Contract Outputs
Location: Siem Reap Budget Year: 2008
Angkor Chum
Angkor Thum
Banteay Srei
Chi Kraeng
Kralanh
Puok
Prasat Bakong
Siem Reab
Soutr Nikom
Srei Snam
Svay Leu
Varin
Angkor Chum, Kouk Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170103/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
39,720,000 |
| Kouk Kraol |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
26,480,000 |
3.500 Width (m) |
844.000 Earth fill m3 |
39,720,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,720,000 |
Angkor Chum, Ta Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170107/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
31,200,000 |
| Svay Chum |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
18,600,000 |
3.000 Total Span (m) |
5.000 Width(m) |
18,600,000 |
| Svay Chum |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
12,600,000 |
2.000 Total Span (m) |
5.000 Width(m) |
12,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,200,000 |
Angkor Thum, Chob Ta Trav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170201/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
22,000,000 |
| Pong Tuek |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
19,130,435 |
5.000 Width (m) |
1,699.000 Earth fill m3 |
22,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,000,000 |
Angkor Thum, Leang Dai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170202/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
25,900,000 |
| Trapeang Svay |
1 |
223 |
Triple cell box culvert |
1.00 [ 1.00 ] |
Place |
25,900,000 |
1.500 Total Span (m) |
4.500 Width(m) |
25,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,900,000 |
Angkor Thum, Peak Snaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170203/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
29,680,000 |
| Peak Snaeng Thmei |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
21,200,000 |
5.000 Width (m) |
2,445.000 Earth fill m3 |
29,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,680,000 |
Angkor Thum, Svay Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170204/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
29,000,000 |
| Svay Chek |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
16,097,638 |
1.000 Diameter (m) |
66.000 Length (m) |
16,097,638 |
| Svay Chek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,950,447 |
0.600 Diameter (m) |
7.000 Length (m) |
1,950,447 |
| Svay Chek |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,699,729 |
0.800 Diameter (m) |
6.000 Length (m) |
2,699,729 |
| Svay Chek |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,830,553 |
1.000 Diameter (m) |
6.000 Length (m) |
3,830,553 |
| Bos Ta Trav |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,835,204 |
0.600 Diameter (m) |
5.000 Length (m) |
1,835,204 |
| Bos Ta Trav |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,586,429 |
0.800 Diameter (m) |
5.000 Length (m) |
2,586,429 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,000,000 |
Banteay Srei, Khnar Sanday
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170301/08/01 |
TSO |
Proeun Tanravuth |
Project Type |
Rural Transport |
45,600,000 |
| Kakos Chrum |
1 |
201 |
Earth road |
1.19 [ 1.19 ] |
Km |
30,814,442 |
5.000 Width (m) |
3,942.000 Earth fill m3 |
36,700,000 |
| Kakos Chrum |
2 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
7,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
7,000,000 |
| Toul Kralanh |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,600,000 |
Banteay Srei, Khun Ream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170302/08/01 |
TSO |
Proeun Tanravuth |
Project Type |
Rural Transport |
43,600,000 |
| Kamprum |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
43,600,000 |
6.000 |
4.000 |
43,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,600,000 |
Banteay Srei, Preak Dak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170303/08/01 |
TSO |
Proeun Tanravuth |
Project Type |
Irrigation |
32,800,000 |
| Preah Dak |
1 |
420 |
Canal |
2.00 [ 2.00 ] |
Km |
16,400,000 |
0.550 Depth (m) |
4,351.000 Volume (m3) |
32,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,800,000 |
Banteay Srei, Rumchek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170304/08/01 |
TSO |
Proeun Tanravuth |
Project Type |
Rural Transport |
38,400,600 |
| Rumchek |
1 |
202 |
Laterite road |
1.72 [ 1.72 ] |
Km |
15,605,000 |
4.000 Width (m) |
971.000 Earth fill m3 |
26,840,600 |
| Rovieng Ta Tum |
2 |
202 |
Laterite road |
0.59 [ 0.59 ] |
Km |
19,726,962 |
4.000 Width (m) |
715.000 Earth fill m3 |
11,560,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,400,600 |
Banteay Srei, Tbaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170306/08/01 |
TSO |
Proeun Tanravuth |
Project Type |
Rural Transport |
39,700,000 |
| Tbaeng Kaeut |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
39,700,000 |
4.000 |
4.000 |
39,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,700,000 |
Chi Kraeng, Anlong Samnar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170401/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
39,440,000 |
| Svay Ta Daok |
1 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
27,200,000 |
4.000 Width (m) |
124.000 Earth fill m3 |
9,520,000 |
| Samraong Thum |
2 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
27,200,000 |
4.000 Width (m) |
313.000 Earth fill m3 |
14,960,000 |
| Chaek Khsach Leu |
3 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
27,200,000 |
4.000 Width (m) |
756.000 Earth fill m3 |
14,960,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,440,000 |
| Contract ID |
170401/08/02 |
TSO |
Mon Chantha |
Project Type |
Education |
10,100,000 |
| Samraong Thum |
1 |
320 |
Brick school (general) |
2.00 [ 2.00 ] |
School room |
5,050,000 |
8.000 Length (m) |
9.000 Width (m) |
10,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,100,000 |
Chi Kraeng, Chi Kraeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170402/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
41,990,000 |
| Chi Kraeng |
1 |
202 |
Laterite road |
1.70 [ 1.70 ] |
Km |
24,700,000 |
4.000 Width (m) |
1,922.000 Earth fill m3 |
41,990,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,990,000 |
Chi Kraeng, Kampong Kdei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170403/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
46,710,000 |
| Sangkae Mean Chey |
1 |
202 |
Laterite road |
1.80 [ 1.80 ] |
Km |
25,950,000 |
4.000 Width (m) |
2,552.000 Earth fill m3 |
46,710,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,710,000 |
Chi Kraeng, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170404/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
41,000,000 |
| Ou |
1 |
202 |
Laterite road |
0.45 [ 0.45 ] |
Km |
25,262,222 |
4.000 Width (m) |
618.000 Earth fill m3 |
11,368,000 |
| Ou |
2 |
202 |
Laterite road |
0.57 [ 0.57 ] |
Km |
20,175,438 |
4.000 Width (m) |
721.000 Earth fill m3 |
11,500,000 |
| Ou |
3 |
202 |
Laterite road |
0.67 [ 0.67 ] |
Km |
19,122,388 |
4.000 Width (m) |
756.000 Earth fill m3 |
12,812,000 |
| Ou |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,416,000 |
0.600 Diameter (m) |
10.000 Length (m) |
2,416,000 |
| Ou |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,904,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,904,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,000,000 |
Chi Kraeng, Kouk Thlok Kraom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170405/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
64,000,000 |
| Bos Kor |
1 |
202 |
Laterite road |
2.80 [ 2.80 ] |
Km |
22,857,143 |
4.000 Width (m) |
1,887.000 Earth fill m3 |
64,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,000,000 |
Chi Kraeng, Kouk Thlok Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170406/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
44,000,000 |
| Slaeng Kaong |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
13,898,305 |
4.000 Width (m) |
619.000 Earth fill m3 |
9,728,814 |
| Slaeng Kaong |
2 |
202 |
Laterite road |
0.67 [ 0.67 ] |
Km |
13,898,305 |
4.000 Width (m) |
237.000 Earth fill m3 |
9,311,864 |
| Thnal |
3 |
202 |
Laterite road |
0.88 [ 0.88 ] |
Km |
13,898,305 |
4.000 Width (m) |
870.000 Earth fill m3 |
12,230,508 |
| Thnal |
4 |
202 |
Laterite road |
0.48 [ 0.48 ] |
Km |
13,898,305 |
4.000 Width (m) |
201.000 Earth fill m3 |
6,671,186 |
| Thnal |
5 |
202 |
Laterite road |
0.22 [ 0.22 ] |
Km |
13,898,305 |
4.000 Width (m) |
122.000 Earth fill m3 |
3,057,627 |
| Thnal |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,000,000 |
Chi Kraeng, Lveaeng Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170407/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
60,128,000 |
| Thnal |
1 |
202 |
Laterite road |
0.66 [ 0.66 ] |
Km |
26,142,609 |
4.000 Width (m) |
401.000 Earth fill m3 |
17,254,122 |
| Lveaeng Ruessei |
2 |
202 |
Laterite road |
1.64 [ 1.64 ] |
Km |
26,142,609 |
4.000 Width (m) |
945.000 Earth fill m3 |
42,873,879 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
60,128,001 |
Chi Kraeng, Pongro Kraom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170408/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
41,336,000 |
| Chey Bour |
1 |
202 |
Laterite road |
0.66 [ 0.66 ] |
Km |
24,315,294 |
4.000 Width (m) |
855.000 Earth fill m3 |
16,048,094 |
| Phlong |
2 |
202 |
Laterite road |
1.04 [ 1.04 ] |
Km |
24,315,294 |
4.000 Width (m) |
1,035.000 Earth fill m3 |
25,287,906 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,336,000 |
Chi Kraeng, Pongro Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170409/08/01 |
TSO |
Chomm Nearg |
Project Type |
Rural Transport |
34,600,000 |
| Chek |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
23,066,666 |
4.000 Width (m) |
958.000 Earth fill m3 |
34,599,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,599,999 |
Chi Kraeng, Ruessei Lok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170410/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
49,130,000 |
| Krouch |
1 |
202 |
Laterite road |
1.70 [ 1.70 ] |
Km |
28,900,000 |
4.000 Width (m) |
1,667.000 Earth fill m3 |
49,130,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,130,000 |
Chi Kraeng, Sangvaeuy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170411/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
46,128,000 |
| Chak |
1 |
202 |
Laterite road |
0.89 [ 0.89 ] |
Km |
24,934,054 |
4.000 Width (m) |
1,057.000 Earth fill m3 |
22,066,638 |
| Ta Prum |
2 |
202 |
Laterite road |
0.97 [ 0.97 ] |
Km |
24,934,054 |
4.000 Width (m) |
286.000 Earth fill m3 |
24,061,362 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,128,000 |
Chi Kraeng, Spean Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170412/08/01 |
TSO |
Mon Chantha |
Project Type |
Rural Transport |
38,882,000 |
| Thnal Louk |
1 |
202 |
Laterite road |
1.06 [ 1.06 ] |
Km |
24,575,472 |
4.000 Width (m) |
688.000 Earth fill m3 |
26,050,000 |
| Ta Yon |
2 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
21,386,667 |
4.000 Width (m) |
256.000 Earth fill m3 |
12,832,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,882,001 |
Kralanh, Chonloas Dai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170601/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
33,836,000 |
| Preah Lean |
1 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
24,168,571 |
4.000 Width (m) |
600.000 Earth fill m3 |
33,835,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,835,999 |
Kralanh, Kampong Thkov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170602/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
27,552,600 |
| Dour Dantrei |
1 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
30,614,000 |
4.000 Width (m) |
1,728.000 Earth fill m3 |
27,552,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,552,600 |
Kralanh, Kralanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170603/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
32,186,000 |
| Sampov Lun |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
32,212,500 |
4.000 Width (m) |
3,120.000 Earth fill m3 |
25,770,000 |
| Sampov Lun |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,208,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,416,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,186,000 |
Kralanh, Roung Kou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170605/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
31,820,000 |
| Khcheay |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
24,476,923 |
3.500 Width (m) |
546.000 Earth fill m3 |
31,820,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,820,000 |
Kralanh, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170606/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
34,220,000 |
| Damnak Khchas |
1 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
24,442,857 |
3.500 Width (m) |
735.000 Earth fill m3 |
34,220,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,220,000 |
Kralanh, Saen Sokh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170607/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
37,320,000 |
| Ta Sokh |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
24,880,000 |
3.500 Width (m) |
600.000 Earth fill m3 |
37,320,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,320,000 |
Kralanh, Sranal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170609/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
36,460,000 |
| Slaeng |
1 |
202 |
Laterite road |
0.67 [ 0.67 ] |
Km |
23,880,594 |
3.000 Width (m) |
300.000 Earth fill m3 |
15,999,998 |
| Rovieng |
2 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
34,100,000 |
4.000 Width (m) |
369.000 Earth fill m3 |
20,460,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,459,998 |
Kralanh, Ta an
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170610/08/01 |
TSO |
Chhoun Monny |
Project Type |
Rural Transport |
26,688,000 |
| Trapeang Chhuk |
1 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
29,653,333 |
4.000 Width (m) |
900.000 Earth fill m3 |
26,688,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,688,000 |
Puok, Sasar Sdam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170701/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
39,500,000 |
| Kouk Chrey |
1 |
201 |
Earth road |
1.28 [ 1.28 ] |
Km |
30,859,375 |
4.000 Width (m) |
4,267.000 Earth fill m3 |
39,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,500,000 |
Puok, Doun Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170702/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
39,700,000 |
| Lbaeuk |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
30,538,461 |
4.000 Width (m) |
4,390.000 Earth fill m3 |
39,699,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,699,999 |
Puok, Kdei Run
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170703/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
30,500,000 |
| Kdei Run |
1 |
201 |
Earth road |
1.13 [ 1.13 ] |
Km |
26,991,150 |
4.000 Width (m) |
3,250.000 Earth fill m3 |
30,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,500,000 |
Puok, Kaev Poar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170704/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
32,820,000 |
| Roka Yea |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
54,700,000 |
5.000 Width (m) |
3,730.000 Earth fill m3 |
32,820,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,820,000 |
Puok, Khnat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170705/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
27,400,000 |
| Chrolong |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
34,250,000 |
5.000 Width (m) |
2,495.000 Earth fill m3 |
27,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,400,000 |
Puok, Krabei Riel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170706/08/01 |
TSO |
Kim Bunnang |
Project Type |
Irrigation |
47,781,600 |
| Totea |
1 |
410 |
Earth dam |
1.06 [ 1.42 ] |
Km |
33,554,502 |
0.500 Max. height (m) |
6,194.000 Volume (m3) |
47,781,611 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,781,611 |
Puok, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170707/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
38,500,000 |
| Roka |
1 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
37,378,640 |
4.000 Width (m) |
618.000 Earth fill m3 |
19,810,679 |
| Lvea |
2 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
37,378,640 |
4.000 Width (m) |
303.000 Earth fill m3 |
18,689,320 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,499,999 |
Puok, Mukh Paen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170708/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
31,000,000 |
| Kouk Reang |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
26,956,522 |
4.000 Width (m) |
3,318.000 Earth fill m3 |
31,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,000,000 |
Puok, Puok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170710/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
50,025,000 |
| Kouk Chuon |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
34,500,000 |
5.000 Width (m) |
4,762.000 Earth fill m3 |
50,025,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,025,000 |
Puok, Prey Chruk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170711/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
39,900,000 |
| Doun Tok |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
57,000,000 |
4.000 Width (m) |
480.000 Earth fill m3 |
39,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,900,000 |
Puok, Reul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170712/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
40,000,000 |
| K'aek Tum |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
40,000,000 |
4.000 Width (m) |
660.000 Earth fill m3 |
40,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,000,000 |
Puok, Samraong Yea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170713/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
26,240,000 |
| Doun Sva |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,000,000 |
| Doun Sva |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,600,000 |
| Ta Chet |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Ta Chet |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,840,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,840,000 |
| Ampil |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
4,000,000 |
| Prey Veaeng |
6 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
12,000,000 |
2.000 Total Span (m) |
4.000 Width(m) |
12,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,240,000 |
Puok, Tuek Vil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170714/08/01 |
TSO |
Kim Bunnang |
Project Type |
Irrigation |
31,700,000 |
| Prayut |
1 |
410 |
Earth dam |
0.82 [ 0.82 ] |
Km |
38,848,039 |
0.500 Max. height (m) |
4,118.000 Volume (m3) |
31,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,700,000 |
Puok, Trei Nhoar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170715/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
39,330,000 |
| Chambak Sa |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,710,000 |
1.000 Diameter (m) |
7.000 Length (m) |
7,710,000 |
| Chambak Sa |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,970,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,970,000 |
| Chuo Chakkrei |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,620,000 |
0.800 Diameter (m) |
7.000 Length (m) |
5,620,000 |
| Chuo Chakkrei |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,530,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,530,000 |
| Chuo Chakkrei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,100,000 |
| Ta Hok |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,670,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,670,000 |
| Svay |
7 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
3,530,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,060,000 |
| Thveas |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,670,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,670,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,330,000 |
Puok, Yeang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170716/08/01 |
TSO |
Kim Bunnang |
Project Type |
Rural Transport |
27,940,000 |
| Yeang |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
19,900,000 |
3.000 Total Span (m) |
5.000 Width(m) |
19,900,000 |
| Sokh San |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,100,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,100,000 |
| Sokh San |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,940,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,940,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,940,000 |
Prasat Bakong, Bakong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170902/08/01 |
TSO |
Kung Sophat |
Project Type |
Education |
34,180,000 |
| Stueng |
1 |
320 |
Brick school (general) |
1.00 [ 1.00 ] |
School room |
34,180,000 |
8.000 Length (m) |
7.000 Width (m) |
34,180,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,180,000 |
Prasat Bakong, Ballangk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170903/08/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
61,450,000 |
| Kouk Ruessei |
1 |
202 |
Laterite road |
2.10 [ 2.10 ] |
Km |
29,261,905 |
3.500 Width (m) |
1,181.000 Earth fill m3 |
61,450,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
61,450,001 |
Prasat Bakong, Kantreang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170905/08/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
26,066,000 |
| Trapeang Thnal |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
26,066,000 |
3.500 Width (m) |
563.000 Earth fill m3 |
26,066,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,066,000 |
Prasat Bakong, Kandaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170906/08/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
49,916,000 |
| Chrey |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
33,277,333 |
4.000 Width (m) |
956.000 Earth fill m3 |
49,916,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,916,000 |
Prasat Bakong, Roluos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170908/08/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
33,919,000 |
| Chambak |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
30,835,455 |
4.000 Width (m) |
701.000 Earth fill m3 |
33,919,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,919,001 |
Prasat Bakong, Trapeang Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
170909/08/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
36,114,000 |
| Roka Kambot |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
24,076,000 |
3.500 Width (m) |
844.000 Earth fill m3 |
36,114,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,114,000 |
Siem Reab, Sla Kram
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171001/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
84,169,800 |
| Boeng Doun Pa |
1 |
201 |
Earth road |
0.91 [ 0.91 ] |
Km |
45,250,602 |
4.000 Width (m) |
2,419.000 Earth fill m3 |
41,313,800 |
| Boeng Doun Pa |
2 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
42,856,000 |
250.000 Length (m) |
0.600 Diameter (m) |
42,856,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
84,169,800 |
Siem Reab, Svay Dangkum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171002/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
64,000,000 |
| Svay Prey |
1 |
201 |
Earth road |
0.79 [ 0.79 ] |
Km |
26,229,508 |
4.000 Width (m) |
785.000 Earth fill m3 |
20,590,164 |
| Phnhea Chey |
2 |
201 |
Earth road |
1.66 [ 1.66 ] |
Km |
26,229,508 |
4.000 Width (m) |
6,702.000 Earth fill m3 |
43,409,836 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,000,000 |
Siem Reab, Kouk Chak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171003/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
46,000,000 |
| Kouk Tnaot |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
41,818,182 |
4.000 Width (m) |
1,402.000 Earth fill m3 |
46,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,000,000 |
Siem Reab, Sala Kamraeuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171004/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
47,000,000 |
| Voat Svay |
1 |
202 |
Laterite road |
0.72 [ 0.72 ] |
Km |
65,459,610 |
4.000 Width (m) |
2,046.000 Earth fill m3 |
47,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,000,000 |
Siem Reab, Nokor Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171005/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
29,293,000 |
| areaks Svay |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
26,630,000 |
3.500 Width (m) |
619.000 Earth fill m3 |
29,293,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,293,000 |
Siem Reab, Chreav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171006/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
31,200,000 |
| Chreav |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
26,000,000 |
4.000 Width (m) |
4,058.000 Earth fill m3 |
31,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,200,000 |
Siem Reab, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171008/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
27,500,000 |
| Ta Kong |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
50,000,000 |
3.500 Width (m) |
2,491.000 Earth fill m3 |
27,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,500,000 |
Siem Reab, Siem Reab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171009/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
46,650,000 |
| Kakranh |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
39,533,898 |
4.000 Width (m) |
5,545.000 Earth fill m3 |
21,743,644 |
| Spean Chreav |
2 |
201 |
Earth road |
0.63 [ 0.63 ] |
Km |
39,533,898 |
4.000 Width (m) |
5,545.000 Earth fill m3 |
24,906,356 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,650,000 |
Siem Reab, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171010/08/01 |
TSO |
Kang Thy |
Project Type |
Rural Transport |
30,700,000 |
| Thnal |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
38,375,000 |
4.000 Width (m) |
2,374.000 Earth fill m3 |
30,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,700,000 |
Soutr Nikom, Chan Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171101/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
35,500,000 |
| Sanlaong |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
23,666,666 |
4.000 Width (m) |
900.000 Earth fill m3 |
35,499,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,499,999 |
Soutr Nikom, Dam Daek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171102/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
39,800,000 |
| Preah Trapeang |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
36,347,032 |
4.000 Width (m) |
2,824.000 Earth fill m3 |
39,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,800,000 |
Soutr Nikom, Dan Run
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171103/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
39,910,000 |
| Bantoat Baoh |
1 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
30,700,000 |
4.000 Width (m) |
773.000 Earth fill m3 |
22,963,600 |
| Santey |
2 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
30,700,000 |
4.000 Width (m) |
571.000 Earth fill m3 |
16,946,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,910,000 |
Soutr Nikom, Kampong Khleang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171104/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
52,000,000 |
| Phsar Khleang |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
11,000,000 |
0.800 Diameter (m) |
51.000 Length (m) |
11,000,000 |
| Ta Uor Sa |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
9,000,000 |
1.000 Diameter (m) |
8.000 Length (m) |
18,000,000 |
| Spean Veaeng |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
9,000,000 |
1.000 Diameter (m) |
8.000 Length (m) |
9,000,000 |
| Preaek Sramaoch |
4 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
14,000,000 |
2.000 Total Span (m) |
8.000 Width(m) |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,000,000 |
Soutr Nikom, Kien Sangkae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171105/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
36,712,000 |
| Trapeang Prey |
1 |
202 |
Laterite road |
1.15 [ 1.25 ] |
Km |
29,487,550 |
4.000 Width (m) |
1,544.000 Earth fill m3 |
36,712,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,712,000 |
Soutr Nikom, Khchas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171106/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
45,987,800 |
| Chrey |
1 |
201 |
Earth road |
1.79 [ 1.79 ] |
Km |
25,749,048 |
4.000 Width (m) |
4,683.000 Earth fill m3 |
45,987,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,987,800 |
| Contract ID |
171106/08/02 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
35,900,000 |
| Chrey |
1 |
202 |
Laterite road |
1.79 [ 1.79 ] |
Km |
20,100,784 |
4.000 Width (m) |
1,072.000 Earth fill m3 |
35,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,900,000 |
Soutr Nikom, Khnar Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171107/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
31,000,000 |
| Bos |
1 |
202 |
Laterite road |
1.34 [ 1.34 ] |
Km |
23,134,328 |
4.000 Width (m) |
1,340.000 Earth fill m3 |
31,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,000,000 |
Soutr Nikom, Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171108/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
32,000,000 |
| Popel Kandal |
1 |
202 |
Laterite road |
1.31 [ 1.31 ] |
Km |
24,521,073 |
4.000 Width (m) |
2,623.000 Earth fill m3 |
32,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,000,000 |
Soutr Nikom, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171109/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
35,900,000 |
| Samraong Khang Tboung |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
21,757,576 |
4.000 Width (m) |
800.000 Earth fill m3 |
21,757,576 |
| Samraong Khang Cheung |
2 |
202 |
Laterite road |
0.65 [ 0.65 ] |
Km |
21,757,576 |
4.000 Width (m) |
520.000 Earth fill m3 |
14,142,424 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,900,000 |
Soutr Nikom, Ta Yaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171110/08/01 |
TSO |
Mao Luck |
Project Type |
Rural Transport |
35,400,000 |
| Boeng Vien |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
32,181,818 |
4.000 Width (m) |
900.000 Earth fill m3 |
35,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,400,000 |
Srei Snam, Chrouy Neang Nguon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171201/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
29,888,000 |
| Chrouy Neang Nguon |
1 |
202 |
Laterite road |
1.24 [ 1.15 ] |
Km |
25,989,565 |
3.500 Width (m) |
1,128.000 Earth fill m3 |
29,888,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,888,000 |
Srei Snam, Klang Hay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171202/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
24,528,000 |
| Lbaeuk |
1 |
202 |
Laterite road |
1.10 [ 1.05 ] |
Km |
23,360,000 |
3.500 Width (m) |
660.000 Earth fill m3 |
24,528,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,528,000 |
Srei Snam, Tram Sasar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171203/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
28,248,000 |
| Thlok |
1 |
202 |
Laterite road |
1.20 [ 1.15 ] |
Km |
24,563,478 |
3.500 Width (m) |
710.000 Earth fill m3 |
28,248,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,248,000 |
Srei Snam, Moung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171204/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
27,192,000 |
| Moung Tboung |
1 |
202 |
Laterite road |
0.95 [ 0.91 ] |
Km |
29,881,319 |
3.500 Width (m) |
1,100.000 Earth fill m3 |
27,192,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,192,000 |
Srei Snam, Prei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171205/08/01 |
TSO |
Som Sarith |
Project Type |
Rural Transport |
21,600,000 |
| Krabau |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
30,857,143 |
4.000 Width (m) |
3,136.000 Earth fill m3 |
21,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,600,000 |
Srei Snam, Slaeng Spean
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171206/08/01 |
TSO |
Born Sophal |
Project Type |
Rural Transport |
32,772,000 |
| Damnak Damrei |
1 |
202 |
Laterite road |
1.95 [ 1.85 ] |
Km |
17,714,594 |
3.500 Width (m) |
1,556.000 Earth fill m3 |
32,771,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,771,999 |
Svay Leu, Boeng Mealea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171301/08/01 |
TSO |
Chomm Nearg |
Project Type |
Rural Transport |
33,956,600 |
| Boeng Mealea |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
16,698,000 |
4.500 Width (m) |
2,995.000 Earth fill m3 |
28,386,600 |
| Boeng Mealea |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,290,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,290,000 |
| Boeng Mealea |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,280,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,280,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,956,600 |
Svay Leu, Kantuot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171302/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
26,140,000 |
| Khnar Krau |
1 |
202 |
Laterite road |
0.73 [ 0.73 ] |
Km |
26,301,370 |
3.500 Width (m) |
440.000 Earth fill m3 |
19,200,000 |
| Khnar Krau |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,470,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,940,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,140,000 |
Svay Leu, Khnang Phnum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171303/08/01 |
TSO |
Hem Sam Ath |
Project Type |
Rural Transport |
22,100,000 |
| Anlong Thum |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
22,100,000 |
3.000 Total Span (m) |
4.000 Width(m) |
22,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,100,000 |
Svay Leu, Svay Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171304/08/01 |
TSO |
Chomm Nearg |
Project Type |
Rural Transport |
33,300,000 |
| Trapeang Svay |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
15,000,000 |
4.500 Width (m) |
2,718.000 Earth fill m3 |
24,000,000 |
| Trapeang Svay |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,100,000 |
0.600 Diameter (m) |
6.000 Length (m) |
6,300,000 |
| Trapeang Svay |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,300,000 |
Svay Leu, Ta Siem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171305/08/01 |
TSO |
Chomm Nearg |
Project Type |
Rural Transport |
34,900,000 |
| Ta Siem |
1 |
232 |
Wood bridge, 5 tonne standard, wood abutments |
1.00 [ 1.00 ] |
Place |
23,900,000 |
15.000 Total Span (m) |
3.000 Width (m) |
23,900,000 |
| Ta Siem |
2 |
232 |
Wood bridge, 5 tonne standard, wood abutments |
1.00 [ 1.00 ] |
Place |
11,000,000 |
5.000 Total Span (m) |
3.000 Width (m) |
11,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,900,000 |
Varin, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171401/08/01 |
TSO |
Dorn Sopheap |
Project Type |
Rural Transport |
26,000,000 |
| Vien |
1 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
24,117,647 |
5.000 Width (m) |
1,299.000 Earth fill m3 |
20,500,000 |
| Vien |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,500,000 |
0.800 Diameter (m) |
6.000 Length (m) |
5,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,000,000 |
Varin, Lvea Krang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171402/08/01 |
TSO |
Dorn Sopheap |
Project Type |
Rural Transport |
25,144,000 |
| Kouk Kandal |
1 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
51,383,399 |
5.000 Width (m) |
894.000 Earth fill m3 |
13,000,000 |
| Kouk Kandal |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,408,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,408,000 |
| Kouk Kandal |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,068,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,068,000 |
| Kouk Kandal |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,668,000 |
1.000 Diameter (m) |
6.000 Length (m) |
6,668,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,144,000 |
Varin, Srae Nouy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171403/08/01 |
TSO |
Dorn Sopheap |
Project Type |
Rural Transport |
39,185,000 |
| Sakmot |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
34,757,142 |
5.000 Width (m) |
4,659.000 Earth fill m3 |
36,494,999 |
| Srae Nouy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,690,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,690,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,184,999 |
Varin, Svay sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171404/08/01 |
TSO |
Dorn Sopheap |
Project Type |
Rural Transport |
22,120,000 |
| Kambaor |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
33,236,363 |
5.000 Width (m) |
3,003.000 Earth fill m3 |
18,280,000 |
| Kambaor |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,840,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,840,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,120,000 |
Varin, Varin
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171405/08/01 |
TSO |
Dorn Sopheap |
Project Type |
Rural Transport |
28,000,000 |
| Varin |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
34,091,428 |
5.000 Width (m) |
1,876.000 Earth fill m3 |
23,864,000 |
| Varin |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,136,000 |
0.600 Diameter (m) |
6.000 Length (m) |
4,136,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,000,000 |