Contract Outputs
Location: Takeo Budget Year: 2003
Angkor Borei
Bati
Bourei Cholsar
Kiri Vong
Kaoh Andaet
Prey Kabbas
Samraong
Doun Kaev
Tram Kak
Treang
Angkor Borei, Angkor Borei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210101/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
10,031,000 |
| Tuol Sang Kha |
1 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
20,062,000 |
1.900 Depth (m) |
2,526.000 Volume (m3) |
10,031,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,031,000 |
Angkor Borei, Ba Srae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210102/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
16,921,400 |
| Svay Tboung |
1 |
420 |
Canal |
0.26 [ 0.26 ] |
Km |
65,842,023 |
3.560 Depth (m) |
4,835.000 Volume (m3) |
16,921,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,921,400 |
| Contract ID |
210102/03/02 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
15,265,700 |
| Svay Tboung |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
4,467,450 |
1.000 Diameter (m) |
6.000 Width (m) |
8,934,900 |
| Svay Cheung |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,467,450 |
1.000 Diameter (m) |
6.000 Length (m) |
4,467,450 |
| Svay Tboung |
4 |
410 |
Earth dam |
0.15 [ 0.15 ] |
Km |
12,340,397 |
1.200 Max. height (m) |
853.000 Volume (m3) |
1,863,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,265,750 |
Angkor Borei, Kouk Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210103/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
19,498,500 |
| Tuol Putrea |
1 |
420 |
Canal |
0.70 [ 0.70 ] |
Km |
27,855,000 |
2.315 Depth (m) |
5,182.000 Volume (m3) |
19,498,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,498,500 |
Angkor Borei, Ponley
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210104/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
6,201,200 |
| Ponley Cheung |
1 |
420 |
Canal |
0.49 [ 0.49 ] |
Km |
12,785,979 |
1.780 Depth (m) |
1,540.000 Volume (m3) |
6,201,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,201,200 |
Angkor Borei, Preaek Phtoul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210105/03/01 |
TSO |
Phan Phanna |
Project Type |
Rural Transport |
25,951,150 |
| Kampong Pou |
1 |
201 |
Earth road |
0.87 [ 0.87 ] |
Km |
23,832,351 |
4.000 Width (m) |
1,400.000 Earth fill m3 |
20,805,642 |
| Kampong Pou |
2 |
201 |
Earth road |
0.62 [ 0.62 ] |
Km |
2,904,376 |
3.000 Width (m) |
200.000 Earth fill m3 |
1,792,000 |
| Kampong Pou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,568,100 |
0.600 Diameter (m) |
5.000 Length (m) |
1,568,100 |
| Kampong Pou |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,054,650 |
0.300 Diameter (m) |
5.000 Length (m) |
1,054,650 |
| Kampong Pou |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
730,750 |
0.800 Diameter (m) |
5.000 Length (m) |
730,750 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,951,142 |
Angkor Borei, Prey Phkoam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210106/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
33,374,000 |
| Prey Phkoam Ka |
1 |
420 |
Canal |
1.26 [ 1.26 ] |
Km |
26,424,386 |
2.725 Depth (m) |
8,565.000 Volume (m3) |
33,374,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,374,000 |
Bati, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210201/03/01 |
TSO |
Phan Phanna |
Project Type |
Rural Domestic Water Supplies |
32,406,100 |
| Bacham |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,109,220 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,109,220 |
| Mreah Prov |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,109,220 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,109,220 |
| Trapeang Lean |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,109,220 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,109,220 |
| Ta Nob |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,109,220 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,109,220 |
| Run |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,109,220 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,109,220 |
| Trapeang Trayueng |
6 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Veal Prei |
7 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Boeng Leach |
8 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Kanlaeng Khla |
9 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Sdau Aem |
10 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Seiha |
11 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Sramaoch Haer |
12 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Ta Nob |
13 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,357,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,357,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,406,100 |
Bati, Champei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210202/03/01 |
TSO |
Pich Sovansou |
Project Type |
Irrigation |
22,631,800 |
| Daeum Doung |
1 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
20,918,800 |
1.500 Depth (m) |
2,485.000 Volume (m3) |
10,459,400 |
| Mkak |
2 |
420 |
Canal |
0.44 [ 0.44 ] |
Km |
27,664,545 |
1.500 Depth (m) |
2,892.000 Volume (m3) |
12,172,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,631,800 |
Bati, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210203/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Domestic Water Supplies |
7,216,300 |
| Pramoul Sokh |
1 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,443,300 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
2,886,600 |
| Yuthka |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,443,300 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
2,886,600 |
| Doung |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,443,100 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,443,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,216,300 |
Bati, Kandoeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210204/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Domestic Water Supplies |
26,778,400 |
| Krasang |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,153,052 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,153,052 |
| Krang Ampil |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,153,052 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,153,052 |
| Haknuman |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,153,052 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,153,052 |
| Kandoeng Touch |
4 |
131 |
Open mixed well |
3.00 [ 3.00 ] |
Place |
1,443,265 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
4,329,795 |
| Preah Mlob |
6 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,443,265 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
2,886,530 |
| Aopheasang |
7 |
131 |
Open mixed well |
3.00 [ 3.00 ] |
Place |
1,443,265 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
4,329,795 |
| Trapeang Leuk |
8 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,443,265 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
2,886,530 |
| Kandoeng Thum |
9 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,443,265 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
2,886,530 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,778,336 |
Bati, Komar Reachea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210205/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Domestic Water Supplies |
11,312,000 |
| Krang Pongro |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,000 |
| Prey Khla |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,616,000 |
| Trapeang Phlong |
3 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
3,232,000 |
| Sdok |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,000 |
| Thmei |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,000 |
| Khnar Tong |
6 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,312,000 |
| Contract ID |
210205/03/02 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
21,339,000 |
| Krang Pongro |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
2,323,818 |
4.000 Width (m) |
500.000 Earth fill m3 |
2,556,200 |
| Royak |
2 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
2,323,818 |
4.000 Width (m) |
500.000 Earth fill m3 |
2,323,818 |
| Krang Pongro |
3 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
7,200,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,920,000 |
| Royak |
4 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
7,200,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,200,000 |
| Royak |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,339,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,339,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,339,018 |
Bati, Krang Leav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210206/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
38,878,500 |
| Trapeang Pou |
1 |
202 |
Laterite road |
0.84 [ 0.84 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,198,326 |
| Srei Krong Reach |
2 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,159,371 |
| Rung |
3 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,848,094 |
| Trapeang Angk |
4 |
202 |
Laterite road |
1.11 [ 1.11 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,879,222 |
| Daeum Svay |
5 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,536,817 |
| Prohut |
6 |
202 |
Laterite road |
1.01 [ 1.01 ] |
Km |
6,225,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,256,668 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,878,500 |
Bati, Lumpong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210208/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
22,974,900 |
| Trayueng Khpos |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
5,564,380 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,895,066 |
| Bak Ronoas |
2 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
5,564,380 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,677,256 |
| Trapeang Kruos |
3 |
202 |
Laterite road |
2.05 [ 2.05 ] |
Km |
5,564,380 |
4.000 Width (m) |
150.000 Earth fill m3 |
11,406,978 |
| Trapeang Kruos |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
995,500 |
0.600 Diameter (m) |
4.000 Length (m) |
995,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,974,800 |
Bati, Pea Ream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210209/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
28,031,300 |
| Tang Nheat |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
12,977,454 |
4.000 Width (m) |
150.000 Earth fill m3 |
12,977,454 |
| Pea Ream |
2 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
12,977,454 |
4.000 Width (m) |
150.000 Earth fill m3 |
10,381,963 |
| Pea Ream |
3 |
202 |
Laterite road |
0.36 [ 0.36 ] |
Km |
12,977,454 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,671,883 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,031,300 |
Bati, Pot Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210210/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
35,197,200 |
| Prey Sva |
1 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
11,383,312 |
5.000 Width (m) |
150.000 Earth fill m3 |
2,845,828 |
| Krang Pou |
2 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
11,383,312 |
5.000 Width (m) |
150.000 Earth fill m3 |
11,383,312 |
| Trapeang Trav |
3 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
11,383,312 |
5.000 Width (m) |
150.000 Earth fill m3 |
8,537,484 |
| Pot Sar |
4 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
11,383,312 |
5.000 Width (m) |
150.000 Earth fill m3 |
5,691,656 |
| Khla Koun |
5 |
202 |
Laterite road |
0.59 [ 0.59 ] |
Km |
11,383,312 |
5.000 Width (m) |
150.000 Earth fill m3 |
6,738,921 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,197,200 |
Bati, Souphi
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210211/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Domestic Water Supplies |
6,213,300 |
| Prohaek |
1 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,553,325 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,106,650 |
| Champa |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,553,325 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,553,325 |
| Trapeang Chhuk |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,553,325 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,553,325 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,213,300 |
Bati, Tang Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210212/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
21,594,400 |
| Rovieng |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
6,120,862 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,732,948 |
| Prey Kray |
2 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
6,120,862 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,508,776 |
| Phsar Kump Ruessei |
3 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
6,120,862 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,508,776 |
| Neal |
4 |
202 |
Laterite road |
0.63 [ 0.63 ] |
Km |
6,120,862 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,843,901 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,594,400 |
Bati, Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210213/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Domestic Water Supplies |
5,970,800 |
| Ta Non |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
5,970,800 |
1.200 Depth (m) |
1,181.000 Volume (m3) |
5,970,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,970,800 |
Bati, Trapeang Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210214/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
30,379,800 |
| Trapeang Prich |
1 |
202 |
Laterite road |
0.34 [ 0.34 ] |
Km |
6,636,041 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,276,162 |
| Kandal |
2 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
1,990,813 |
| Kou Duol |
3 |
202 |
Laterite road |
0.56 [ 0.56 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,716,183 |
| Rumduol |
4 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,517,102 |
| Tuek Thla |
5 |
202 |
Laterite road |
0.48 [ 0.48 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,185,300 |
| Boeng Ponhea Kuk |
6 |
202 |
Laterite road |
0.78 [ 0.78 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,176,113 |
| Trapeang Chamkar |
7 |
202 |
Laterite road |
1.59 [ 1.59 ] |
Km |
6,636,042 |
4.000 Width (m) |
150.000 Earth fill m3 |
10,518,126 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,379,800 |
Bati, Trapeang Sab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210215/03/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Domestic Water Supplies |
12,932,000 |
| Trapeang Sab |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Daeum Kray |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Sdok Prei |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Ta Su |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| A Cheang |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Prech |
6 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Trakiet |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Smau Khnhei |
8 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,616,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,616,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,932,000 |
Bourei Cholsar, Bourei Cholsar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210301/03/01 |
TSO |
Taing Touch |
Project Type |
Irrigation |
21,570,600 |
| Angk Krouch |
1 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
3,780,150 |
1.000 Diameter (m) |
5.000 Width (m) |
7,560,300 |
| Angk Krouch |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
6,766,300 |
1.000 Total span (m) |
5.000 Width (m) |
6,766,300 |
| Angk Krouch |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
1,855,100 |
0.800 Diameter (m) |
5.000 Width (m) |
1,855,100 |
| Angk Krouch |
4 |
410 |
Earth dam |
1.30 [ 1.30 ] |
Km |
2,343,000 |
5.000 Max. height (m) |
535.000 Volume (m3) |
3,045,900 |
| Kampong Ampil |
5 |
410 |
Earth dam |
1.00 [ 1.00 ] |
Km |
2,343,000 |
5.000 Max. height (m) |
500.000 Volume (m3) |
2,343,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,570,600 |
Bourei Cholsar, Chey Chouk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210302/03/01 |
TSO |
Taing Touch |
Project Type |
Irrigation |
17,037,000 |
| Banteay Sloek |
1 |
420 |
Canal |
0.85 [ 0.85 ] |
Km |
20,043,529 |
1.110 Depth (m) |
3,805.000 Volume (m3) |
17,037,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,037,000 |
Bourei Cholsar, Doung Khpos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210303/03/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
25,172,400 |
| Doung Khpos |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
9,264,000 |
5.000 Width (m) |
400.000 Earth fill m3 |
5,558,400 |
| Trapeang Tonle |
2 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
9,264,000 |
5.000 Width (m) |
350.000 Earth fill m3 |
6,021,600 |
| Roteh Phluk |
3 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
9,264,000 |
5.000 Width (m) |
350.000 Earth fill m3 |
6,021,600 |
| Ta Sai |
4 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
9,264,000 |
5.000 Width (m) |
450.000 Earth fill m3 |
4,632,000 |
| Roteh Phluk |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,469,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,469,000 |
| Trapeang Tonle |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,469,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,469,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,171,600 |
Bourei Cholsar, Kampong Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210304/03/01 |
TSO |
Taing Touch |
Project Type |
Education |
22,326,000 |
| Kdol Chrum |
1 |
321 |
Brick school with tile roof |
1.00 [ 1.00 ] |
School room |
22,326,000 |
8.000 Length (m) |
9.000 Width (m) |
22,326,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,326,000 |
Bourei Cholsar, Kouk Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210305/03/01 |
TSO |
Taing Touch |
Project Type |
Irrigation |
31,083,700 |
| Chrey Kouk Pou |
1 |
460 |
Pumping station |
1.00 [ 1.00 ] |
Place |
24,177,700 |
3.000 |
3.500 |
24,177,700 |
| Chrey Kouk Pou |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
3,453,000 |
0.800 Diameter (m) |
5.000 Width (m) |
6,906,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,083,700 |
Kiri Vong, Angk Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210401/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
27,710,400 |
| Prachreay |
1 |
202 |
Laterite road |
1.03 [ 1.03 ] |
Km |
5,562,243 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,701,299 |
| Prachreay |
2 |
201 |
Earth road |
1.29 [ 1.29 ] |
Km |
13,927,610 |
4.000 Width (m) |
450.000 Earth fill m3 |
18,008,400 |
| Prachreay |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,163,650 |
0.600 Diameter (m) |
5.000 Length (m) |
2,327,300 |
| Prachreay |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,673,400 |
0.800 Diameter (m) |
5.000 Length (m) |
1,673,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,710,399 |
Kiri Vong, Preah Bat Choan Chum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210402/03/01 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
44,470,000 |
| Traeuy Tonloab |
1 |
420 |
Canal |
2.15 [ 2.15 ] |
Km |
13,475,767 |
1.300 Depth (m) |
7,574.000 Volume (m3) |
28,972,900 |
| Kampong |
2 |
420 |
Canal |
1.15 [ 1.15 ] |
Km |
13,475,739 |
1.250 Depth (m) |
4,579.000 Volume (m3) |
15,497,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,470,000 |
| Contract ID |
210402/03/02 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
4,349,000 |
| Kampong |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
4,349,000 |
1.000 Diameter (m) |
7.000 Width (m) |
4,349,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,349,000 |
Kiri Vong, Kamnab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210403/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Irrigation |
19,100,000 |
| Kamnab |
1 |
420 |
Canal |
0.88 [ 0.88 ] |
Km |
21,704,545 |
1.800 Depth (m) |
4,617.000 Volume (m3) |
19,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,100,000 |
Kiri Vong, Kampeaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210404/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
35,561,900 |
| Hantea |
4 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
6,624,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,636,800 |
| Andoung Chrung |
5 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
6,624,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,961,600 |
| Ponley |
7 |
202 |
Laterite road |
0.43 [ 0.43 ] |
Km |
6,924,800 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,977,664 |
| Hantea |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,262,400 |
0.600 Diameter (m) |
5.000 Length (m) |
1,262,400 |
| Andoung Chrung |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,262,400 |
0.600 Diameter (m) |
5.000 Length (m) |
1,262,400 |
| Ponley |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,262,400 |
0.600 Diameter (m) |
5.000 Length (m) |
1,262,400 |
| Hantea |
11 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
8,964,827 |
4.000 Width (m) |
600.000 Earth fill m3 |
6,275,379 |
| Andoung Chrung |
12 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
8,964,828 |
4.000 Width (m) |
600.000 Earth fill m3 |
8,068,345 |
| Ponley |
13 |
201 |
Earth road |
0.43 [ 0.43 ] |
Km |
8,964,828 |
4.000 Width (m) |
600.000 Earth fill m3 |
3,854,876 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,561,864 |
Kiri Vong, Kiri Chong Kaoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210405/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
5,970,000 |
| Preal |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,492,500 |
0.600 Diameter (m) |
5.000 Length (m) |
4,477,500 |
| Daeum Beng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,492,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,492,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,970,000 |
Kiri Vong, Kouk Prech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210406/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
37,283,400 |
| Kbal Damrei |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
9,393,750 |
5.000 Width (m) |
700.000 Earth fill m3 |
7,515,000 |
| Kbal Damrei |
2 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
7,783,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,226,400 |
| Kbal Damrei |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,243,400 |
0.600 Diameter (m) |
5.000 Length (m) |
2,486,800 |
| Kouk Kruos |
4 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
9,393,810 |
5.000 Width (m) |
700.000 Earth fill m3 |
9,863,500 |
| Kouk Kruos |
5 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
7,783,048 |
5.000 Width (m) |
150.000 Earth fill m3 |
8,172,200 |
| Kouk Kruos |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,243,400 |
0.600 Diameter (m) |
5.000 Length (m) |
1,243,400 |
| Kouk Kruos |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,776,100 |
0.800 Diameter (m) |
5.000 Length (m) |
1,776,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,283,400 |
Kiri Vong, Prey Ampok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210408/03/01 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
28,707,800 |
| Thnal Louk |
1 |
420 |
Canal |
1.21 [ 1.21 ] |
Km |
16,085,600 |
1.700 Depth (m) |
5,073.000 Volume (m3) |
19,495,747 |
| Thnal Louk |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
9,212,100 |
2.000 Total span (m) |
5.000 Width (m) |
9,212,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,707,847 |
Kiri Vong, Prey Rumdeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210409/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Domestic Water Supplies |
9,085,000 |
| Buor |
1 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
4,542,500 |
45.000 Depth (m) |
100.000 Diameter (mm) |
9,085,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,085,000 |
Kiri Vong, Ream Andaeuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210410/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
23,081,300 |
| Trayueng |
1 |
201 |
Earth road |
1.13 [ 1.13 ] |
Km |
9,379,399 |
5.000 Width (m) |
500.000 Earth fill m3 |
10,608,100 |
| Trayueng |
2 |
202 |
Laterite road |
1.13 [ 1.13 ] |
Km |
6,616,534 |
5.000 Width (m) |
150.000 Earth fill m3 |
7,483,300 |
| Trayueng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
775,000 |
0.300 Diameter (m) |
5.000 Length (m) |
775,000 |
| Trayueng |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,234,300 |
0.600 Diameter (m) |
5.000 Length (m) |
2,468,600 |
| Trayueng |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,746,300 |
0.800 Diameter (m) |
5.000 Length (m) |
1,746,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,081,300 |
Kiri Vong, Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210411/03/01 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
30,628,400 |
| Saom |
1 |
410 |
Earth dam |
1.63 [ 1.63 ] |
Km |
16,030,802 |
1.600 Max. height (m) |
5,668.000 Volume (m3) |
26,178,300 |
| Saom |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
4,450,100 |
1.000 Diameter (m) |
7.000 Width (m) |
4,450,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,628,400 |
Kiri Vong, Ta Ou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210412/03/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
28,788,750 |
| Sla |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
7,338,333 |
4.000 Width (m) |
600.000 Earth fill m3 |
4,403,000 |
| Ta Ou Khang Cheung |
2 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
7,338,333 |
4.000 Width (m) |
600.000 Earth fill m3 |
7,705,250 |
| Sla |
3 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
7,669,333 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,601,600 |
| Ta Ou Khang Cheung |
4 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
7,669,333 |
4.000 Width (m) |
150.000 Earth fill m3 |
8,052,800 |
| Sla |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,342,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,342,000 |
| Ta Ou Khang Cheung |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,342,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,684,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,788,650 |
Kaoh Andaet, Krapum Chhuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210501/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Education |
34,100,000 |
| Krapum Chhuk |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
17,050,000 |
16.000 Length (m) |
9.000 Width (m) |
34,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,100,000 |
Kaoh Andaet, Prey Khla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210503/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Education |
34,000,000 |
| Samphli |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
17,000,000 |
16.000 Length (m) |
9.000 Width (m) |
34,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,000,000 |
Kaoh Andaet, Prey Yuthka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210504/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Irrigation |
19,586,100 |
| Ta Phan |
1 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
65,287,000 |
4.700 Depth (m) |
6,946.000 Volume (m3) |
19,586,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,586,100 |
Kaoh Andaet, Romenh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210505/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Education |
32,969,400 |
| Pralay Meas |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
16,484,700 |
16.000 Length (m) |
9.000 Width (m) |
32,969,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,969,400 |
Kaoh Andaet, Thlea Prachum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210506/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Education |
23,820,800 |
| Roluos |
1 |
321 |
Brick school with tile roof |
1.00 [ 1.00 ] |
School room |
17,050,000 |
8.000 Length (m) |
9.000 Width (m) |
17,050,000 |
| Roluos |
2 |
321 |
Brick school with tile roof |
1.00 [ 1.00 ] |
School room |
6,770,800 |
9.000 Length (m) |
8.000 Width (m) |
6,770,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,820,800 |
Prey Kabbas, Angkanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210601/03/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
23,601,100 |
| Pring |
1 |
420 |
Canal |
1.40 [ 1.40 ] |
Km |
16,857,929 |
2.690 Depth (m) |
6,651.000 Volume (m3) |
23,601,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,601,100 |
Prey Kabbas, Ban Kam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210602/03/01 |
TSO |
Suon San |
Project Type |
Irrigation |
26,491,300 |
| Samraong Mreah |
1 |
410 |
Earth dam |
0.86 [ 0.86 ] |
Km |
30,696,756 |
1.200 Max. height (m) |
6,844.000 Volume (m3) |
26,491,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,491,300 |
Prey Kabbas, Champa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210603/03/01 |
TSO |
Suon San |
Project Type |
Rural Domestic Water Supplies |
7,174,000 |
| Danghet |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
7,174,000 |
1.500 Depth (m) |
1,391.000 Volume (m3) |
7,174,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,174,000 |
Prey Kabbas, Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210604/03/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
8,290,000 |
| Angk Svay Chek |
1 |
201 |
Earth road |
0.17 [ 0.17 ] |
Km |
49,053,254 |
4.000 Width (m) |
600.000 Earth fill m3 |
8,290,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,290,000 |
Prey Kabbas, Kampeaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210605/03/01 |
TSO |
Suon San |
Project Type |
Rural Domestic Water Supplies |
8,290,000 |
| Angk Chruk |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
8,290,000 |
1.500 Depth (m) |
1,639.000 Volume (m3) |
8,290,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,290,000 |
Prey Kabbas, Kampong Reab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210606/03/01 |
TSO |
Suon San |
Project Type |
Irrigation |
24,776,000 |
| Klaeng Kong |
1 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
44,185,000 |
2.900 Depth (m) |
3,656.000 Volume (m3) |
13,255,500 |
| Klaeng Kong |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
11,520,500 |
2.000 Total span (m) |
5.000 Width (m) |
11,520,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,776,000 |
Prey Kabbas, Kdanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210607/03/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
23,303,100 |
| Veal |
1 |
201 |
Earth road |
1.04 [ 1.04 ] |
Km |
8,750,000 |
4.000 Width (m) |
420.000 Earth fill m3 |
9,082,500 |
| Veal |
2 |
202 |
Laterite road |
1.04 [ 1.04 ] |
Km |
13,700,000 |
4.500 Width (m) |
150.000 Earth fill m3 |
14,220,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,303,100 |
Prey Kabbas, Prey Kabbas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210609/03/01 |
TSO |
Suon San |
Project Type |
Irrigation |
24,741,200 |
| Ampil Rieng |
1 |
420 |
Canal |
0.91 [ 0.91 ] |
Km |
24,877,348 |
1.600 Depth (m) |
5,980.000 Volume (m3) |
22,514,000 |
| Ampil Rieng |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,227,200 |
0.800 Diameter (m) |
5.000 Width (m) |
2,227,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,741,200 |
Prey Kabbas, Prey Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210610/03/01 |
TSO |
Suon San |
Project Type |
Irrigation |
7,437,700 |
| Prey Lvea Kaeut |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
6,826,100 |
0.800 Diameter (m) |
6.000 Width (m) |
6,826,100 |
| Prey Lvea Kaeut |
2 |
410 |
Earth dam |
0.05 [ 0.05 ] |
Km |
12,232,000 |
1.500 Max. height (m) |
375.000 Volume (m3) |
611,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,437,700 |
Prey Kabbas, Prey Phdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210611/03/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
8,240,000 |
| Sman Muni |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
11,771,429 |
4.000 Width (m) |
321.000 Earth fill m3 |
8,240,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,240,000 |
Prey Kabbas, Snao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210612/03/01 |
TSO |
Suon San |
Project Type |
Irrigation |
24,061,400 |
| Roka |
1 |
420 |
Canal |
0.90 [ 0.90 ] |
Km |
17,823,259 |
1.400 Depth (m) |
4,381.000 Volume (m3) |
16,040,933 |
| Thomm Viney |
2 |
420 |
Canal |
0.45 [ 0.45 ] |
Km |
17,823,333 |
1.400 Depth (m) |
2,050.000 Volume (m3) |
8,020,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,061,433 |
Prey Kabbas, Tang Yab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210613/03/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
7,471,400 |
| Trapeang Tea |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,448,424 |
0.800 Diameter (m) |
5.000 Length (m) |
4,896,847 |
| Chumrov |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,287,300 |
0.600 Diameter (m) |
5.000 Length (m) |
1,287,300 |
| Prey Chambak |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,287,300 |
0.600 Diameter (m) |
5.000 Length (m) |
1,287,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,471,447 |
Samraong, Boeng Tranh Khang Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210701/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
31,352,200 |
| Angk Reang |
1 |
201 |
Earth road |
0.58 [ 0.58 ] |
Km |
23,121,092 |
4.000 Width (m) |
1,300.000 Earth fill m3 |
13,294,628 |
| Chheu Teal |
2 |
201 |
Earth road |
0.58 [ 0.58 ] |
Km |
23,121,092 |
4.000 Width (m) |
1,300.000 Earth fill m3 |
13,294,628 |
| Bei Pey |
3 |
201 |
Earth road |
0.21 [ 0.21 ] |
Km |
23,121,092 |
4.000 Width (m) |
1,300.000 Earth fill m3 |
4,762,945 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,352,201 |
Samraong, Boeng Tranh Khang Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210702/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
37,479,200 |
| Khnar Rung |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
26,056,571 |
5.000 Width (m) |
1,300.000 Earth fill m3 |
36,479,200 |
| Khnar Rung |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,479,200 |
Samraong, Cheung Kuon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210703/03/01 |
TSO |
Vong Lo |
Project Type |
Irrigation |
14,539,000 |
| Ta Mau |
1 |
420 |
Canal |
0.70 [ 0.70 ] |
Km |
17,266,187 |
1.300 Depth (m) |
3,251.000 Volume (m3) |
12,000,000 |
| Ta Mau |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,539,000 |
0.600 Diameter (m) |
4.000 Width (m) |
2,539,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,539,000 |
| Contract ID |
210703/03/02 |
TSO |
Vong Lo |
Project Type |
Irrigation |
10,565,000 |
| Ta Mau |
1 |
461 |
Pumping station structure (not pump) |
1.00 [ 1.00 ] |
Place |
10,565,000 |
3.000 |
3.500 |
10,565,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,565,000 |
| Contract ID |
210703/03/03 |
TSO |
Vong Lo |
Project Type |
Irrigation |
3,500,000 |
| Ta Mau |
1 |
462 |
Fixed water pump |
1.00 [ 1.00 ] |
Pump |
3,500,000 |
5,000.000 litres/hour |
0.000 |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,500,000 |
Samraong, Chumreah Pen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210704/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
39,892,600 |
| Kansaom Khlaeng |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
22,669,938 |
4.000 Width (m) |
1,200.000 Earth fill m3 |
22,669,938 |
| Ponlueu |
2 |
201 |
Earth road |
0.61 [ 0.61 ] |
Km |
22,669,938 |
4.000 Width (m) |
1,200.000 Earth fill m3 |
13,828,662 |
| Ponlueu |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,072,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,144,000 |
| Ponlueu |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,892,600 |
Samraong, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210705/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
39,460,700 |
| Tram Kol |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,100,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,100,000 |
| Kab Nuem |
2 |
211 |
Single pipe culvert |
7.00 [ 7.00 ] |
Place |
1,072,000 |
0.600 Diameter (m) |
4.000 Length (m) |
7,504,000 |
| Khvav |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,250,000 |
| Khvav |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
750,000 |
0.300 Diameter (m) |
4.000 Length (m) |
750,000 |
| Tuol Ta Chen |
5 |
202 |
Laterite road |
3.20 [ 3.20 ] |
Km |
6,381,833 |
4.000 Width (m) |
150.000 Earth fill m3 |
20,421,865 |
| Tram Kol |
6 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
6,381,833 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,105,466 |
| Kab Nuem |
7 |
202 |
Laterite road |
0.37 [ 0.37 ] |
Km |
6,381,833 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,329,369 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,460,700 |
Samraong, Lumchang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210706/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
5,873,800 |
| Svay Prey |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,800 |
0.800 Diameter (m) |
5.000 Length (m) |
2,500,800 |
| Khvav |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,370,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,370,000 |
| Pong Tuek |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,003,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,003,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,873,800 |
Samraong, Rovieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210707/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
10,500,000 |
| Prey Khcheay |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
950,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,900,000 |
| Taol |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
950,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,850,000 |
| Taol |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,200,000 |
| Taol |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,650,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,650,000 |
| Char |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
950,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,500,000 |
Samraong, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210708/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
25,832,000 |
| Ta Poun Kaeut |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,833,000 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,833,000 |
| Ta Poun Lech |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,833,000 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,833,000 |
| Kansaom Ak |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,833,000 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,833,000 |
| Krang Roout |
4 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,833,000 |
45.000 Depth (m) |
100.000 Diameter (mm) |
3,833,000 |
| Samraong |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,500,000 |
| Tuol Char |
6 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,500,000 |
| Dei Kraham |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,500,000 |
| Svay |
8 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,500,000 |
| Kansaom Ak |
9 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,500,000 |
| Prey Totueng |
10 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
100.000 Diameter (mm) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,832,000 |
Samraong, Soeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210709/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
28,369,100 |
| Pa Na |
1 |
201 |
Earth road |
0.93 [ 0.93 ] |
Km |
1,897,656 |
5.000 Width (m) |
1.100 Earth fill m3 |
1,764,820 |
| Pa Na |
2 |
202 |
Laterite road |
0.93 [ 0.93 ] |
Km |
28,606,774 |
5.000 Width (m) |
150.000 Earth fill m3 |
26,604,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,369,120 |
Samraong, Sla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210710/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
8,050,000 |
| Sla Kaeut |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
6,192,308 |
5.000 Width (m) |
450.000 Earth fill m3 |
8,050,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,050,000 |
Samraong, Trea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210711/03/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
25,077,700 |
| Kampong Trea |
1 |
201 |
Earth road |
1.39 [ 1.39 ] |
Km |
16,309,582 |
5.000 Width (m) |
1.000 Earth fill m3 |
22,637,700 |
| Kampong Trea |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,040,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,040,000 |
| Thmea |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,077,700 |
Doun Kaev, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210801/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
10,009,900 |
| Chong Thnal |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
14,299,857 |
4.000 Width (m) |
100.000 Earth fill m3 |
10,009,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,009,900 |
Doun Kaev, Roka Knong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210802/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
6,852,000 |
| Chak |
1 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,284,000 |
45.000 Depth (m) |
49.000 Diameter (mm) |
2,568,000 |
| Sambuor |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,284,000 |
45.000 Depth (m) |
49.000 Diameter (mm) |
1,284,000 |
| Chak |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,500,000 |
| Chres |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,500,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,852,000 |
| Contract ID |
210802/03/02 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
2,170,000 |
| Phsar Ta Kao |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,085,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,170,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,170,000 |
Doun Kaev, Roka Krau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210803/03/01 |
TSO |
Pes Phat |
Project Type |
Irrigation |
8,224,000 |
| Tram |
1 |
460 |
Pumping station |
1.00 [ 1.00 ] |
Place |
8,224,000 |
3.000 |
3.500 |
8,224,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,224,000 |
| Contract ID |
210803/03/02 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
2,470,000 |
| Tom |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,235,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,470,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,470,000 |
Tram Kak, Angk Ta Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210901/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
10,794,600 |
| Prey Chheu Teal Kraom |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
1,199,400 |
| Prey Chheu Teal Leu |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
1,199,400 |
| Prey Sraong |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
1,199,400 |
| Trapeang Trabaek |
4 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
1,199,400 |
| Angk Tnaot Kaeut |
5 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
1,199,400 |
| Ou Phot |
6 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
2,398,800 |
| Chheu Teal Prakeab |
7 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,199,400 |
35.000 Depth (m) |
75.000 Diameter (mm) |
2,398,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,794,600 |
Tram Kak, Cheang Tong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210902/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
34,698,600 |
| Srae Khvav |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
5,552,200 |
4.000 Width (m) |
300.000 Earth fill m3 |
5,552,200 |
| Ta Reab |
2 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
5,552,200 |
4.000 Width (m) |
300.000 Earth fill m3 |
8,883,520 |
| Nomou |
3 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
5,552,200 |
4.000 Width (m) |
300.000 Earth fill m3 |
3,331,320 |
| Srae Khvav |
4 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
4,869,500 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,869,500 |
| Ta Reab |
5 |
202 |
Laterite road |
1.60 [ 1.60 ] |
Km |
4,869,500 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,791,200 |
| Nomou |
6 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
4,869,500 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,921,700 |
| Srae Khvav |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,349,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,349,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,698,640 |
Tram Kak, Kus
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210903/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
40,369,900 |
| Ta Leak Tboung |
1 |
201 |
Earth road |
0.88 [ 0.88 ] |
Km |
6,241,302 |
4.000 Width (m) |
300.000 Earth fill m3 |
5,461,140 |
| Trapeang Ampil |
2 |
201 |
Earth road |
1.17 [ 1.17 ] |
Km |
6,241,302 |
4.000 Width (m) |
400.000 Earth fill m3 |
7,283,600 |
| Trapeang Ta Sokh |
3 |
201 |
Earth road |
1.78 [ 1.78 ] |
Km |
6,241,302 |
4.000 Width (m) |
400.000 Earth fill m3 |
11,078,312 |
| Ta Leak Tboung |
4 |
202 |
Laterite road |
0.88 [ 0.88 ] |
Km |
3,981,320 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,483,655 |
| Trapeang Ampil |
5 |
202 |
Laterite road |
1.17 [ 1.17 ] |
Km |
3,981,320 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,646,200 |
| Trapeang Ta Sokh |
6 |
202 |
Laterite road |
1.78 [ 1.78 ] |
Km |
3,981,320 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,066,842 |
| Trapeang Ta Sokh |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,349,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,349,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,368,749 |
Tram Kak, Leay Bour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210904/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
51,664,800 |
| Angk Ta Chan |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
16,225,650 |
5.000 Width (m) |
1,100.000 Earth fill m3 |
32,451,300 |
| Seima |
2 |
201 |
Earth road |
0.77 [ 0.77 ] |
Km |
16,225,676 |
5.000 Width (m) |
1,100.000 Earth fill m3 |
12,542,448 |
| Angk Ta Chan |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,334,200 |
0.600 Diameter (m) |
4.000 Length (m) |
4,002,600 |
| Seima |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,334,200 |
0.600 Diameter (m) |
4.000 Length (m) |
2,668,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,664,748 |
Tram Kak, Nhaeng Nhang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210905/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
23,168,200 |
| Ou Sngaeun |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
11,680,000 |
4.000 Width (m) |
700.000 Earth fill m3 |
12,848,000 |
| Ta Tai |
2 |
201 |
Earth road |
0.82 [ 0.82 ] |
Km |
11,680,000 |
4.000 Width (m) |
700.000 Earth fill m3 |
9,577,600 |
| Ta Tai |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
742,500 |
0.300 Diameter (m) |
4.000 Length (m) |
742,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,168,100 |
Tram Kak, Ou Saray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210906/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Domestic Water Supplies |
46,019,800 |
| Trapeang Krasang |
1 |
123 |
Drilled well with Afridev pump |
3.00 [ 3.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
11,504,940 |
| Trapeang Phlu |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Tnaot Chum |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Trapeang Kralanh |
4 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Ruessei Muoy Kump |
5 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Trapeang Dang Tuek |
6 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
7,669,960 |
| Tuol Khlong |
7 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Damnak Khlong |
8 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Sokram |
9 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,834,980 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,834,980 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,019,760 |
Tram Kak, Otdam Souriya
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210908/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
8,595,000 |
| Prab Siem |
1 |
131 |
Open mixed well |
3.00 [ 3.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
5,157,000 |
| Rumlich Svay |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Angk Rumpeak |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,595,000 |
Tram Kak, Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210909/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
29,223,000 |
| Ta Set |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Cham Pol |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,438,000 |
| Trapeang Pring |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Trapeang Kak |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Romiet |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Damnak Rovieng |
6 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,438,000 |
| Prey Mien |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Prey Chuor |
8 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,438,000 |
| Prey Chheu Teal |
9 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,719,000 |
| Trav Aem |
10 |
131 |
Open mixed well |
3.00 [ 3.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
5,157,000 |
| Kngaok Pong |
11 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,719,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,438,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,223,000 |
Tram Kak, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210910/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
26,690,500 |
| Paen Meas |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
10,676,125 |
4.000 Width (m) |
1.000 Earth fill m3 |
8,540,900 |
| Krang Banteay |
2 |
201 |
Earth road |
1.03 [ 1.03 ] |
Km |
10,676,195 |
4.000 Width (m) |
7.000 Earth fill m3 |
10,943,100 |
| Pong Tuek |
3 |
201 |
Earth road |
0.68 [ 0.68 ] |
Km |
10,676,296 |
4.000 Width (m) |
800.000 Earth fill m3 |
7,206,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,690,500 |
Tram Kak, Srae Ronoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210911/03/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
8,000,000 |
| Sameakki |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
5,376,286 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,763,400 |
| Thum |
2 |
202 |
Laterite road |
0.79 [ 0.79 ] |
Km |
5,376,286 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,236,513 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,999,913 |
Tram Kak, Ta Phem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210912/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
32,664,000 |
| Ta Much |
1 |
201 |
Earth road |
1.11 [ 1.11 ] |
Km |
11,254,905 |
4.000 Width (m) |
0.000 Earth fill m3 |
12,504,200 |
| Moha Sena |
2 |
201 |
Earth road |
1.07 [ 1.07 ] |
Km |
11,254,851 |
4.000 Width (m) |
0.000 Earth fill m3 |
12,065,200 |
| Ta Much |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,349,100 |
0.600 Diameter (m) |
4.000 Length (m) |
4,047,300 |
| Moha Sena |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,349,100 |
0.600 Diameter (m) |
4.000 Length (m) |
4,047,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,664,000 |
Tram Kak, Tram Kak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210913/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Domestic Water Supplies |
7,752,400 |
| Chrey Tnaot |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,876,200 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,876,200 |
| Trapeang Ruessei |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,876,200 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,876,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,752,400 |
Tram Kak, Trapeang Thum Khang Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210914/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
27,199,700 |
| Trapeang Svay |
1 |
201 |
Earth road |
1.72 [ 1.72 ] |
Km |
6,847,350 |
4.000 Width (m) |
300.000 Earth fill m3 |
11,756,900 |
| Prey Dak Por |
2 |
201 |
Earth road |
0.83 [ 0.83 ] |
Km |
6,847,350 |
4.000 Width (m) |
300.000 Earth fill m3 |
5,703,843 |
| Trapeang Svay |
3 |
202 |
Laterite road |
1.72 [ 1.72 ] |
Km |
4,869,540 |
4.000 Width (m) |
150.000 Earth fill m3 |
8,361,000 |
| Prey Dak Por |
4 |
202 |
Laterite road |
0.28 [ 0.28 ] |
Km |
4,869,541 |
4.000 Width (m) |
150.000 Earth fill m3 |
1,378,080 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,199,823 |
Tram Kak, Trapeang Thum Khang Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210915/03/01 |
TSO |
Huy Prim |
Project Type |
Rural Transport |
29,571,300 |
| Prakeab |
1 |
201 |
Earth road |
1.46 [ 1.46 ] |
Km |
5,466,667 |
5.000 Width (m) |
200.000 Earth fill m3 |
7,970,400 |
| Prey Rumduol |
2 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
5,466,667 |
5.000 Width (m) |
200.000 Earth fill m3 |
5,450,267 |
| Prakeab |
3 |
202 |
Laterite road |
1.46 [ 1.46 ] |
Km |
6,342,181 |
5.000 Width (m) |
150.000 Earth fill m3 |
9,246,900 |
| Prey Rumduol |
4 |
202 |
Laterite road |
0.97 [ 0.97 ] |
Km |
6,342,181 |
5.000 Width (m) |
150.000 Earth fill m3 |
6,164,600 |
| Prey Rumduol |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
738,600 |
0.300 Diameter (m) |
5.000 Length (m) |
738,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,570,767 |
Treang, Angkanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211001/03/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
7,019,250 |
| Prey Tuk |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
12,762,091 |
4.000 Width (m) |
800.000 Earth fill m3 |
7,019,150 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,019,150 |
Treang, Angk Khnaor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211002/03/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
19,883,200 |
| Trapeang Prei |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
12,666,600 |
4.000 Width (m) |
500.000 Earth fill m3 |
5,066,640 |
| Ta Pheak |
2 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
12,666,600 |
4.000 Width (m) |
500.000 Earth fill m3 |
4,433,310 |
| Trapeang Prei |
3 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
13,844,400 |
4.000 Width (m) |
150.000 Earth fill m3 |
5,537,760 |
| Ta Pheak |
4 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
13,844,400 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,845,540 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,883,250 |
Treang, Chi Khmar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211003/03/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
6,517,500 |
| Chuos |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
9,585,533 |
4.000 Width (m) |
600.000 Earth fill m3 |
2,875,660 |
| Chuos |
2 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
12,139,667 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,641,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,517,560 |
Treang, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211004/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
34,084,550 |
| Doun Pheu |
1 |
201 |
Earth road |
1.48 [ 1.48 ] |
Km |
9,258,900 |
4.000 Width (m) |
800.000 Earth fill m3 |
13,703,172 |
| Sama Leu |
2 |
201 |
Earth road |
0.15 [ 0.15 ] |
Km |
9,258,900 |
4.000 Width (m) |
800.000 Earth fill m3 |
1,388,835 |
| Doun Pheu |
3 |
202 |
Laterite road |
1.48 [ 1.48 ] |
Km |
11,651,900 |
4.000 Width (m) |
150.000 Earth fill m3 |
17,244,812 |
| Sama Leu |
4 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
11,651,900 |
4.000 Width (m) |
150.000 Earth fill m3 |
1,747,785 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,084,604 |
Treang, Prambei Mom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211005/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
25,730,300 |
| Ponhea Lueu |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
12,865,150 |
4.000 Width (m) |
150.000 Earth fill m3 |
9,005,605 |
| Prey Chheu Teal |
2 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
12,865,150 |
4.000 Width (m) |
150.000 Earth fill m3 |
12,865,150 |
| Krang Sbaek |
3 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
12,865,150 |
4.000 Width (m) |
150.000 Earth fill m3 |
3,859,545 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,730,300 |
Treang, Angk Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211006/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
19,998,800 |
| Ou Ta Sek |
1 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
11,560,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
12,138,000 |
| Trapeang Kak |
2 |
202 |
Laterite road |
0.22 [ 0.22 ] |
Km |
11,560,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,543,200 |
| Ou Kralang Duol |
3 |
202 |
Laterite road |
0.21 [ 0.21 ] |
Km |
11,560,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,427,600 |
| Serei Duoch |
4 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
11,560,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,890,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,998,800 |
Treang, Prey Sloek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211007/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
35,850,200 |
| Baray |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
11,639,670 |
4.000 Width (m) |
150.000 Earth fill m3 |
11,639,670 |
| Trapeang Veaeng |
2 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
11,639,670 |
4.000 Width (m) |
150.000 Earth fill m3 |
8,147,769 |
| Samraong Mean Chey |
3 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
11,639,670 |
4.000 Width (m) |
150.000 Earth fill m3 |
6,983,802 |
| Trapeang Ta Muong |
4 |
202 |
Laterite road |
0.17 [ 0.17 ] |
Km |
11,639,670 |
4.000 Width (m) |
150.000 Earth fill m3 |
1,978,744 |
| Trapeang Angk |
5 |
202 |
Laterite road |
0.61 [ 0.61 ] |
Km |
11,639,670 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,100,199 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,850,184 |
Treang, Roneam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211008/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
30,059,500 |
| Trapeang Chrey |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
10,204,150 |
4.000 Width (m) |
800.000 Earth fill m3 |
15,306,225 |
| Trapeang Chrey |
2 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
11,867,174 |
4.000 Width (m) |
150.000 Earth fill m3 |
13,647,250 |
| Trapeang Chrey |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,106,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,106,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,059,475 |
Treang, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211009/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
9,006,000 |
| Pou |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
1,866,375 |
4.000 Width (m) |
400.000 Earth fill m3 |
746,550 |
| Pou |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
20,648,625 |
4.000 Width (m) |
150.000 Earth fill m3 |
8,259,450 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,006,000 |
Treang, Sanlung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211010/03/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
5,666,000 |
| Dei Chrab |
1 |
410 |
Earth dam |
0.04 [ 0.04 ] |
Km |
161,885,714 |
3.500 Max. height (m) |
1,041.000 Volume (m3) |
5,666,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,666,000 |
| Contract ID |
211010/03/02 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
18,999,000 |
| Chen |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
14,073,330 |
4.000 Width (m) |
600.000 Earth fill m3 |
9,851,331 |
| Ta Preah |
2 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
14,073,330 |
4.000 Width (m) |
600.000 Earth fill m3 |
4,221,999 |
| Krasang |
3 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
14,073,330 |
4.000 Width (m) |
600.000 Earth fill m3 |
4,925,666 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,998,996 |
Treang, Smaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211011/03/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
7,185,000 |
| Kampong Chrey |
1 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
14,088,334 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,226,500 |
| Smaong |
2 |
202 |
Laterite road |
0.21 [ 0.21 ] |
Km |
14,088,334 |
4.000 Width (m) |
150.000 Earth fill m3 |
2,958,550 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,185,050 |
Treang, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211012/03/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
8,280,000 |
| Kantuot |
1 |
421 |
Concrete canal |
0.04 [ 0.04 ] |
Km |
207,000,000 |
1.500 Depth (m) |
0.000 |
8,280,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,280,000 |
Treang, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211013/03/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
39,507,900 |
| Krang Thum |
1 |
420 |
Canal |
0.43 [ 0.43 ] |
Km |
29,265,111 |
1.920 Depth (m) |
2,376.000 Volume (m3) |
12,437,672 |
| Prey Chheu Teal |
2 |
420 |
Canal |
0.43 [ 0.43 ] |
Km |
29,265,111 |
2.440 Depth (m) |
3,464.000 Volume (m3) |
12,437,672 |
| Krang Dai |
3 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
29,265,111 |
1.390 Depth (m) |
3,686.000 Volume (m3) |
11,706,044 |
| Chheu Teal Bak |
4 |
420 |
Canal |
0.10 [ 0.10 ] |
Km |
29,265,111 |
2.470 Depth (m) |
1,308.000 Volume (m3) |
2,926,511 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,507,900 |
Treang, Tralach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211014/03/01 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
7,120,000 |
| Trapeang Chhuk |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,780,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,780,000 |
| Samraong |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,780,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,780,000 |
| Poun |
3 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,780,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,560,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,120,000 |
| Contract ID |
211014/03/02 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
16,187,100 |
| Chingou |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,065,850 |
1.000 Depth (m) |
415.000 Volume (m3) |
2,065,850 |
| Kantuot Thum |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
7,382,550 |
1.000 Depth (m) |
1,345.000 Volume (m3) |
7,382,550 |
| Kantuot Touch |
3 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
6,738,800 |
1.000 Depth (m) |
1,197.000 Volume (m3) |
6,738,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,187,200 |