Contract Outputs

Location: Banteay Meanchey Budget Year: 2006

Mongkol Borei    Phnum Srok    Preah Netr Preah    Ou Chrov    Serei Saophoan    Thma Puok    Svay Chek    Malai   

Mongkol Borei, Banteay Neang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010201/06/01 TSO Ly Heng Project Type Irrigation 48,062,565
Khile 1 420 Canal 0.80 [ 0.80 ] Km 9,603,300 0.550 Depth (m) 1,624.000 Volume (m3) 7,682,640
Kouk Kduoch 2 420 Canal 0.85 [ 0.85 ] Km 17,178,000 1.050 Depth (m) 3,167.000 Volume (m3) 14,601,300
Phnum 3 420 Canal 1.28 [ 1.28 ] Km 14,595,000 1.060 Depth (m) 4,143.000 Volume (m3) 18,608,625
Kouk Kduoch 4 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,170,000 1.200 Total Span (m) 1.200 Width(m) 7,170,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,062,565

Mongkol Borei, Bat Trang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010202/06/01 TSO Ly Heng Project Type Rural Transport 37,886,143
Anlong Thngan Lech 1 203 Gravel road 0.70 [ 0.79 ] Km 47,957,142 4.000 Width (m) 2,522.000 Earth fill m3 37,886,142
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,886,142

Mongkol Borei, Kouk Ballangk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010204/06/01 TSO Has Samphy Project Type Rural Transport 32,643,000
Ta Sal 1 201 Earth road 1.17 [ 1.17 ] Km 27,900,000 5.000 Width (m) 6,727.500 Earth fill m3 32,643,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,643,000

Mongkol Borei, Koy Maeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010205/06/01 TSO Ly Heng Project Type Rural Transport 30,283,555
Koy Maeng 1 201 Earth road 0.55 [ 0.55 ] Km 32,700,000 5.000 Width (m) 4,130.000 Earth fill m3 17,985,000
Phlov Siem 2 201 Earth road 0.38 [ 0.38 ] Km 32,796,149 5.000 Width (m) 2,191.000 Earth fill m3 12,298,556
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,283,556

Mongkol Borei, Ou Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010206/06/01 TSO Ly Heng Project Type Rural Transport 12,000,000
Rung Krabau 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 12,000,000 2.000 Total Span (m) 4.000 Width(m) 12,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,000,000
Contract ID 010206/06/02 TSO Ly Heng Project Type Rural Transport 36,506,400
Ou Snguot 1 203 Gravel road 1.03 [ 1.03 ] Km 28,700,000 4.000 Width (m) 923.000 Earth fill m3 29,417,500
Ou Prasat 2 203 Gravel road 0.25 [ 0.25 ] Km 28,700,000 4.000 Width (m) 222.000 Earth fill m3 7,088,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,506,400

Mongkol Borei, Phnum Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010207/06/01 TSO Ly Heng Project Type Irrigation 36,385,470
Boeng Reang 1 420 Canal 0.45 [ 0.45 ] Km 4,428,000 0.500 Depth (m) 330.000 Volume (m3) 1,983,744
Boeng Reang 2 420 Canal 2.50 [ 2.50 ] Km 7,887,000 0.750 Depth (m) 4,355.000 Volume (m3) 19,701,726
Boeng Reang 3 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 14,700,000 2.000 Total span (m) 1.600 Width (m) 14,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,385,470

Mongkol Borei, Rohat Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010208/06/01 TSO Ly Heng Project Type Rural Transport 31,277,390
Khtum Chrum 1 201 Earth road 0.60 [ 0.60 ] Km 23,997,000 5.000 Width (m) 2,560.000 Earth fill m3 14,398,200
Chak Kaeut 2 201 Earth road 0.27 [ 0.27 ] Km 23,997,000 5.000 Width (m) 876.000 Earth fill m3 6,479,190
Khtum Chrum 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,500,000 1.000 Diameter (m) 7.000 Length (m) 7,000,000
Chak Kaeut 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,400,000 1.000 Diameter (m) 7.000 Length (m) 3,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,277,390
Contract ID 010208/06/02 TSO Ly Heng Project Type Rural Transport 20,091,695
Preaek Samraong 1 203 Gravel road 0.52 [ 0.52 ] Km 39,013,000 4.000 Width (m) 881.000 Earth fill m3 20,091,695
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,091,695

Mongkol Borei, Ruessei Kraok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010209/06/01 TSO Ly Heng Project Type Rural Transport 57,936,000
Ou Ta Kol 1 203 Gravel road 1.36 [ 1.36 ] Km 42,600,000 4.000 Width (m) 0.000 Earth fill m3 57,936,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  57,936,000

Mongkol Borei, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010210/06/01 TSO Ly Heng Project Type Rural Transport 32,655,604
Doun Loek 1 201 Earth road 0.65 [ 0.67 ] Km 48,812,562 5.000 Width (m) 7,145.600 Earth fill m3 32,655,604
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,655,604

Mongkol Borei, Soea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010211/06/01 TSO Ly Heng Project Type Rural Transport 40,610,000
Boeng Touch 1 201 Earth road 1.35 [ 1.35 ] Km 24,600,000 5.000 Width (m) 6,984.000 Earth fill m3 33,210,000
Boeng Touch 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,700,000 1.000 Diameter (m) 7.000 Length (m) 7,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,610,000

Mongkol Borei, Srah Reang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010212/06/01 TSO Ly Heng Project Type Rural Transport 11,527,000
Ta Chan 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,157,000 1.000 Diameter (m) 7.000 Length (m) 6,157,000
Ta Chan 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,470,000 1.000 Diameter (m) 7.000 Length (m) 3,470,000
Ta Chan 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 7.000 Length (m) 1,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,527,000
Contract ID 010212/06/02 TSO Ly Heng Project Type Rural Transport 17,376,000
Kouk Chrab 1 203 Gravel road 0.30 [ 0.30 ] Km 28,960,000 4.000 Width (m) 46.000 Earth fill m3 8,688,000
Kouk Krasang 2 203 Gravel road 0.30 [ 0.30 ] Km 28,960,000 4.000 Width (m) 46.000 Earth fill m3 8,688,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,376,000

Mongkol Borei, Ta Lam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010213/06/01 TSO Ly Heng Project Type Rural Transport 9,388,961
Preah Srae 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 9,388,961 1.000 Total Span (m) 4.000 Width(m) 9,388,961
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,388,961
Contract ID 010213/06/02 TSO Ly Heng Project Type Rural Transport 20,841,480
Chong Kouk 1 203 Gravel road 0.38 [ 0.38 ] Km 54,846,000 4.000 Width (m) 2,263.000 Earth fill m3 20,841,480
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,841,480

Phnum Srok, Nam Tau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010301/06/01 TSO Pen Phal Project Type Rural Transport 38,055,022
Rongvean 1 201 Earth road 0.46 [ 0.46 ] Km 51,467,221 5.000 Width (m) 5,030.000 Earth fill m3 23,674,922
Rongvean 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 7,190,050 1.000 Diameter (m) 7.000 Length (m) 14,380,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,055,022

Phnum Srok, Paoy Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010302/06/01 TSO Pen Phal Project Type Rural Transport 34,102,963
Paoy Char 1 202 Laterite road 0.96 [ 0.92 ] Km 28,175,938 3.000 Width (m) 2,323.000 Earth fill m3 25,921,863
Paoy Snuol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,509,900 0.800 Diameter (m) 5.000 Length (m) 2,509,900
Paoy Snuol 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,890,400 0.600 Diameter (m) 5.000 Length (m) 5,671,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,102,963

Phnum Srok, Ponley

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010303/06/01 TSO Pen Phal Project Type Rural Transport 37,242,848
Svay Khmau 1 202 Laterite road 0.96 [ 0.96 ] Km 17,602,040 3.000 Width (m) 286.000 Earth fill m3 16,897,958
Svay Khmau 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,427,547 0.600 Diameter (m) 7.000 Length (m) 2,427,547
Pou Roam Bon 3 202 Laterite road 1.00 [ 0.88 ] Km 17,602,040 3.000 Width (m) 359.000 Earth fill m3 15,489,795
Pou Roam Bon 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,427,547 0.600 Diameter (m) 7.000 Length (m) 2,427,547
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,242,848

Phnum Srok, Spean Sraeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010304/06/01 TSO Pen Phal Project Type Rural Transport 25,261,550
Kouk Char 1 202 Laterite road 1.52 [ 1.39 ] Km 15,907,590 3.000 Width (m) 1,599.000 Earth fill m3 22,111,550
Spean 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,150,000 0.800 Diameter (m) 7.000 Length (m) 3,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,261,550

Phnum Srok, Srah Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010305/06/01 TSO Pen Phal Project Type Rural Transport 28,166,400
Kouk Rumchek 1 202 Laterite road 1.00 [ 0.96 ] Km 29,340,000 3.000 Width (m) 3,484.000 Earth fill m3 28,166,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,166,400

Phnum Srok, Phnum Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010306/06/01 TSO Pen Phal Project Type Rural Transport 31,080,688
Ponley 1 202 Laterite road 0.35 [ 0.31 ] Km 28,355,800 3.000 Width (m) 907.000 Earth fill m3 8,705,231
Ponley 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,240,300 0.600 Diameter (m) 7.000 Length (m) 2,240,300
Kamping Puoy 4 202 Laterite road 0.55 [ 0.55 ] Km 28,355,800 3.000 Width (m) 2,021.000 Earth fill m3 15,680,757
Kamping Puoy 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,227,200 0.600 Diameter (m) 7.000 Length (m) 4,454,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,080,688

Preah Netr Preah, Chhnuor Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010401/06/01 TSO Oeung Vuthy Project Type Irrigation 27,043,006
Thma Koul 1 455 Single cell box culvert with gate 2.00 [ 2.00 ] Place 13,521,503 4.000 Total span (m) 2.000 Width (m) 27,043,006
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,043,006

Preah Netr Preah, Chob Veari

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010402/06/01 TSO Oeung Vuthy Project Type Rural Transport 29,632,113
Kak 1 202 Laterite road 2.20 [ 1.98 ] Km 14,958,159 3.700 Width (m) 897.000 Earth fill m3 29,632,113
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,632,113
Contract ID 010402/06/02 TSO Oeung Vuthy Project Type Rural Transport 6,014,002
Kak 1 251 Drift 1.00 [ 1.00 ] Place 6,014,002 15.000 Length (m) 4.000 Width (m) 6,014,002
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,014,002

Preah Netr Preah, Phnum Lieb

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010403/06/01 TSO Oeung Vuthy Project Type Rural Transport 40,538,000
Anlong Sar 1 202 Laterite road 2.40 [ 2.40 ] Km 16,000,000 3.500 Width (m) 1,440.000 Earth fill m3 38,400,000
Anlong Sar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,138,000 0.600 Diameter (m) 7.000 Length (m) 2,138,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,538,000

Preah Netr Preah, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010404/06/01 TSO Oeung Vuthy Project Type Rural Transport 30,707,368
Tonloab 2 202 Laterite road 0.47 [ 0.52 ] Km 47,648,000 4.000 Width (m) 3,472.000 Earth fill m3 24,586,368
Ampil 2 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 6,121,000 2.700 4.000 6,121,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,707,368

Preah Netr Preah, Preah Netr Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010405/06/01 TSO Oeung Vuthy Project Type Rural Transport 39,549,597
Sramaoch 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 39,549,597 4.800 4.000 39,549,597
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,549,597
Contract ID 010405/06/02 TSO Oeung Vuthy Project Type Rural Transport 4,334,254
Cheung Voat 1 202 Laterite road 0.05 [ 0.07 ] Km 61,917,914 4.000 Width (m) 480.000 Earth fill m3 4,334,254
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,334,254

Preah Netr Preah, Rohal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010406/06/01 TSO Oeung Vuthy Project Type Irrigation 28,728,390
Tep Kaosa 1 420 Canal 1.57 [ 1.57 ] Km 18,310,000 1.000 Depth (m) 5,756.000 Volume (m3) 28,728,390
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,728,390
Contract ID 010406/06/02 TSO Oeung Vuthy Project Type Rural Transport 2,999,000
Tep Kaosa 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,999,000 1.000 Diameter (m) 5.000 Length (m) 2,999,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,999,000

Preah Netr Preah, Tean Kam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010407/06/01 TSO Oeung Vuthy Project Type Rural Transport 16,900,000
Tean Kam Tboung 1 202 Laterite road 0.96 [ 0.96 ] Km 17,677,825 3.500 Width (m) 229.000 Earth fill m3 16,900,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,900,001
Contract ID 010407/06/02 TSO Oeung Vuthy Project Type Irrigation 7,400,000
Tean Kam Tboung 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 7,400,000 2.000 Total span (m) 1.000 Width (m) 7,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,400,000

Preah Netr Preah, Tuek Chour

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010408/06/01 TSO Oeung Vuthy Project Type Rural Transport 37,600,000
Kandal 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 37,600,000 6.000 4.000 37,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,600,000

Ou Chrov, Changha

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010501/06/01 TSO Uy Phirun Project Type Rural Transport 27,526,490
Boeng Seila 1 201 Earth road 1.01 [ 1.01 ] Km 23,749,000 5.000 Width (m) 4,989.000 Earth fill m3 23,986,490
Boeng Seila 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,540,000 1.000 Diameter (m) 7.000 Length (m) 3,540,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,526,490

Ou Chrov, Koub

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010502/06/01 TSO Uy Phirun Project Type Rural Transport 32,881,000
Ou Chrov 1 202 Laterite road 2.51 [ 2.51 ] Km 13,100,000 3.500 Width (m) 276.000 Earth fill m3 32,881,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,881,000
Contract ID 010502/06/02 TSO Uy Phirun Project Type Rural Transport 1,100,000
Mak Heun 1 202 Laterite road 0.16 [ 0.16 ] Km 6,962,000 4.000 Width (m) 65.000 Earth fill m3 1,099,996
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,099,996

Ou Chrov, Kuttasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010503/06/01 TSO Uy Phirun Project Type Rural Transport 29,300,200
Kuttaksat 1 201 Earth road 0.86 [ 0.86 ] Km 34,070,000 5.000 Width (m) 5,962.000 Earth fill m3 29,300,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,300,200

Ou Chrov, Nimitt

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010504/06/01 TSO Uy Phirun Project Type Rural Transport 52,524,900
Souriya 1 202 Laterite road 5.10 [ 5.10 ] Km 10,299,000 4.000 Width (m) 4,281.000 Earth fill m3 52,524,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,524,900

Ou Chrov, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010505/06/01 TSO Uy Phirun Project Type Rural Transport 31,247,787
Thmenh Trei 1 201 Earth road 1.22 [ 1.22 ] Km 25,718,343 5.000 Width (m) 6,659.000 Earth fill m3 31,247,787
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,247,787

Ou Chrov, Souphi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010506/06/01 TSO Uy Phirun Project Type Education 22,063,125
Kouk Prich 1 303 School yard 1.00 [ 1.00 ] Place 22,063,125 8,405.000 3,541.000 22,063,125
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,063,125

Ou Chrov, Soengh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010507/06/01 TSO Uy Phirun Project Type Rural Transport 28,990,000
Roka 1 202 Laterite road 2.23 [ 2.23 ] Km 13,000,000 4.000 Width (m) 347.000 Earth fill m3 28,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,990,000

Ou Chrov, Paoy Paet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010508/06/01 TSO Uy Phirun Project Type Rural Transport 145,536,700
Kbal Spean 1 202 Laterite road 0.24 [ 0.24 ] Km 17,950,000 4.000 Width (m) 938.000 Earth fill m3 4,308,000
Kbal Spean 2 202 Laterite road 0.80 [ 0.80 ] Km 17,950,000 4.000 Width (m) 64.000 Earth fill m3 14,360,000
Kbal Spean 3 202 Laterite road 0.30 [ 0.30 ] Km 17,950,000 4.000 Width (m) 24.000 Earth fill m3 5,385,000
Kbal Spean 4 202 Laterite road 1.10 [ 1.09 ] Km 17,950,000 4.000 Width (m) 380.000 Earth fill m3 19,493,700
Kbal Spean 5 211 Single pipe culvert 7.00 [ 7.00 ] Place 3,300,000 0.800 Diameter (m) 8.000 Length (m) 23,100,000
Ou Roesey 6 202 Laterite road 0.50 [ 0.50 ] Km 17,950,000 4.000 Width (m) 719.000 Earth fill m3 8,975,000
Ou Roesey 7 202 Laterite road 0.50 [ 0.50 ] Km 17,950,000 4.000 Width (m) 250.000 Earth fill m3 8,975,000
Ou Roesey 8 211 Single pipe culvert 5.00 [ 4.00 ] Place 3,200,000 0.800 Diameter (m) 7.000 Length (m) 12,800,000
Andoung Thmor Meas 9 202 Laterite road 1.48 [ 1.48 ] Km 15,500,000 4.000 Width (m) 318.000 Earth fill m3 22,940,000
Andoung Thmor Meas 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,200,000 1.000 Diameter (m) 8.000 Length (m) 4,200,000
Baliley 11 202 Laterite road 0.30 [ 0.30 ] Km 70,000,000 5.000 Width (m) 1,530.000 Earth fill m3 21,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  145,536,700

Ou Chrov, Ou Bei Choan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010509/06/01 TSO Uy Phirun Project Type Rural Transport 34,489,897
Thnal Bat 1 202 Laterite road 2.18 [ 2.18 ] Km 10,147,000 4.000 Width (m) 2,088.000 Earth fill m3 22,069,725
Thnal Bat 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,896,410 0.800 Diameter (m) 7.000 Length (m) 8,689,230
Thnal Bat 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,730,942 1.000 Diameter (m) 7.000 Length (m) 3,730,942
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,489,897

Serei Saophoan, Bos Sbov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010601/06/01 TSO Leng Heang Project Type Rural Transport 39,031,300
Trabaek 1 202 Laterite road 1.60 [ 1.51 ] Km 25,900,000 4.000 Width (m) 3,263.000 Earth fill m3 39,031,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,031,300

Serei Saophoan, Kampong Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010602/06/01 TSO Leng Heang Project Type Rural Transport 63,478,400
Pongro 1 201 Earth road 1.04 [ 1.04 ] Km 13,600,000 5.000 Width (m) 2,776.000 Earth fill m3 14,198,400
Kampong Svay 2 201 Earth road 1.00 [ 1.00 ] Km 35,000,000 6.000 Width (m) 6,507.000 Earth fill m3 35,000,000
Pongro 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,950,000 0.800 Diameter (m) 6.000 Length (m) 5,900,000
Kampong Svay 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 0.800 Diameter (m) 7.000 Length (m) 2,600,000
Souphi 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,890,000 0.800 Diameter (m) 8.000 Length (m) 5,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  63,478,400

Serei Saophoan, Kaoh Pong Satv

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010603/06/01 TSO Leng Heang Project Type Rural Transport 27,518,700
Snay Dangkot 1 202 Laterite road 1.00 [ 0.95 ] Km 19,700,000 4.000 Width (m) 403.000 Earth fill m3 18,734,700
Snay Dangkot 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,784,000 2.000 Total Span (m) 5.000 Width(m) 8,784,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,518,700

Serei Saophoan, Mkak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010604/06/01 TSO Leng Heang Project Type Rural Transport 31,696,800
Doun Lei 1 202 Laterite road 2.40 [ 2.25 ] Km 14,100,000 3.000 Width (m) 516.000 Earth fill m3 31,696,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,696,800

Serei Saophoan, Ou Ambel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010605/06/01 TSO Leng Heang Project Type Rural Transport 47,095,145
Ou Ambel 1 202 Laterite road 0.95 [ 0.95 ] Km 26,596,760 5.000 Width (m) 1,739.000 Earth fill m3 25,266,922
Saesen 2 202 Laterite road 0.93 [ 0.93 ] Km 23,471,208 4.000 Width (m) 1,381.000 Earth fill m3 21,828,223
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,095,145

Serei Saophoan, Phniet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010606/06/01 TSO Leng Heang Project Type Rural Transport 28,099,375
Bangruh 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 28,099,375 4.000 5.000 28,099,375
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,099,375

Serei Saophoan, Preah Ponlea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010607/06/01 TSO Leng Heang Project Type Rural Transport 44,298,062
Preah Ponlea 1 202 Laterite road 0.60 [ 0.60 ] Km 27,675,839 4.000 Width (m) 1,233.000 Earth fill m3 16,605,503
Chak 2 201 Earth road 0.71 [ 0.71 ] Km 39,280,226 5.000 Width (m) 6,040.000 Earth fill m3 27,692,559
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,298,063

Serei Saophoan, Tuek Thla

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010608/06/01 TSO Leng Heang Project Type Rural Transport 40,317,743
Tuek Thla 1 202 Laterite road 1.00 [ 1.00 ] Km 17,016,795 4.000 Width (m) 1,485.000 Earth fill m3 17,016,795
Keab 2 202 Laterite road 0.70 [ 0.70 ] Km 33,287,069 4.000 Width (m) 1,450.000 Earth fill m3 23,300,948
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,317,743

Thma Puok, Banteay Chhmar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010701/06/01 TSO Has Samphy Project Type Rural Transport 41,243,233
Kouk Samraong Lech 1 202 Laterite road 2.89 [ 2.89 ] Km 12,978,590 4.000 Width (m) 830.000 Earth fill m3 37,443,232
Kouk Samraong Lech 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,900,000 0.600 Diameter (m) 6.000 Length (m) 3,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,243,232

Thma Puok, Kouk Romiet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010702/06/01 TSO Has Samphy Project Type Rural Transport 45,675,000
Kouk Prich 1 202 Laterite road 3.00 [ 3.00 ] Km 14,235,000 4.000 Width (m) 900.000 Earth fill m3 42,705,000
Kouk Prich 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,970,000 0.800 Diameter (m) 6.000 Length (m) 2,970,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,675,000

Thma Puok, Phum Thmei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010703/06/01 TSO Has Samphy Project Type Rural Transport 32,800,000
Thmei Kandal 1 202 Laterite road 2.04 [ 2.04 ] Km 14,215,690 3.500 Width (m) 700.000 Earth fill m3 29,000,008
Thmei Kandal 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,900,000 0.600 Diameter (m) 6.000 Length (m) 3,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,800,008

Thma Puok, Thma Puok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010704/06/01 TSO Has Samphy Project Type Rural Transport 32,680,000
Kasen 1 202 Laterite road 2.34 [ 2.34 ] Km 13,953,886 4.000 Width (m) 480.000 Earth fill m3 32,680,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,680,001

Thma Puok, Kouk Kakthen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010705/06/01 TSO Has Samphy Project Type Rural Transport 33,420,050
Kouk Kakthen 1 201 Earth road 1.60 [ 1.60 ] Km 17,635,530 4.000 Width (m) 5,980.000 Earth fill m3 28,216,848
Kouk Kakthen 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,601,601 0.800 Diameter (m) 6.000 Length (m) 5,203,202
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,420,050

Thma Puok, Kumru

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010706/06/01 TSO Has Samphy Project Type Rural Transport 31,760,000
Andoung Khlong 1 202 Laterite road 1.76 [ 1.76 ] Km 16,000,000 4.000 Width (m) 2,920.000 Earth fill m3 28,160,000
Kumru 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,800,000 0.600 Diameter (m) 6.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,760,000

Svay Chek, Phkoam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010801/06/01 TSO Suon Sor Project Type Rural Transport 36,055,300
Ampil 1 202 Laterite road 2.70 [ 2.70 ] Km 12,539,000 3.500 Width (m) 2,330.000 Earth fill m3 33,855,300
Mau 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 7.000 Length (m) 2,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,055,300

Svay Chek, Sarongk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010802/06/01 TSO Suon Sor Project Type Irrigation 27,631,184
Chrung 1 420 Canal 0.35 [ 0.35 ] Km 11,532,000 1.500 Depth (m) 1,869.000 Volume (m3) 4,036,200
Pheas Cheung 2 420 Canal 0.42 [ 0.42 ] Km 11,532,000 1.500 Depth (m) 901.000 Volume (m3) 4,843,440
Pheas Tboung 3 420 Canal 0.43 [ 0.43 ] Km 11,532,000 1.500 Depth (m) 1,434.000 Volume (m3) 4,958,760
Kantrong 4 420 Canal 0.47 [ 0.47 ] Km 11,532,000 1.500 Depth (m) 708.000 Volume (m3) 5,385,444
Chrung 5 221 Single cell box culvert 1.00 [ 1.00 ] Place 6,677,340 3.000 Total Span (m) 1.200 Width(m) 6,677,340
Kantrong 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,730,000 0.600 Diameter (m) 5.000 Length (m) 1,730,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,631,184

Svay Chek, Sla Kram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010803/06/01 TSO Suon Sor Project Type Rural Transport 34,104,870
Kamnab 1 202 Laterite road 2.26 [ 2.12 ] Km 16,110,000 3.800 Width (m) 405.000 Earth fill m3 34,104,870
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,104,870

Svay Chek, Ta Baen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010805/06/01 TSO Suon Sor Project Type Rural Transport 27,270,000
Kouk Roka 1 202 Laterite road 0.15 [ 0.15 ] Km 13,500,000 3.300 Width (m) 54.000 Earth fill m3 1,971,000
Ou Veaeng Tboung 2 202 Laterite road 0.70 [ 0.68 ] Km 13,500,000 3.300 Width (m) 265.000 Earth fill m3 9,166,500
Ou Veaeng 3 202 Laterite road 0.65 [ 0.63 ] Km 13,500,000 3.300 Width (m) 250.000 Earth fill m3 8,518,500
Ta Baen 4 202 Laterite road 0.58 [ 0.56 ] Km 13,500,000 3.300 Width (m) 230.000 Earth fill m3 7,614,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,270,000

Svay Chek, Ta Phou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010806/06/01 TSO Suon Sor Project Type Rural Transport 31,616,000
Phchoek 1 202 Laterite road 1.23 [ 1.20 ] Km 13,000,000 3.500 Width (m) 80.000 Earth fill m3 15,574,000
Prech Tboung 2 202 Laterite road 1.27 [ 1.23 ] Km 13,000,000 3.500 Width (m) 105.000 Earth fill m3 16,042,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,616,000

Svay Chek, Treas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010807/06/01 TSO Suon Sor Project Type Rural Transport 34,523,730
Treas 1 202 Laterite road 2.29 [ 2.14 ] Km 16,110,000 3.800 Width (m) 1,262.000 Earth fill m3 34,523,730
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,523,730

Svay Chek, Roluos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010808/06/01 TSO Suon Sor Project Type Rural Transport 26,227,600
Roluos 1 201 Earth road 0.45 [ 0.45 ] Km 26,800,000 5.000 Width (m) 1,974.000 Earth fill m3 12,060,000
Roluos 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,960,700 0.600 Diameter (m) 7.000 Length (m) 5,882,100
Slaeng 3 201 Earth road 0.24 [ 0.24 ] Km 26,800,000 5.000 Width (m) 893.000 Earth fill m3 6,324,800
Slaeng 4 211 Single pipe culvert 2.00 [ 1.00 ] Place 1,960,700 0.600 Diameter (m) 7.000 Length (m) 1,960,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,227,600

Malai, Boeng Beng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010901/06/01 TSO Tuch Lom Project Type Rural Transport 26,915,630
Lvea 1 202 Laterite road 1.60 [ 1.54 ] Km 17,500,234 4.000 Width (m) 1,440.000 Earth fill m3 26,915,360
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,915,360

Malai, Malai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010902/06/01 TSO Tuch Lom Project Type Rural Domestic Water Supplies 32,811,297
Thmei 1 141 Pond with no filter 1.00 [ 1.00 ] Place 32,811,297 4.000 Depth (m) 9,222.000 Volume (m3) 32,811,297
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,811,297

Malai, Ou Sampor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010903/06/01 TSO Tuch Lom Project Type Rural Transport 28,000,000
Ou Sampor Pi 1 201 Earth road 1.45 [ 1.40 ] Km 20,000,000 5.000 Width (m) 5,970.000 Earth fill m3 28,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,000,000

Malai, Ou Sralau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010904/06/01 TSO Tuch Lom Project Type Rural Transport 25,742,057
Phnum Kaubei 1 202 Laterite road 1.63 [ 1.52 ] Km 16,902,204 4.000 Width (m) 224.000 Earth fill m3 25,742,057
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,742,057

Malai, Tuol Pongro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010905/06/01 TSO Tuch Lom Project Type Rural Transport 33,801,922
Ou Ampil 1 201 Earth road 1.30 [ 1.30 ] Km 26,001,479 5.000 Width (m) 7,020.000 Earth fill m3 33,801,923
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,801,923

Malai, Ta Kong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 010906/06/01 TSO Tuch Lom Project Type Rural Transport 30,722,400
Srah Phlouh 1 201 Earth road 1.27 [ 1.22 ] Km 25,100,000 5.000 Width (m) 6,489.000 Earth fill m3 30,722,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,722,400