Contract Outputs
Location: Kracheh Budget Year: 2007
Chhloung
Kracheh
Preaek Prasab
Sambour
Snuol
Chhloung, Chhloung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100101/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
36,000,000 |
| Kandal |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
25,000,000 |
7.000 Width (m) |
5,088.000 Earth fill m3 |
32,500,000 |
| Kaoh Kandaor |
2 |
202 |
Laterite road |
0.10 [ 0.10 ] |
Km |
20,000,000 |
5.000 Width (m) |
556.000 Earth fill m3 |
2,000,000 |
| Kaoh Kandaor |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,000,000 |
Chhloung, Damrei Phong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100102/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
26,451,750 |
| Boeng Kieb |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
19,947,000 |
5.000 Width (m) |
3,241.000 Earth fill m3 |
24,933,750 |
| Boeng Kieb |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
759,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,518,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,451,750 |
Chhloung, Han Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100103/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
31,705,135 |
| Hanchey Muoy |
1 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
28,232,000 |
6.500 Width (m) |
4,444.000 Earth fill m3 |
22,444,440 |
| Hanchey Bei |
2 |
202 |
Laterite road |
0.17 [ 0.17 ] |
Km |
28,232,000 |
4.500 Width (m) |
441.000 Earth fill m3 |
4,799,440 |
| Hanchey Pir |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,502,896 |
0.500 Diameter (m) |
10.000 Length (m) |
1,502,896 |
| Hanchey Pir |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,603,720 |
0.500 Diameter (m) |
9.000 Length (m) |
1,603,720 |
| Hanchey Bei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,354,640 |
0.500 Diameter (m) |
6.000 Length (m) |
1,354,640 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,705,136 |
Chhloung, Kampong Damrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100104/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
49,662,000 |
| Veal Kansaeng |
1 |
201 |
Earth road |
1.80 [ 1.80 ] |
Km |
25,723,330 |
5.000 Width (m) |
6,956.000 Earth fill m3 |
46,301,994 |
| Veal Kansaeng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,360,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,360,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,661,994 |
Chhloung, Kanhchor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100105/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Irrigation |
27,996,000 |
| Kanhchor |
1 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
46,660,000 |
2.100 Depth (m) |
4,454.000 Volume (m3) |
27,996,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,996,000 |
Chhloung, Khsach Andaet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100106/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
35,816,000 |
| Preaek Samraong Ti Muoy |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
20,320,000 |
4.000 Width (m) |
3,508.000 Earth fill m3 |
22,352,000 |
| Preaek Ta Hub |
2 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
13,600,000 |
4.000 Width (m) |
1,958.000 Earth fill m3 |
12,104,000 |
| Preaek Ta Hub |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,360,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,816,000 |
Chhloung, Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100107/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
47,166,000 |
| Pongro Muoy |
2 |
202 |
Laterite road |
1.45 [ 1.45 ] |
Km |
29,080,000 |
5.000 Width (m) |
6,098.000 Earth fill m3 |
42,166,000 |
| Pongro Muoy |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,166,000 |
Chhloung, Preaek Saman
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100108/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
39,420,000 |
| Preaek Saman |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
21,512,500 |
5.000 Width (m) |
5,539.000 Earth fill m3 |
34,420,000 |
| Preaek Saman |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,420,000 |
Kracheh, Bos Leav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100201/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
34,920,000 |
| Lvea Tong |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
25,909 |
5.000 Width (m) |
5,568.000 Earth fill m3 |
28,500 |
| Lvea Tong |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,850,000 |
1.000 Diameter (m) |
6.000 Length (m) |
4,850,000 |
| Lvea Tong |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,570,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,570,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,448,500 |
Kracheh, Changkrang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100202/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
29,000,000 |
| Kasang |
1 |
201 |
Earth road |
1.67 [ 1.67 ] |
Km |
15,770,610 |
4.000 Width (m) |
7,563.000 Earth fill m3 |
26,400,001 |
| Kasang |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,600,000 |
1.000 Diameter (m) |
6.000 Length (m) |
2,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,000,001 |
Kracheh, Dar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100203/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
48,980,000 |
| Chuor Chrey |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
14,000,000 |
4.000 Width (m) |
3,139.000 Earth fill m3 |
17,500,000 |
| Chuor Chrey |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
14,000,000 |
14.800 Total Span (m) |
3.000 Width(m) |
14,000,000 |
| Chuor Chrey |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
1.000 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Chuor Chrey |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,300,000 |
| Khnang Pos |
5 |
201 |
Earth road |
0.82 [ 0.82 ] |
Km |
14,000,000 |
4.000 Width (m) |
2,060.000 Earth fill m3 |
11,480,000 |
| Khnang Pos |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,980,000 |
Kracheh, Kantuot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100204/07/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
11,605,000 |
| A Loch |
1 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
15,700,000 |
4.000 Width (m) |
1,784.000 Earth fill m3 |
10,205,000 |
| A Loch |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
650,000 |
0.600 Diameter (m) |
5.000 Length (m) |
650,000 |
| A Loch |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
750,000 |
0.800 Diameter (m) |
5.000 Length (m) |
750,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,605,000 |
| Contract ID |
100204/07/02 |
TSO |
CHHIT-SOPHEA |
Project Type |
Education |
38,499,900 |
| Antong Vien |
1 |
310 |
Wooden school (general) |
3.00 [ 3.00 ] |
School room |
12,833,300 |
24.000 Length (m) |
9.000 Width (m) |
38,499,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,499,900 |
| Contract ID |
100204/07/03 |
TSO |
CHHIT-SOPHEA |
Project Type |
Education |
4,800,000 |
| Antong Vien |
1 |
740 |
School furniture |
3.00 [ 3.00 ] |
School room |
1,600,000 |
120.000 Students |
0.000 |
4,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,800,000 |
Kracheh, Kou Loab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100205/07/01 |
TSO |
Roth Tola |
Project Type |
Rural Transport |
29,500,000 |
| Kou Loab |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
29,500,000 |
6.000 |
4.500 |
29,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,500,000 |
Kracheh, Kaoh Chraeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100206/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Education |
29,100,050 |
| Voat |
1 |
320 |
Brick school (general) |
7.00 [ 7.00 ] |
School room |
4,157,150 |
53.000 Length (m) |
11.000 Width (m) |
29,100,050 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,100,050 |
Kracheh, Kaoh Trong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100207/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
27,000,000 |
| Chong Kaoh |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
8,709,677 |
305.000 Width (m) |
2,232.000 Earth fill m3 |
8,709,677 |
| Kbal Kaoh |
2 |
201 |
Earth road |
2.10 [ 2.10 ] |
Km |
8,709,678 |
3.500 Width (m) |
3,180.000 Earth fill m3 |
18,290,324 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,000,001 |
Kracheh, Krakor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100208/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
26,522,500 |
| Krakor |
1 |
202 |
Laterite road |
0.84 [ 0.84 ] |
Km |
15,000,000 |
4.000 Width (m) |
3,223.000 Earth fill m3 |
12,630,000 |
| Krakor |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,200,000 |
| Krakor |
3 |
202 |
Laterite road |
0.65 [ 0.65 ] |
Km |
14,500,000 |
3.500 Width (m) |
1,950.000 Earth fill m3 |
9,352,500 |
| Tuol Monourom |
4 |
202 |
Laterite road |
0.16 [ 0.16 ] |
Km |
14,000,000 |
3.500 Width (m) |
402.000 Earth fill m3 |
2,240,000 |
| Tuol Monourom |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,100,000 |
0.400 Diameter (m) |
4.000 Length (m) |
1,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,522,500 |
Kracheh, Kracheh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100209/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
28,000,000 |
| Doun Chroam |
1 |
202 |
Laterite road |
0.49 [ 0.49 ] |
Km |
34,108,527 |
8.000 Width (m) |
4,071.000 Earth fill m3 |
16,542,636 |
| Doun Chroam |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
9.000 Length (m) |
4,000,000 |
| Trapeang Pring |
3 |
202 |
Laterite road |
0.16 [ 0.16 ] |
Km |
34,108,520 |
6.000 Width (m) |
801.000 Earth fill m3 |
5,457,363 |
| Trapeang Pring |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
8.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,999,999 |
Kracheh, Ou Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100210/07/02 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
14,975,000 |
| Kantring |
1 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
18,500,000 |
4.000 Width (m) |
2,290.000 Earth fill m3 |
13,875,000 |
| Kantring |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,975,000 |
Kracheh, Roka Kandal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100211/07/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
23,807,600 |
| Roka Kandal Muoy |
1 |
202 |
Laterite road |
0.48 [ 0.48 ] |
Km |
31,100,000 |
5.000 Width (m) |
2,316.000 Earth fill m3 |
14,928,000 |
| Roka Kandal Pir |
2 |
202 |
Laterite road |
0.19 [ 0.19 ] |
Km |
40,000,000 |
5.000 Width (m) |
1,102.000 Earth fill m3 |
7,600,000 |
| Roka Kandal Muoy |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
639,800 |
0.600 Diameter (m) |
6.000 Length (m) |
1,279,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,807,600 |
Kracheh, Sambok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100212/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
32,536,200 |
| Kakot |
1 |
202 |
Laterite road |
0.94 [ 0.94 ] |
Km |
28,230,000 |
4.000 Width (m) |
5,221.000 Earth fill m3 |
26,536,200 |
| Srae Haen |
2 |
202 |
Laterite road |
0.08 [ 0.08 ] |
Km |
75,000,000 |
5.000 Width (m) |
1,199.000 Earth fill m3 |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,536,200 |
Kracheh, Thma Andaeuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100213/07/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
26,940,000 |
| L'ak |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
10,890,000 |
4.000 Width (m) |
5,341.000 Earth fill m3 |
21,780,000 |
| L'ak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,470,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,470,000 |
| L'ak |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,690,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,690,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,940,000 |
Kracheh, Thma Kreae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100214/07/02 |
TSO |
Ung Sambath |
Project Type |
Irrigation |
19,890,000 |
| Thma Krae Leu |
1 |
410 |
Earth dam |
0.10 [ 0.10 ] |
Km |
62,000,000 |
2.500 Max. height (m) |
1,041.000 Volume (m3) |
5,890,000 |
| Thma Krae Leu |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
14,000,000 |
2.000 Total span (m) |
5.000 Width (m) |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,890,000 |
| Contract ID |
100214/07/03 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
10,524,200 |
| Thma Krae Kandal |
1 |
201 |
Earth road |
0.91 [ 0.91 ] |
Km |
17,154,500 |
5.000 Width (m) |
2,968.000 Earth fill m3 |
15,524,823 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,524,823 |
| Contract ID |
100214/07/04 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
15,385,000 |
| Thma Krae Kandal |
1 |
201 |
Earth road |
0.91 [ 0.91 ] |
Km |
17,000,000 |
5.000 Width (m) |
2,968.000 Earth fill m3 |
15,385,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,385,000 |
Kracheh, Thmei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100215/07/01 |
TSO |
Ung Sambath |
Project Type |
Education |
44,500,000 |
| Treab |
1 |
310 |
Wooden school (general) |
3.00 [ 3.00 ] |
School room |
14,833,333 |
24.000 Length (m) |
9.000 Width (m) |
44,499,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,499,999 |
Preaek Prasab, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100301/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
19,950,000 |
| Stueng Thum |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
13,035,700 |
5.000 Width (m) |
4,185.000 Earth fill m3 |
18,249,980 |
| Stueng Thum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,949,980 |
Preaek Prasab, Chrouy Banteay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100302/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
41,440,000 |
| Chrouy Banteay |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
30,800,000 |
4.000 Width (m) |
4,469.000 Earth fill m3 |
40,040,000 |
| Chrouy Banteay |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,440,000 |
Preaek Prasab, Kampong Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100303/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
26,410,000 |
| Ta Mau Leu |
1 |
202 |
Laterite road |
1.39 [ 1.39 ] |
Km |
19,000,000 |
4.000 Width (m) |
3,897.000 Earth fill m3 |
26,410,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,410,000 |
Preaek Prasab, Kaoh Ta Suy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100304/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
19,500,000 |
| Chong Kaoh |
1 |
201 |
Earth road |
1.75 [ 1.75 ] |
Km |
10,114,285 |
3.500 Width (m) |
3,719.160 Earth fill m3 |
17,699,999 |
| Chong Kaoh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,499,999 |
Preaek Prasab, Preaek Prasab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100305/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Irrigation |
45,959,700 |
| Preaek Prasab Kandal |
1 |
420 |
Canal |
0.48 [ 0.48 ] |
Km |
96,150,000 |
2.000 Depth (m) |
7,203.000 Volume (m3) |
45,959,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,959,700 |
Preaek Prasab, Ruessei Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100306/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
28,000,000 |
| Ruessei Kaev |
1 |
202 |
Laterite road |
1.24 [ 1.24 ] |
Km |
22,580,645 |
6.000 Width (m) |
3,226.000 Earth fill m3 |
28,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,000,000 |
Preaek Prasab, Saob
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100307/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
21,312,870 |
| Preaek Chik |
1 |
202 |
Laterite road |
0.87 [ 0.87 ] |
Km |
15,846,000 |
4.000 Width (m) |
1,640.000 Earth fill m3 |
13,786,020 |
| Saob Leu |
2 |
202 |
Laterite road |
0.24 [ 0.24 ] |
Km |
15,846,000 |
4.000 Width (m) |
897.000 Earth fill m3 |
3,803,040 |
| Boeng Chraeng |
3 |
202 |
Laterite road |
0.17 [ 0.17 ] |
Km |
15,846,000 |
4.000 Width (m) |
587.000 Earth fill m3 |
2,614,590 |
| Preaek Roka |
4 |
202 |
Laterite road |
0.07 [ 0.07 ] |
Km |
15,846,000 |
4.000 Width (m) |
314.000 Earth fill m3 |
1,109,220 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,312,870 |
| Contract ID |
100307/07/02 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Domestic Water Supplies |
6,705,000 |
| Khla |
1 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,235,000 |
12.000 Depth (m) |
1.000 Diameter (m) |
4,470,000 |
| Boeng Chraeng |
2 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,235,000 |
12.000 Depth (m) |
1.000 Diameter (m) |
2,235,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,705,000 |
| Contract ID |
100307/07/04 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
28,110,500 |
| Preaek Chik |
1 |
202 |
Laterite road |
0.87 [ 0.87 ] |
Km |
20,900,000 |
4.000 Width (m) |
1,640.000 Earth fill m3 |
18,183,000 |
| Boeng Chraeng |
2 |
202 |
Laterite road |
0.17 [ 0.17 ] |
Km |
20,900,000 |
4.000 Width (m) |
587.000 Earth fill m3 |
3,448,500 |
| Saob Leu |
3 |
202 |
Laterite road |
0.24 [ 0.24 ] |
Km |
20,900,000 |
4.000 Width (m) |
897.000 Earth fill m3 |
5,016,000 |
| Preaek Roka |
4 |
202 |
Laterite road |
0.07 [ 0.07 ] |
Km |
20,900,000 |
4.000 Width (m) |
314.000 Earth fill m3 |
1,463,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,110,500 |
Preaek Prasab, Ta Mau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100308/07/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Irrigation |
33,484,000 |
| Kraham Ka Leu |
1 |
420 |
Canal |
0.55 [ 0.55 ] |
Km |
60,880,000 |
1.500 Depth (m) |
5,003.000 Volume (m3) |
33,484,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,484,000 |
Sambour, Boeng Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100401/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
27,500,000 |
| Kaoh Dambang |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
22,000,000 |
25.000 Total Span (m) |
3.000 Width (m) |
22,000,000 |
| Kampong Roteh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,500,000 |
0.800 Diameter (m) |
7.000 Length (m) |
5,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,500,000 |
Sambour, Kampong Cham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100402/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
37,683,200 |
| Yeav |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
17,126,243 |
21.000 Total Span (m) |
3.500 Width(m) |
17,126,243 |
| Yeav |
2 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
16,212,543 |
20.500 Total Span (m) |
3.500 Width(m) |
16,212,543 |
| Yeav |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,344,452 |
0.600 Diameter (m) |
7.000 Length (m) |
4,344,452 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,683,238 |
Sambour, Kbal Damrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100403/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Domestic Water Supplies |
46,258,900 |
| Srae Sbov |
1 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
5,520,682 |
30.000 Depth (m) |
100.000 Diameter (mm) |
11,041,364 |
| Ou Ta Noeng |
2 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
5,520,682 |
30.000 Depth (m) |
100.000 Diameter (mm) |
11,041,364 |
| Changhab |
3 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
5,520,682 |
30.000 Depth (m) |
100.000 Diameter (mm) |
11,041,364 |
| Ou Pou |
4 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
5,520,682 |
30.000 Depth (m) |
100.000 Diameter (mm) |
5,520,682 |
| Srae Traeng |
5 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
5,520,682 |
30.000 Depth (m) |
100.000 Diameter (mm) |
5,520,682 |
| Srae Traeng |
6 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,093,454 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,093,454 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,258,910 |
Sambour, Kaoh Khnhaer
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100404/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
22,880,000 |
| Cheung Peat |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
22,880,000 |
26.000 Total Span (m) |
3.500 Width(m) |
22,880,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,880,000 |
| Contract ID |
100404/07/02 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
5,500,000 |
| Cheung Peat |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
5,500,000 |
30.000 Total Span (m) |
3.500 Width(m) |
5,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,500,000 |
Sambour, Ou Krieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100405/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
27,600,000 |
| Khsach Leav |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
12,000,000 |
13.000 Total Span (m) |
3.500 Width(m) |
12,000,000 |
| Khsach Leav |
2 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
6.000 Length (m) |
9,000,000 |
| Khsach Leav |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.800 Diameter (m) |
6.000 Length (m) |
2,500,000 |
| Khsach Leav |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,600,000 |
0.600 Diameter (m) |
8.000 Length (m) |
2,600,000 |
| Khsach Leav |
5 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,600,000 |
Sambour, Roluos Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100406/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
37,945,000 |
| Srae Roluos |
1 |
201 |
Earth road |
0.36 [ 0.36 ] |
Km |
17,000,000 |
3.500 Width (m) |
905.000 Earth fill m3 |
6,120,000 |
| Srae Roluos |
2 |
201 |
Earth road |
1.52 [ 1.52 ] |
Km |
17,000,000 |
4.400 Width (m) |
5,228.000 Earth fill m3 |
25,755,000 |
| Srae Roluos |
3 |
201 |
Earth road |
0.11 [ 0.11 ] |
Km |
17,000,000 |
3.000 Width (m) |
185.000 Earth fill m3 |
1,870,000 |
| Srae Roluos |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,300,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,300,000 |
| Srae Roluos |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,945,000 |
Sambour, Sambour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100407/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
6,569,600 |
| Srae Khoean |
1 |
201 |
Earth road |
0.46 [ 0.46 ] |
Km |
14,407,000 |
4.000 Width (m) |
1,397.000 Earth fill m3 |
6,569,592 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,569,592 |
| Contract ID |
100407/07/02 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
20,000,000 |
| Srae Khoean |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
20,000,000 |
26.000 Total Span (m) |
3.500 Width(m) |
20,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,000,000 |
Sambour, Sandan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100408/07/01 |
TSO |
Rey Raksmey |
Project Type |
Irrigation |
8,346,000 |
| Sandan |
1 |
410 |
Earth dam |
0.03 [ 0.03 ] |
Km |
333,840,000 |
6.000 Max. height (m) |
1,772.000 Volume (m3) |
8,346,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,346,000 |
| Contract ID |
100408/07/02 |
TSO |
Rey Raksmey |
Project Type |
Rural Domestic Water Supplies |
10,500,000 |
| Thmei |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
10,500,000 |
3.000 Depth (m) |
3,204.000 Volume (m3) |
10,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,500,000 |
| Contract ID |
100408/07/03 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
12,000,000 |
| Sangkom |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
12,000,000 |
17.000 Total Span (m) |
3.500 Width(m) |
12,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,000,000 |
Sambour, Srae Chis
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100409/07/01 |
TSO |
Rey Raksmey |
Project Type |
Education |
30,500,000 |
| Ampok |
1 |
310 |
Wooden school (general) |
2.00 [ 2.00 ] |
School room |
14,000,000 |
8.000 Length (m) |
9.000 Width (m) |
28,000,000 |
| Ampok |
2 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,250,000 |
90.000 Students |
90.000 |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,500,000 |
Sambour, Voadthonak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100410/07/01 |
TSO |
Rey Raksmey |
Project Type |
Rural Transport |
25,000,000 |
| Ta Nguon |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
22,000,000 |
1.000 Diameter (m) |
16.000 Length (m) |
22,000,000 |
| Preaek Krieng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.600 Diameter (m) |
3.800 Length (m) |
2,000,000 |
| Preaek Krieng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
1.300 Diameter (m) |
3.400 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,000,000 |
Snuol, Pir Thnu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100502/07/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
17,136,800 |
| Thma Hal Dei Kraham |
1 |
201 |
Earth road |
1.24 [ 1.24 ] |
Km |
13,820,000 |
4.000 Width (m) |
2,776.000 Earth fill m3 |
17,136,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,136,800 |
Snuol, Snuol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100503/07/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
31,760,000 |
| Kbal Snuol |
1 |
201 |
Earth road |
1.78 [ 1.78 ] |
Km |
16,000,000 |
4.000 Width (m) |
3,712.000 Earth fill m3 |
28,480,000 |
| Kbal Snuol |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,640,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,280,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,760,000 |
Snuol, Srae Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100504/07/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
29,445,000 |
| S'at |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,920,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,920,000 |
| S'at |
3 |
201 |
Earth road |
1.85 [ 1.85 ] |
Km |
12,500,000 |
4.000 Width (m) |
5,026.000 Earth fill m3 |
23,125,000 |
| S'at |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,445,000 |
Snuol, Svay Chreah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100505/07/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
49,765,700 |
| Rumpuk |
1 |
201 |
Earth road |
0.83 [ 0.83 ] |
Km |
16,610,000 |
4.000 Width (m) |
1,606.767 Earth fill m3 |
13,786,300 |
| Doun Mea |
2 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
16,610,000 |
4.000 Width (m) |
1,258.312 Earth fill m3 |
10,796,500 |
| Ta Pum |
3 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
16,610,000 |
4.000 Width (m) |
1,722.919 Earth fill m3 |
14,782,900 |
| Rumpuk |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,200,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,200,000 |
| Voat |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,200,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,765,700 |