Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030101/06/01 TSO IM SARAN Project Type Rural Transport 45,679,400
Batheay 1 202 Laterite road 1.50 [ 1.50 ] Km 11,500,000 3.500 Width (m) 787.000 Earth fill m3 17,250,000
Chreaek 2 202 Laterite road 2.15 [ 2.42 ] Km 11,500,000 3.500 Width (m) 1,129.000 Earth fill m3 27,779,400
Batheay 3 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,679,400

Batheay, Chbar Ampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030102/06/01 TSO IM SARAN Project Type Rural Transport 30,131,300
Stueng Chveng 1 201 Earth road 1.60 [ 1.60 ] Km 14,788,000 4.000 Width (m) 4,389.000 Earth fill m3 23,660,800
Tuol Chan 2 201 Earth road 0.25 [ 0.35 ] Km 14,800,857 4.000 Width (m) 688.000 Earth fill m3 5,180,300
Stueng Chveng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,290,200 0.600 Diameter (m) 5.000 Length (m) 1,290,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,131,300

Batheay, Chealea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030103/06/01 TSO IM SARAN Project Type Rural Transport 31,000,000
Phnum Thum 1 203 Gravel road 1.77 [ 1.77 ] Km 17,563,739 3.500 Width (m) 3,564.000 Earth fill m3 31,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,000,000

Batheay, Cheung Prey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030104/06/01 TSO IM SARAN Project Type Rural Transport 16,975,000
Andoung Snay 1 201 Earth road 0.35 [ 0.35 ] Km 48,500,000 4.000 Width (m) 3,197.000 Earth fill m3 16,975,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,975,000
Contract ID 030104/06/02 TSO IM SARAN Project Type Rural Transport 16,800,000
Prasoutr Kha 1 202 Laterite road 1.50 [ 1.50 ] Km 10,800,000 3.500 Width (m) 788.000 Earth fill m3 16,200,000
Prasoutr Kha 2 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,800,000

Batheay, Me Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030105/06/01 TSO IM SARAN Project Type Rural Transport 32,749,900
Me Pring 1 202 Laterite road 0.80 [ 0.80 ] Km 14,619,000 3.500 Width (m) 800.000 Earth fill m3 11,695,200
Tang Thlaeung 2 202 Laterite road 1.30 [ 1.30 ] Km 14,619,000 3.500 Width (m) 1,184.000 Earth fill m3 19,004,700
Tang Thlaeung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 1,450,000
Tang Thlaeung 4 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,749,900

Batheay, Ph'av

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030106/06/01 TSO IM SARAN Project Type Rural Transport 23,300,000
Ph'av 1 202 Laterite road 0.27 [ 0.27 ] Km 10,377,355 3.500 Width (m) 139.000 Earth fill m3 2,749,999
Samraong 2 202 Laterite road 0.55 [ 0.55 ] Km 10,377,358 3.500 Width (m) 289.000 Earth fill m3 5,707,547
Prey Nha 3 202 Laterite road 1.31 [ 1.31 ] Km 10,377,358 3.500 Width (m) 685.000 Earth fill m3 13,542,452
Ph'av 4 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Prey Nha 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,299,998
Contract ID 030106/06/02 TSO IM SARAN Project Type Rural Transport 7,500,000
Prey Nha 1 201 Earth road 0.33 [ 0.33 ] Km 22,727,273 4.000 Width (m) 1,459.000 Earth fill m3 7,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,500,000

Batheay, Sambour

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030107/06/01 TSO IM SARAN Project Type Rural Transport 40,356,000
Ta Poy 1 201 Earth road 0.35 [ 0.35 ] Km 19,821,760 4.000 Width (m) 1,271.000 Earth fill m3 6,937,616
Sambour 2 201 Earth road 0.50 [ 0.50 ] Km 19,821,760 4.000 Width (m) 1,816.000 Earth fill m3 9,910,880
Veal 3 201 Earth road 0.23 [ 0.23 ] Km 19,821,760 4.000 Width (m) 836.000 Earth fill m3 4,559,005
Balang 4 201 Earth road 0.85 [ 0.85 ] Km 19,821,760 4.000 Width (m) 3,088.000 Earth fill m3 16,848,496
Balang 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,355,997

Batheay, Sandaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030108/06/02 TSO IM SARAN Project Type Rural Transport 38,900,000
Tang Chrey 1 202 Laterite road 2.85 [ 2.85 ] Km 13,192,980 3.500 Width (m) 2,052.000 Earth fill m3 37,599,993
Tang Chrey 2 281 Width restriction posts 2.00 [ 2.00 ] Place 650,000 0.400 0.000 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,899,993

Batheay, Tang Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030109/06/01 TSO IM SARAN Project Type Rural Transport 35,842,200
Cheung Chhnok 1 201 Earth road 0.95 [ 0.95 ] Km 16,724,600 4.000 Width (m) 3,000.000 Earth fill m3 15,888,370
Tboung Phnum 2 201 Earth road 0.93 [ 0.93 ] Km 16,724,600 4.000 Width (m) 2,871.000 Earth fill m3 15,553,878
Cheung Chhnok 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 3,300,000
Tboung Phnum 6 211 Single pipe culvert 0.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,842,248
Contract ID 030109/06/02 TSO IM SARAN Project Type Irrigation 7,672,600
Tang Kouk 1 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,836,300 0.600 Diameter (m) 7.000 Width (m) 7,672,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,672,600

Batheay, Tang Krasang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030110/06/01 TSO IM SARAN Project Type Rural Transport 37,980,600
Khvet 1 201 Earth road 0.85 [ 0.85 ] Km 16,600,000 4.000 Width (m) 2,737.000 Earth fill m3 14,110,000
Boeng Veaeng 2 201 Earth road 1.05 [ 1.27 ] Km 20,067,240 4.000 Width (m) 3,472.000 Earth fill m3 25,465,328
Boeng Veaeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Khvet 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,375,328

Batheay, Trab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030111/06/01 TSO IM SARAN Project Type Rural Transport 36,547,700
Tum Prong 1 203 Gravel road 0.55 [ 0.55 ] Km 15,915,750 4.000 Width (m) 821.000 Earth fill m3 8,674,084
Thmei 2 203 Gravel road 1.50 [ 1.50 ] Km 15,915,750 4.000 Width (m) 2,259.000 Earth fill m3 23,873,625
Thmei 3 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,547,709

Batheay, Tumnob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030112/06/01 TSO IM SARAN Project Type Rural Domestic Water Supplies 33,950,000
Sroeng 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,850,000 50.000 Depth (m) 100.000 Diameter (mm) 4,850,000
Rung 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,850,000 50.000 Depth (m) 100.000 Diameter (mm) 4,850,000
Prayuk 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,850,000 60.000 Depth (m) 100.000 Diameter (mm) 4,850,000
Doun Paen 5 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 4,850,000 60.000 Depth (m) 100.000 Diameter (mm) 9,700,000
Tumnob Leu 6 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 4,850,000 60.000 Depth (m) 100.000 Diameter (mm) 9,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,950,000

Chamkar Leu, Bos Khnaor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030201/06/01 TSO Kheng Rattana Project Type Rural Transport 42,076,000
Dab Meakkakra 1 201 Earth road 0.60 [ 0.60 ] Km 13,400,000 3.500 Width (m) 1,334.000 Earth fill m3 8,040,000
Bos Khnor 2 201 Earth road 0.20 [ 0.20 ] Km 13,400,000 3.500 Width (m) 444.000 Earth fill m3 2,680,000
Bos Khnor 3 201 Earth road 0.35 [ 0.35 ] Km 13,400,000 4.000 Width (m) 869.000 Earth fill m3 4,690,000
Prasaeur 4 201 Earth road 0.62 [ 0.62 ] Km 13,400,000 3.500 Width (m) 1,378.000 Earth fill m3 8,308,000
Saray 5 201 Earth road 0.92 [ 0.92 ] Km 13,400,000 3.500 Width (m) 2,045.000 Earth fill m3 12,328,000
Chranaom 6 201 Earth road 0.30 [ 0.30 ] Km 13,400,000 3.500 Width (m) 667.000 Earth fill m3 4,020,000
Sameakki 7 201 Earth road 0.15 [ 0.15 ] Km 13,400,000 3.500 Width (m) 709.000 Earth fill m3 2,010,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,076,000
Contract ID 030201/06/02 TSO Kheng Rattana Project Type Rural Transport 18,000,000
Prasaeur 1 201 Earth road 1.30 [ 1.30 ] Km 13,846,150 4.000 Width (m) 2,992.000 Earth fill m3 17,999,995
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,999,995

Chamkar Leu, Chamkar Andoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030202/06/01 TSO Kheng Rattana Project Type Rural Transport 46,500,000
Souchey 1 202 Laterite road 1.50 [ 1.50 ] Km 25,833,333 4.000 Width (m) 3,987.000 Earth fill m3 38,749,999
Chamkar Andoung 2 202 Laterite road 0.30 [ 0.30 ] Km 25,833,330 3.000 Width (m) 630.000 Earth fill m3 7,749,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,499,998

Chamkar Leu, Cheyyou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030203/06/01 TSO Kheng Rattana Project Type Rural Transport 22,000,000
Cheyyou 1 202 Laterite road 1.37 [ 1.37 ] Km 16,117,216 3.000 Width (m) 2,842.000 Earth fill m3 22,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,000,000
Contract ID 030203/06/02 TSO Kheng Rattana Project Type Rural Transport 17,500,000
Trapeang Lpov 1 201 Earth road 1.07 [ 1.07 ] Km 16,355,140 3.000 Width (m) 3,200.000 Earth fill m3 17,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,500,000

Chamkar Leu, Lvea Leu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030204/06/01 TSO Kheng Rattana Project Type Rural Transport 32,609,900
Lvea Tboung 1 201 Earth road 0.35 [ 0.35 ] Km 16,940,206 3.000 Width (m) 815.000 Earth fill m3 5,929,072
Lvea Cheung 2 201 Earth road 0.40 [ 0.40 ] Km 16,940,205 3.000 Width (m) 932.000 Earth fill m3 6,776,082
Kralaeng Lech 3 201 Earth road 0.60 [ 0.60 ] Km 16,940,207 3.000 Width (m) 1,398.000 Earth fill m3 10,164,124
Phum Bei 4 201 Earth road 0.58 [ 0.58 ] Km 16,940,207 3.000 Width (m) 1,339.000 Earth fill m3 9,740,619
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,609,897

Chamkar Leu, Spueu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030205/06/01 TSO Kheng Rattana Project Type Rural Transport 44,000,000
Spueu Lech 1 202 Laterite road 0.30 [ 0.30 ] Km 21,103,118 3.500 Width (m) 813.000 Earth fill m3 6,330,935
Spueu Kaeut 2 202 Laterite road 0.74 [ 0.74 ] Km 21,103,118 3.500 Width (m) 1,993.000 Earth fill m3 15,510,791
Ou Veay 3 202 Laterite road 0.65 [ 0.65 ] Km 21,103,118 3.500 Width (m) 1,925.000 Earth fill m3 13,717,026
Peaeng Meas Tboung 4 202 Laterite road 0.40 [ 0.40 ] Km 21,103,118 3.000 Width (m) 734.000 Earth fill m3 8,441,247
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,000,000

Chamkar Leu, Svay Teab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030206/06/01 TSO Kheng Rattana Project Type Rural Transport 59,500,000
Svay Teab 1 201 Earth road 1.41 [ 1.41 ] Km 15,736,577 3.500 Width (m) 3,534.000 Earth fill m3 22,109,890
Veal Ri Kaeut 2 201 Earth road 0.85 [ 0.85 ] Km 15,736,577 3.500 Width (m) 2,145.000 Earth fill m3 13,423,300
Tang Krang 3 201 Earth road 0.82 [ 0.82 ] Km 15,736,576 3.500 Width (m) 2,070.000 Earth fill m3 12,951,202
Thnal Baek Lech 4 201 Earth road 0.70 [ 0.70 ] Km 15,736,576 3.500 Width (m) 1,621.000 Earth fill m3 11,015,603
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,499,995

Chamkar Leu, Ta Ong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030207/06/01 TSO Kheng Rattana Project Type Rural Transport 47,300,000
Tuol Meas 1 201 Earth road 1.45 [ 1.45 ] Km 18,920,000 3.000 Width (m) 4,532.000 Earth fill m3 27,434,000
Tuol Srov 2 201 Earth road 1.05 [ 1.05 ] Km 18,920,000 3.000 Width (m) 3,281.000 Earth fill m3 19,866,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,300,000

Chamkar Leu, Ta Prok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030208/06/01 TSO Kheng Rattana Project Type Rural Transport 32,200,000
Ou Ta Saeng 1 201 Earth road 1.38 [ 1.38 ] Km 18,115,942 4.000 Width (m) 3,386.000 Earth fill m3 25,000,000
Ou Ta Saeng 2 222 Double cell box culvert 1.00 [ 1.00 ] Place 7,200,000 3.000 Total Span (m) 4.000 Width(m) 7,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,200,000

Cheung Prey, Khnaor Dambang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030301/06/01 TSO Mem vibol Project Type Rural Transport 32,400,000
Veal 1 202 Laterite road 1.90 [ 1.90 ] Km 14,000,000 4.000 Width (m) 1,140.000 Earth fill m3 26,600,000
Veal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.800 Diameter (m) 5.000 Length (m) 2,200,000
Veal 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 10.000 Length (m) 3,000,000
Veal 4 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,400,000

Cheung Prey, Kouk Rovieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030302/06/01 TSO Mem vibol Project Type Rural Transport 18,540,000
Ba Krong 3 202 Laterite road 0.50 [ 0.50 ] Km 11,915,290 2.500 Width (m) 187.500 Earth fill m3 5,957,645
Ba Krong 4 202 Laterite road 0.30 [ 0.30 ] Km 16,666,670 3.000 Width (m) 135.000 Earth fill m3 5,000,001
Kouk Rovieng 5 202 Laterite road 0.59 [ 0.59 ] Km 11,915,290 2.500 Width (m) 220.000 Earth fill m3 6,982,360
Ba Krong 6 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,540,006
Contract ID 030302/06/02 TSO Mem vibol Project Type Rural Domestic Water Supplies 10,000,000
Totoul 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,000,000 55.000 Depth (m) 100.000 Diameter (mm) 5,000,000
Chhuk 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,000,000 55.000 Depth (m) 100.000 Diameter (mm) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,000,000

Cheung Prey, Phdau Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030303/06/01 TSO Mem vibol Project Type Irrigation 17,910,000
Phdau Chum Lech 1 420 Canal 1.55 [ 1.55 ] Km 10,200,000 1.100 Depth (m) 6,248.000 Volume (m3) 15,810,000
Phdau Chum Lech 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 4.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,910,000
Contract ID 030303/06/02 TSO Mem vibol Project Type Irrigation 17,590,000
Phdau Chum Lech 1 420 Canal 0.30 [ 0.30 ] Km 40,300,000 1.330 Depth (m) 2,298.000 Volume (m3) 12,090,000
Phdau Chum Lech 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,500,000 1.000 Diameter (m) 4.000 Length (m) 5,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,590,000

Cheung Prey, Prey Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030304/06/01 TSO Mem vibol Project Type Irrigation 21,800,000
Pnov Kaeut 1 420 Canal 0.97 [ 0.97 ] Km 20,496,890 1.930 Depth (m) 4,536.000 Volume (m3) 19,799,996
Pnov Kaeut 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 4.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,799,996
Contract ID 030304/06/02 TSO Mem vibol Project Type Irrigation 12,699,999
Bati 1 420 Canal 0.30 [ 0.30 ] Km 42,333,330 1.900 Depth (m) 2,285.000 Volume (m3) 12,699,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,699,999

Cheung Prey, Pring Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030305/06/01 TSO Mem vibol Project Type Rural Transport 31,283,500
Pring Chum 1 202 Laterite road 2.01 [ 2.01 ] Km 12,835,820 4.000 Width (m) 1,206.000 Earth fill m3 25,799,998
Pring Chum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,536,100 0.600 Diameter (m) 5.000 Length (m) 1,536,100
Pring Chum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,259,200 1.000 Diameter (m) 5.000 Length (m) 3,259,200
Pring Chum 4 281 Width restriction posts 1.00 [ 1.00 ] Place 688,200 0.400 0.000 688,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,283,498

Cheung Prey, Sampong Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030306/06/01 TSO Mem vibol Project Type Irrigation 31,000,000
Svay Meas 1 420 Canal 2.35 [ 2.35 ] Km 8,614,072 0.800 Depth (m) 5,437.000 Volume (m3) 20,199,999
Svay Meas 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 800,000 0.600 Diameter (m) 6.000 Length (m) 1,600,000
Sampong Chey 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 800,000 0.600 Diameter (m) 12.000 Length (m) 3,200,000
Svay Meas 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.800 Diameter (m) 4.000 Length (m) 1,200,000
Sampong Chey 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,200,000 0.800 Diameter (m) 16.000 Length (m) 4,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,999,999
Contract ID 030306/06/02 TSO Mem vibol Project Type Irrigation 21,384,000
Bos Ta Mom 1 410 Earth dam 0.36 [ 0.36 ] Km 59,400,000 1.900 Max. height (m) 3,919.000 Volume (m3) 21,384,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,384,000

Cheung Prey, Sdaeung Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030307/06/01 TSO Mem vibol Project Type Rural Transport 37,500,000
Kdoy 1 202 Laterite road 2.40 [ 2.40 ] Km 12,875,000 4.000 Width (m) 1,440.000 Earth fill m3 30,900,000
Damnak Ampil 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 9.000 Length (m) 4,000,000
Kdoy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Kdoy 4 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,500,000

Cheung Prey, Soutip

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030308/06/01 TSO Mem vibol Project Type Rural Transport 42,373,100
Thmei 1 202 Laterite road 1.50 [ 1.50 ] Km 11,080,000 4.000 Width (m) 902.400 Earth fill m3 16,664,320
Ta Saen 2 202 Laterite road 1.50 [ 1.50 ] Km 11,080,000 4.000 Width (m) 902.400 Earth fill m3 16,664,320
Skon 3 202 Laterite road 0.63 [ 0.63 ] Km 11,080,000 4.000 Width (m) 378.000 Earth fill m3 6,980,400
Skon 4 281 Width restriction posts 1.00 [ 1.00 ] Place 688,200 0.400 0.000 688,200
Ta Saen 5 281 Width restriction posts 1.00 [ 1.00 ] Place 688,200 0.400 0.000 688,200
Thmei 6 281 Width restriction posts 1.00 [ 1.00 ] Place 688,200 0.400 0.000 688,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,373,640

Cheung Prey, Srama

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030309/06/01 TSO Mem vibol Project Type Rural Transport 31,993,900
Sram Kaeut 1 202 Laterite road 1.30 [ 1.30 ] Km 10,766,890 3.000 Width (m) 585.000 Earth fill m3 13,996,957
Trapeang Snao 2 202 Laterite road 1.30 [ 1.30 ] Km 10,766,890 3.000 Width (m) 585.000 Earth fill m3 13,996,957
Sram Kaeut 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 10.000 Length (m) 3,000,000
Trapeang Snao 4 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Sram Kaeut 5 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,993,914

Cheung Prey, Trapeang Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030310/06/01 TSO Mem vibol Project Type Irrigation 14,990,000
S'ang 1 420 Canal 1.88 [ 1.88 ] Km 7,964,931 1.050 Depth (m) 4,782.000 Volume (m3) 14,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,990,000
Contract ID 030310/06/02 TSO Mem vibol Project Type Irrigation 15,900,000
S'ang 1 452 Single pipe Culvert with gate 3.00 [ 3.00 ] Place 5,300,000 0.800 Diameter (m) 12.000 Width (m) 15,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,900,000

Dambae, Chong Cheach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030401/06/01 TSO Him huon Project Type Rural Transport 48,892,300
Svay Pak 1 202 Laterite road 0.97 [ 0.97 ] Km 14,090,000 3.500 Width (m) 3,078.000 Earth fill m3 13,667,300
Cheach Cheung 2 202 Laterite road 2.00 [ 2.00 ] Km 14,090,000 3.500 Width (m) 770.000 Earth fill m3 28,180,000
Ta Meakh Thmei 3 202 Laterite road 0.50 [ 0.50 ] Km 14,090,000 3.500 Width (m) 513.000 Earth fill m3 7,045,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,892,300

Dambae, Dambae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030402/06/01 TSO Him huon Project Type Rural Transport 38,352,000
Kakaoh 1 202 Laterite road 1.36 [ 1.36 ] Km 17,000,000 3.500 Width (m) 1,508.000 Earth fill m3 23,052,000
Chey Sambatt 2 202 Laterite road 0.90 [ 0.90 ] Km 17,000,000 3.500 Width (m) 1,014.000 Earth fill m3 15,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,352,000

Dambae, Kouk Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030403/06/01 TSO Him huon Project Type Rural Transport 41,900,000
Kouk Char 1 202 Laterite road 2.00 [ 2.00 ] Km 11,000,000 3.500 Width (m) 2,253.000 Earth fill m3 22,000,000
SomBor Meas 2 202 Laterite road 1.40 [ 1.40 ] Km 11,000,000 3.500 Width (m) 1,578.000 Earth fill m3 15,400,000
Kouk Char 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
SomBor Meas 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,900,000

Dambae, Neang Teut

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030404/06/01 TSO Him huon Project Type Rural Transport 28,855,000
Sangkom 1 202 Laterite road 1.40 [ 1.40 ] Km 9,450,000 3.500 Width (m) 954.000 Earth fill m3 13,230,000
Neang Teut 2 202 Laterite road 1.50 [ 1.50 ] Km 9,450,000 3.500 Width (m) 1,690.000 Earth fill m3 14,175,000
Sangkom 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 1,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,855,000

Dambae, Seda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030405/06/01 TSO Him huon Project Type Rural Transport 45,890,000
Andoung Lngieng 1 201 Earth road 2.90 [ 2.90 ] Km 13,100,000 4.000 Width (m) 6,090.000 Earth fill m3 37,990,000
Andoung Lngieng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 3,400,000
Andoung Lngieng 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,250,000 0.800 Diameter (m) 5.000 Length (m) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,890,000

Dambae, Tuek Chrov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030406/06/01 TSO Him huon Project Type Rural Transport 50,544,680
Srae Veaeng 1 201 Earth road 2.60 [ 2.60 ] Km 16,931,800 4.000 Width (m) 7,013.000 Earth fill m3 44,022,680
Srae Veaeng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,583,000 0.600 Diameter (m) 5.000 Length (m) 3,166,000
Srae Veaeng 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,356,000 0.800 Diameter (m) 5.000 Length (m) 3,356,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,544,680

Dambae, Trapeang Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030407/06/01 TSO Him huon Project Type Rural Transport 53,000,000
Trapeang Pring 1 201 Earth road 2.40 [ 2.40 ] Km 12,919,540 4.000 Width (m) 5,729.000 Earth fill m3 31,006,896
Pralaoh 2 201 Earth road 1.50 [ 1.50 ] Km 12,919,540 4.000 Width (m) 3,017.000 Earth fill m3 19,379,310
Trapeang Pring 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,613,800 0.600 Diameter (m) 5.000 Length (m) 2,613,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  53,000,006

Kampong Cham, Boeng Kok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030501/06/01 TSO Va Kimheng Project Type Urban transport 18,320,000
Boeng Kok Pir 2 201 Earth road 0.40 [ 0.40 ] Km 38,500,000 4.000 Width (m) 1,555.000 Earth fill m3 15,400,000
Boeng Kok Pir 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,460,000 0.600 Diameter (m) 7.000 Length (m) 2,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,320,000
Contract ID 030501/06/02 TSO Va Kimheng Project Type Irrigation 16,000,000
Boeng Kok Muoy 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 16,000,000 1.000 Diameter (m) 18.000 Width (m) 16,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,000,000

Kampong Cham, Kampong Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030502/06/01 TSO Va Kimheng Project Type Urban Drainage and Flood Protection 40,678,900
Phum Prambei 1 542 Foul water sewer 1.00 [ 1.00 ] Line 5,964,300 0.400 0.700 5,964,300
Phum Prambei 2 542 Foul water sewer 1.00 [ 1.00 ] Line 2,606,900 2.700 107.000 2,606,900
Phum Prambuon 3 542 Foul water sewer 1.00 [ 1.00 ] Line 8,695,600 0.400 0.700 8,695,600
Phum Prambuon 4 542 Foul water sewer 1.00 [ 1.00 ] Line 3,572,200 2.540 156.000 3,572,200
Phum Dabpir 5 542 Foul water sewer 1.00 [ 1.00 ] Line 8,639,900 0.400 0.700 8,639,900
Phum Dabpir 6 542 Foul water sewer 1.00 [ 1.00 ] Line 3,500,000 2.000 155.000 3,500,000
Phum Prambei 7 542 Foul water sewer 1.00 [ 1.00 ] Line 7,700,000 0.600 67.000 7,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,678,900

Kampong Cham, Sambuor Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030503/06/01 TSO Va Kimheng Project Type Urban transport 40,378,200
Roka Kraom 1 201 Earth road 1.43 [ 1.43 ] Km 25,762,831 3.500 Width (m) 3,007.000 Earth fill m3 36,943,899
Roka Kraom 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,460,000 0.600 Diameter (m) 6.000 Length (m) 1,460,000
Roka Kraom 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,974,300 0.800 Diameter (m) 6.000 Length (m) 1,974,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,378,199

Kampong Cham, Veal Vong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030504/06/01 TSO Va Kimheng Project Type Urban transport 41,960,000
Phum Pir 1 201 Earth road 0.69 [ 0.69 ] Km 56,000,000 5.000 Width (m) 4,210.000 Earth fill m3 38,360,000
Phum Pir 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.400 Diameter (m) 6.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,960,000

Kampong Siem, Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030601/06/01 TSO Ou Chhengloch Project Type Rural Transport 43,845,200
Ampil Leu 1 201 Earth road 0.18 [ 0.18 ] Km 11,173,184 5.000 Width (m) 264.000 Earth fill m3 2,000,000
Ampil Leu 2 201 Earth road 0.88 [ 0.88 ] Km 11,173,182 4.000 Width (m) 1,040.000 Earth fill m3 9,832,400
Ampil Leu 3 201 Earth road 1.49 [ 2.27 ] Km 11,174,890 3.500 Width (m) 1,461.000 Earth fill m3 25,367,000
Ampil Leu 4 201 Earth road 0.38 [ 0.38 ] Km 11,173,158 3.000 Width (m) 308.000 Earth fill m3 4,245,800
Ampil Leu 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Ampil Leu 6 281 Width restriction posts 3.00 [ 3.00 ] Place 400,000 0.400 0.000 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,845,200

Kampong Siem, Han Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030602/06/01 TSO Ou Chhengloch Project Type Rural Transport 31,000,000
Moan Haeur 1 201 Earth road 0.13 [ 0.13 ] Km 30,000,000 4.000 Width (m) 795.000 Earth fill m3 3,990,000
Lvea Ter 2 201 Earth road 0.38 [ 0.38 ] Km 30,000,000 4.000 Width (m) 1,809.000 Earth fill m3 11,460,000
Krouch Saeuch 3 201 Earth road 0.21 [ 0.21 ] Km 30,000,000 4.000 Width (m) 869.000 Earth fill m3 6,300,000
Hanchey 4 201 Earth road 0.18 [ 0.18 ] Km 30,000,000 2.500 Width (m) 492.000 Earth fill m3 5,250,000
Moan Haeur 5 221 Single cell box culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Total Span (m) 4.000 Width(m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,000,000

Kampong Siem, Kien Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030603/06/01 TSO Ou Chhengloch Project Type Rural Transport 28,500,000
Kien Chrey Krau 1 201 Earth road 0.32 [ 0.32 ] Km 16,000,000 4.000 Width (m) 1,100.000 Earth fill m3 5,184,000
Kien Chrey Knong 2 201 Earth road 0.98 [ 0.98 ] Km 16,000,000 4.000 Width (m) 2,631.000 Earth fill m3 15,616,000
Preaek Yuon 3 201 Earth road 0.41 [ 0.41 ] Km 16,000,000 4.000 Width (m) 874.000 Earth fill m3 6,528,000
Kien Chrey Knong 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,172,000 0.800 Diameter (m) 6.000 Length (m) 1,172,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,500,000

Kampong Siem, Kokor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030604/06/01 TSO Ou Chhengloch Project Type Irrigation 30,965,100
Kampong Krabei 2 420 Canal 0.75 [ 0.79 ] Km 32,784,220 2.000 Depth (m) 4,441.000 Volume (m3) 25,965,102
Kampong Krabei 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 4.000 Width (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,965,102
Contract ID 030604/06/02 TSO Ou Chhengloch Project Type Irrigation 27,026,100
Kokor Muoy 2 420 Canal 0.96 [ 0.96 ] Km 28,035,370 1.730 Depth (m) 5,649.000 Volume (m3) 27,026,096
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,026,096

Kampong Siem, Kaoh Mitt

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030605/06/01 TSO Ou Chhengloch Project Type Rural Transport 35,457,500
Kaoh Paen Kho 1 201 Earth road 0.90 [ 0.90 ] Km 15,996,460 4.000 Width (m) 1,262.000 Earth fill m3 14,460,800
Kaoh Dach 2 201 Earth road 1.05 [ 1.05 ] Km 15,996,463 4.000 Width (m) 3,215.000 Earth fill m3 16,732,300
Kaoh Prolung 3 201 Earth road 0.05 [ 0.27 ] Km 16,031,580 4.000 Width (m) 350.000 Earth fill m3 4,264,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,457,500

Kampong Siem, Kaoh Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030606/06/01 TSO Ou Chhengloch Project Type Rural Drainage and Flood Protection 34,433,500
Kaoh Roka Knong 1 561 River bank protection 1.00 [ 1.00 ] Place 34,433,500 6.500 Height (m) 40.000 Length (m) 34,433,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,433,500

Kampong Siem, Kaoh Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030607/06/01 TSO Ou Chhengloch Project Type Rural Domestic Water Supplies 34,900,000
Phum Muoy 1 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Pir 2 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Bei 3 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Buon 4 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Buon 5 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.001 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Pram 6 111 Ring well 1.00 [ 1.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 3,490,000
Phum Prammuoy 7 111 Ring well 2.00 [ 2.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 6,980,000
Phum Prampir 8 111 Ring well 2.00 [ 2.00 ] Place 3,490,000 15.000 Depth (m) 1.200 Diameter (m) 6,980,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,900,000

Kampong Siem, Kaoh Tontuem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030608/06/01 TSO Ou Chhengloch Project Type Rural Transport 26,929,500
Kaoh Prak Kraom 1 201 Earth road 1.51 [ 1.51 ] Km 17,857,760 4.000 Width (m) 3,862.000 Earth fill m3 26,929,502
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,929,502

Kampong Siem, Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030609/06/01 TSO Ou Chhengloch Project Type Rural Transport 36,428,325
Trapeang Char 1 201 Earth road 0.11 [ 0.11 ] Km 14,832,955 3.000 Width (m) 249.000 Earth fill m3 1,631,625
Trapeang Char 2 201 Earth road 0.64 [ 0.64 ] Km 14,832,969 4.000 Width (m) 1.547 Earth fill m3 9,493,100
Tuol Popel 3 201 Earth road 1.46 [ 1.56 ] Km 14,835,797 4.000 Width (m) 2,216.000 Earth fill m3 23,084,500
Trapeang Char 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,480,200 0.600 Diameter (m) 5.000 Length (m) 1,480,200
Trapeang Char 5 281 Width restriction posts 1.00 [ 1.00 ] Place 738,900 0.400 0.000 738,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,428,325

Kampong Siem, Ou Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030610/06/01 TSO Ou Chhengloch Project Type Irrigation 22,000,000
Khael Chey 1 420 Canal 0.04 [ 0.04 ] Km 550,000,000 2.000 Depth (m) 3,788.000 Volume (m3) 22,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,000,000
Contract ID 030610/06/02 TSO Ou Chhengloch Project Type Rural Domestic Water Supplies 16,260,000
Prey Chakkrei 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,420,000 57.000 Depth (m) 100.000 Diameter (mm) 5,420,000
Ampil Kranhanh 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,420,000 57.000 Depth (m) 100.000 Diameter (mm) 5,420,000
Ou Svay 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,420,000 57.000 Depth (m) 100.000 Diameter (mm) 5,420,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,260,000

Kampong Siem, Ro'ang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030611/06/01 TSO Ou Chhengloch Project Type Rural Transport 41,911,301
Veal Khsach 1 202 Laterite road 1.00 [ 1.00 ] Km 13,564,300 4.000 Width (m) 664.000 Earth fill m3 13,564,300
Thma Koul 2 202 Laterite road 0.77 [ 0.77 ] Km 13,564,286 4.000 Width (m) 292.000 Earth fill m3 10,444,500
Prasam 3 202 Laterite road 0.33 [ 0.49 ] Km 13,567,816 4.000 Width (m) 145.000 Earth fill m3 6,702,501
Veal Khsach 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Thma Koul 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Prasam 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Prasam 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Veal Khsach 8 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Prasam 9 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,911,301

Kampong Siem, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030612/06/01 TSO Ou Chhengloch Project Type Rural Transport 21,423,280
Rumlech 1 201 Earth road 0.51 [ 0.67 ] Km 23,940,899 4.000 Width (m) 1,857.000 Earth fill m3 15,932,668
Thmei 2 201 Earth road 0.10 [ 0.10 ] Km 23,940,000 3.000 Width (m) 264.000 Earth fill m3 2,465,820
Rumlech 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,024,780 1.000 Diameter (m) 6.000 Length (m) 3,024,780
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,423,268
Contract ID 030612/06/02 TSO Ou Chhengloch Project Type Irrigation 8,001,000
Chheu Teal Srot Kraom 1 410 Earth dam 0.09 [ 0.09 ] Km 88,900,000 2.180 Max. height (m) 1,022.000 Volume (m3) 8,001,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,001,000

Kampong Siem, Srak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030613/06/01 TSO Ou Chhengloch Project Type Rural Transport 36,607,700
Lpeak 2 201 Earth road 0.55 [ 0.55 ] Km 18,000,000 4.000 Width (m) 1,771.000 Earth fill m3 9,864,000
Lpeak 3 201 Earth road 0.62 [ 1.00 ] Km 18,007,685 3.500 Width (m) 1,819.000 Earth fill m3 18,043,700
Lpeak 4 201 Earth road 0.20 [ 0.40 ] Km 18,000,000 3.000 Width (m) 584.000 Earth fill m3 7,200,000
Lpeak 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,607,700

Kampong Siem, Trean

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030614/06/01 TSO Ou Chhengloch Project Type Rural Transport 46,505,600
Chranieng 8 202 Laterite road 1.36 [ 1.36 ] Km 9,609,559 3.500 Width (m) 363.000 Earth fill m3 13,069,000
Trapeang Ampil 8 202 Laterite road 0.56 [ 0.56 ] Km 9,609,549 3.000 Width (m) 133.000 Earth fill m3 5,333,300
Ta Khong 8 202 Laterite road 0.83 [ 0.83 ] Km 9,609,507 3.000 Width (m) 198.000 Earth fill m3 7,985,500
Trean 8 202 Laterite road 0.83 [ 0.83 ] Km 9,609,443 3.000 Width (m) 169.000 Earth fill m3 7,937,400
Veal Kriel 8 202 Laterite road 0.40 [ 0.66 ] Km 9,608,447 3.000 Width (m) 568.000 Earth fill m3 6,370,400
Trapeang Ampil 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Ta Khong 8 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,300,000 0.600 Diameter (m) 5.000 Length (m) 2,300,000
Chranieng 8 281 Width restriction posts 1.00 [ 1.00 ] Place 710,000 0.400 0.000 710,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,505,601

Kampong Siem, Vihear Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030615/06/01 TSO Ou Chhengloch Project Type Rural Transport 32,910,100
Kdei Boeng 1 202 Laterite road 0.80 [ 0.80 ] Km 12,000,000 3.000 Width (m) 163.000 Earth fill m3 9,600,000
Kdei Boeng 2 202 Laterite road 0.50 [ 0.50 ] Km 12,000,000 3.500 Width (m) 250.000 Earth fill m3 6,000,000
Kong Moha 3 202 Laterite road 1.20 [ 1.20 ] Km 14,425,083 3.500 Width (m) 872.000 Earth fill m3 17,310,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,910,100

Kang Meas, Angkor Ban

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030701/06/01 TSO Sum Chin Project Type Irrigation 36,149,900
Angkor Ban Ti Muoy 1 420 Canal 0.20 [ 0.37 ] Km 95,000,000 3.000 Depth (m) 6,091.000 Volume (m3) 35,150,000
Angkor Ban Ti Pram 2 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 999,900 1.000 Diameter (m) 4.000 Width (m) 999,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,149,900

Kang Meas, Kang Ta Noeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030702/06/01 TSO Sum Chin Project Type Irrigation 23,921,100
Phum Ti Buon 1 420 Canal 0.40 [ 0.40 ] Km 17,086,520 1.300 Depth (m) 1,271.000 Volume (m3) 6,834,608
Phum Ti Prammuoy 2 420 Canal 1.00 [ 1.00 ] Km 17,086,520 1.300 Depth (m) 3,248.000 Volume (m3) 17,086,520
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,921,128
Contract ID 030702/06/02 TSO Sum Chin Project Type Irrigation 13,800,000
Phum Ti Pram 1 410 Earth dam 0.46 [ 0.46 ] Km 30,000,000 1.800 Max. height (m) 2,540.000 Volume (m3) 13,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,800,000

Kang Meas, Khchau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030703/06/01 TSO Sum Chin Project Type Irrigation 38,414,700
Svay Poan Ti Muoy 1 420 Canal 0.33 [ 0.33 ] Km 19,807,880 1.800 Depth (m) 1,550.000 Volume (m3) 6,536,600
Svay Poan Ti Pir 2 420 Canal 1.49 [ 1.62 ] Km 19,629,370 1.500 Depth (m) 4,892.000 Volume (m3) 31,878,097
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,414,697

Kang Meas, Peam Chi Kang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030704/06/01 TSO Sum Chin Project Type Irrigation 37,969,400
Sambuor Meas Ka 1 410 Earth dam 1.22 [ 1.62 ] Km 22,932,020 1.600 Max. height (m) 8,569.000 Volume (m3) 37,172,804
Sach Sou 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 796,600 0.800 Diameter (m) 7.000 Width (m) 796,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,969,404
Contract ID 030704/06/02 TSO Sum Chin Project Type Irrigation 9,660,000
Sambuor Meas Ka 1 420 Canal 0.50 [ 0.50 ] Km 19,320,000 1.200 Depth (m) 1,594.000 Volume (m3) 9,660,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,660,000

Kang Meas, Preaek Koy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030705/06/01 TSO Sum Chin Project Type Rural Transport 32,700,000
Preaek Koy 1 201 Earth road 0.20 [ 0.20 ] Km 25,360,000 3.000 Width (m) 906.000 Earth fill m3 5,072,000
Anlong Kokir 2 201 Earth road 1.05 [ 1.05 ] Km 25,360,000 3.000 Width (m) 4,757.000 Earth fill m3 26,628,000
Anlong Kokir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 6.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,700,000

Kang Meas, Preaek Krabau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030706/06/01 TSO Sum Chin Project Type Rural Transport 34,000,000
Tuek Chenh 1 202 Laterite road 2.35 [ 2.35 ] Km 7,600,001 2.700 Width (m) 950.000 Earth fill m3 17,860,002
Andoung Ta Ong 2 202 Laterite road 0.90 [ 0.90 ] Km 7,600,000 2.700 Width (m) 355.000 Earth fill m3 6,840,000
Andoung Dai 3 202 Laterite road 0.75 [ 0.75 ] Km 7,600,000 2.700 Width (m) 304.000 Earth fill m3 5,700,000
Tuek Chenh 4 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,800,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,000,002

Kang Meas, Reay Pay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030707/06/01 TSO Sum Chin Project Type Irrigation 36,586,300
Kok Krabei 1 410 Earth dam 0.75 [ 0.75 ] Km 19,540,270 1.500 Max. height (m) 3,029.000 Volume (m3) 14,655,203
Reay Pay Leu 2 410 Earth dam 0.15 [ 0.15 ] Km 19,540,670 2.500 Max. height (m) 1,739.000 Volume (m3) 2,931,101
Kok Krabei 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 9,500,000 0.600 Diameter (m) 7.000 Width (m) 9,500,000
Reay Pay Leu 7 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 9,500,000 0.600 Diameter (m) 7.000 Width (m) 9,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,586,303

Kang Meas, Roka ar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030708/06/01 TSO Sum Chin Project Type Irrigation 34,000,000
Svay Sranaoh Ti Pir 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 6,000,000 2.000 Total span (m) 1.600 Width (m) 6,000,000
Preaek Liv Ti Muoy 2 453 Double pipe culvert with gate 2.00 [ 2.00 ] Place 5,000,000 1.000 Diameter (m) 7.000 Width (m) 10,000,000
Chrouy Krabau Ti Pir 3 420 Canal 0.25 [ 0.25 ] Km 72,000,000 2.000 Depth (m) 1,300.000 Volume (m3) 18,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,000,000

Kang Meas, Roka Koy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030709/06/01 TSO Sum Chin Project Type Irrigation 29,700,000
Roka Koy Ka 1 410 Earth dam 0.65 [ 0.85 ] Km 13,500,000 1.500 Max. height (m) 2,906.000 Volume (m3) 11,475,000
Roka Koy Kha 2 410 Earth dam 1.35 [ 1.35 ] Km 13,500,000 1.800 Max. height (m) 4,939.000 Volume (m3) 18,225,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,700,000
Contract ID 030709/06/02 TSO Sum Chin Project Type Irrigation 15,094,600
PhumThmei Kha 1 420 Canal 0.40 [ 0.40 ] Km 23,261,500 1.000 Depth (m) 1,055.000 Volume (m3) 9,304,600
PhumThmei Kha 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 5,790,000 1.000 Diameter (m) 8.000 Width (m) 5,790,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,094,600

Kang Meas, Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030710/06/01 TSO Sum Chin Project Type Irrigation 31,332,000
Sdau 1 420 Canal 0.60 [ 0.70 ] Km 31,332,000 2.000 Depth (m) 5,520.000 Volume (m3) 21,932,400
Anlong Kokir 3 420 Canal 0.00 [ 0.15 ] Km 31,332,000 0.001 Depth (m) 0.001 Volume (m3) 4,699,800
Lvea Leu 4 420 Canal 0.00 [ 0.15 ] Km 31,332,000 0.001 Depth (m) 0.001 Volume (m3) 4,699,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,332,000

Kang Meas, Sour Kong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030711/06/01 TSO Sum Chin Project Type Irrigation 39,031,200
Kaoh Ta Ngao Ti Pir 1 420 Canal 0.53 [ 0.53 ] Km 10,400,000 1.700 Depth (m) 1,664.000 Volume (m3) 5,512,000
Kaoh Ta Ngao Ti Muoy 2 420 Canal 0.47 [ 0.47 ] Km 10,400,000 1.500 Depth (m) 1,596.000 Volume (m3) 4,919,200
Boeng Sang Lech 3 420 Canal 0.75 [ 0.75 ] Km 10,400,000 1.000 Depth (m) 602.000 Volume (m3) 7,800,000
Boeng Trav 4 420 Canal 0.50 [ 1.00 ] Km 10,400,000 1.000 Depth (m) 1,995.000 Volume (m3) 10,400,000
Anlong Ak Kaeut 6 420 Canal 0.00 [ 1.00 ] Km 10,400,000 0.001 Depth (m) 0.001 Volume (m3) 10,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,031,200

Kaoh Soutin, Kampong Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030801/06/01 TSO Yem Savong Project Type Rural Transport 25,410,000
Kampong Sdei Leu 1 201 Earth road 0.61 [ 0.61 ] Km 42,000,000 4.000 Width (m) 4,049.000 Earth fill m3 25,410,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,410,000
Contract ID 030801/06/02 TSO Yem Savong Project Type Rural Transport 3,500,000
Kampong Sdei Leu 1 201 Earth road 0.34 [ 0.34 ] Km 10,233,920 4.000 Width (m) 895.000 Earth fill m3 3,500,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,500,001

Kaoh Soutin, Kaoh Soutin

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030802/06/01 TSO Yem Savong Project Type Rural Transport 39,869,959
Phum Pram 1 205 Concrete road 0.47 [ 0.47 ] Km 84,829,700 2.700 Width (m) 127.000 Earth fill m3 39,869,959
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,869,959

Kaoh Soutin, Lve

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030803/06/01 TSO Yem Savong Project Type Rural Transport 32,000,000
Preaek Kol 1 201 Earth road 0.70 [ 0.70 ] Km 25,600,000 4.000 Width (m) 3,099.000 Earth fill m3 17,920,000
Roka Kaong 2 201 Earth road 0.55 [ 0.55 ] Km 25,600,000 4.000 Width (m) 2,815.000 Earth fill m3 14,080,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,000,000

Kaoh Soutin, Moha Leaph

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030804/06/01 TSO Yem Savong Project Type Rural Transport 31,655,400
Roka Kaong Tboung 1 201 Earth road 0.44 [ 0.49 ] Km 64,602,860 4.000 Width (m) 6,040.000 Earth fill m3 31,655,401
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,655,401

Kaoh Soutin, Moha Khnhoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030805/06/01 TSO Yem Savong Project Type Irrigation 26,943,700
Mohasiek Kraom 1 410 Earth dam 0.63 [ 0.63 ] Km 42,700,000 1.600 Max. height (m) 5,608.000 Volume (m3) 26,943,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,943,700
Contract ID 030805/06/02 TSO Yem Savong Project Type Irrigation 2,797,800
Khnhoung Leu 1 410 Earth dam 0.04 [ 0.04 ] Km 71,738,460 2.000 Max. height (m) 462.000 Volume (m3) 2,797,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,797,800

Kaoh Soutin, Peam Prathnuoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030806/06/01 TSO Yem Savong Project Type Rural Transport 35,019,097
Moha Leaph 1 201 Earth road 1.39 [ 1.39 ] Km 25,248,090 4.500 Width (m) 6,502.000 Earth fill m3 35,019,101
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,019,101

Kaoh Soutin, Pongro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030807/06/01 TSO Yem Savong Project Type Rural Transport 21,950,400
Preaek Rumdeng Kaeut 1 201 Earth road 0.18 [ 0.18 ] Km 28,763,400 3.000 Width (m) 213.000 Earth fill m3 5,177,412
Preaek Rumdeng Kaeut 2 201 Earth road 0.32 [ 0.32 ] Km 28,763,400 4.000 Width (m) 2,128.000 Earth fill m3 9,204,288
Pongro Kaeut 3 201 Earth road 0.17 [ 0.17 ] Km 28,763,400 3.000 Width (m) 507.000 Earth fill m3 4,889,778
Preaek Rumdeng Kaeut 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,339,500 0.600 Diameter (m) 6.000 Length (m) 2,679,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,950,478

Kaoh Soutin, Preaek Ta Nong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030808/06/01 TSO Yem Savong Project Type Irrigation 35,000,000
Preaek Ta Nong Buon 1 410 Earth dam 0.50 [ 0.50 ] Km 35,000,000 1.000 Max. height (m) 2,561.000 Volume (m3) 17,535,000
Preaek Ta Nong Buon 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 11,800,000 2.000 Total span (m) 2.000 Width (m) 11,800,000
Preaek Ta Nong Prammuoy 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 5,665,000 0.800 Diameter (m) 6.000 Width (m) 5,665,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Krouch Chhmar, Chhuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030901/06/01 TSO Ly Khamchuor Project Type Rural Transport 36,000,000
Chhuk 1 201 Earth road 2.00 [ 2.00 ] Km 18,000,000 6.000 Width (m) 7,295.000 Earth fill m3 36,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,000,000

Krouch Chhmar, Chumnik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030902/06/01 TSO Ly Khamchuor Project Type Rural Transport 34,111,000
Svay Damnak 3 201 Earth road 1.30 [ 1.30 ] Km 22,461,540 4.000 Width (m) 5,360.000 Earth fill m3 29,200,002
Svay Damnak 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,911,001 1.000 Diameter (m) 7.000 Length (m) 4,911,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,111,003

Krouch Chhmar, Kampong Treas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030903/06/01 TSO Ly Khamchuor Project Type Rural Transport 36,300,000
Phum Prammuoy 1 202 Laterite road 1.00 [ 1.00 ] Km 12,100,000 3.500 Width (m) 525.000 Earth fill m3 12,100,000
Phum Pram 2 202 Laterite road 0.70 [ 0.70 ] Km 12,100,000 3.500 Width (m) 367.000 Earth fill m3 8,470,000
Phum Buon 3 202 Laterite road 0.40 [ 0.40 ] Km 12,100,000 3.500 Width (m) 210.000 Earth fill m3 4,840,000
Phum Bei 4 202 Laterite road 0.90 [ 0.90 ] Km 12,100,000 3.500 Width (m) 472.000 Earth fill m3 10,890,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,300,000

Krouch Chhmar, Kaoh Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030904/06/01 TSO Ly Khamchuor Project Type Rural Transport 25,563,500
Kaoh Krabei 1 201 Earth road 1.45 [ 1.45 ] Km 17,630,000 4.000 Width (m) 4,504.000 Earth fill m3 25,563,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,563,500

Krouch Chhmar, Krouch Chhmar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030905/06/01 TSO Ly Khamchuor Project Type Rural Transport 27,500,000
Khsach Prachheh Kraom 1 201 Earth road 1.20 [ 1.20 ] Km 22,916,670 4.000 Width (m) 4,759.000 Earth fill m3 27,500,004
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,500,004

Krouch Chhmar, Peus Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030906/06/01 TSO Ly Khamchuor Project Type Rural Transport 38,600,000
Saoy Muoy 1 201 Earth road 1.30 [ 1.30 ] Km 29,692,310 6.000 Width (m) 5,102.000 Earth fill m3 38,600,003
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,600,003

Krouch Chhmar, Peus Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030907/06/02 TSO Ly Khamchuor Project Type Irrigation 28,679,100
Ampil 1 420 Canal 0.30 [ 0.30 ] Km 47,798,500 2.020 Depth (m) 2,839.000 Volume (m3) 14,339,550
Poes 2 420 Canal 0.30 [ 0.30 ] Km 47,798,500 2.020 Depth (m) 2,839.000 Volume (m3) 14,339,550
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,679,100

Krouch Chhmar, Preaek a Chi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030908/06/01 TSO Ly Khamchuor Project Type Rural Transport 32,160,200
Phum Ti Pir 1 201 Earth road 1.55 [ 1.55 ] Km 12,864,080 4.000 Width (m) 3,363.000 Earth fill m3 19,939,324
Phum Ti Bei 2 201 Earth road 0.95 [ 0.95 ] Km 12,864,080 4.000 Width (m) 2,064.000 Earth fill m3 12,220,876
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,160,200

Krouch Chhmar, Roka Khnaor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030909/06/01 TSO Ly Khamchuor Project Type Rural Transport 38,999,994
Phum Ti Prampir 1 201 Earth road 1.10 [ 1.10 ] Km 35,454,540 6.000 Width (m) 5,667.000 Earth fill m3 38,999,994
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,999,994

Krouch Chhmar, Svay Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030910/06/01 TSO Ly Khamchuor Project Type Rural Transport 26,700,000
Phum Ti Prammuoy 1 201 Earth road 1.40 [ 1.40 ] Km 19,071,430 4.500 Width (m) 4,355.000 Earth fill m3 26,700,002
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,700,002

Krouch Chhmar, Trea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030911/06/01 TSO Ly Khamchuor Project Type Rural Transport 34,640,600
Kdol Kandal 1 201 Earth road 0.90 [ 0.90 ] Km 13,856,240 5.000 Width (m) 2,052.000 Earth fill m3 12,470,616
Ti Muoy 2 201 Earth road 0.65 [ 0.65 ] Km 13,856,240 5.000 Width (m) 1,482.000 Earth fill m3 9,006,556
Ti Pir 3 201 Earth road 0.45 [ 0.45 ] Km 20,014,570 5.000 Width (m) 1,026.000 Earth fill m3 9,006,557
Ti Bei 4 201 Earth road 0.50 [ 0.50 ] Km 8,313,744 5.000 Width (m) 1,141.000 Earth fill m3 4,156,872
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,640,601

Krouch Chhmar, Tuol Snuol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030912/06/01 TSO Ly Khamchuor Project Type Rural Transport 41,500,000
Cheung Chrang 1 201 Earth road 0.69 [ 0.69 ] Km 11,126,010 4.000 Width (m) 1,032.000 Earth fill m3 7,676,947
Ta Pav 2 201 Earth road 2.20 [ 2.20 ] Km 11,126,010 4.000 Width (m) 3,293.000 Earth fill m3 24,477,222
Thnal Bei Maetr 3 201 Earth road 0.84 [ 0.84 ] Km 11,126,010 4.000 Width (m) 1,261.000 Earth fill m3 9,345,848
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,500,017

Memot, Chan Mul

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031001/06/01 TSO Mith Phally Project Type Education 37,900,000
Kantraeuy 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 18,950,000 16.000 Length (m) 9.000 Width (m) 37,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,900,000

Memot, Choam Kravien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031003/06/01 TSO Mith Phally Project Type Rural Transport 34,000,000
Thma Da 1 201 Earth road 0.33 [ 0.33 ] Km 15,280,136 4.000 Width (m) 1,010.000 Earth fill m3 5,073,005
Thma Da 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 6.000 Length (m) 3,000,000
Kbal Slaeng 3 201 Earth road 1.44 [ 1.44 ] Km 15,280,135 4.000 Width (m) 3,677.000 Earth fill m3 21,926,994
Kbal Slaeng 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Kbal Slaeng 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,999,999
Contract ID 031003/06/02 TSO Mith Phally Project Type Rural Transport 29,000,000
Doung 1 202 Laterite road 1.60 [ 1.60 ] Km 18,125,000 3.500 Width (m) 4,092.000 Earth fill m3 29,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,000,000

Memot, Choam Ta Mau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031004/06/01 TSO Mith Phally Project Type Rural Transport 34,413,600
Thma Totueng 1 201 Earth road 0.61 [ 0.61 ] Km 15,600,000 4.000 Width (m) 1,554.000 Earth fill m3 9,453,600
Kantuot 2 201 Earth road 1.60 [ 1.60 ] Km 15,600,000 4.000 Width (m) 4,272.000 Earth fill m3 24,960,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,413,600

Memot, Dar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031005/06/01 TSO Doul Son Project Type Rural Transport 53,394,000
Samraong Cheung 1 201 Earth road 2.00 [ 2.00 ] Km 11,832,121 4.000 Width (m) 4,718.000 Earth fill m3 23,664,242
Chhngar Kandal 2 201 Earth road 1.30 [ 1.30 ] Km 11,832,121 4.000 Width (m) 4,000.000 Earth fill m3 15,381,758
Samraong Cheung 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,172,080 0.600 Diameter (m) 5.000 Length (m) 3,516,240
Chhngar Kandal 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,172,080 0.600 Diameter (m) 5.000 Length (m) 3,516,240
Dar Kandaol 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,408,400 0.600 Diameter (m) 5.000 Length (m) 5,633,600
Samraong Cheung 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,682,000 0.800 Diameter (m) 6.000 Length (m) 1,682,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  53,394,080

Memot, Kampoan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031006/06/01 TSO Mith Phally Project Type Rural Transport 39,374,900
Srae Saom Thmei 1 201 Earth road 1.25 [ 1.25 ] Km 14,475,200 4.000 Width (m) 3,718.000 Earth fill m3 18,036,099
Srae Kandal 2 201 Earth road 0.83 [ 0.83 ] Km 14,822,330 4.000 Width (m) 2,150.000 Earth fill m3 12,361,823
Srae Kandal 3 213 Triple pipe culvert 1.00 [ 1.00 ] Place 6,589,000 1.000 Diameter (m) 6.000 Length (m) 6,589,000
Srae Kandal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,388,000 0.800 Diameter (m) 5.000 Length (m) 2,388,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,374,922

Memot, Memong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031007/06/01 TSO Mith Phally Project Type Rural Transport 34,220,000
Sambour 1 201 Earth road 1.00 [ 1.00 ] Km 13,600,000 4.000 Width (m) 2,758.000 Earth fill m3 13,600,000
Memong 2 201 Earth road 1.10 [ 1.10 ] Km 13,600,000 4.000 Width (m) 3,105.000 Earth fill m3 14,960,000
Sambour 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,430,000 0.600 Diameter (m) 6.000 Length (m) 1,430,000
Sambour 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Memong 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,430,000 0.600 Diameter (m) 6.000 Length (m) 1,430,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,220,000

Memot, Memot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031008/06/01 TSO Doul Son Project Type Rural Transport 36,603,978
Chi Peh 1 201 Earth road 1.40 [ 1.40 ] Km 16,019,948 5.000 Width (m) 4,826.000 Earth fill m3 22,427,927
Chhngar Kaeut 2 201 Earth road 0.55 [ 0.55 ] Km 16,019,947 5.000 Width (m) 3,000.000 Earth fill m3 8,810,971
Chi Peh 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,812,300 0.800 Diameter (m) 7.000 Length (m) 1,812,300
Chhngar Kaeut 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,184,260 0.600 Diameter (m) 6.000 Length (m) 3,552,780
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,603,978

Memot, Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031010/06/01 TSO Doul Son Project Type Rural Transport 26,156,800
Taonh 1 201 Earth road 0.90 [ 0.90 ] Km 8,898,000 4.000 Width (m) 2,117.000 Earth fill m3 8,008,200
Masin 2 201 Earth road 0.28 [ 0.28 ] Km 8,897,857 4.000 Width (m) 1,000.000 Earth fill m3 2,491,400
Andoung Ta Chou 3 201 Earth road 1.10 [ 1.10 ] Km 8,898,000 4.000 Width (m) 2,000.000 Earth fill m3 9,787,800
Masin 4 201 Earth road 0.30 [ 0.30 ] Km 8,898,000 4.000 Width (m) 862.000 Earth fill m3 2,669,400
Masin 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,600,000 0.600 Diameter (m) 6.000 Length (m) 3,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,156,800

Memot, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031011/06/01 TSO Mith Phally Project Type Rural Transport 27,984,000
Kantuot 1 201 Earth road 1.04 [ 1.04 ] Km 14,000,000 4.000 Width (m) 2,820.000 Earth fill m3 14,574,000
Kantuot 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.600 Diameter (m) 6.000 Length (m) 1,800,000
Kantuot 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 3,400,000
Khpob 4 201 Earth road 0.47 [ 0.47 ] Km 14,000,000 4.000 Width (m) 1,414.000 Earth fill m3 6,510,000
Khpob 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,984,000

Memot, Tramung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031013/06/01 TSO Mith Phally Project Type Rural Transport 39,900,000
Roung Chakr Skar 1 201 Earth road 0.25 [ 0.25 ] Km 12,000,000 4.000 Width (m) 460.000 Earth fill m3 3,000,000
Andoung Thma Leu 2 201 Earth road 0.42 [ 0.42 ] Km 12,000,000 4.000 Width (m) 1,674.000 Earth fill m3 5,040,000
Andoung Thma Kraom 3 201 Earth road 0.33 [ 0.33 ] Km 12,000,000 4.000 Width (m) 638.000 Earth fill m3 3,960,000
Andoung Thma Kraom 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Andoung Thma Kraom 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Andoung Thma Kraom 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 1.000 Diameter (m) 6.000 Length (m) 2,500,000
Tramaeng Leu 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 0.600 Diameter (m) 6.000 Length (m) 4,000,000
Roung Chakr Skar 8 201 Earth road 0.35 [ 0.35 ] Km 12,000,000 4.000 Width (m) 435.000 Earth fill m3 4,236,000
Andoung Thma Leu 9 201 Earth road 1.10 [ 1.10 ] Km 12,000,000 4.000 Width (m) 2,490.000 Earth fill m3 13,164,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,900,000

Memot, Tonlung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031014/06/01 TSO Mith Phally Project Type Rural Transport 27,119,500
Changkum Kandal 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 27,119,500 6.600 4.000 27,119,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,119,500
Contract ID 031014/06/02 TSO Mith Phally Project Type Rural Transport 14,889,900
Kdol Phsar 1 202 Laterite road 1.35 [ 1.35 ] Km 9,024,200 3.500 Width (m) 1,000.000 Earth fill m3 12,182,670
Changkum Kandal 2 202 Laterite road 0.30 [ 0.30 ] Km 9,024,200 3.500 Width (m) 389.000 Earth fill m3 2,707,260
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,889,930

Memot, Treak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031015/06/01 TSO Doul Son Project Type Rural Transport 38,066,840
Preah Ponlea 1 201 Earth road 0.75 [ 0.75 ] Km 17,974,200 4.000 Width (m) 2,479.000 Earth fill m3 13,480,650
Bangkov 2 201 Earth road 0.66 [ 1.18 ] Km 17,984,881 4.000 Width (m) 2,296.000 Earth fill m3 21,186,190
Preah Ponlea 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,930,000 0.800 Diameter (m) 5.000 Length (m) 1,930,000
Bangkov 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,470,000 0.600 Diameter (m) 5.000 Length (m) 1,470,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,066,840

Memot, Kokir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031016/06/01 TSO Mith Phally Project Type Rural Transport 35,264,745
Kngaok 1 201 Earth road 0.86 [ 0.86 ] Km 14,315,000 4.000 Width (m) 2,792.000 Earth fill m3 12,267,955
Kngaok 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,700,000 0.600 Diameter (m) 5.000 Length (m) 2,700,000
Chamkar Thmey 3 201 Earth road 0.87 [ 0.87 ] Km 14,315,000 4.000 Width (m) 2,341.000 Earth fill m3 12,396,790
Chamkar Thmey 4 213 Triple pipe culvert 1.00 [ 1.00 ] Place 7,900,000 1.000 Diameter (m) 6.000 Length (m) 7,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,264,745

Ou Reang Ov, Ampil Ta Pok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031101/06/01 TSO Chea Theng Project Type Rural Transport 32,890,700
Svay Roluos 1 201 Earth road 2.44 [ 2.44 ] Km 12,315,270 4.000 Width (m) 6,178.000 Earth fill m3 29,999,998
Svay Roluos 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,445,350 1.000 Diameter (m) 5.000 Length (m) 2,890,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,890,698
Contract ID 031101/06/02 TSO Chea Theng Project Type Rural Transport 14,837,300
Svay Roluos 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 10,000,000 2.000 Total Span (m) 5.000 Width(m) 10,000,000
Svay Roluos 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,556,000 0.800 Diameter (m) 5.000 Length (m) 3,556,000
Svay Roluos 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,281,300 0.600 Diameter (m) 5.000 Length (m) 1,281,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,837,300

Ou Reang Ov, Chak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031102/06/01 TSO Chea Theng Project Type Rural Transport 40,769,300
Chruol 1 202 Laterite road 1.00 [ 1.00 ] Km 6,846,703 3.500 Width (m) 267.000 Earth fill m3 6,846,703
Chruol 2 281 Width restriction posts 1.00 [ 1.00 ] Place 3,423,351 0.400 0.000 3,423,351
Trapeang Kandaol 3 202 Laterite road 0.88 [ 0.88 ] Km 7,824,804 3.500 Width (m) 233.000 Earth fill m3 6,846,704
Trach Chrum 4 202 Laterite road 1.08 [ 1.08 ] Km 6,345,416 3.500 Width (m) 288.000 Earth fill m3 6,846,704
Daeum Changkran 5 202 Laterite road 2.05 [ 2.05 ] Km 3,346,385 3.500 Width (m) 545.000 Earth fill m3 6,846,704
Daeum Changkran 6 281 Width restriction posts 1.00 [ 1.00 ] Place 3,423,351 0.400 0.000 3,423,351
Chamkar Kor 8 202 Laterite road 0.00 [ 1.03 ] Km 6,345,437 3.500 Width (m) 0.000 Earth fill m3 6,535,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,769,316

Ou Reang Ov, Damrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031103/06/01 TSO Chea Theng Project Type Rural Transport 36,600,000
Thlok 1 201 Earth road 2.17 [ 2.17 ] Km 11,000,000 4.000 Width (m) 750.000 Earth fill m3 23,859,000
Chanlaong 2 201 Earth road 0.00 [ 0.43 ] Km 11,000,000 4.000 Width (m) 0.000 Earth fill m3 4,741,000
Thlok 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 5.000 Length (m) 2,000,000
Thlok 4 212 Double pipe culvert 1.00 [ 2.00 ] Place 3,000,000 1.000 Diameter (m) 5.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,600,000

Ou Reang Ov, Kong Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031104/06/01 TSO Chea Theng Project Type Rural Transport 48,776,000
Tuol Ta Hao 1 201 Earth road 2.98 [ 2.98 ] Km 8,000,000 4.000 Width (m) 5,054.000 Earth fill m3 23,840,000
Tuol Ta Hao 2 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Srae Spey 3 201 Earth road 1.16 [ 1.16 ] Km 8,000,000 4.000 Width (m) 2,179.000 Earth fill m3 9,248,000
Srae Spey 4 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Lekh Pir 10 201 Earth road 0.00 [ 1.13 ] Km 8,000,001 4.000 Width (m) 0.000 Earth fill m3 9,072,001
Thmei 11 201 Earth road 0.00 [ 0.70 ] Km 8,000,000 4.000 Width (m) 0.001 Earth fill m3 5,616,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,776,001

Ou Reang Ov, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031105/06/01 TSO Chea Theng Project Type Rural Transport 25,078,260
Banteay Mien 1 201 Earth road 1.25 [ 1.25 ] Km 10,070,000 4.000 Width (m) 2,902.000 Earth fill m3 12,587,500
Prey Sambuor Kaeut 2 201 Earth road 0.87 [ 0.87 ] Km 10,070,000 4.000 Width (m) 1,602.000 Earth fill m3 8,740,760
Banteay Mien 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Prey Sambuor Kaeut 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,078,260
Contract ID 031105/06/02 TSO Chea Theng Project Type Rural Transport 10,089,000
Me Loung 1 202 Laterite road 0.55 [ 0.55 ] Km 8,500,000 3.500 Width (m) 147.000 Earth fill m3 4,675,000
Me Loung 2 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Mien 3 202 Laterite road 0.57 [ 0.57 ] Km 8,500,000 3.500 Width (m) 151.000 Earth fill m3 4,811,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,086,000

Ou Reang Ov, Preah Theat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031107/06/01 TSO Chea Theng Project Type Irrigation 44,220,000
Phnum 1 410 Earth dam 0.14 [ 0.14 ] Km 135,000,000 4.000 Max. height (m) 1,593.000 Volume (m3) 19,305,000
Phnum 2 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 6,800,000 0.800 Diameter (m) 7.000 Width (m) 6,800,000
Trapeang Neang 3 410 Earth dam 0.07 [ 0.07 ] Km 135,000,000 4.000 Max. height (m) 2,235.000 Volume (m3) 9,315,000
Trapeang Neang 4 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 4,400,000 0.800 Diameter (m) 7.000 Width (m) 8,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,220,000

Ou Reang Ov, Tuol Sophi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031108/06/01 TSO Chea Theng Project Type Rural Transport 33,023,000
Trapeang Lvea Tboung 1 202 Laterite road 1.37 [ 1.37 ] Km 10,136,030 3.500 Width (m) 496.000 Earth fill m3 13,926,905
Trapeang Lvea Cheung 2 202 Laterite road 0.49 [ 0.49 ] Km 10,136,010 3.500 Width (m) 485.000 Earth fill m3 4,926,101
Trapeang Lvea Cheung 3 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Tuol Sopoar 4 202 Laterite road 0.50 [ 0.50 ] Km 10,136,020 3.500 Width (m) 86.000 Earth fill m3 5,037,602
Tuol Sopoar 5 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Boeng Kampues 6 202 Laterite road 0.75 [ 0.75 ] Km 10,135,990 3.500 Width (m) 1,065.000 Earth fill m3 7,632,400
Boeng Kampues 7 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,023,008

Ponhea Kraek, Doun Tei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031202/06/01 TSO Doul Son Project Type Education 41,000,000
Prey Tumnob 1 320 Brick school (general) 2.00 [ 2.00 ] School room 20,500,000 16.000 Length (m) 9.000 Width (m) 41,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,000,000

Ponhea Kraek, Kak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031203/06/01 TSO Doul Son Project Type Rural Transport 46,550,000
Krasaom Sat 1 202 Laterite road 1.00 [ 1.00 ] Km 10,681,750 3.500 Width (m) 525.000 Earth fill m3 10,681,750
Santey Ti Muoy 2 202 Laterite road 1.00 [ 1.00 ] Km 10,681,750 3.500 Width (m) 525.000 Earth fill m3 10,681,750
Santey Ti Pir 3 202 Laterite road 2.00 [ 2.00 ] Km 10,681,750 3.500 Width (m) 1,050.000 Earth fill m3 21,363,500
Krasaom Sat 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,660,000 0.800 Diameter (m) 5.000 Length (m) 2,660,000
Krasaom Sat 5 281 Width restriction posts 1.00 [ 1.00 ] Place 1,163,000 0.400 0.000 1,163,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,550,000

Ponhea Kraek, Kandaol Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031204/06/01 TSO Doul Son Project Type Rural Transport 39,450,000
Kouk Lvieng 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 1,450,000
Sovann Kom 2 222 Double cell box culvert 1.00 [ 1.00 ] Place 10,000,000 3.000 Total Span (m) 5.000 Width(m) 10,000,000
Sovann Kom 3 223 Triple cell box culvert 1.00 [ 1.00 ] Place 13,600,000 4.500 Total Span (m) 5.000 Width(m) 13,600,000
Trapeang Prei 4 223 Triple cell box culvert 1.00 [ 1.00 ] Place 14,400,000 6.000 Total Span (m) 4.500 Width(m) 14,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,450,000
Contract ID 031204/06/02 TSO Doul Son Project Type Rural Domestic Water Supplies 9,400,000
Trapeang Tonsaong 1 121 Drilled well with VN no 6 pump 4.00 [ 4.00 ] Place 2,350,000 30.000 Depth (m) 100.000 Diameter (mm) 9,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,400,000

Ponhea Kraek, Kaong Kang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031205/06/01 TSO Doul Son Project Type Education 41,000,000
Kantuot 1 320 Brick school (general) 2.00 [ 2.00 ] School room 20,500,000 16.000 Length (m) 9.000 Width (m) 41,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,000,000

Ponhea Kraek, Kraek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031206/06/01 TSO Doul Son Project Type Education 63,090,000
Bos Lvea 1 320 Brick school (general) 3.00 [ 3.00 ] School room 21,030,000 124.000 Length (m) 9.000 Width (m) 63,090,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  63,090,000
Contract ID 031206/06/02 TSO Doul Son Project Type Rural Transport 9,800,000
Serei Sokha 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,800,000 3.000 Total Span (m) 5.000 Width(m) 9,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,800,000

Ponhea Kraek, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031207/06/01 TSO Doul Son Project Type Rural Transport 37,301,000
Popel 1 201 Earth road 1.95 [ 1.95 ] Km 15,480,000 4.000 Width (m) 5,886.000 Earth fill m3 30,186,000
Popel 2 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,423,000 0.600 Diameter (m) 5.000 Length (m) 7,115,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,301,000

Ponhea Kraek, Trapeang Phlong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031208/06/01 TSO Doul Son Project Type Rural Domestic Water Supplies 48,276,000
Trapeang Phlong Muoy 1 111 Ring well 7.00 [ 7.00 ] Place 1,788,000 8.000 Depth (m) 1.000 Diameter (m) 12,516,000
Trapeang Phlong Pir 2 111 Ring well 10.00 [ 10.00 ] Place 1,788,000 8.000 Depth (m) 1.000 Diameter (m) 17,880,000
Trach Khaol 3 111 Ring well 8.00 [ 8.00 ] Place 1,788,000 8.000 Depth (m) 1.000 Diameter (m) 14,304,000
Trapeang Pring Muoy 4 111 Ring well 2.00 [ 2.00 ] Place 1,788,000 8.000 Depth (m) 1.000 Diameter (m) 3,576,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,276,000

Ponhea Kraek, Veal Mlu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031209/06/01 TSO Doul Son Project Type Education 40,000,000
Veal Mlu 1 320 Brick school (general) 2.00 [ 2.00 ] School room 20,000,000 16.000 Length (m) 9.000 Width (m) 40,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,000,000

Prey Chhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031301/06/01 TSO Im Koy Project Type Rural Transport 24,978,900
Prey Khchay 1 202 Laterite road 0.35 [ 0.35 ] Km 5,922,000 3.000 Width (m) 228.000 Earth fill m3 2,072,700
Roung Kou 2 202 Laterite road 2.62 [ 2.62 ] Km 5,921,963 3.000 Width (m) 1,702.000 Earth fill m3 15,503,700
Kouk Sralau 3 202 Laterite road 0.25 [ 0.25 ] Km 5,922,000 3.000 Width (m) 175.000 Earth fill m3 1,480,500
Leang Khsach 4 202 Laterite road 1.00 [ 1.00 ] Km 5,922,000 3.000 Width (m) 650.000 Earth fill m3 5,922,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,978,900
Contract ID 031301/06/02 TSO Im Koy Project Type Rural Transport 10,200,000
Kouk Sralau 1 201 Earth road 1.45 [ 1.70 ] Km 6,000,000 4.000 Width (m) 3,058.000 Earth fill m3 10,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,200,000

Prey Chhor, Boeng Nay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031302/06/01 TSO Im Koy Project Type Rural Transport 40,999,700
Boeng Nay 1 201 Earth road 1.25 [ 1.25 ] Km 19,158,717 4.000 Width (m) 2,525.000 Earth fill m3 23,948,396
Trapeang Anhchanh 2 201 Earth road 0.70 [ 0.70 ] Km 19,158,716 4.000 Width (m) 1,427.000 Earth fill m3 13,411,101
Boeng Nay 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,543,000 0.600 Diameter (m) 5.000 Length (m) 1,543,000
Trapeang Anhchanh 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,097,200 0.800 Diameter (m) 5.000 Length (m) 2,097,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,999,697

Prey Chhor, Chrey Vien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031303/06/01 TSO Im Koy Project Type Rural Transport 47,183,100
Trapeang Tuk 2 201 Earth road 1.03 [ 1.05 ] Km 11,370,020 4.000 Width (m) 2,260.000 Earth fill m3 11,938,521
Tuek Nuem 3 201 Earth road 0.55 [ 0.55 ] Km 6,202,275 3.000 Width (m) 643.500 Earth fill m3 3,411,251
Chrey Vien 4 201 Earth road 0.42 [ 0.42 ] Km 6,202,274 3.000 Width (m) 491.400 Earth fill m3 2,604,955
Dai Buon 5 201 Earth road 0.30 [ 0.30 ] Km 6,202,273 3.000 Width (m) 360.100 Earth fill m3 1,860,682
Ta Ream 6 201 Earth road 0.02 [ 1.54 ] Km 11,370,050 4.000 Width (m) 44.000 Earth fill m3 17,453,027
Doun Dei 11 201 Earth road 0.87 [ 0.87 ] Km 11,370,070 4.000 Width (m) 2,067.600 Earth fill m3 9,914,701
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,183,137

Prey Chhor, Khvet Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031304/06/01 TSO Im Koy Project Type Irrigation 21,000,000
Khvet Thum 2 420 Canal 0.08 [ 0.08 ] Km 243,589,700 1.200 Depth (m) 7,920.000 Volume (m3) 18,999,997
Khvet Thum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 6.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,999,997

Prey Chhor, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031305/06/01 TSO Im Koy Project Type Irrigation 26,000,000
Rumduol 1 420 Canal 0.12 [ 0.12 ] Km 210,084,034 0.670 Depth (m) 9,123.000 Volume (m3) 25,000,000
Rumduol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 1.000 Diameter (m) 6.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000

Prey Chhor, Krouch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031306/06/01 TSO Im Koy Project Type Rural Transport 35,000,000
Krouch 1 201 Earth road 0.37 [ 0.37 ] Km 26,936,024 4.000 Width (m) 1,246.000 Earth fill m3 10,047,137
Samraong 2 201 Earth road 0.55 [ 0.55 ] Km 26,936,025 4.000 Width (m) 1,837.000 Earth fill m3 14,814,814
Prey Sak 3 201 Earth road 0.27 [ 0.27 ] Km 26,936,023 4.000 Width (m) 896.000 Earth fill m3 7,138,046
Samraong 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Prey Sak 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,999,997

Prey Chhor, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031307/06/01 TSO Im Koy Project Type Rural Transport 25,651,800
Ta Chak 1 202 Laterite road 1.92 [ 1.92 ] Km 9,365,245 3.000 Width (m) 392.000 Earth fill m3 18,000,000
Lvea 2 202 Laterite road 0.63 [ 0.63 ] Km 7,099,391 2.500 Width (m) 94.000 Earth fill m3 4,451,318
Kouk Trea Lech 3 202 Laterite road 0.36 [ 0.36 ] Km 7,099,391 2.500 Width (m) 54.000 Earth fill m3 2,548,681
Ta Chak 4 281 Width restriction posts 1.00 [ 1.00 ] Place 651,800 0.400 0.000 651,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,651,800
Contract ID 031307/06/02 TSO Im Koy Project Type Rural Transport 6,600,000
Kouk Trea Lech 1 202 Laterite road 0.61 [ 0.61 ] Km 10,749,186 2.500 Width (m) 231.000 Earth fill m3 6,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,600,000

Prey Chhor, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031308/06/01 TSO Im Koy Project Type Rural Transport 24,893,600
Tuol Prich 1 201 Earth road 0.60 [ 0.60 ] Km 13,750,000 4.000 Width (m) 2,750.000 Earth fill m3 8,250,000
Kampong Samnanh 2 201 Earth road 1.00 [ 1.00 ] Km 13,750,000 4.000 Width (m) 3,730.000 Earth fill m3 13,750,000
Tuol Prich 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,893,600 1.000 Diameter (m) 6.000 Length (m) 2,893,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,893,600
Contract ID 031308/06/02 TSO Im Koy Project Type Rural Transport 17,208,000
Krasang Pul 2 202 Laterite road 0.89 [ 1.38 ] Km 12,000,000 4.000 Width (m) 712.000 Earth fill m3 16,608,000
Krasang Pul 2 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,208,000

Prey Chhor, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031309/06/01 TSO Im Koy Project Type Rural Transport 26,000,000
Sek Yum 1 202 Laterite road 0.47 [ 0.47 ] Km 28,604,043 3.500 Width (m) 1,394.000 Earth fill m3 13,443,900
Sangkae 2 202 Laterite road 0.40 [ 0.40 ] Km 28,604,208 3.500 Width (m) 1,131.000 Earth fill m3 11,556,100
Sek Yum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000

Prey Chhor, Sour Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031310/06/01 TSO Im Koy Project Type Rural Transport 33,200,000
Sour Saen 1 202 Laterite road 3.03 [ 3.03 ] Km 10,619,986 2.500 Width (m) 462.000 Earth fill m3 32,199,797
Sour Saen 2 281 Width restriction posts 2.00 [ 2.00 ] Place 500,000 0.400 0.000 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,199,797

Prey Chhor, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031311/06/01 TSO Im Koy Project Type Irrigation 32,300,000
Thmei 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 13,000,000 3.000 Total Span (m) 5.000 Width(m) 13,000,000
Thmei 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 0.600 Diameter (m) 3.000 Width (m) 3,000,000
Svay Prey 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 6,000,000 1.000 Diameter (m) 10.000 Length (m) 6,000,000
Svay Prey 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 10.000 Length (m) 3,000,000
Svay Prey 5 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,800,000 0.600 Diameter (m) 3.000 Width (m) 2,800,000
Samraong 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 1.000 Diameter (m) 3.000 Length (m) 1,400,000
Kandaol Kaong 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,100,000 0.800 Diameter (m) 10.000 Length (m) 3,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,300,000

Prey Chhor, Srangae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031312/06/01 TSO Im Koy Project Type Irrigation 34,392,000
Srangae Cheung 1 420 Canal 1.40 [ 2.67 ] Km 11,000,000 1.190 Depth (m) 4,469.000 Volume (m3) 29,392,000
Srangae Cheung 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 5.000 Width (m) 2,500,000
Senson Cheung 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 5.000 Width (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,392,000

Prey Chhor, Thma Pun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031313/06/01 TSO Im Koy Project Type Rural Transport 37,113,400
Andoung Phdau 1 202 Laterite road 1.95 [ 1.95 ] Km 10,454,500 5.000 Width (m) 975.000 Earth fill m3 20,386,275
Trang 2 202 Laterite road 0.35 [ 0.35 ] Km 10,454,500 5.000 Width (m) 175.000 Earth fill m3 3,659,075
Lech Voat 3 202 Laterite road 0.35 [ 0.35 ] Km 10,454,500 5.000 Width (m) 175.000 Earth fill m3 3,659,075
Andoung Pech 4 202 Laterite road 0.35 [ 0.35 ] Km 10,454,500 5.000 Width (m) 175.000 Earth fill m3 3,659,075
Trapeang Boeng 5 202 Laterite road 0.50 [ 0.50 ] Km 10,454,500 5.000 Width (m) 250.000 Earth fill m3 5,227,250
Thma Pun Kandal 6 202 Laterite road 0.05 [ 0.05 ] Km 10,454,500 5.000 Width (m) 25.000 Earth fill m3 522,725
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,113,475

Prey Chhor, Tong Rong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031314/06/01 TSO Im Koy Project Type Rural Transport 30,700,000
Prasat 1 202 Laterite road 1.00 [ 1.00 ] Km 11,475,000 3.000 Width (m) 200.000 Earth fill m3 11,475,000
Phteah Khpos 2 202 Laterite road 1.50 [ 1.50 ] Km 11,475,000 3.000 Width (m) 310.000 Earth fill m3 17,212,500
Phteah Khpos 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 806,250 0.600 Diameter (m) 5.000 Length (m) 1,612,500
Phteah Khpos 4 281 Width restriction posts 1.00 [ 1.00 ] Place 400,000 0.400 0.000 400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,700,000

Prey Chhor, Trapeang Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031315/06/01 TSO Im Koy Project Type Rural Transport 18,444,600
Pring Bei Daeum 1 201 Earth road 1.55 [ 1.55 ] Km 9,458,774 4.000 Width (m) 1,866.000 Earth fill m3 14,661,100
Pring Bei Daeum 2 201 Earth road 0.40 [ 0.40 ] Km 9,458,750 4.000 Width (m) 741.000 Earth fill m3 3,783,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,444,600
Contract ID 031315/06/02 TSO Im Koy Project Type Rural Transport 14,000,000
Doung 1 202 Laterite road 0.57 [ 0.57 ] Km 7,179,487 3.000 Width (m) 253.000 Earth fill m3 4,092,308
Pring Bei Daeum 2 202 Laterite road 0.35 [ 0.35 ] Km 7,179,487 3.000 Width (m) 155.000 Earth fill m3 2,512,821
Prey Sralanh 3 202 Laterite road 1.03 [ 1.03 ] Km 7,179,487 3.000 Width (m) 457.000 Earth fill m3 7,394,872
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,000,000
Contract ID 031315/06/03 TSO Im Koy Project Type Rural Transport 13,140,000
Doung 1 201 Earth road 0.50 [ 0.92 ] Km 9,000,000 4.000 Width (m) 1,052.000 Earth fill m3 8,280,000
Tonle Sar 2 201 Earth road 0.54 [ 0.54 ] Km 9,000,000 4.000 Width (m) 1,352.000 Earth fill m3 4,860,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,140,000

Srei Santhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031401/06/01 TSO Tep That Project Type Rural Transport 24,280,200
Sya Ampil 1 201 Earth road 0.35 [ 0.42 ] Km 28,818,225 4.000 Width (m) 2,429.000 Earth fill m3 12,017,200
Banteay 2 201 Earth road 0.22 [ 0.26 ] Km 42,825,095 4.000 Width (m) 623.000 Earth fill m3 11,263,000
Sya Ampil 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 6.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,280,200
Contract ID 031401/06/02 TSO Tep That Project Type Irrigation 15,000,000
Kamphlak 1 420 Canal 0.30 [ 0.30 ] Km 50,000,000 1.000 Depth (m) 3,279.000 Volume (m3) 15,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,000,000

Srei Santhor, Chi Bal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031402/06/01 TSO Tep That Project Type Rural Transport 25,000,000
Slaeng 1 201 Earth road 1.04 [ 1.04 ] Km 21,215,043 4.000 Width (m) 3,403.000 Earth fill m3 22,000,000
Slaeng 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.800 Diameter (m) 6.000 Length (m) 1,500,000
Slaeng 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 750,000 0.600 Diameter (m) 6.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,000,000

Srei Santhor, Khnar Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031403/06/01 TSO Tep That Project Type Rural Transport 28,000,000
Treas 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,222,222 0.800 Diameter (m) 5.000 Length (m) 6,666,666
Kngaok 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,222,222 0.800 Diameter (m) 5.000 Length (m) 2,222,222
Ampil 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,222,222 0.800 Diameter (m) 5.000 Length (m) 4,444,444
Khnar Sa 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,733,333 1.000 Diameter (m) 5.000 Length (m) 8,199,999
Angk 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,222,222 0.800 Diameter (m) 5.000 Length (m) 6,666,666
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,199,997

Srei Santhor, Kaoh Andaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031404/06/01 TSO Tep That Project Type Irrigation 32,000,000
Krouch Saeuch 1 420 Canal 0.09 [ 0.09 ] Km 355,555,556 2.360 Depth (m) 6,926.000 Volume (m3) 32,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,000,000

Srei Santhor, Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031405/06/01 TSO Tep That Project Type Irrigation 32,500,000
Moan Dab Kraom 1 420 Canal 0.10 [ 0.10 ] Km 95,000,000 1.500 Depth (m) 2,182.800 Volume (m3) 9,500,000
Pok Paen 2 420 Canal 1.25 [ 1.20 ] Km 19,166,667 1.500 Depth (m) 2,948.000 Volume (m3) 23,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,500,000

Srei Santhor, Pteah Kandal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031406/06/01 TSO Tep That Project Type Irrigation 33,500,000
Chong Boeng Krau 1 420 Canal 0.43 [ 0.43 ] Km 77,906,977 1.700 Depth (m) 6,008.000 Volume (m3) 33,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,500,000

Srei Santhor, Pram Yam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031407/06/01 TSO Tep That Project Type Irrigation 31,333,300
Pram Yam 1 420 Canal 0.55 [ 0.55 ] Km 25,454,545 1.000 Depth (m) 2,370.000 Volume (m3) 14,000,000
Cheung Doek 2 420 Canal 0.60 [ 0.80 ] Km 21,666,625 1.000 Depth (m) 3,599.000 Volume (m3) 17,333,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,333,300

Srei Santhor, Preaek Dambouk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031408/06/01 TSO Tep That Project Type Rural Transport 28,200,000
Ta Kay 1 201 Earth road 1.05 [ 1.05 ] Km 18,975,332 4.000 Width (m) 2,901.000 Earth fill m3 20,000,000
Ampil 2 201 Earth road 0.27 [ 0.27 ] Km 30,036,630 4.000 Width (m) 1,182.000 Earth fill m3 8,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,200,000
Contract ID 031408/06/02 TSO Tep That Project Type Irrigation 11,800,000
Chong Boeng Knong 1 561 River bank protection 1.00 [ 1.00 ] Place 11,800,000 2.300 Height (m) 8.600 Length (m) 11,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,800,000

Srei Santhor, Preaek Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031409/06/01 TSO Tep That Project Type Domestic Sanitation 30,000,000
Roka Tvear 2 542 Foul water sewer 1.00 [ 1.00 ] Line 30,000,000 280.000 0.600 30,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,000,000
Contract ID 031409/06/02 TSO Tep That Project Type Irrigation 18,582,600
Prey Tbeh 1 420 Canal 0.75 [ 0.91 ] Km 20,533,260 1.400 Depth (m) 3,376.000 Volume (m3) 18,582,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,582,600

Srei Santhor, Preaek Rumdeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031410/06/01 TSO Tep That Project Type Irrigation 42,500,000
Tnaot Ka 1 420 Canal 0.24 [ 0.24 ] Km 177,083,333 1.500 Depth (m) 8,971.000 Volume (m3) 42,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,500,000

Srei Santhor, Ruessei Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031411/06/01 TSO Tep That Project Type Rural Transport 30,600,000
Tnaot Leu 1 201 Earth road 0.41 [ 0.41 ] Km 24,213,075 4.000 Width (m) 1,245.000 Earth fill m3 10,000,000
Ruessei Srok 2 201 Earth road 0.57 [ 0.57 ] Km 24,561,404 4.000 Width (m) 2,624.000 Earth fill m3 14,000,000
Tnaot Leu 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.600 Diameter (m) 5.000 Length (m) 1,600,000
Ruessei Srok 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,500,000 0.800 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,600,000

Srei Santhor, Svay Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031412/06/01 TSO Tep That Project Type Rural Transport 34,314,200
Svay 1 201 Earth road 0.35 [ 0.45 ] Km 13,142,667 4.000 Width (m) 467.000 Earth fill m3 5,914,200
Chi Pao 2 201 Earth road 0.74 [ 0.74 ] Km 12,890,095 4.000 Width (m) 1,078.000 Earth fill m3 9,500,000
Teahean 3 201 Earth road 0.60 [ 0.60 ] Km 13,333,333 4.000 Width (m) 1,697.000 Earth fill m3 8,000,000
Teahean 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 1,500,000
Trea 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,350,000 0.800 Diameter (m) 6.000 Length (m) 4,700,000
Teahean 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,350,000 0.800 Diameter (m) 6.000 Length (m) 2,350,000
Pou 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,350,000 0.800 Diameter (m) 6.000 Length (m) 2,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,314,200

Srei Santhor, Svay Sach Phnum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031413/06/01 TSO Tep That Project Type Rural Transport 24,900,000
Svay Leu 1 201 Earth road 0.88 [ 0.88 ] Km 25,000,000 4.000 Width (m) 3,384.000 Earth fill m3 22,000,000
Svay Leu 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,900,000 0.800 Diameter (m) 6.000 Length (m) 2,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,900,000
Contract ID 031413/06/02 TSO Tep That Project Type Irrigation 4,500,000
Svay Tboung 1 410 Earth dam 0.05 [ 0.05 ] Km 90,000,000 1.500 Max. height (m) 549.000 Volume (m3) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,500,000

Srei Santhor, Tong Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031414/06/01 TSO Tep That Project Type Irrigation 27,300,000
Boeng Ting 1 410 Earth dam 0.85 [ 0.85 ] Km 32,117,647 4.000 Max. height (m) 4,479.000 Volume (m3) 27,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,300,000

Stueng Trang, areaks Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031501/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 22,800,000
Beak Anlung 1 201 Earth road 1.00 [ 1.00 ] Km 15,200,000 4.000 Width (m) 1.602 Earth fill m3 15,200,000
Kilou Prampir 2 201 Earth road 0.50 [ 0.50 ] Km 15,200,000 4.000 Width (m) 801.000 Earth fill m3 7,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,800,000
Contract ID 031501/06/02 TSO Ten Chan Thuoen Project Type Irrigation 9,992,000
Lvea 1 410 Earth dam 0.14 [ 0.14 ] Km 67,800,000 1.400 Max. height (m) 1,685.000 Volume (m3) 9,492,000
Lvea 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 500,000 2.420 Total span (m) 2.000 Width (m) 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,992,000

Stueng Trang, Dang Kdar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031503/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 37,500,000
Santich Kaeut 2 201 Earth road 1.35 [ 1.35 ] Km 16,304,350 4.000 Width (m) 3,134.000 Earth fill m3 22,010,873
Santich Lech 3 201 Earth road 0.35 [ 0.35 ] Km 16,304,350 4.000 Width (m) 813.000 Earth fill m3 5,706,523
Santich Kandal 4 201 Earth road 0.60 [ 0.60 ] Km 16,304,350 4.000 Width (m) 1,393.000 Earth fill m3 9,782,610
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,500,005

Stueng Trang, Khpob Ta Nguon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031504/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 35,892,000
Ou Run 2 201 Earth road 1.00 [ 1.00 ] Km 15,605,250 4.000 Width (m) 1,547.000 Earth fill m3 15,605,250
Preaek Tok 3 201 Earth road 1.30 [ 1.30 ] Km 15,605,190 4.000 Width (m) 2,012.000 Earth fill m3 20,286,747
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,891,997

Stueng Trang, Me Sar Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031505/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 41,808,600
Ou Beng 1 201 Earth road 1.31 [ 1.31 ] Km 14,261,574 4.000 Width (m) 2,168.000 Earth fill m3 18,639,877
Bos Pou 2 201 Earth road 0.57 [ 0.57 ] Km 14,261,574 4.000 Width (m) 1,120.000 Earth fill m3 8,100,574
Ou Leu 3 201 Earth road 0.24 [ 0.24 ] Km 14,261,574 4.000 Width (m) 376.000 Earth fill m3 3,351,470
Trapeang Chhuk 4 201 Earth road 0.47 [ 0.47 ] Km 14,261,574 4.000 Width (m) 751.000 Earth fill m3 6,688,678
Bos Pou 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,676,000 0.600 Diameter (m) 5.000 Length (m) 1,676,000
Ou Leu 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,676,000 0.600 Diameter (m) 6.000 Length (m) 1,676,000
Ou Beng 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,676,000 0.600 Diameter (m) 5.000 Length (m) 1,676,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,808,599

Stueng Trang, Ou Mlu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031506/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 38,918,000
Khtuoy Muoy 2 201 Earth road 1.00 [ 1.00 ] Km 13,039,800 4.000 Width (m) 2,107.000 Earth fill m3 13,039,800
Khtuoy Pir 3 201 Earth road 1.00 [ 1.00 ] Km 13,039,800 4.000 Width (m) 2,107.000 Earth fill m3 13,039,800
Khtuoy Bei 4 201 Earth road 0.60 [ 0.60 ] Km 13,039,830 4.000 Width (m) 1,263.000 Earth fill m3 7,823,898
Khtuoy Muoy 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,671,500 0.600 Diameter (m) 5.000 Length (m) 1,671,500
Khtuoy Pir 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,671,500 0.600 Diameter (m) 5.000 Length (m) 1,671,500
Khtuoy Bei 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,671,500 0.600 Diameter (m) 5.000 Length (m) 1,671,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,917,998

Stueng Trang, Peam Kaoh Sna

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031507/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 48,455,000
Kaoh Kandal 1 201 Earth road 1.50 [ 1.50 ] Km 19,934,000 4.000 Width (m) 3,693.000 Earth fill m3 29,901,000
Dei Leu 2 201 Earth road 0.70 [ 0.70 ] Km 19,934,000 4.000 Width (m) 1,688.000 Earth fill m3 13,953,800
Kaoh Kandal 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,200 0.600 Diameter (m) 5.000 Length (m) 1,300,200
Kaoh Kandal 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,300,000 0.600 Diameter (m) 5.000 Length (m) 3,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,455,000

Stueng Trang, Preah Andoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031508/06/01 TSO Ten Chan Thuoen Project Type Irrigation 28,999,999
Preah Andoung Muoy 1 420 Canal 0.35 [ 0.35 ] Km 82,857,140 1.220 Depth (m) 6,234.000 Volume (m3) 28,999,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,999,999

Stueng Trang, Preaek Bak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031509/06/01 TSO Ten Chan Thuoen Project Type Irrigation 36,500,000
Preaek Bak 1 420 Canal 0.65 [ 0.65 ] Km 56,153,850 2.950 Depth (m) 7,869.000 Volume (m3) 36,500,003
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,500,003

Stueng Trang, Preaek Kak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031510/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 66,423,200
Ou Pram 1 201 Earth road 1.30 [ 1.30 ] Km 13,383,440 4.000 Width (m) 2,361.000 Earth fill m3 17,398,472
Ou Prampir 2 201 Earth road 1.70 [ 1.70 ] Km 13,383,440 4.000 Width (m) 3,087.000 Earth fill m3 22,751,848
Andoung Svay 3 201 Earth road 1.30 [ 1.30 ] Km 13,383,440 4.000 Width (m) 2,361.000 Earth fill m3 17,398,472
Ou Prampir 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 4,437,200 1.000 Diameter (m) 6.000 Length (m) 8,874,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  66,423,192

Stueng Trang, Soupheas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031512/06/01 TSO Ten Chan Thuoen Project Type Irrigation 52,500,000
Dei Kraham 1 420 Canal 0.55 [ 0.55 ] Km 16,877,800 1.300 Depth (m) 4,100.000 Volume (m3) 9,198,401
Dei Kraham 2 420 Canal 0.64 [ 0.64 ] Km 41,484,880 0.700 Depth (m) 1,693.000 Volume (m3) 26,342,899
Dei Kraham 3 456 Double cell box culvert with gate 1.00 [ 1.00 ] Place 16,958,700 2.000 Total span (m) 2.000 Width (m) 16,958,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,500,000

Stueng Trang, Tuol Preah Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031513/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 37,459,693
Thum 1 201 Earth road 0.34 [ 0.34 ] Km 15,532,519 4.000 Width (m) 813.000 Earth fill m3 5,327,654
Ta Meung 2 201 Earth road 0.82 [ 0.82 ] Km 15,532,519 4.000 Width (m) 2,151.000 Earth fill m3 12,736,666
Sampiengkrom 3 201 Earth road 0.26 [ 0.26 ] Km 15,532,519 4.000 Width (m) 654.000 Earth fill m3 4,069,520
Doun Tor 4 201 Earth road 0.34 [ 0.44 ] Km 15,532,519 4.000 Width (m) 776.000 Earth fill m3 6,834,308
Thmei 5 201 Earth road 0.12 [ 0.12 ] Km 15,532,519 4.000 Width (m) 213.000 Earth fill m3 1,801,772
Sam Piengleu 6 201 Earth road 0.21 [ 0.21 ] Km 15,532,519 4.000 Width (m) 477.000 Earth fill m3 3,215,231
Ta Meung 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,178,100 0.800 Diameter (m) 5.000 Length (m) 1,178,100
Sampiengkrom 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,178,100 0.600 Diameter (m) 5.000 Length (m) 1,178,100
Voat 10 201 Earth road 0.00 [ 0.07 ] Km 15,532,519 4.000 Width (m) 1,706.000 Earth fill m3 1,118,341
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,459,693

Stueng Trang, Tuol Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031514/06/01 TSO Ten Chan Thuoen Project Type Rural Transport 26,934,400
Tuol Sambuor 1 201 Earth road 0.25 [ 0.25 ] Km 21,547,520 4.000 Width (m) 1,013.000 Earth fill m3 5,386,880
Poun 2 201 Earth road 1.00 [ 1.00 ] Km 21,547,520 4.000 Width (m) 4,052.000 Earth fill m3 21,547,520
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,934,400

Tboung Khmum, Anhchaeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031601/06/01 TSO Ven Vorn Project Type Rural Transport 38,128,400
Trapeang Chak 1 201 Earth road 0.65 [ 0.65 ] Km 16,362,240 4.000 Width (m) 1,219.000 Earth fill m3 10,635,456
Mochchhuem Pheak 2 201 Earth road 0.50 [ 0.50 ] Km 16,362,240 4.000 Width (m) 976.000 Earth fill m3 8,181,120
Koun Tnaot 3 201 Earth road 0.55 [ 0.55 ] Km 16,362,240 4.000 Width (m) 1,092.000 Earth fill m3 8,999,232
Chheu Teal Chrum 4 201 Earth road 0.30 [ 0.30 ] Km 16,362,240 4.000 Width (m) 655.000 Earth fill m3 4,908,672
Koun Tnaot 5 201 Earth road 0.14 [ 0.33 ] Km 16,375,490 4.000 Width (m) 158.000 Earth fill m3 5,403,912
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,128,392

Tboung Khmum, Boeng Pruol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031602/06/01 TSO Ven Vorn Project Type Rural Transport 33,569,000
Bat Dei Kraom 5 202 Laterite road 0.95 [ 0.95 ] Km 26,842,600 3.500 Width (m) 1,880.000 Earth fill m3 25,500,470
Boeng Kambaor 6 202 Laterite road 0.20 [ 0.20 ] Km 26,842,650 3.500 Width (m) 267.000 Earth fill m3 5,368,530
Boeng Kambaor 7 222 Double cell box culvert 1.00 [ 1.00 ] Place 2,500,000 3.000 Total Span (m) 4.300 Width(m) 2,500,000
Boeng Kambaor 8 281 Width restriction posts 1.00 [ 1.00 ] Place 200,000 0.400 1.500 200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,569,000
Contract ID 031602/06/02 TSO Ven Vorn Project Type Rural Transport 18,195,500
Boeng Kambaor 1 202 Laterite road 0.56 [ 0.56 ] Km 17,053,050 3.500 Width (m) 949.000 Earth fill m3 9,515,602
Tuol Dambang 2 202 Laterite road 0.34 [ 0.34 ] Km 23,186,840 3.500 Width (m) 615.000 Earth fill m3 7,929,899
Boeng Kambaor 3 281 Width restriction posts 1.00 [ 1.00 ] Place 750,000 0.400 0.000 750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,195,501
Contract ID 031602/06/03 TSO Ven Vorn Project Type Rural Transport 16,840,700
Tuol Kampot Ti Bei 1 202 Laterite road 0.51 [ 0.51 ] Km 7,909,882 3.500 Width (m) 135.000 Earth fill m3 4,002,400
Masin Srov 2 202 Laterite road 0.45 [ 0.45 ] Km 7,910,000 3.500 Width (m) 120.000 Earth fill m3 3,559,500
Vihear Kraom 3 202 Laterite road 1.09 [ 1.09 ] Km 7,909,991 3.500 Width (m) 291.000 Earth fill m3 8,629,800
Vihear Kraom 4 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,841,700

Tboung Khmum, Chikor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031604/06/01 TSO Chea Theng Project Type Rural Transport 44,000,000
Khtum Kandal 1 202 Laterite road 0.87 [ 0.87 ] Km 17,709,750 3.500 Width (m) 3,611.000 Earth fill m3 15,442,902
Khtum Kandal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,009,500 0.800 Diameter (m) 5.000 Length (m) 2,009,500
Khtum Kandal 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,092,800 0.800 Diameter (m) 5.000 Length (m) 6,185,600
Svay Tipv 4 202 Laterite road 0.54 [ 0.54 ] Km 17,709,850 3.500 Width (m) 539.000 Earth fill m3 9,527,899
Veal 5 202 Laterite road 0.54 [ 0.54 ] Km 17,709,740 3.500 Width (m) 1,057.000 Earth fill m3 9,634,099
Veal 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,000,000

Tboung Khmum, Chirou Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031605/06/01 TSO Ven Vorn Project Type Rural Transport 35,144,000
Preaek Touch 1 202 Laterite road 0.55 [ 0.55 ] Km 10,778,750 3.500 Width (m) 147.000 Earth fill m3 5,939,091
Roka Thum 2 202 Laterite road 1.40 [ 1.40 ] Km 10,778,750 3.500 Width (m) 467.000 Earth fill m3 15,101,029
Chirou Kraom Muoy 3 202 Laterite road 0.90 [ 0.90 ] Km 10,778,750 3.500 Width (m) 448.000 Earth fill m3 9,690,096
Chirou Kraom Pir 4 202 Laterite road 0.35 [ 0.35 ] Km 10,778,750 3.500 Width (m) 96.000 Earth fill m3 3,761,784
Chirou Kraom Pir 5 281 Width restriction posts 1.00 [ 1.00 ] Place 652,000 0.400 0.000 652,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,144,000

Tboung Khmum, Chirou Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031606/06/01 TSO Ven Vorn Project Type Rural Transport 39,999,100
Chruoy Kor 1 201 Earth road 1.19 [ 1.19 ] Km 12,043,970 4.000 Width (m) 2,550.000 Earth fill m3 14,284,148
Tuol Vihear 2 201 Earth road 1.01 [ 1.01 ] Km 12,043,970 4.000 Width (m) 2,185.000 Earth fill m3 12,176,454
Mream Teak 4 201 Earth road 0.88 [ 0.88 ] Km 12,044,000 4.000 Width (m) 1,721.000 Earth fill m3 10,538,500
Mream Teak 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Tuol Vihear 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,999,102

Tboung Khmum, Chob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031608/06/01 TSO Chea Theng Project Type Irrigation 50,100,000
Andoung Lve 1 420 Canal 0.08 [ 0.08 ] Km 576,757,500 1.500 Depth (m) 7,560.000 Volume (m3) 46,140,600
Andoung Lve 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,959,400 0.600 Diameter (m) 8.000 Width (m) 3,959,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,100,000

Tboung Khmum, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031612/06/01 TSO Ven Vorn Project Type Rural Transport 45,800,000
Sok San 1 201 Earth road 0.80 [ 0.80 ] Km 9,974,212 4.000 Width (m) 1,347.000 Earth fill m3 7,979,370
Kbal Boeng Seh 2 201 Earth road 0.45 [ 0.45 ] Km 9,974,211 4.000 Width (m) 721.000 Earth fill m3 4,488,395
Trapeang Bei 3 201 Earth road 0.45 [ 0.45 ] Km 9,974,211 4.000 Width (m) 757.000 Earth fill m3 4,488,395
Seh 4 201 Earth road 0.56 [ 0.56 ] Km 9,974,214 4.000 Width (m) 965.000 Earth fill m3 5,545,663
Veal Tuek Chenh 5 201 Earth road 0.35 [ 0.35 ] Km 9,974,212 4.000 Width (m) 682.000 Earth fill m3 3,490,974
Veal Khmum 6 201 Earth road 0.58 [ 0.56 ] Km 10,332,350 4.000 Width (m) 1,104.000 Earth fill m3 5,755,119
Tumnob Senchey 7 201 Earth road 0.10 [ 0.10 ] Km 9,974,200 4.000 Width (m) 160.000 Earth fill m3 997,420
Kbal Ou 8 201 Earth road 0.75 [ 0.75 ] Km 9,974,215 4.000 Width (m) 160.000 Earth fill m3 7,480,661
Seh 9 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,393,500 0.600 Diameter (m) 5.000 Length (m) 2,787,000
Veal Khmum 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,393,500 0.600 Diameter (m) 5.000 Length (m) 1,393,500
Trapeang Bei 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,393,500 0.600 Diameter (m) 5.000 Length (m) 1,393,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,799,997

Tboung Khmum, Lngieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031613/06/01 TSO Ven Vorn Project Type Rural Transport 32,393,600
Khien Chak 1 201 Earth road 0.63 [ 0.63 ] Km 9,792,504 4.000 Width (m) 1,178.000 Earth fill m3 6,139,900
Lngieng 2 201 Earth road 0.79 [ 0.79 ] Km 9,792,522 4.500 Width (m) 672.000 Earth fill m3 7,726,300
Lngieng 3 201 Earth road 0.49 [ 0.49 ] Km 9,792,479 4.000 Width (m) 966.000 Earth fill m3 4,817,900
Lvea Thum 4 201 Earth road 1.40 [ 1.40 ] Km 9,792,500 4.000 Width (m) 2,998.000 Earth fill m3 13,709,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,393,600

Tboung Khmum, Moung Riev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031614/06/01 TSO Chea Theng Project Type Irrigation 32,998,290
Chrouy Changhar 1 420 Canal 0.07 [ 0.07 ] Km 471,404,100 1.500 Depth (m) 5,486.000 Volume (m3) 32,998,287
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,998,287

Tboung Khmum, Peam Chileang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031615/06/01 TSO Ven Vorn Project Type Rural Transport 40,275,800
Kampong Chanloh Kaeut 1 202 Laterite road 1.95 [ 1.95 ] Km 14,245,280 3.500 Width (m) 3,169.000 Earth fill m3 27,778,296
Preaek Phdau 2 202 Laterite road 0.70 [ 0.70 ] Km 16,782,140 3.500 Width (m) 813.000 Earth fill m3 11,747,498
Preaek Phdau 3 281 Width restriction posts 1.00 [ 1.00 ] Place 750,000 0.400 0.000 750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,275,794

Tboung Khmum, Roka Po Pram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031616/06/01 TSO Ven Vorn Project Type Rural Transport 82,128,600
Vihear Sambour 1 201 Earth road 0.81 [ 0.81 ] Km 11,084,900 4.000 Width (m) 1,827.000 Earth fill m3 8,956,599
Roka Pram Ti Pir 2 201 Earth road 0.79 [ 0.79 ] Km 11,084,990 4.000 Width (m) 1,459.000 Earth fill m3 8,712,802
Preah Angk 3 201 Earth road 1.02 [ 1.02 ] Km 11,085,000 4.000 Width (m) 1,985.000 Earth fill m3 11,306,700
Roka Pram Ti Muoy 4 201 Earth road 2.50 [ 3.24 ] Km 11,085,000 4.000 Width (m) 4,857.000 Earth fill m3 35,915,400
Praphat 5 201 Earth road 0.81 [ 0.81 ] Km 11,084,970 4.000 Width (m) 1,672.000 Earth fill m3 8,923,401
Chhuk Sandal 6 201 Earth road 0.55 [ 0.55 ] Km 11,084,910 4.000 Width (m) 947.000 Earth fill m3 6,096,701
Ta Pav Bampenh Tes 7 201 Earth road 0.20 [ 0.20 ] Km 11,085,000 4.000 Width (m) 351.000 Earth fill m3 2,217,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  82,128,603

Tboung Khmum, Sralab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031618/06/01 TSO Ven Vorn Project Type Rural Transport 38,986,000
Nikom Kraom 1 202 Laterite road 0.80 [ 0.80 ] Km 10,200,000 3.500 Width (m) 213.000 Earth fill m3 8,160,000
Prayab 2 202 Laterite road 0.65 [ 0.65 ] Km 10,200,000 3.500 Width (m) 2,783.000 Earth fill m3 6,630,000
Nikom Leu 3 202 Laterite road 0.83 [ 0.83 ] Km 10,200,000 3.500 Width (m) 377.000 Earth fill m3 8,466,000
Trabos 4 202 Laterite road 0.85 [ 0.85 ] Km 10,200,000 3.500 Width (m) 226.000 Earth fill m3 8,670,000
Khlaong 5 202 Laterite road 0.30 [ 0.30 ] Km 10,200,000 3.500 Width (m) 81.000 Earth fill m3 3,060,000
Nikom Leu 9 281 Width restriction posts 2.00 [ 2.00 ] Place 500,000 0.400 0.000 1,000,000
Trabos 10 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Nikom Kraom 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Nikom Kraom 11 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Khlaong 11 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Prayab 12 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.400 0.000 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,986,000

Tboung Khmum, Suong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031619/06/01 TSO Ven Vorn Project Type Rural Transport 57,873,000
Suong Kaeut 1 201 Earth road 1.15 [ 1.15 ] Km 27,717,500 5.000 Width (m) 2,308.000 Earth fill m3 31,958,278
Toung 2 201 Earth road 0.50 [ 0.50 ] Km 27,717,500 6.000 Width (m) 880.000 Earth fill m3 13,858,750
Pou Kel 3 201 Earth road 0.23 [ 0.23 ] Km 27,717,500 6.000 Width (m) 789.000 Earth fill m3 6,375,025
Suong Lech 4 201 Earth road 0.08 [ 0.23 ] Km 25,026,200 6.000 Width (m) 182.000 Earth fill m3 5,680,947
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  57,873,000

Tboung Khmum, Thma Pechr

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031621/06/01 TSO Ven Vorn Project Type Rural Transport 45,366,500
Chambak 1 201 Earth road 1.14 [ 1.14 ] Km 12,463,320 4.000 Width (m) 3,099.000 Earth fill m3 14,208,185
Peuk 2 201 Earth road 1.15 [ 1.15 ] Km 12,463,320 4.000 Width (m) 1,642.000 Earth fill m3 14,332,818
Toul Oupir 3 201 Earth road 0.88 [ 0.88 ] Km 12,463,320 4.000 Width (m) 2,149.000 Earth fill m3 10,905,405
Roung kou 4 201 Earth road 0.48 [ 0.48 ] Km 12,463,320 4.000 Width (m) 1,055.000 Earth fill m3 5,920,077
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,366,485

Tboung Khmum, Tonle Bet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031622/06/01 TSO Ven Vorn Project Type Rural Transport 27,600,000
Preaek Touch 1 202 Laterite road 0.36 [ 0.36 ] Km 13,348,220 4.000 Width (m) 419.000 Earth fill m3 4,805,359
Tonle Bet Kraom 3 202 Laterite road 0.18 [ 0.18 ] Km 13,348,220 4.000 Width (m) 47.000 Earth fill m3 2,335,939
Yaysor 4 202 Laterite road 0.50 [ 0.50 ] Km 13,348,220 4.000 Width (m) 133.000 Earth fill m3 6,674,110
Tonle Bet Leu 5 281 Width restriction posts 1.00 [ 1.00 ] Place 652,000 0.400 0.000 652,000
Tonle Bet Kraom 6 281 Width restriction posts 1.00 [ 1.00 ] Place 652,000 0.400 0.000 652,000
Tonle Bet Leu 7 202 Laterite road 0.94 [ 0.94 ] Km 13,348,220 4.000 Width (m) 1,538.000 Earth fill m3 12,480,586
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,599,993
Contract ID 031622/06/02 TSO Ven Vorn Project Type Rural Transport 15,138,000
Tahuy 1 201 Earth road 0.95 [ 0.95 ] Km 12,955,070 4.000 Width (m) 2,089.000 Earth fill m3 12,307,317
Phnum 2 201 Earth road 0.28 [ 0.28 ] Km 10,109,580 4.000 Width (m) 862.000 Earth fill m3 2,830,682
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,137,999
Contract ID 031622/06/03 TSO Ven Vorn Project Type Irrigation 3,700,000
Chrouy Sralau 1 420 Canal 0.16 [ 0.16 ] Km 23,125,000 1.400 Depth (m) 708.000 Volume (m3) 3,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,700,000

Tboung Khmum, Vihear Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031623/06/01 TSO Ven Vorn Project Type Rural Transport 41,358,000
Kandal 1 201 Earth road 1.20 [ 1.20 ] Km 12,200,000 4.000 Width (m) 1,613.000 Earth fill m3 14,640,000
Chi Kae 2 201 Earth road 0.93 [ 0.93 ] Km 12,200,000 4.000 Width (m) 1,407.000 Earth fill m3 11,285,000
Cheung Voat 3 201 Earth road 0.55 [ 0.55 ] Km 12,200,000 4.000 Width (m) 614.000 Earth fill m3 6,649,000
Thnal Thmei 4 201 Earth road 0.72 [ 0.72 ] Km 12,200,000 4.000 Width (m) 1,326.000 Earth fill m3 8,784,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,358,000