Contract Outputs
Location: Banteay Meanchey Budget Year: 2008
Mongkol Borei
Phnum Srok
Preah Netr Preah
Ou Chrov
Serei Saophoan
Thma Puok
Svay Chek
Malai
Mongkol Borei, Banteay Neang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010201/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
56,824,692 |
| Kouk Tonloab |
1 |
203 |
Gravel road |
1.00 [ 1.00 ] |
Km |
47,079,281 |
4.000 Width (m) |
1,193.000 Earth fill m3 |
47,079,281 |
| Khile |
2 |
203 |
Gravel road |
0.34 [ 0.21 ] |
Km |
47,079,281 |
4.000 Width (m) |
247.000 Earth fill m3 |
9,745,411 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,824,692 |
Mongkol Borei, Bat Trang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010202/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
34,166,310 |
| Bang Bat Lech |
1 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
35,223,000 |
3.000 Width (m) |
89.000 Earth fill m3 |
5,283,450 |
| Bat Trang Thum Lech |
2 |
202 |
Laterite road |
0.82 [ 0.82 ] |
Km |
35,223,000 |
3.000 Width (m) |
484.000 Earth fill m3 |
28,882,860 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,166,310 |
Mongkol Borei, Chamnaom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010203/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
53,527,700 |
| Chamnaom Kaeut |
1 |
203 |
Gravel road |
0.58 [ 0.56 ] |
Km |
96,100,000 |
4.000 Width (m) |
1,812.000 Earth fill m3 |
53,527,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
53,527,700 |
Mongkol Borei, Kouk Ballangk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010204/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
71,728,000 |
| Kouk Ballangk |
1 |
201 |
Earth road |
0.63 [ 0.63 ] |
Km |
49,600,000 |
5.000 Width (m) |
4,332.000 Earth fill m3 |
31,248,000 |
| Cheung Chab |
2 |
201 |
Earth road |
0.37 [ 0.37 ] |
Km |
110,000,000 |
5.000 Width (m) |
3,826.000 Earth fill m3 |
40,480,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
71,728,000 |
Mongkol Borei, Koy Maeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010205/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
33,433,900 |
| Stueng Chas |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
60,350,000 |
4.000 Width (m) |
4,270.000 Earth fill m3 |
33,433,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,433,900 |
Mongkol Borei, Ou Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010206/08/01 |
TSO |
Pen Phal |
Project Type |
Irrigation |
30,911,500 |
| Anlong Sdei |
1 |
420 |
Canal |
1.47 [ 1.47 ] |
Km |
21,100,000 |
1.000 Depth (m) |
5,570.000 Volume (m3) |
30,911,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,911,500 |
Mongkol Borei, Phnum Touch
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010207/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
42,389,739 |
| Boeng Tras |
1 |
201 |
Earth road |
1.09 [ 1.09 ] |
Km |
38,997,000 |
4.000 Width (m) |
5,500.000 Earth fill m3 |
42,389,739 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,389,739 |
Mongkol Borei, Rohat Tuek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010208/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
43,822,400 |
| Kramol |
1 |
201 |
Earth road |
0.49 [ 0.49 ] |
Km |
89,800,000 |
5.000 Width (m) |
4,036.000 Earth fill m3 |
43,822,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,822,400 |
Mongkol Borei, Ruessei Kraok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010209/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Drainage and Flood Protection |
83,076,800 |
| Ruessei Kraom |
1 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
83,076,800 |
379.000 Length (m) |
0.600 Diameter (m) |
83,076,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
83,076,800 |
Mongkol Borei, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010210/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
47,260,000 |
| Doun Loek |
1 |
221 |
Single cell box culvert |
2.00 [ 2.00 ] |
Place |
23,630,000 |
1.000 Total Span (m) |
5.000 Width(m) |
47,260,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,260,000 |
Mongkol Borei, Soea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010211/08/01 |
TSO |
Pen Phal |
Project Type |
Rural Transport |
37,946,580 |
| Ta Mau |
1 |
203 |
Gravel road |
0.31 [ 0.31 ] |
Km |
61,718,000 |
3.500 Width (m) |
231.000 Earth fill m3 |
19,132,580 |
| Boeng Touch |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
9,407,000 |
1.000 Diameter (m) |
8.000 Length (m) |
18,814,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,946,580 |
Mongkol Borei, Srah Reang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010212/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
48,331,600 |
| Kouk Krasang |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
36,400,000 |
5.000 Width (m) |
4,867.000 Earth fill m3 |
36,400,000 |
| Kouk Krasang |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,870,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,870,000 |
| Chamkar Chek |
3 |
201 |
Earth road |
0.24 [ 0.24 ] |
Km |
38,560,000 |
5.000 Width (m) |
1,064.000 Earth fill m3 |
9,061,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,331,600 |
| Contract ID |
010212/08/02 |
TSO |
Tuch Lom |
Project Type |
Irrigation |
14,306,040 |
| Srah Reang |
1 |
420 |
Canal |
0.59 [ 0.59 ] |
Km |
24,330,000 |
1.250 Depth (m) |
3,043.000 Volume (m3) |
14,306,040 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,306,040 |
Mongkol Borei, Ta Lam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010213/08/01 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
31,953,200 |
| Preah Srae |
1 |
203 |
Gravel road |
0.51 [ 0.51 ] |
Km |
62,900,000 |
3.500 Width (m) |
366.000 Earth fill m3 |
31,953,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,953,200 |
| Contract ID |
010213/08/02 |
TSO |
Tuch Lom |
Project Type |
Rural Transport |
48,129,000 |
| Khla Kham Chhkae |
1 |
203 |
Gravel road |
0.61 [ 0.61 ] |
Km |
78,900,000 |
3.000 Width (m) |
359.000 Earth fill m3 |
48,129,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,129,000 |
Phnum Srok, Nam Tau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010301/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
42,920,240 |
| Chrab |
1 |
202 |
Laterite road |
0.60 [ 0.57 ] |
Km |
34,965,000 |
3.500 Width (m) |
432.000 Earth fill m3 |
19,860,120 |
| Thmei Khang Cheung |
2 |
202 |
Laterite road |
0.60 [ 0.57 ] |
Km |
34,965,000 |
3.500 Width (m) |
432.000 Earth fill m3 |
19,860,120 |
| Thmei Khang Cheung |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,920,240 |
Phnum Srok, Paoy Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010302/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
30,876,400 |
| Paoy Snuol |
1 |
202 |
Laterite road |
0.62 [ 0.62 ] |
Km |
40,465,021 |
3.000 Width (m) |
1,207.000 Earth fill m3 |
25,250,173 |
| Paoy Snuol |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,813,114 |
0.600 Diameter (m) |
5.000 Length (m) |
5,626,228 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,876,401 |
| Contract ID |
010302/08/02 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
47,719,176 |
| Sambuor |
1 |
202 |
Laterite road |
0.76 [ 0.76 ] |
Km |
28,767,122 |
3.500 Width (m) |
578.000 Earth fill m3 |
21,863,013 |
| Pongro |
2 |
202 |
Laterite road |
0.70 [ 0.73 ] |
Km |
28,767,122 |
3.500 Width (m) |
551.000 Earth fill m3 |
20,856,163 |
| Pongro |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Sambuor |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,719,176 |
Phnum Srok, Ponley
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010303/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
84,696,800 |
| Ta Vong |
1 |
202 |
Laterite road |
2.00 [ 2.08 ] |
Km |
39,200,000 |
4.000 Width (m) |
1,580.000 Earth fill m3 |
81,496,800 |
| Ta Vong |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,200,000 |
0.600 Diameter (m) |
7.000 Length (m) |
3,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
84,696,800 |
Phnum Srok, Spean Sraeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010304/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
22,250,000 |
| Spean |
1 |
201 |
Earth road |
0.40 [ 0.36 ] |
Km |
62,500,000 |
4.000 Width (m) |
2,043.000 Earth fill m3 |
22,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,250,000 |
| Contract ID |
010304/08/02 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
37,464,286 |
| Pongro |
1 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
26,666,666 |
3.500 Width (m) |
570.000 Earth fill m3 |
20,000,000 |
| Rouk |
2 |
202 |
Laterite road |
0.56 [ 0.65 ] |
Km |
26,785,714 |
3.500 Width (m) |
496.000 Earth fill m3 |
17,464,286 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,464,285 |
Phnum Srok, Srah Chik
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010305/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
32,480,000 |
| Kouk Ta Reach |
1 |
202 |
Laterite road |
0.40 [ 0.46 ] |
Km |
70,000,000 |
4.000 Width (m) |
2,338.000 Earth fill m3 |
32,480,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,480,000 |
| Contract ID |
010305/08/02 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
35,535,201 |
| Moat Srah |
1 |
201 |
Earth road |
0.37 [ 0.33 ] |
Km |
41,988,700 |
4.000 Width (m) |
1,647.000 Earth fill m3 |
13,856,271 |
| Moat Srah |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
21,678,930 |
1.000 Total Span (m) |
2.000 Width(m) |
21,678,930 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,535,201 |
Phnum Srok, Phnum Dei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010306/08/01 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
33,977,406 |
| Khchay |
1 |
202 |
Laterite road |
1.35 [ 1.29 ] |
Km |
26,421,000 |
3.000 Width (m) |
759.000 Earth fill m3 |
33,977,406 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,977,406 |
| Contract ID |
010306/08/02 |
TSO |
Phay Sovann |
Project Type |
Rural Transport |
39,335,430 |
| Kamping Puoy |
1 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
28,481,760 |
3.500 Width (m) |
304.000 Earth fill m3 |
11,392,704 |
| Trang |
2 |
202 |
Laterite road |
1.00 [ 0.86 ] |
Km |
21,321,360 |
3.500 Width (m) |
651.000 Earth fill m3 |
18,272,406 |
| Kamping Puoy |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,067,200 |
0.600 Diameter (m) |
5.000 Length (m) |
6,134,400 |
| Trang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,535,920 |
0.600 Diameter (m) |
7.000 Length (m) |
3,535,920 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,335,430 |
Preah Netr Preah, Chhnuor Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010401/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
40,559,616 |
| Chhnuor |
1 |
202 |
Laterite road |
1.00 [ 0.78 ] |
Km |
20,736,000 |
4.000 Width (m) |
305.000 Earth fill m3 |
16,174,080 |
| Ruessei Kandal |
2 |
202 |
Laterite road |
1.00 [ 0.78 ] |
Km |
20,736,000 |
4.000 Width (m) |
305.000 Earth fill m3 |
16,174,080 |
| Bantoat Baoh |
3 |
202 |
Laterite road |
0.50 [ 0.40 ] |
Km |
20,736,000 |
4.000 Width (m) |
140.000 Earth fill m3 |
8,211,456 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,559,616 |
Preah Netr Preah, Chob Veari
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010402/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Irrigation |
46,073,700 |
| Pradak |
1 |
410 |
Earth dam |
0.43 [ 0.43 ] |
Km |
45,300,000 |
1.600 Max. height (m) |
2,097.000 Volume (m3) |
19,433,700 |
| Pradak |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
14,000,000 |
2.000 Total span (m) |
2.000 Width (m) |
14,000,000 |
| Pradak |
3 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
6,320,000 |
0.800 Diameter (m) |
5.000 Width (m) |
12,640,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,073,700 |
Preah Netr Preah, Phnum Lieb
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010403/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
93,275,640 |
| Kandaol |
1 |
202 |
Laterite road |
4.03 [ 3.36 ] |
Km |
24,813,960 |
3.000 Width (m) |
2,458.000 Earth fill m3 |
83,275,650 |
| Kandaol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,000,000 |
| Kandaol |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
8,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
93,275,650 |
Preah Netr Preah, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010404/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
23,500,000 |
| Char |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
23,500,000 |
3.000 Total Span (m) |
4.500 Width(m) |
23,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,500,000 |
| Contract ID |
010404/08/02 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
16,987,839 |
| Char |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
7,978,000 |
4.500 Width (m) |
191.000 Earth fill m3 |
5,584,600 |
| Sampov Lun |
2 |
201 |
Earth road |
0.85 [ 0.85 ] |
Km |
4,643,835 |
4.500 Width (m) |
135.000 Earth fill m3 |
3,947,260 |
| Thmei |
3 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
2,631,500 |
4.500 Width (m) |
108.000 Earth fill m3 |
3,157,800 |
| Ampil |
4 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
2,964,261 |
4.500 Width (m) |
147.000 Earth fill m3 |
4,298,178 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,987,838 |
Preah Netr Preah, Preah Netr Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010405/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
46,274,700 |
| Sramaoch |
1 |
202 |
Laterite road |
2.00 [ 1.24 ] |
Km |
21,900,000 |
3.000 Width (m) |
775.000 Earth fill m3 |
27,156,000 |
| Peam Sreh |
2 |
202 |
Laterite road |
0.89 [ 0.87 ] |
Km |
21,900,000 |
3.000 Width (m) |
237.000 Earth fill m3 |
19,118,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,274,700 |
Preah Netr Preah, Rohal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010406/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
40,300,000 |
| Chak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,400,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,400,000 |
| Chak |
2 |
201 |
Earth road |
0.90 [ 0.92 ] |
Km |
40,000,000 |
4.000 Width (m) |
4,472.000 Earth fill m3 |
36,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,300,000 |
Preah Netr Preah, Tean Kam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010407/08/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Domestic Water Supplies |
38,200,000 |
| Bantoat Baoh |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
22,400,000 |
3.000 Depth (m) |
2,529.000 Volume (m3) |
22,400,000 |
| Tean Kam Cheung |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
15,800,000 |
3.000 Depth (m) |
1,764.000 Volume (m3) |
15,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,200,000 |
Ou Chrov, Changha
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010501/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
34,154,000 |
| Boeng Seila |
1 |
201 |
Earth road |
0.43 [ 0.43 ] |
Km |
57,800,000 |
5.000 Width (m) |
959.000 Earth fill m3 |
24,854,000 |
| Boeng Seila |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,650,000 |
1.000 Diameter (m) |
7.000 Length (m) |
9,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,154,000 |
Ou Chrov, Koub
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010502/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
39,911,000 |
| Souriya |
1 |
201 |
Earth road |
0.25 [ 0.25 ] |
Km |
144,700,000 |
5.000 Width (m) |
3,533.000 Earth fill m3 |
36,175,000 |
| Souriya |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,736,000 |
0.800 Diameter (m) |
7.000 Length (m) |
3,736,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,911,000 |
Ou Chrov, Kuttasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010503/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
32,527,240 |
| Kuttaksat |
1 |
202 |
Laterite road |
1.45 [ 1.35 ] |
Km |
24,130,000 |
3.000 Width (m) |
668.000 Earth fill m3 |
32,527,240 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,527,240 |
Ou Chrov, Nimitt
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010504/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
56,315,000 |
| Nimit Muoy |
1 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
63,100,000 |
5.000 Width (m) |
6,498.000 Earth fill m3 |
41,015,000 |
| Nimit Muoy |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,100,000 |
1.000 Diameter (m) |
7.000 Length (m) |
8,100,000 |
| Nimit Muoy |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,600,000 |
0.800 Diameter (m) |
7.000 Length (m) |
7,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,315,000 |
Ou Chrov, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010505/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
69,396,563 |
| Thmei |
1 |
202 |
Laterite road |
1.80 [ 1.69 ] |
Km |
41,000,000 |
4.000 Width (m) |
1,072.000 Earth fill m3 |
69,396,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
69,396,600 |
Ou Chrov, Souphi
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010506/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
30,043,000 |
| Souphi Cheung |
1 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
45,400,000 |
5.000 Width (m) |
2,473.000 Earth fill m3 |
20,203,000 |
| Souphi Cheung |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
3,280,000 |
0.600 Diameter (m) |
7.000 Length (m) |
9,840,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,043,000 |
Ou Chrov, Soengh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010507/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
51,954,750 |
| Soeng Lech |
1 |
202 |
Laterite road |
0.77 [ 0.77 ] |
Km |
56,150,000 |
4.000 Width (m) |
484.000 Earth fill m3 |
42,954,750 |
| Soeng Lech |
2 |
211 |
Single pipe culvert |
4.00 [ 3.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
7.000 Length (m) |
9,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,954,750 |
Ou Chrov, Paoy Paet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010508/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
81,490,000 |
| Baliley |
1 |
202 |
Laterite road |
1.80 [ 1.80 ] |
Km |
23,600,000 |
5.000 Width (m) |
1,431.000 Earth fill m3 |
42,480,000 |
| Kbal Spean |
2 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
23,150,000 |
5.000 Width (m) |
795.000 Earth fill m3 |
23,150,000 |
| Baliley |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
8,620,000 |
1.000 Diameter (m) |
14.000 Length (m) |
8,620,000 |
| Baliley |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
7,240,000 |
0.800 Diameter (m) |
14.000 Length (m) |
7,240,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
81,490,000 |
| Contract ID |
010508/08/02 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
77,610,000 |
| Baliley |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
20,200,000 |
4.000 Width (m) |
323.000 Earth fill m3 |
10,100,000 |
| Kilou Lekh Buon |
2 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
15,700,000 |
4.000 Width (m) |
710.000 Earth fill m3 |
17,270,000 |
| Ou Roesey |
3 |
202 |
Laterite road |
1.80 [ 1.80 ] |
Km |
15,700,000 |
4.000 Width (m) |
1,161.000 Earth fill m3 |
28,260,000 |
| Ou Neang |
4 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
15,700,000 |
4.000 Width (m) |
903.000 Earth fill m3 |
21,980,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
77,610,000 |
Ou Chrov, Ou Bei Choan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010509/08/01 |
TSO |
Uy Phirun |
Project Type |
Rural Transport |
44,737,500 |
| Yeang Dangkum |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
46,500,000 |
5.000 Width (m) |
4,431.000 Earth fill m3 |
36,037,500 |
| Yeang Dangkum |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,350,000 |
0.800 Diameter (m) |
7.000 Length (m) |
8,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,737,500 |
Serei Saophoan, Bos Sbov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010601/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
83,036,500 |
| Kbal Khting |
1 |
201 |
Earth road |
0.50 [ 0.45 ] |
Km |
66,500,000 |
4.000 Width (m) |
1,100.000 Earth fill m3 |
29,991,500 |
| Pring Kaong |
2 |
201 |
Earth road |
0.52 [ 0.52 ] |
Km |
103,000,000 |
4.000 Width (m) |
2,703.500 Earth fill m3 |
53,045,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
83,036,500 |
Serei Saophoan, Kampong Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010602/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
56,630,550 |
| Phum Pir |
2 |
203 |
Gravel road |
0.29 [ 0.29 ] |
Km |
78,200,000 |
5.000 Width (m) |
967.000 Earth fill m3 |
22,990,800 |
| Phum Pir |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,700,000 |
1.000 Diameter (m) |
8.000 Length (m) |
4,700,000 |
| Pongro |
4 |
203 |
Gravel road |
0.21 [ 0.21 ] |
Km |
77,000,000 |
4.000 Width (m) |
1,162.000 Earth fill m3 |
16,170,000 |
| Phum Pir |
5 |
203 |
Gravel road |
0.17 [ 0.13 ] |
Km |
62,075,000 |
4.000 Width (m) |
582.000 Earth fill m3 |
8,069,750 |
| Pongro |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,700,000 |
1.000 Diameter (m) |
8.000 Length (m) |
4,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,630,550 |
Serei Saophoan, Kaoh Pong Satv
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010603/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
76,190,370 |
| Kaoh Pong Satv |
2 |
201 |
Earth road |
0.27 [ 0.21 ] |
Km |
54,700,000 |
5.000 Width (m) |
1,088.000 Earth fill m3 |
11,596,400 |
| Preah Angk |
2 |
201 |
Earth road |
0.18 [ 0.18 ] |
Km |
83,090,000 |
5.000 Width (m) |
1,347.000 Earth fill m3 |
15,205,470 |
| Angkea Bos |
3 |
201 |
Earth road |
0.13 [ 0.13 ] |
Km |
95,500,000 |
4.000 Width (m) |
1,062.000 Earth fill m3 |
12,128,500 |
| Angkea Bos |
4 |
201 |
Earth road |
0.62 [ 0.62 ] |
Km |
60,000,000 |
5.000 Width (m) |
3,986.000 Earth fill m3 |
37,260,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
76,190,370 |
Serei Saophoan, Mkak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010604/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
68,302,000 |
| Doun Lei |
1 |
203 |
Gravel road |
1.10 [ 1.03 ] |
Km |
40,000,000 |
4.000 Width (m) |
660.000 Earth fill m3 |
41,240,000 |
| Mkak |
2 |
203 |
Gravel road |
0.30 [ 0.30 ] |
Km |
45,140,000 |
4.000 Width (m) |
192.000 Earth fill m3 |
13,542,000 |
| Baek Chan |
3 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
3,380,000 |
0.800 Diameter (m) |
6.000 Length (m) |
13,520,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
68,302,000 |
Serei Saophoan, Ou Ambel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010605/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
51,099,200 |
| Ou Ambel |
1 |
202 |
Laterite road |
1.46 [ 1.17 ] |
Km |
43,600,000 |
4.500 Width (m) |
1,758.000 Earth fill m3 |
51,099,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,099,200 |
Serei Saophoan, Phniet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010606/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
58,000,000 |
| Kampring |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
58,000,000 |
6.000 Total Span (m) |
4.000 Width (m) |
58,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
58,000,000 |
Serei Saophoan, Preah Ponlea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010607/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
36,788,680 |
| Phum Muoy |
1 |
202 |
Laterite road |
0.72 [ 0.72 ] |
Km |
46,730,000 |
3.500 Width (m) |
810.000 Earth fill m3 |
33,458,680 |
| Phum Muoy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,330,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,330,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,788,680 |
| Contract ID |
010607/08/02 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
56,184,000 |
| Kbal Spean |
1 |
201 |
Earth road |
0.61 [ 0.61 ] |
Km |
78,000,000 |
5.000 Width (m) |
6,062.000 Earth fill m3 |
47,424,000 |
| Kbal Spean |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,380,000 |
1.000 Diameter (m) |
7.000 Length (m) |
8,760,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,184,000 |
Serei Saophoan, Tuek Thla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010608/08/01 |
TSO |
Ly Heng |
Project Type |
Rural Transport |
44,044,000 |
| Tuek Thla |
1 |
202 |
Laterite road |
1.05 [ 0.85 ] |
Km |
52,000,000 |
4.000 Width (m) |
1,933.000 Earth fill m3 |
44,044,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,044,000 |
Thma Puok, Banteay Chhmar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010701/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
48,676,535 |
| Srah Chrey |
1 |
202 |
Laterite road |
0.94 [ 0.94 ] |
Km |
21,464,000 |
4.000 Width (m) |
715.400 Earth fill m3 |
20,068,840 |
| Banteay Chhmar Tboung |
2 |
202 |
Laterite road |
0.57 [ 0.57 ] |
Km |
21,639,200 |
4.000 Width (m) |
432.400 Earth fill m3 |
12,226,148 |
| Srah Chrey |
3 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
9,519,846 |
1.000 Diameter (m) |
7.000 Length (m) |
9,519,846 |
| Srah Chrey |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,861,701 |
1.000 Diameter (m) |
7.000 Length (m) |
6,861,701 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,676,535 |
Thma Puok, Kouk Romiet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010702/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
51,729,100 |
| Ta Lei |
1 |
201 |
Earth road |
0.25 [ 0.25 ] |
Km |
33,642,000 |
5.000 Width (m) |
980.000 Earth fill m3 |
8,410,500 |
| Ta Lei |
2 |
221 |
Single cell box culvert |
2.00 [ 2.00 ] |
Place |
18,430,000 |
1.000 Total Span (m) |
2.000 Width(m) |
36,860,000 |
| Ta Lei |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,229,300 |
0.600 Diameter (m) |
7.000 Length (m) |
6,458,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,729,100 |
Thma Puok, Phum Thmei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010703/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
36,696,631 |
| Thmei Khang Tbong |
1 |
202 |
Laterite road |
1.40 [ 1.18 ] |
Km |
31,098,840 |
3.500 Width (m) |
786.000 Earth fill m3 |
36,696,631 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,696,631 |
Thma Puok, Thma Puok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010704/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
37,726,000 |
| Anlong Trach |
1 |
202 |
Laterite road |
1.80 [ 1.80 ] |
Km |
18,070,000 |
4.000 Width (m) |
1,337.000 Earth fill m3 |
32,526,000 |
| Anlong Trach |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,200,000 |
0.600 Diameter (m) |
7.000 Length (m) |
5,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,726,000 |
Thma Puok, Kouk Kakthen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010705/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
35,118,897 |
| Kouk Kakthen |
1 |
202 |
Laterite road |
1.70 [ 1.44 ] |
Km |
24,405,070 |
4.000 Width (m) |
1,101.000 Earth fill m3 |
35,118,896 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,118,896 |
Thma Puok, Kumru
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010706/08/01 |
TSO |
Has Samphy |
Project Type |
Rural Transport |
37,082,500 |
| Aekakpheap |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
19,295,000 |
5.000 Width (m) |
3,221.000 Earth fill m3 |
28,942,500 |
| Aekakpheap |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,070,000 |
1.000 Diameter (m) |
7.000 Length (m) |
8,140,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,082,500 |
Svay Chek, Phkoam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010801/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
80,412,050 |
| Prasat Vien |
1 |
201 |
Earth road |
1.32 [ 1.32 ] |
Km |
21,770,000 |
4.000 Width (m) |
3,501.000 Earth fill m3 |
28,627,550 |
| Yeang |
2 |
202 |
Laterite road |
1.44 [ 1.44 ] |
Km |
16,670,000 |
3.500 Width (m) |
1,282.000 Earth fill m3 |
24,004,800 |
| Prasat Vien |
3 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
4,480,300 |
0.800 Diameter (m) |
7.000 Length (m) |
22,401,500 |
| Prasat Vien |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,378,200 |
1.000 Diameter (m) |
7.000 Length (m) |
5,378,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
80,412,050 |
Svay Chek, Sarongk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010802/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
62,101,442 |
| Pheas Tboung |
1 |
201 |
Earth road |
0.82 [ 0.82 ] |
Km |
42,461,000 |
5.000 Width (m) |
3,967.000 Earth fill m3 |
34,902,942 |
| Pheas Tboung |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
2,960,000 |
0.600 Diameter (m) |
7.000 Length (m) |
11,840,000 |
| Pheas Tboung |
3 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
30,717,000 |
4.000 Width (m) |
1,830.000 Earth fill m3 |
15,358,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
62,101,442 |
Svay Chek, Sla Kram
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010803/08/01 |
TSO |
Suon Sor |
Project Type |
Irrigation |
39,930,000 |
| Kakaoh |
1 |
442 |
Concrete weir with gates |
1.00 [ 1.00 ] |
Place |
39,930,000 |
12.600 Length (m) |
2.000 Height (m) |
39,930,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,930,000 |
Svay Chek, Svay Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010804/08/01 |
TSO |
Suon Sor |
Project Type |
Irrigation |
43,230,000 |
| Ponsay Tboung |
1 |
410 |
Earth dam |
0.79 [ 0.79 ] |
Km |
55,000,000 |
2.200 Max. height (m) |
7,435.000 Volume (m3) |
43,230,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,230,000 |
Svay Chek, Ta Baen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010805/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
59,050,000 |
| Ta Baen |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
48,460,000 |
5.000 Width (m) |
6,204.000 Earth fill m3 |
48,460,000 |
| Ta Baen |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
3,530,000 |
8.000 Diameter (m) |
7.000 Length (m) |
10,590,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
59,050,000 |
Svay Chek, Ta Phou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010806/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
40,033,400 |
| Baray |
1 |
201 |
Earth road |
1.17 [ 1.17 ] |
Km |
34,100,000 |
5.000 Width (m) |
6,814.000 Earth fill m3 |
40,033,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,033,400 |
Svay Chek, Treas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010807/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
77,947,127 |
| Doun Nouy |
1 |
202 |
Laterite road |
1.79 [ 1.69 ] |
Km |
46,068,042 |
4.000 Width (m) |
1,049.000 Earth fill m3 |
77,947,127 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
77,947,127 |
Svay Chek, Roluos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010808/08/01 |
TSO |
Suon Sor |
Project Type |
Rural Transport |
31,963,636 |
| Roluos |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
36,363,636 |
3.800 Width (m) |
650.000 Earth fill m3 |
20,000,000 |
| Slaeng |
2 |
202 |
Laterite road |
0.39 [ 0.33 ] |
Km |
36,363,636 |
3.800 Width (m) |
159.000 Earth fill m3 |
11,963,636 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,963,636 |
Malai, Boeng Beng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010901/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
31,592,500 |
| Lvea |
1 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
34,325,000 |
5.000 Width (m) |
2,866.000 Earth fill m3 |
25,057,250 |
| Lvea |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
6,535,250 |
1.000 Diameter (m) |
8.000 Length (m) |
6,535,250 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,592,500 |
Malai, Malai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010902/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
34,997,900 |
| Thmei |
1 |
202 |
Laterite road |
1.19 [ 1.19 ] |
Km |
29,410,000 |
4.400 Width (m) |
1,484.000 Earth fill m3 |
34,997,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,997,900 |
Malai, Ou Sampor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010903/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
32,011,180 |
| Kbal Tomnob |
1 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
36,130,000 |
5.000 Width (m) |
3,992.000 Earth fill m3 |
32,011,180 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,011,180 |
Malai, Ou Sralau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010904/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
30,777,700 |
| Kandaol |
1 |
201 |
Earth road |
0.81 [ 0.81 ] |
Km |
30,370,000 |
5.000 Width (m) |
2,847.000 Earth fill m3 |
24,599,700 |
| Kandaol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
6,178,000 |
1.000 Diameter (m) |
7.000 Length (m) |
6,178,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,777,700 |
Malai, Tuol Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010905/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
44,224,800 |
| Bantey Timouy |
1 |
201 |
Earth road |
1.08 [ 1.08 ] |
Km |
30,560,000 |
5.000 Width (m) |
4,170.000 Earth fill m3 |
33,004,800 |
| Bantey Timouy |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
5,610,000 |
1.000 Diameter (m) |
7.000 Length (m) |
11,220,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,224,800 |
Malai, Ta Kong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010906/08/01 |
TSO |
Leng Heang |
Project Type |
Rural Transport |
40,894,000 |
| Ta Kong |
1 |
201 |
Earth road |
1.27 [ 1.27 ] |
Km |
32,200,000 |
5.000 Width (m) |
5,267.000 Earth fill m3 |
40,894,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,894,000 |