 0.66 [ 0.66 ] Km 23,438,000 4.000 Width (m) 396.000 Earth fill m3 15,469,080
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,469,080

Serei Saophoan, Phniet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010606/05/01 TSO Leng Heang Project Type Rural Transport 22,520,700
Bangruh 1 201 Earth road 0.90 [ 0.90 ] Km 25,023,000 5.000 Width (m) 4,674.410 Earth fill m3 22,520,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,520,700

Serei Saophoan, Preah Ponlea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010607/05/01 TSO Leng Heang Project Type Rural Transport 38,393,299
Prey Ruessei 1 202 Laterite road 1.30 [ 1.35 ] Km 28,492,244 4.000 Width (m) 877.500 Earth fill m3 38,393,299
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,393,299

Serei Saophoan, Tuek Thla

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010608/05/01 TSO Leng Heang Project Type Rural Transport 33,502,400
Tuek Thla 1 202 Laterite road 0.82 [ 0.82 ] Km 14,751,000 4.000 Width (m) 513.000 Earth fill m3 12,095,820
Dei Lou 2 202 Laterite road 1.01 [ 1.11 ] Km 14,751,000 4.000 Width (m) 631.000 Earth fill m3 16,417,863
Dei Lou 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,421,720 1.000 Diameter (m) 8.000 Length (m) 3,421,720
Dei Lou 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,567,000 0.600 Diameter (m) 7.000 Length (m) 1,567,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,502,403

Thma Puok, Banteay Chhmar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010701/05/01 TSO Has Samphy Project Type Rural Transport 32,491,588
Prey Changha 1 202 Laterite road 3.74 [ 3.74 ] Km 7,563,449 4.000 Width (m) 300.000 Earth fill m3 28,302,426
Prey Changha 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,094,582 0.600 Diameter (m) 6.000 Length (m) 4,189,164
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,491,590

Thma Puok, Kouk Romiet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010702/05/01 TSO Has Samphy Project Type Rural Transport 38,659,200
Kouk Prich 1 202 Laterite road 3.35 [ 3.35 ] Km 11,241,552 4.000 Width (m) 1,200.000 Earth fill m3 37,659,199
Kouk Prich 2 201 Earth road 0.11 [ 0.11 ] Km 8,928,571 4.000 Width (m) 225.000 Earth fill m3 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,659,199
Contract ID 010702/05/02 TSO Has Samphy Project Type Rural Transport 1,200,000
Kouk Prich 1 201 Earth road 0.40 [ 0.40 ] Km 3,000,000 4.000 Width (m) 160.000 Earth fill m3 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,200,000

Thma Puok, Phum Thmei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010703/05/01 TSO Has Samphy Project Type Irrigation 25,864,270
Kab Chaor 1 410 Earth dam 0.86 [ 0.86 ] Km 30,074,733 4.000 Max. height (m) 644.000 Volume (m3) 25,864,270
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,864,270

Thma Puok, Thma Puok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010704/05/01 TSO Has Samphy Project Type Rural Transport 26,570,279
Neak Ta 1 202 Laterite road 2.47 [ 2.47 ] Km 10,752,845 4.000 Width (m) 1,779.000 Earth fill m3 26,570,280
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,570,280

Thma Puok, Kouk Kakthen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010705/05/01 TSO Suon Sor Project Type Rural Transport 26,149,695
Ta Trai 1 202 Laterite road 2.85 [ 2.85 ] Km 9,185,000 4.000 Width (m) 2,680.000 Earth fill m3 26,149,695
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,149,695

Thma Puok, Kumru

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010706/05/01 TSO Has Samphy Project Type Rural Transport 27,654,633
Svay Chrum 1 201 Earth road 0.74 [ 0.74 ] Km 31,991,727 4.000 Width (m) 5,841.000 Earth fill m3 23,673,878
Svay Chrum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,980,755 0.600 Diameter (m) 7.000 Length (m) 3,980,755
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,654,633

Svay Chek, Phkoam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010801/05/01 TSO Suon Sor Project Type Rural Transport 29,310,000
Yeang Vien 1 202 Laterite road 2.95 [ 2.95 ] Km 9,935,593 3.500 Width (m) 2,330.000 Earth fill m3 29,309,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,309,999

Svay Chek, Sarongk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010802/05/01 TSO Suon Sor Project Type Rural Transport 21,709,110
Chrung 1 202 Laterite road 1.62 [ 1.62 ] Km 12,055,594 3.500 Width (m) 769.000 Earth fill m3 19,493,895
Kantrong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,215,215 0.600 Diameter (m) 7.000 Length (m) 2,215,215
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,709,110
Contract ID 010802/05/02 TSO Suon Sor Project Type Rural Transport 1,300,000
Pheas Tboung 1 202 Laterite road 0.16 [ 0.16 ] Km 8,075,000 3.500 Width (m) 1,015.000 Earth fill m3 1,300,075
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,300,075

Svay Chek, Sla Kram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010803/05/01 TSO Suon Sor Project Type Rural Transport 27,271,050
Kouk Ampil 1 202 Laterite road 1.20 [ 1.20 ] Km 12,170,000 4.000 Width (m) 674.000 Earth fill m3 14,604,000
Prasat 2 202 Laterite road 0.87 [ 0.87 ] Km 12,170,000 4.000 Width (m) 486.000 Earth fill m3 10,527,050
khlaeng Poar 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,140,000 0.600 Diameter (m) 7.000 Length (m) 2,140,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,271,050
Contract ID 010803/05/02 TSO Suon Sor Project Type Rural Transport 1,100,000
Kamnab 1 202 Laterite road 1.20 [ 1.20 ] Km 916,667 4.000 Width (m) 98.000 Earth fill m3 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,100,000

Svay Chek, Svay Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010804/05/01 TSO Suon Sor Project Type Rural Transport 27,681,928
Ponsay Cheung 1 202 Laterite road 0.36 [ 0.36 ] Km 20,777,000 4.000 Width (m) 1,443.850 Earth fill m3 7,562,828
Ponsay Cheung 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,913,225 0.600 Diameter (m) 7.000 Length (m) 3,826,450
Ta Ong Lech 3 202 Laterite road 0.60 [ 0.60 ] Km 20,777,000 4.000 Width (m) 879.520 Earth fill m3 12,466,200
Ta Ong Lech 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,913,225 0.600 Diameter (m) 7.000 Length (m) 3,826,450
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,681,928

Svay Chek, Ta Baen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010805/05/01 TSO Suon Sor Project Type Rural Transport 22,121,901
Kouk Ta Aek 1 211 Single pipe culvert 4.00 [ 4.00 ] Place 2,998,156 0.800 Diameter (m) 10.000 Length (m) 11,992,624
Kouk Ta Aek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,042,144 0.600 Diameter (m) 10.000 Length (m) 2,042,144
Kouk Ta Aek 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,584,011 0.600 Diameter (m) 6.000 Length (m) 4,752,033
Kouk Ta Aek 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,111,700 0.800 Diameter (m) 3.000 Length (m) 3,335,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,121,901

Svay Chek, Ta Phou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010806/05/01 TSO Suon Sor Project Type Rural Transport 27,725,400
Baray 1 202 Laterite road 2.11 [ 2.11 ] Km 13,140,000 4.000 Width (m) 1,689.000 Earth fill m3 27,725,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,725,400
Contract ID 010806/05/02 TSO Suon Sor Project Type Rural Transport 1,000,000
Baray 1 202 Laterite road 1.11 [ 1.11 ] Km 900,901 3.400 Width (m) 125.000 Earth fill m3 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,000,000

Svay Chek, Treas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010807/05/01 TSO Suon Sor Project Type Rural Transport 28,725,580
Treas 1 202 Laterite road 0.80 [ 0.80 ] Km 11,390,000 4.000 Width (m) 77.000 Earth fill m3 9,112,000
Ta Voek 2 202 Laterite road 0.65 [ 0.65 ] Km 11,390,000 4.000 Width (m) 62.000 Earth fill m3 7,403,500
Doun Nouy 3 202 Laterite road 1.07 [ 1.07 ] Km 11,390,000 4.000 Width (m) 111.000 Earth fill m3 12,210,080
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,725,580
Contract ID 010807/05/02 TSO Suon Sor Project Type Rural Transport 1,296,121
Treas 1 202 Laterite road 0.22 [ 0.22 ] Km 5,891,459 4.000 Width (m) 92.500 Earth fill m3 1,296,121
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,296,121

Svay Chek, Roluos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010808/05/01 TSO Suon Sor Project Type Rural Transport 20,931,950
Baek Chan Thmei 1 202 Laterite road 0.24 [ 0.24 ] Km 26,900,000 3.500 Width (m) 1,009.000 Earth fill m3 6,482,900
Baek Chan Thmei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,920,000 0.600 Diameter (m) 7.000 Length (m) 1,920,000
Khvav Kaeut 3 202 Laterite road 0.45 [ 0.45 ] Km 23,450,000 3.500 Width (m) 597.000 Earth fill m3 10,529,050
Khvav Kaeut 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 7.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,931,950
Contract ID 010808/05/02 TSO Suon Sor Project Type Rural Transport 1,200,000
Baek Chan Thmei 1 202 Laterite road 0.12 [ 0.12 ] Km 10,000,000 3.500 Width (m) 89.500 Earth fill m3 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,200,000

Malai, Boeng Beng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010901/05/01 TSO Tuch Lom Project Type Rural Transport 23,136,800
Lvea 1 201 Earth road 0.83 [ 0.85 ] Km 27,187,779 5.000 Width (m) 6,537.000 Earth fill m3 23,136,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,136,800

Malai, Malai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010902/05/01 TSO Tuch Lom Project Type Rural Transport 26,603,000
Thmei 1 201 Earth road 1.44 [ 1.44 ] Km 18,500,000 5.000 Width (m) 6,537.000 Earth fill m3 26,603,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,603,000

Malai, Ou Sampor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010903/05/01 TSO Tuch Lom Project Type Rural Transport 24,405,200
Bantey Tipi 1 201 Earth road 1.40 [ 1.51 ] Km 14,497,154 5.000 Width (m) 5,113.000 Earth fill m3 21,905,200
Bantey Tipi 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 7.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,405,200

Malai, Ou Sralau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010904/05/01 TSO Tuch Lom Project Type Rural Transport 22,149,699
Ou Sralau 1 201 Earth road 0.71 [ 0.74 ] Km 29,972,528 5.000 Width (m) 5,220.000 Earth fill m3 22,149,698
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,149,698

Malai, Tuol Pongro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010905/05/01 TSO Tuch Lom Project Type Rural Transport 28,508,401
Khla Ngeab 1 201 Earth road 1.25 [ 1.27 ] Km 19,000,000 5.000 Width (m) 4,704.000 Earth fill m3 24,149,000
Khla Ngeab 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,180,000 0.600 Diameter (m) 7.000 Length (m) 4,360,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,509,000

Malai, Ta Kong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010906/05/01 TSO Tuch Lom Project Type Rural Transport 27,527,368
Kcheay 1 201 Earth road 1.74 [ 1.81 ] Km 15,191,704 5.000 Width (m) 6,600.000 Earth fill m3 27,527,368
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,527,368