Contract Outputs
Location: Kracheh Budget Year: 2008
Chhloung
Kracheh
Preaek Prasab
Sambour
Snuol
Chhloung, Chhloung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100101/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
41,080,400 |
| Kaoh Kandaor |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
24,285,714 |
4.000 Width (m) |
2,241.000 Earth fill m3 |
17,000,000 |
| Kaoh Kandaor |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Kaoh Kandaor |
3 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
26,666,666 |
6.000 Width (m) |
515.000 Earth fill m3 |
4,000,000 |
| Kampong Srae |
4 |
202 |
Laterite road |
0.35 [ 0.23 ] |
Km |
34,531,623 |
4.000 Width (m) |
1,434.000 Earth fill m3 |
8,080,400 |
| Kampong Srae |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Chhney |
6 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
22,857,140 |
5.000 Width (m) |
1,090.000 Earth fill m3 |
7,999,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,080,398 |
Chhloung, Damrei Phong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100102/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
32,573,750 |
| Boeng Kieb |
1 |
201 |
Earth road |
1.00 [ 0.83 ] |
Km |
28,550,000 |
5.000 Width (m) |
2,948.000 Earth fill m3 |
23,553,750 |
| Boeng Kieb |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,510,000 |
1.000 Diameter (m) |
6.000 Length (m) |
9,020,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,573,750 |
Chhloung, Han Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100103/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Irrigation |
16,061,500 |
| Hanchey Pir |
1 |
420 |
Canal |
1.40 [ 1.07 ] |
Km |
14,996,732 |
1.500 Depth (m) |
6,227.000 Volume (m3) |
16,061,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,061,500 |
| Contract ID |
100103/08/02 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
26,712,000 |
| Hanchey Bei |
1 |
202 |
Laterite road |
0.90 [ 0.74 ] |
Km |
32,000,000 |
5.000 Width (m) |
2,782.000 Earth fill m3 |
23,712,000 |
| Hanchey Bei |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,712,000 |
Chhloung, Kanhchor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100105/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
40,300,000 |
| Chheu Teal Phluoh Kraom |
1 |
202 |
Laterite road |
1.50 [ 1.41 ] |
Km |
25,000,000 |
4.000 Width (m) |
4,514.000 Earth fill m3 |
35,200,000 |
| Chheu Teal Phluoh Kraom |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,550,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,300,000 |
Chhloung, Khsach Andaet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100106/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
32,711,075 |
| Preaek Samraong Ti Muoy |
1 |
202 |
Laterite road |
1.65 [ 1.44 ] |
Km |
19,993,784 |
4.000 Width (m) |
3,622.000 Earth fill m3 |
28,711,074 |
| Preaek Ta Hub |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,711,074 |
Chhloung, Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100107/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
37,646,075 |
| Pongro Muoy |
1 |
202 |
Laterite road |
1.48 [ 1.27 ] |
Km |
21,646,290 |
4.000 Width (m) |
3,606.000 Earth fill m3 |
27,534,081 |
| Pongro Pir |
2 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
19,000,000 |
3.000 Width (m) |
770.000 Earth fill m3 |
6,612,000 |
| Pongro Muoy |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,646,081 |
Chhloung, Preaek Saman
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100108/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
36,408,987 |
| Preaek Saman |
1 |
202 |
Laterite road |
1.80 [ 1.57 ] |
Km |
20,005,724 |
4.000 Width (m) |
3,488.000 Earth fill m3 |
31,408,987 |
| Chheu Teal Phluoh |
2 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
25,000,000 |
3.000 Width (m) |
530.000 Earth fill m3 |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,408,987 |
Kracheh, Bos Leav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100201/08/01 |
TSO |
HIENG HOEUN |
Project Type |
Rural Transport |
37,050,000 |
| Ta Luh |
1 |
202 |
Laterite road |
1.35 [ 1.35 ] |
Km |
23,000,000 |
3.500 Width (m) |
3,746.000 Earth fill m3 |
31,050,000 |
| Ta Luh |
2 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
24,000,000 |
5.000 Width (m) |
427.000 Earth fill m3 |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,050,000 |
Kracheh, Changkrang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100202/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
28,100,000 |
| Kasang |
1 |
201 |
Earth road |
2.89 [ 2.17 ] |
Km |
10,000,000 |
3.000 Width (m) |
2,880.000 Earth fill m3 |
21,700,000 |
| Kasang |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
4,000,000 |
| Kasang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,100,000 |
Kracheh, Dar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100203/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
51,164,500 |
| Mreum |
1 |
201 |
Earth road |
0.80 [ 0.72 ] |
Km |
21,500,000 |
5.000 Width (m) |
1,980.000 Earth fill m3 |
15,437,000 |
| Mreum |
2 |
201 |
Earth road |
1.05 [ 0.81 ] |
Km |
21,500,000 |
4.000 Width (m) |
2,083.000 Earth fill m3 |
17,307,500 |
| Anhchanh |
3 |
201 |
Earth road |
0.37 [ 0.37 ] |
Km |
21,500,000 |
3.000 Width (m) |
865.000 Earth fill m3 |
7,955,000 |
| Mreum |
4 |
211 |
Single pipe culvert |
3.00 [ 2.00 ] |
Place |
1,858,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,716,000 |
| Anhchanh |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,583,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,583,000 |
| Mreum |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,722,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,166,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,164,500 |
Kracheh, Kou Loab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100205/08/01 |
TSO |
Roth Tola |
Project Type |
Rural Transport |
28,500,000 |
| Kambaor |
1 |
202 |
Laterite road |
0.62 [ 0.62 ] |
Km |
23,506,366 |
3.000 Width (m) |
3,100.000 Earth fill m3 |
14,597,453 |
| Kambaor |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Chrava |
3 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
23,506,360 |
3.000 Width (m) |
660.000 Earth fill m3 |
9,402,544 |
| Chrava |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,499,997 |
Kracheh, Kaoh Chraeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100206/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
28,236,400 |
| Roka Knaor |
1 |
201 |
Earth road |
2.00 [ 1.37 ] |
Km |
15,400,000 |
3.000 Width (m) |
3,391.000 Earth fill m3 |
21,036,400 |
| Roka Knaor |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
5,000,000 |
| Roka Knaor |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,200,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,236,400 |
Kracheh, Kaoh Trong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100207/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
30,012,000 |
| Kbal Kaoh |
1 |
201 |
Earth road |
0.52 [ 0.52 ] |
Km |
24,600,000 |
4.000 Width (m) |
1,164.000 Earth fill m3 |
12,792,000 |
| Chong Kaoh |
2 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
24,600,000 |
4.000 Width (m) |
2,591.000 Earth fill m3 |
17,220,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,012,000 |
Kracheh, Krakor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100208/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
39,674,000 |
| Krakor |
1 |
202 |
Laterite road |
0.27 [ 0.27 ] |
Km |
22,000,000 |
3.000 Width (m) |
778.270 Earth fill m3 |
5,830,000 |
| Krakor |
2 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
22,000,000 |
4.000 Width (m) |
3,348.000 Earth fill m3 |
19,778,000 |
| Krakor |
3 |
202 |
Laterite road |
0.60 [ 0.50 ] |
Km |
22,000,000 |
3.500 Width (m) |
1,117.000 Earth fill m3 |
11,066,000 |
| Krakor |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,674,000 |
Kracheh, Kracheh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100209/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
36,000,000 |
| Trapeang Pring |
1 |
202 |
Laterite road |
0.78 [ 0.78 ] |
Km |
24,158,757 |
4.000 Width (m) |
2,993.000 Earth fill m3 |
18,892,148 |
| Trapeang Pring |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Doun Chroam |
3 |
202 |
Laterite road |
0.38 [ 0.38 ] |
Km |
24,158,757 |
4.000 Width (m) |
1,389.000 Earth fill m3 |
9,107,851 |
| Doun Chroam |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,999,999 |
Kracheh, Ou Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100210/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
32,441,600 |
| Ou Ruessei Muoy |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
29,200,000 |
5.000 Width (m) |
1,977.000 Earth fill m3 |
14,483,200 |
| Ou Ruessei Muoy |
2 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
29,200,000 |
4.000 Width (m) |
1,505.000 Earth fill m3 |
10,278,400 |
| Ou Ruessei Muoy |
3 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,200,000 |
0.400 Diameter (m) |
6.000 Length (m) |
4,800,000 |
| Ou Ruessei Muoy |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,880,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,880,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,441,600 |
| Contract ID |
100210/08/02 |
TSO |
Ung Sambath |
Project Type |
Irrigation |
21,501,000 |
| Srae Sdau |
1 |
420 |
Canal |
0.70 [ 0.70 ] |
Km |
30,715,714 |
1.780 Depth (m) |
4,170.000 Volume (m3) |
21,501,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,501,000 |
Kracheh, Sambok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100212/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
31,226,000 |
| Boeng Run |
1 |
201 |
Earth road |
1.37 [ 0.96 ] |
Km |
21,500,000 |
3.500 Width (m) |
2,277.000 Earth fill m3 |
20,726,000 |
| Smabok |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
12.000 Length (m) |
7,500,000 |
| Smabok |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
12.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,226,000 |
Kracheh, Thma Andaeuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100213/08/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
39,460,000 |
| Damnak Sasar |
1 |
202 |
Laterite road |
1.97 [ 1.97 ] |
Km |
20,000,000 |
3.000 Width (m) |
6,599.270 Earth fill m3 |
39,460,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,460,000 |
Kracheh, Thma Kreae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100214/08/01 |
TSO |
Roth Tola |
Project Type |
Rural Transport |
24,000,000 |
| Thma Krae Leu |
1 |
202 |
Laterite road |
0.54 [ 0.54 ] |
Km |
33,333,330 |
4.000 Width (m) |
2,816.000 Earth fill m3 |
17,999,998 |
| Thma Krae Leu |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,999,998 |
Kracheh, Thmei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100215/08/01 |
TSO |
Ung Sambath |
Project Type |
Rural Transport |
41,272,000 |
| Thmei |
1 |
202 |
Laterite road |
1.83 [ 1.54 ] |
Km |
26,800,000 |
4.000 Width (m) |
4,792.300 Earth fill m3 |
41,272,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,272,000 |
Preaek Prasab, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100301/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Irrigation |
40,885,800 |
| Chambak Ti Pir |
1 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
43,100,000 |
2.900 Depth (m) |
6,056.000 Volume (m3) |
21,463,800 |
| Chrouy Thma |
2 |
420 |
Canal |
2.83 [ 2.16 ] |
Km |
9,000,000 |
1.000 Depth (m) |
8,478.000 Volume (m3) |
19,422,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,885,800 |
| Contract ID |
100301/08/02 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
5,880,000 |
| Chrouy Thma |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,888,000 |
1.000 Diameter (m) |
7.000 Length (m) |
5,888,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,888,000 |
Preaek Prasab, Chrouy Banteay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100302/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
45,920,000 |
| Tuol Prich |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
33,260,000 |
4.000 Width (m) |
3,703.000 Earth fill m3 |
33,260,000 |
| Tuol Prich |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,462,000 |
1.000 Diameter (m) |
6.000 Length (m) |
8,462,000 |
| Tuol Prich |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,198,000 |
1.000 Diameter (m) |
6.000 Length (m) |
4,198,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,920,000 |
Preaek Prasab, Kaoh Ta Suy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100304/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
30,170,000 |
| Kandal Kaoh |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,400,000 |
1.000 Diameter (m) |
6.000 Length (m) |
8,400,000 |
| Kandal Kaoh |
2 |
201 |
Earth road |
0.70 [ 0.64 ] |
Km |
34,285,000 |
4.000 Width (m) |
2,758.000 Earth fill m3 |
21,770,975 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,170,975 |
Preaek Prasab, Preaek Prasab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100305/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
43,010,560 |
| Thma Reab |
1 |
201 |
Earth road |
2.50 [ 2.27 ] |
Km |
17,480,000 |
4.000 Width (m) |
5,734.000 Earth fill m3 |
39,714,560 |
| Thma Reab |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,296,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,296,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,010,560 |
Preaek Prasab, Ruessei Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100306/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
45,910,800 |
| Ruessei Kaev |
1 |
202 |
Laterite road |
1.09 [ 1.09 ] |
Km |
42,120,000 |
6.000 Width (m) |
2,856.000 Earth fill m3 |
45,910,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,910,800 |
Preaek Prasab, Saob
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100307/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Rural Transport |
24,200,000 |
| Khla |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
22,000,000 |
4.000 Width (m) |
2,446.000 Earth fill m3 |
24,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,200,000 |
Preaek Prasab, Ta Mau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100308/08/01 |
TSO |
NHEP CHHUNSROEUN |
Project Type |
Irrigation |
32,206,000 |
| Kraham Ka Kraom |
1 |
420 |
Canal |
0.38 [ 0.38 ] |
Km |
72,500,000 |
1.500 Depth (m) |
7,280.000 Volume (m3) |
27,550,000 |
| Khsat |
2 |
410 |
Earth dam |
0.07 [ 0.07 ] |
Km |
35,500,000 |
1.000 Max. height (m) |
385.000 Volume (m3) |
2,556,000 |
| Kraham Ka Leu |
3 |
410 |
Earth dam |
0.06 [ 0.06 ] |
Km |
35,000,000 |
1.000 Max. height (m) |
424.000 Volume (m3) |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,206,000 |
Sambour, Kampong Cham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100402/08/01 |
TSO |
Pech bunthath |
Project Type |
Rural Transport |
42,600,000 |
| Ampil Tuek |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
42,600,000 |
27.000 Total Span (m) |
4.000 Width (m) |
42,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,600,000 |
Sambour, Kbal Damrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100403/08/01 |
TSO |
Pech bunthath |
Project Type |
Rural Transport |
26,277,000 |
| Ou Ta Noeng |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
14,400,000 |
4.000 Width (m) |
3,090.000 Earth fill m3 |
21,600,000 |
| Ou Ta Noeng |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,338,500 |
0.600 Diameter (m) |
5.000 Length (m) |
4,677,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,277,000 |
| Contract ID |
100403/08/02 |
TSO |
Pech bunthath |
Project Type |
Rural Domestic Water Supplies |
9,130,000 |
| Srae Sbov |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
9,130,000 |
2.400 Depth (m) |
1,543.000 Volume (m3) |
9,130,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,130,000 |
Sambour, Kaoh Khnhaer
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100404/08/01 |
TSO |
Pech bunthath |
Project Type |
Rural Transport |
23,950,000 |
| Cheung Peat |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
23,950,000 |
10.000 Total Span (m) |
4.000 Width(m) |
23,950,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,950,000 |
Sambour, Roluos Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100406/08/01 |
TSO |
Pech bunthath |
Project Type |
Rural Transport |
49,598,000 |
| Srae Roluos |
1 |
201 |
Earth road |
0.36 [ 0.36 ] |
Km |
19,851,122 |
3.500 Width (m) |
905.000 Earth fill m3 |
7,146,404 |
| Srae Roluos |
2 |
201 |
Earth road |
1.04 [ 1.04 ] |
Km |
26,453,860 |
4.400 Width (m) |
4,079.000 Earth fill m3 |
27,512,014 |
| Srae Roluos |
3 |
201 |
Earth road |
0.11 [ 0.11 ] |
Km |
11,344,000 |
3.000 Width (m) |
185.000 Earth fill m3 |
1,247,840 |
| Srae Roluos |
4 |
201 |
Earth road |
0.48 [ 0.48 ] |
Km |
16,315,000 |
4.400 Width (m) |
1,149.000 Earth fill m3 |
7,749,625 |
| Srae Roluos |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,138,841 |
0.600 Diameter (m) |
7.000 Length (m) |
3,138,841 |
| Srae Roluos |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,803,276 |
0.600 Diameter (m) |
5.000 Length (m) |
2,803,276 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,598,000 |
Sambour, Sambour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100407/08/01 |
TSO |
Pech bunthath |
Project Type |
Rural Transport |
16,650,000 |
| Kaoh Sam |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
8,325,000 |
1.000 Diameter (m) |
7.000 Length (m) |
16,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,650,000 |
Sambour, Sandan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100408/08/01 |
TSO |
Pech bunthath |
Project Type |
Irrigation |
19,064,000 |
| Sandan |
1 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
23,985,000 |
1.380 Depth (m) |
2,077.000 Volume (m3) |
9,594,000 |
| Sandan |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
9,470,000 |
1.000 Diameter (m) |
5.000 Width (m) |
9,470,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,064,000 |
| Contract ID |
100408/08/02 |
TSO |
Pech bunthath |
Project Type |
Rural Domestic Water Supplies |
16,550,000 |
| Thmei |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
16,550,000 |
3.000 Depth (m) |
3,924.000 Volume (m3) |
16,550,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,550,000 |
Snuol, Khsuem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100501/08/02 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
61,000,000 |
| Choeng |
1 |
201 |
Earth road |
2.50 [ 2.50 ] |
Km |
21,000,000 |
4.000 Width (m) |
8,093.000 Earth fill m3 |
52,500,000 |
| Choeng |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,600,000 |
| Choeng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Samrang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
61,000,000 |
Snuol, Pir Thnu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100502/08/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
25,253,400 |
| Cheung Khle |
1 |
201 |
Earth road |
0.78 [ 0.72 ] |
Km |
15,000,000 |
4.000 Width (m) |
2,082.000 Earth fill m3 |
10,753,500 |
| Cheung Khle |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
8,000,000 |
| Cheung Khle |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,200,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,200,000 |
| Cheung Khle |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,253,500 |
Snuol, Snuol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100503/08/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
49,000,000 |
| Kbal Snuol |
1 |
201 |
Earth road |
0.76 [ 0.76 ] |
Km |
19,896,500 |
4.000 Width (m) |
2,302.000 Earth fill m3 |
15,021,858 |
| Kbal Snuol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Kbal Snuol |
3 |
201 |
Earth road |
0.18 [ 0.18 ] |
Km |
19,896,500 |
6.000 Width (m) |
727.000 Earth fill m3 |
3,501,784 |
| Snuol Keat |
4 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
19,896,500 |
4.000 Width (m) |
2,997.000 Earth fill m3 |
23,776,318 |
| Snuol Keat |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,400,000 |
| Snuol Keat |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,999,959 |
Snuol, Srae Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100504/08/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
50,000,000 |
| Treak Anhchanh |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
23,000,000 |
4.000 Width (m) |
4,703.000 Earth fill m3 |
32,200,000 |
| Treak Anhchanh |
3 |
213 |
Triple pipe culvert |
2.00 [ 2.00 ] |
Place |
8,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
16,000,000 |
| Treak Anhchanh |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,000,000 |
Snuol, Svay Chreah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
100505/08/01 |
TSO |
CHHIT-SOPHEA |
Project Type |
Rural Transport |
26,500,000 |
| Ta Pum |
1 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
20,000,000 |
4.000 Width (m) |
92,931.000 Earth fill m3 |
7,000,000 |
| Srae Char |
2 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
20,000,000 |
4.000 Width (m) |
2,124.000 Earth fill m3 |
16,000,000 |
| Ta Saom |
3 |
201 |
Earth road |
0.30 [ 0.18 ] |
Km |
20,000,000 |
4.000 Width (m) |
446.650 Earth fill m3 |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,500,000 |