Contract Outputs
Location: Otdar Meanchey Budget Year: 2008
Anlong Veaeng
Banteay Ampil
Chong Kal
Samraong
Trapeang Prasat
Anlong Veaeng, Anlong Veaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220101/08/01 |
TSO |
Mr HOURT TEKLEANG |
Project Type |
Rural Transport |
35,500,000 |
| Anlong Veng |
1 |
201 |
Earth road |
0.86 [ 0.86 ] |
Km |
34,883,720 |
4.500 Width (m) |
2,710.000 Earth fill m3 |
29,999,999 |
| Anlong Veng |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
12.000 Length (m) |
4,000,000 |
| Anlong Veng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,499,999 |
Anlong Veaeng, Thlat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220102/08/01 |
TSO |
Mr HOURT TEKLEANG |
Project Type |
Rural Transport |
25,900,000 |
| Phoum Thmei |
1 |
202 |
Laterite road |
1.09 [ 1.09 ] |
Km |
23,870,967 |
4.000 Width (m) |
1,112.000 Earth fill m3 |
25,899,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,899,999 |
Anlong Veaeng, Trapeang Tav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220103/08/01 |
TSO |
Mr HOURT TEKLEANG |
Project Type |
Rural Transport |
30,847,100 |
| Toulsvay |
1 |
201 |
Earth road |
0.51 [ 0.51 ] |
Km |
48,210,000 |
8.000 Width (m) |
2,299.000 Earth fill m3 |
24,587,100 |
| Toulsvay |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,130,000 |
0.600 Diameter (m) |
8.000 Length (m) |
6,260,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,847,100 |
Anlong Veaeng, Lumtong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220104/08/01 |
TSO |
Mr HOURT TEKLEANG |
Project Type |
Rural Transport |
28,800,000 |
| Korki Krom |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
43,636,363 |
4.000 Width (m) |
1,831.000 Earth fill m3 |
24,000,000 |
| Korki Krom |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,800,000 |
0.800 Diameter (m) |
12.000 Length (m) |
4,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,800,000 |
Anlong Veaeng, Trapeang Prei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220105/08/01 |
TSO |
Mr HOURT TEKLEANG |
Project Type |
Rural Transport |
31,500,000 |
| Sras Chhouk |
1 |
202 |
Laterite road |
0.73 [ 0.73 ] |
Km |
37,671,232 |
4.000 Width (m) |
670.000 Earth fill m3 |
27,499,999 |
| Toul Sala |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,499,999 |
Banteay Ampil, Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220201/08/01 |
TSO |
Mr SOURN SAMKOL |
Project Type |
Rural Transport |
42,292,800 |
| Kok ovlok |
1 |
202 |
Laterite road |
1.67 [ 1.19 ] |
Km |
35,600,000 |
4.000 Width (m) |
4,409.000 Earth fill m3 |
42,292,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,292,800 |
Banteay Ampil, Beng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220202/08/01 |
TSO |
Mr SOURN SAMKOL |
Project Type |
Rural Transport |
41,339,000 |
| Beng |
1 |
202 |
Laterite road |
0.86 [ 0.86 ] |
Km |
35,260,818 |
4.000 Width (m) |
2,092.000 Earth fill m3 |
30,147,999 |
| Pou Thmei |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,888,597 |
0.600 Diameter (m) |
6.000 Length (m) |
2,888,597 |
| Beng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,888,597 |
0.600 Diameter (m) |
6.000 Length (m) |
2,888,597 |
| Beng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,413,806 |
0.800 Diameter (m) |
6.000 Length (m) |
5,413,806 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,338,999 |
Banteay Ampil, Kouk Khpos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220203/08/01 |
TSO |
Mr SOURN SAMKOL |
Project Type |
Rural Transport |
27,540,000 |
| Chheu Slab |
1 |
202 |
Laterite road |
0.85 [ 0.77 ] |
Km |
36,000,000 |
4.000 Width (m) |
2,907.000 Earth fill m3 |
27,540,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,540,000 |
Banteay Ampil, Kouk Mon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220204/08/01 |
TSO |
Mr SOURN SAMKOL |
Project Type |
Rural Transport |
34,398,000 |
| Kouk Mon |
1 |
202 |
Laterite road |
1.07 [ 0.88 ] |
Km |
39,000,000 |
4.000 Width (m) |
2,714.000 Earth fill m3 |
34,398,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,398,000 |
Chong Kal, Cheung Tien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220301/08/01 |
TSO |
Mr SOEUR TEUN |
Project Type |
Rural Transport |
52,900,000 |
| Kouk Trang |
1 |
202 |
Laterite road |
0.38 [ 0.38 ] |
Km |
33,648,256 |
4.000 Width (m) |
561.000 Earth fill m3 |
12,651,744 |
| Kok Reang |
2 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
33,648,256 |
4.000 Width (m) |
609.000 Earth fill m3 |
33,648,256 |
| Kok Reang |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,600,000 |
0.800 Diameter (m) |
6.000 Length (m) |
6,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,900,000 |
Chong Kal, Chong Kal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220302/08/01 |
TSO |
Mr SOEUR TEUN |
Project Type |
Irrigation |
33,854,000 |
| Bonteay Chas |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
26,662,000 |
3.300 Total span (m) |
4.000 Width (m) |
26,662,000 |
| Chhork |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
7,192,000 |
1.200 Total span (m) |
2.300 Width (m) |
7,192,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,854,000 |
Chong Kal, Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220303/08/01 |
TSO |
Mr SOEUR TEUN |
Project Type |
Rural Transport |
26,700,000 |
| Kok Samrech |
1 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
48,369,565 |
4.000 Width (m) |
431.000 Earth fill m3 |
9,673,913 |
| Koul |
2 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
48,369,565 |
4.000 Width (m) |
502.000 Earth fill m3 |
17,026,087 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,700,000 |
| Contract ID |
220303/08/02 |
TSO |
Mr SOEUR TEUN |
Project Type |
Rural Transport |
28,270,000 |
| Chhuk |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
29,930,781 |
5.000 Width (m) |
1,470.000 Earth fill m3 |
14,965,391 |
| Chek Kbo |
2 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
29,930,781 |
5.000 Width (m) |
1,380.000 Earth fill m3 |
10,415,912 |
| Chek Kbo |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,888,697 |
0.600 Diameter (m) |
6.000 Length (m) |
2,888,697 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,269,999 |
Chong Kal, Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220304/08/01 |
TSO |
Mr SOEUR TEUN |
Project Type |
Rural Transport |
32,300,000 |
| Ta Paen |
1 |
201 |
Earth road |
1.03 [ 1.03 ] |
Km |
31,512,195 |
5.000 Width (m) |
8,276.000 Earth fill m3 |
32,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,300,000 |
Samraong, Bansay Reak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220401/08/01 |
TSO |
Kao Phat |
Project Type |
Rural Transport |
29,685,000 |
| Bansay Reak |
1 |
201 |
Earth road |
0.73 [ 0.71 ] |
Km |
36,800,000 |
4.000 Width (m) |
3,458.000 Earth fill m3 |
26,128,000 |
| Bansay Reak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,557,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,557,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,685,000 |
Samraong, Bos Sbov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220402/08/01 |
TSO |
Kao Phat |
Project Type |
Rural Transport |
25,275,100 |
| Bos Sbov |
1 |
202 |
Laterite road |
0.43 [ 0.30 ] |
Km |
27,473,000 |
4.000 Width (m) |
660.000 Earth fill m3 |
8,241,900 |
| Ou Preal |
2 |
202 |
Laterite road |
0.50 [ 0.62 ] |
Km |
27,473,000 |
4.000 Width (m) |
1,375.000 Earth fill m3 |
17,033,260 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,275,160 |
| Contract ID |
220402/08/02 |
TSO |
Kao Phat |
Project Type |
Rural Transport |
27,289,900 |
| Bos Sbov |
1 |
202 |
Laterite road |
0.37 [ 0.30 ] |
Km |
42,375,621 |
4.000 Width (m) |
1,200.000 Earth fill m3 |
12,712,686 |
| Krasang |
2 |
202 |
Laterite road |
0.36 [ 0.34 ] |
Km |
42,375,621 |
4.000 Width (m) |
1,376.000 Earth fill m3 |
14,577,214 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,289,900 |
Samraong, Koun Kriel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220403/08/01 |
TSO |
Kao Phat |
Project Type |
Irrigation |
42,524,700 |
| Khtum |
1 |
410 |
Earth dam |
0.36 [ 0.36 ] |
Km |
119,116,700 |
4.000 Max. height (m) |
6,982.000 Volume (m3) |
42,524,662 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,524,662 |
Samraong, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220404/08/01 |
TSO |
Kao Phat |
Project Type |
Rural Transport |
48,583,886 |
| Ou Kravan |
1 |
201 |
Earth road |
0.44 [ 0.44 ] |
Km |
45,337,000 |
4.000 Width (m) |
2,630.000 Earth fill m3 |
19,902,943 |
| Samraong |
2 |
201 |
Earth road |
0.44 [ 0.44 ] |
Km |
45,337,000 |
4.000 Width (m) |
2,630.000 Earth fill m3 |
19,902,943 |
| Ou Kravan |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
8,778,000 |
1.000 Diameter (m) |
6.000 Length (m) |
8,778,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,583,886 |
Trapeang Prasat, Trapeang Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220501/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
38,150,000 |
| Ou Krouch |
1 |
201 |
Earth road |
2.45 [ 2.45 ] |
Km |
15,571,428 |
4.000 Width (m) |
4,233.800 Earth fill m3 |
38,149,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,149,999 |
Trapeang Prasat, Bak Anlung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220502/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
23,725,000 |
| Srae L'a -Or |
1 |
201 |
Earth road |
0.87 [ 0.87 ] |
Km |
27,270,114 |
4.000 Width (m) |
2,773.000 Earth fill m3 |
23,724,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,724,999 |
Trapeang Prasat, Preah Pralay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220503/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
26,025,400 |
| Preah Pralay |
1 |
201 |
Earth road |
0.96 [ 0.96 ] |
Km |
24,553,024 |
4.000 Width (m) |
2,663.240 Earth fill m3 |
23,521,797 |
| Preah Pralay |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,503,700 |
0.600 Diameter (m) |
6.000 Length (m) |
2,503,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,025,497 |
Trapeang Prasat, Tumnob Dach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220504/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
26,729,200 |
| Toul Cha |
1 |
201 |
Earth road |
1.49 [ 1.49 ] |
Km |
17,939,064 |
4.000 Width (m) |
3,518.400 Earth fill m3 |
26,729,205 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,729,205 |
Trapeang Prasat, Ou Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220505/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
29,600,000 |
| Ta Sam |
1 |
201 |
Earth road |
1.51 [ 1.51 ] |
Km |
19,563,780 |
4.000 Width (m) |
3,388.600 Earth fill m3 |
29,599,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,599,999 |
Trapeang Prasat, Ph'av
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
220506/08/01 |
TSO |
Mr LEAK LIN |
Project Type |
Rural Transport |
28,300,000 |
| Thkov |
1 |
201 |
Earth road |
1.17 [ 1.17 ] |
Km |
24,146,757 |
4.000 Width (m) |
3,258.000 Earth fill m3 |
28,299,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,299,999 |