Contract Outputs
Location: Ratanak Kiri Budget Year: 2008
Andoung Meas
Ban Lung
Bar Kaev
Koun Mom
Lumphat
Ou Chum
Ou Ya Dav
Ta Veaeng
Veun Sai
Andoung Meas, Malik
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160101/08/01 |
TSO |
Moue dora |
Project Type |
Rural Transport |
7,350,000 |
| Ka Hal |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,675,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,350,000 |
Andoung Meas, Ta Lav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160104/08/01 |
TSO |
Moue dora |
Project Type |
Rural Transport |
22,220,000 |
| Ka Nat |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
20,200,000 |
4.000 Width (m) |
2,726.670 Earth fill m3 |
22,220,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,220,000 |
Ban Lung, Kachanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160201/08/01 |
TSO |
Soun Eng Lang |
Project Type |
Rural Transport |
42,448,000 |
| Phum Bei |
1 |
202 |
Laterite road |
1.27 [ 2.24 ] |
Km |
18,950,000 |
5.000 Width (m) |
2,939.260 Earth fill m3 |
42,448,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,448,000 |
Ban Lung, Labansiek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160202/08/01 |
TSO |
Soun Eng Lang |
Project Type |
Rural Transport |
44,600,000 |
| Phum Muoy |
1 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
22,300,000 |
4.000 Width (m) |
1,200.000 Earth fill m3 |
44,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,600,000 |
Ban Lung, Yeak Laom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160203/08/01 |
TSO |
Soun Eng Lang |
Project Type |
Urban Domestic Water Supplies |
19,122,400 |
| La Pou |
1 |
180 |
Piped water supplies |
212.00 [ 212.00 ] |
Houses |
90,200 |
0.640 km of pipe |
10.000 |
19,122,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,122,400 |
Bar Kaev, Ke Chong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160302/08/01 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
26,600,000 |
| Reu Han |
1 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
19,000,000 |
4.000 Width (m) |
892.140 Earth fill m3 |
26,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,600,000 |
Bar Kaev, Laming
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160303/08/01 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
40,800,000 |
| Nhal |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
37,300,000 |
10.000 Total Span (m) |
3.000 Width (m) |
37,300,000 |
| Nhal |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,800,000 |
Bar Kaev, Lung Khung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160304/08/01 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
22,281,000 |
| Lung Khung |
1 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
18,567,500 |
4.000 Width (m) |
765.000 Earth fill m3 |
22,281,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,281,000 |
Bar Kaev, Seung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160305/08/01 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
19,027,000 |
| Smach |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
19,027,000 |
4.000 Width (m) |
638.000 Earth fill m3 |
19,027,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,027,000 |
Bar Kaev, Ting Chak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160306/08/01 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
52,318,800 |
| Lut |
1 |
202 |
Laterite road |
3.00 [ 3.00 ] |
Km |
17,439,600 |
4.000 Width (m) |
2,550.000 Earth fill m3 |
52,318,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,318,800 |
| Contract ID |
160306/08/02 |
TSO |
KEIV VONGSA |
Project Type |
Rural Transport |
13,800,000 |
| Lut |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,250,000 |
0.600 Diameter (m) |
4.000 Length (m) |
6,500,000 |
| Lut |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,300,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,800,000 |
Koun Mom, Serei Mongkol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160401/08/01 |
TSO |
Sous Sovannarith |
Project Type |
Rural Transport |
18,800,000 |
| Srae Pok |
1 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
6,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Srae Pok Touch |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
4,950,000 |
0.600 Diameter (m) |
5.000 Length (m) |
9,900,000 |
| Srae Pok |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,900,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,800,000 |
Koun Mom, Ta Ang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160403/08/01 |
TSO |
Sous Sovannarith |
Project Type |
Rural Transport |
36,996,400 |
| Tus |
1 |
202 |
Laterite road |
3.65 [ 3.65 ] |
Km |
10,136,000 |
5.000 Width (m) |
2,874.000 Earth fill m3 |
36,996,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,996,400 |
Koun Mom, Trapeang Chres
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160405/08/01 |
TSO |
Sous Sovannarith |
Project Type |
Rural Transport |
24,900,000 |
| Phum Pir |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
24,900,000 |
4.000 Width (m) |
637.000 Earth fill m3 |
24,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,900,000 |
| Contract ID |
160405/08/02 |
TSO |
Sous Sovannarith |
Project Type |
Rural Transport |
3,340,000 |
| Phum Pir |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,340,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,340,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,340,000 |
Koun Mom, Trapeang Kraham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160406/08/01 |
TSO |
Sous Sovannarith |
Project Type |
Rural Transport |
58,383,500 |
| Phum Muoy |
1 |
202 |
Laterite road |
2.30 [ 2.45 ] |
Km |
23,830,000 |
4.000 Width (m) |
1,466.000 Earth fill m3 |
58,383,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
58,383,500 |
Lumphat, La Bang Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160503/08/01 |
TSO |
Von Thokna |
Project Type |
Rural Domestic Water Supplies |
24,120,000 |
| Ka Tieng |
1 |
123 |
Drilled well with Afridev pump |
3.00 [ 3.00 ] |
Place |
8,040,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
24,120,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,120,000 |
Lumphat, La Bang Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160504/08/01 |
TSO |
Von Thokna |
Project Type |
Rural Transport |
24,050,000 |
| Ka Tieng |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
18,500,000 |
4.000 Width (m) |
828.000 Earth fill m3 |
24,050,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,050,000 |
Lumphat, Pa Tang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160505/08/01 |
TSO |
Von Thokna |
Project Type |
Rural Transport |
25,090,000 |
| Ul |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
19,300,000 |
4.000 Width (m) |
828.000 Earth fill m3 |
25,090,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,090,000 |
Lumphat, Seda
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160506/08/01 |
TSO |
Von Thokna |
Project Type |
Rural Transport |
25,389,000 |
| Nang Hai |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
19,530,000 |
4.000 Width (m) |
828.000 Earth fill m3 |
25,389,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,389,000 |
Ou Chum, Cha Ung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160601/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
21,520,000 |
| Char Ung Chan |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
7,000,000 |
4.000 Width (m) |
828.000 Earth fill m3 |
9,100,000 |
| Thuoy Tum |
2 |
202 |
Laterite road |
0.07 [ 0.07 ] |
Km |
180,000,000 |
4.000 Width (m) |
1,722.000 Earth fill m3 |
12,420,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,520,000 |
Ou Chum, Chan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160602/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
20,900,000 |
| Ta Ngach |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
19,000,000 |
4.000 Width (m) |
701.000 Earth fill m3 |
20,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,900,000 |
Ou Chum, Aekakpheap
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160603/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Domestic Water Supplies |
26,300,000 |
| Pa or |
1 |
111 |
Ring well |
3.00 [ 3.00 ] |
Place |
3,287,500 |
30.000 Depth (m) |
1.000 Diameter (m) |
9,862,500 |
| Pa Chon Thum |
2 |
111 |
Ring well |
4.00 [ 4.00 ] |
Place |
3,287,500 |
30.000 Depth (m) |
1.000 Diameter (m) |
13,150,000 |
| Krouch |
3 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
3,287,500 |
30.000 Depth (m) |
1.000 Diameter (m) |
3,287,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,300,000 |
Ou Chum, Kalai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160604/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
17,370,000 |
| Kalai Muoy |
1 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
19,300,000 |
4.000 Width (m) |
573.000 Earth fill m3 |
17,370,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,370,000 |
| Contract ID |
160604/08/02 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
2,800,000 |
| Kalai Muoy |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,800,000 |
Ou Chum, Ou Chum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160605/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
34,560,000 |
| L'eun Kreaeng |
1 |
202 |
Laterite road |
2.70 [ 2.70 ] |
Km |
12,800,000 |
4.000 Width (m) |
1,721.000 Earth fill m3 |
34,560,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,560,000 |
Ou Chum, Sameakki
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160606/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
25,375,000 |
| Ka Meaen |
1 |
202 |
Laterite road |
1.45 [ 1.45 ] |
Km |
17,500,000 |
4.000 Width (m) |
924.000 Earth fill m3 |
25,375,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,375,000 |
Ou Chum, L'ak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160607/08/01 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
17,580,000 |
| Kouk |
1 |
202 |
Laterite road |
3.00 [ 3.00 ] |
Km |
5,860,000 |
4.000 Width (m) |
1,868.000 Earth fill m3 |
17,580,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,580,000 |
| Contract ID |
160607/08/02 |
TSO |
Kong Sopheak |
Project Type |
Rural Transport |
4,400,000 |
| Phum Pir |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,200,000 |
0.600 Diameter (m) |
4.000 Length (m) |
4,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,400,000 |
Ou Ya Dav, Pate
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160704/08/01 |
TSO |
Mam Bunnarith |
Project Type |
Rural Transport |
30,750,000 |
| Plang |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
20,500,000 |
5.000 Width (m) |
1,864.000 Earth fill m3 |
20,500,000 |
| Kong Thum |
2 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
20,500,000 |
5.000 Width (m) |
932.000 Earth fill m3 |
10,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,750,000 |
Ou Ya Dav, Sesant
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160705/08/01 |
TSO |
Mam Bunnarith |
Project Type |
Rural Transport |
55,020,000 |
| Ka Tang |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
18,340,000 |
4.000 Width (m) |
2,979.000 Earth fill m3 |
18,340,000 |
| Phi |
2 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
18,340,000 |
4.000 Width (m) |
11,918.000 Earth fill m3 |
36,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,020,000 |
Ta Veaeng, Ta Veaeng Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160801/08/01 |
TSO |
Heng Som Oun |
Project Type |
Rural Transport |
16,852,000 |
| Ke Kuong |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
16,852,000 |
4.000 Width (m) |
637.000 Earth fill m3 |
16,852,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,852,000 |
Ta Veaeng, Ta Veaeng Kraom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160802/08/01 |
TSO |
Heng Som Oun |
Project Type |
Rural Transport |
16,800,000 |
| Ke Kuong |
1 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
14,000,000 |
4.000 Width (m) |
765.000 Earth fill m3 |
16,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,800,000 |
Veun Sai, Ka Choun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160904/08/01 |
TSO |
Yin Kim Chhoun |
Project Type |
Rural Transport |
55,800,000 |
| Ka Choun Kraom |
1 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
19,500,000 |
4.000 Width (m) |
1,104.000 Earth fill m3 |
11,700,000 |
| Ka Choun Kraom |
2 |
202 |
Laterite road |
1.92 [ 1.92 ] |
Km |
12,600,000 |
4.000 Width (m) |
2,678.000 Earth fill m3 |
24,154,200 |
| Tiem Leu |
3 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
12,600,000 |
4.000 Width (m) |
1,467.000 Earth fill m3 |
13,230,000 |
| Ka Choun Kraom |
4 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
12,600,000 |
4.000 Width (m) |
380.000 Earth fill m3 |
6,715,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,800,000 |
Veun Sai, Kaoh Peak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160906/08/01 |
TSO |
Yin Kim Chhoun |
Project Type |
Rural Transport |
54,500,000 |
| Phak Nam |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
54,500,000 |
21.000 Total Span (m) |
3.000 Width (m) |
54,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,500,000 |
Veun Sai, Veun Sai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
160910/08/01 |
TSO |
Yin Kim Chhoun |
Project Type |
Rural Transport |
17,024,000 |
| Kang Nak |
1 |
202 |
Laterite road |
1.22 [ 1.22 ] |
Km |
14,000,000 |
4.000 Width (m) |
1,425.000 Earth fill m3 |
17,024,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,024,000 |