Contract Outputs
Location: Banteay Meanchey \ Preah Netr Preah Budget Year: 2004
Mongkol Borei
Phnum Srok
Preah Netr Preah
Ou Chrov
Serei Saophoan
Thma Puok
Svay Chek
Malai
Preah Netr Preah, Chhnuor Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010401/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Domestic Water Supplies |
7,975,000 |
| Samraong Touch |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
7,975,000 |
2.000 Depth (m) |
2,544.000 Volume (m3) |
7,975,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,975,000 |
| Contract ID |
010401/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
7,172,700 |
| Bantoat Baoh |
1 |
202 |
Laterite road |
0.36 [ 0.36 ] |
Km |
12,171,944 |
4.000 Width (m) |
259.000 Earth fill m3 |
4,381,900 |
| Samraong Thum |
2 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
1,395,400 |
4.000 Width (m) |
224.000 Earth fill m3 |
2,790,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,172,700 |
| Contract ID |
010401/04/03 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
7,200,000 |
| Samraong Thum |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,700,000 |
1.000 Diameter (m) |
6.000 Length (m) |
2,700,000 |
| Samraong Thum |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
4,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,200,000 |
Preah Netr Preah, Chob Veari
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010402/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Domestic Water Supplies |
16,118,700 |
| Pradak |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
16,118,700 |
1.000 Depth (m) |
4,915.000 Volume (m3) |
16,118,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,118,700 |
| Contract ID |
010402/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Irrigation |
11,215,000 |
| Chob |
1 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
10,454,400 |
6.000 Length (m) |
1.800 Height (m) |
10,454,400 |
| Chob |
2 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
760,600 |
38.000 Depth (m) |
1.000 Diameter (m) |
760,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,215,000 |
| Contract ID |
010402/04/03 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
5,292,000 |
| Kak |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
10,584,000 |
4.000 Width (m) |
360.000 Earth fill m3 |
5,292,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,292,000 |
Preah Netr Preah, Phnum Lieb
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010403/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
19,350,000 |
| Laote |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
19,350,000 |
4.150 Total Span (m) |
4.000 Width (m) |
19,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,350,000 |
| Contract ID |
010403/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Irrigation |
17,493,800 |
| Rumduol |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
16,010,000 |
4.000 Total span (m) |
4.000 Width (m) |
16,010,000 |
| Rumduol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,483,800 |
0.600 Diameter (m) |
6.000 Length (m) |
1,483,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,493,800 |
Preah Netr Preah, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010404/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
23,131,800 |
| Prasat |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
26,490,909 |
4.000 Width (m) |
396.000 Earth fill m3 |
14,570,000 |
| Tonloab |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,750,000 |
1.000 Diameter (m) |
10.000 Length (m) |
5,250,000 |
| Prasat |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,610,000 |
1.000 Diameter (m) |
10.000 Length (m) |
2,610,000 |
| Tonloab |
4 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
701,800 |
5.000 Total Span (m) |
4.000 Width (m) |
701,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,131,800 |
Preah Netr Preah, Preah Netr Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010405/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
28,169,000 |
| Paoy Kdoeang |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
25,608,182 |
5.000 Width (m) |
7,168.000 Earth fill m3 |
28,169,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,169,000 |
| Contract ID |
010405/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
4,083,400 |
| Cheung Voat |
1 |
251 |
Drift |
1.00 [ 1.00 ] |
Place |
4,083,400 |
15.000 Length (m) |
4.000 Width (m) |
4,083,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,083,400 |
Preah Netr Preah, Rohal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010406/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
25,972,300 |
| Paoy Svay |
1 |
202 |
Laterite road |
2.62 [ 2.62 ] |
Km |
8,728,626 |
3.500 Width (m) |
1,650.000 Earth fill m3 |
22,869,000 |
| Popel |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,333,000 |
0.800 Diameter (m) |
7.000 Length (m) |
2,333,000 |
| Popel |
3 |
202 |
Laterite road |
2.15 [ 2.15 ] |
Km |
359,114 |
3.500 Width (m) |
70.000 Earth fill m3 |
770,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,972,300 |
| Contract ID |
010406/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
1,500,000 |
| Paoy Svay |
1 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
750,000 |
3.500 Width (m) |
125.000 Earth fill m3 |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,500,000 |
Preah Netr Preah, Tean Kam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010407/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Domestic Water Supplies |
16,731,600 |
| Ta Un |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
16,731,600 |
2.000 Depth (m) |
3,484.000 Volume (m3) |
16,731,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,731,600 |
| Contract ID |
010407/04/02 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
2,990,000 |
| Bantoat Baoh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,550,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,550,000 |
| Bantoat Baoh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,440,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,990,000 |
Preah Netr Preah, Tuek Chour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
010408/04/01 |
TSO |
Oeung Vuthy |
Project Type |
Rural Transport |
31,365,560 |
| Smach |
1 |
242 |
Concrete bridge with piers |
1.00 [ 1.00 ] |
Place |
25,450,000 |
16.000 Total Span (m) |
4.000 Width (m) |
25,450,000 |
| Tuek Chour |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,915,560 |
1.000 Diameter (m) |
7.000 Length (m) |
5,915,560 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,365,560 |