Contract Outputs
Location: Prey Veng Budget Year: 2004
Ba Phnum
Kamchay Mear
Kampong Trabaek
Kanhchriech
Me Sang
Peam Chor
Peam Ro
Pea Reang
Preah Sdach
Prey Veaeng
Kampong Leav
Sithor Kandal
Ba Phnum, Boeng Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140101/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
89,430,000 |
| Kandal |
1 |
201 |
Earth road |
1.16 [ 1.16 ] |
Km |
9,288,800 |
4.000 Width (m) |
4,067.000 Earth fill m3 |
10,793,586 |
| Boeng Preah |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
9,288,800 |
4.000 Width (m) |
4,200.000 Earth fill m3 |
11,146,560 |
| Ruessei K'aek |
3 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
9,288,800 |
4.000 Width (m) |
4,656.250 Earth fill m3 |
12,075,440 |
| Prasrae |
4 |
201 |
Earth road |
0.99 [ 1.76 ] |
Km |
9,288,800 |
4.000 Width (m) |
8,500.000 Earth fill m3 |
16,329,710 |
| Kandal |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
700,000 |
| Kandal |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
700,000 |
| Ruessei K'aek |
7 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Prasrae |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
700,000 |
| Ta Ma |
9 |
201 |
Earth road |
1.37 [ 1.37 ] |
Km |
13,034,750 |
4.000 Width (m) |
7,310.000 Earth fill m3 |
17,792,434 |
| Dei Thoy |
10 |
201 |
Earth road |
1.37 [ 1.37 ] |
Km |
13,034,690 |
4.000 Width (m) |
7,311.000 Earth fill m3 |
17,792,352 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
89,430,082 |
Ba Phnum, Cheung Phnum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140102/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
68,693,000 |
| Andoung |
1 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
2,475,393 |
4.000 Width (m) |
1,178.000 Earth fill m3 |
2,351,623 |
| Boeng Roka |
2 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
2,475,393 |
4.000 Width (m) |
1,364.000 Earth fill m3 |
2,722,932 |
| Phlov Roluos |
3 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
2,475,393 |
4.000 Width (m) |
868.000 Earth fill m3 |
1,732,775 |
| Pou Andaot |
4 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
2,475,393 |
4.000 Width (m) |
2,125.000 Earth fill m3 |
4,208,168 |
| Andoung |
5 |
211 |
Single pipe culvert |
4.00 [ 11.00 ] |
Place |
2,027,700 |
0.800 Diameter (m) |
5.000 Length (m) |
22,304,700 |
| Boeng Roka |
6 |
211 |
Single pipe culvert |
4.00 [ 6.00 ] |
Place |
2,049,600 |
1.000 Diameter (m) |
5.000 Length (m) |
12,297,600 |
| Phlov Roluos |
7 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,226,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,226,000 |
| Pou Andaot |
8 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
2,226,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,452,000 |
| Pou Andaot |
9 |
211 |
Single pipe culvert |
1.00 [ 8.00 ] |
Place |
2,049,650 |
0.800 Diameter (m) |
5.000 Length (m) |
16,397,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
68,692,999 |
Ba Phnum, Chheu Kach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140103/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
79,691,300 |
| Chheu Kach |
1 |
203 |
Gravel road |
2.50 [ 2.50 ] |
Km |
6,140,203 |
5.000 Width (m) |
3,450.000 Earth fill m3 |
15,350,507 |
| Khleang |
2 |
203 |
Gravel road |
1.15 [ 4.40 ] |
Km |
6,140,203 |
5.000 Width (m) |
6,072.000 Earth fill m3 |
27,016,892 |
| Kandal |
4 |
203 |
Gravel road |
1.20 [ 4.45 ] |
Km |
6,140,203 |
5.000 Width (m) |
6,141.000 Earth fill m3 |
27,323,902 |
| Chheu Kach |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Tnaot |
7 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Kandal |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Trapeang Sala |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Khleang |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
79,691,300 |
Ba Phnum, Reaks Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140104/04/01 |
TSO |
Chea Sarin |
Project Type |
Education |
32,122,400 |
| Chheu Traeng |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
9,243,467 |
24.000 Length (m) |
7.000 Width (m) |
27,730,400 |
| Chheu Traeng |
2 |
740 |
School furniture |
3.00 [ 3.00 ] |
School room |
1,464,000 |
146.000 Students |
0.000 |
4,392,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,122,400 |
Ba Phnum, Roung Damrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140105/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
70,798,300 |
| Voa Yeav |
1 |
201 |
Earth road |
0.75 [ 0.75 ] |
Km |
11,062,234 |
4.000 Width (m) |
1,685.250 Earth fill m3 |
8,296,676 |
| Tnaot Svay |
2 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
11,062,234 |
4.000 Width (m) |
2,247.000 Earth fill m3 |
11,062,234 |
| Traok |
3 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
11,062,234 |
4.000 Width (m) |
2,808.750 Earth fill m3 |
13,827,793 |
| Tnaot Svay |
4 |
203 |
Gravel road |
1.00 [ 1.00 ] |
Km |
11,062,234 |
4.000 Width (m) |
600.000 Earth fill m3 |
11,062,234 |
| Traok |
5 |
203 |
Gravel road |
1.25 [ 1.25 ] |
Km |
11,062,234 |
4.000 Width (m) |
750.000 Earth fill m3 |
13,827,793 |
| Voa Yeav |
6 |
203 |
Gravel road |
0.75 [ 1.15 ] |
Km |
11,062,234 |
4.000 Width (m) |
690.000 Earth fill m3 |
12,721,570 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,798,300 |
Ba Phnum, Sdau Kaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140106/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
40,736,400 |
| Ta Kouk |
1 |
201 |
Earth road |
0.56 [ 0.56 ] |
Km |
3,448,276 |
5.000 Width (m) |
1,909.000 Earth fill m3 |
1,931,034 |
| Sempoli |
2 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
3,448,276 |
5.000 Width (m) |
3,035.000 Earth fill m3 |
3,068,965 |
| Ta Kouk |
6 |
203 |
Gravel road |
0.56 [ 2.36 ] |
Km |
8,408,565 |
5.000 Width (m) |
1,449.000 Earth fill m3 |
19,844,213 |
| Sempoli |
7 |
203 |
Gravel road |
0.29 [ 1.89 ] |
Km |
8,408,565 |
5.000 Width (m) |
1,161.000 Earth fill m3 |
15,892,187 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,736,400 |
| Contract ID |
140106/04/02 |
TSO |
Chea Sarin |
Project Type |
Irrigation |
7,000,000 |
| Prey Phdau |
1 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
7,000,000 |
1.000 Diameter (m) |
5.000 Width (m) |
7,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,000,000 |
Ba Phnum, Spueu Ka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140107/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
28,245,900 |
| Svay Pok |
1 |
211 |
Single pipe culvert |
2.00 [ 5.00 ] |
Place |
907,700 |
1.000 Diameter (m) |
5.000 Length (m) |
4,538,500 |
| Svay Pok |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
907,700 |
0.600 Diameter (m) |
5.000 Length (m) |
1,815,400 |
| Kalei Cheung |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
842,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,684,000 |
| Kalei Cheung |
4 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,684,000 |
| Kalei Tboung |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
842,000 |
0.800 Diameter (m) |
5.000 Length (m) |
842,000 |
| Snuol |
6 |
211 |
Single pipe culvert |
2.00 [ 6.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,052,000 |
| Krang |
7 |
211 |
Single pipe culvert |
3.00 [ 5.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,210,000 |
| Ta Laon |
8 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
842,000 |
1.600 Diameter (m) |
5.000 Length (m) |
1,684,000 |
| Sdau Kaong |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
842,000 |
| Spueu Lech |
10 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,526,000 |
| Spueu Kaeut |
11 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
842,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,368,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,245,900 |
Ba Phnum, Spueu Kha
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140108/04/01 |
TSO |
Chea Sarin |
Project Type |
Irrigation |
78,073,000 |
| Prey Chamkar |
1 |
420 |
Canal |
0.80 [ 1.43 ] |
Km |
17,090,975 |
1.500 Depth (m) |
18,666.000 Volume (m3) |
24,491,367 |
| Thlok |
2 |
420 |
Canal |
0.70 [ 1.33 ] |
Km |
17,090,900 |
1.500 Depth (m) |
11,736.000 Volume (m3) |
22,782,170 |
| Chan Ra Ka |
3 |
420 |
Canal |
0.70 [ 1.33 ] |
Km |
17,090,975 |
1.500 Depth (m) |
11,735.000 Volume (m3) |
22,799,361 |
| Prey Chamkar |
4 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
5.000 Width (m) |
4,000,000 |
| Prey Chamkar |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Thlok |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Prey Chamkar |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Thlok |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
78,072,898 |
Ba Phnum, Theay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140109/04/01 |
TSO |
Chea Sarin |
Project Type |
Rural Transport |
73,984,600 |
| Angkal |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
2,954,733 |
4.000 Width (m) |
1,978.260 Earth fill m3 |
2,289,918 |
| Snuol |
2 |
201 |
Earth road |
0.78 [ 2.83 ] |
Km |
2,954,733 |
4.000 Width (m) |
1,378.260 Earth fill m3 |
8,347,120 |
| Krang |
3 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
10,878,892 |
4.000 Width (m) |
2,223.000 Earth fill m3 |
13,598,615 |
| Sdau |
4 |
201 |
Earth road |
1.25 [ 2.37 ] |
Km |
10,878,892 |
4.000 Width (m) |
2,223.000 Earth fill m3 |
25,815,611 |
| Angkal |
5 |
203 |
Gravel road |
0.78 [ 0.78 ] |
Km |
5,909,500 |
4.000 Width (m) |
465.000 Earth fill m3 |
4,579,863 |
| Snuol |
6 |
203 |
Gravel road |
0.78 [ 0.78 ] |
Km |
5,909,500 |
4.000 Width (m) |
465.000 Earth fill m3 |
4,579,863 |
| Krang |
7 |
203 |
Gravel road |
1.25 [ 1.25 ] |
Km |
5,909,465 |
4.000 Width (m) |
750.000 Earth fill m3 |
7,386,831 |
| Sdau |
8 |
203 |
Gravel road |
1.25 [ 1.25 ] |
Km |
5,909,465 |
4.000 Width (m) |
750.000 Earth fill m3 |
7,386,831 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
73,984,651 |
Kamchay Mear, Cheach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140201/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
32,693,900 |
| Cheach Tboung |
1 |
201 |
Earth road |
2.32 [ 2.47 ] |
Km |
13,252,492 |
4.000 Width (m) |
6,764.000 Earth fill m3 |
32,693,898 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,693,898 |
Kamchay Mear, Doun Koeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140202/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Education |
11,900,000 |
| Pou Pir |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
4,365,000 |
16.000 Length (m) |
9.000 Width (m) |
8,730,000 |
| Pou Pir |
2 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,400,000 |
80.000 Students |
0.000 |
2,800,000 |
| Pou Pir |
3 |
740 |
School furniture |
1.00 [ 1.00 ] |
School room |
370,000 |
80.000 Students |
0.000 |
370,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,900,000 |
| Contract ID |
140202/04/02 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
15,154,100 |
| Doun Koeng |
1 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,322,050 |
0.600 Diameter (m) |
5.000 Length (m) |
2,644,100 |
| Thmei |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,390,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,780,000 |
| Chuor Ph'av |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,390,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,780,000 |
| Trapeang Danghet |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,390,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,780,000 |
| Ta Dok |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,390,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,780,000 |
| Svay Sokhom |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,390,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,390,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,154,100 |
Kamchay Mear, Kranhung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140203/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
32,714,700 |
| Snuol |
1 |
201 |
Earth road |
1.34 [ 2.28 ] |
Km |
12,056,496 |
4.000 Width (m) |
8,310.000 Earth fill m3 |
27,464,698 |
| Snuol |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Snuol |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Snuol |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,750,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,750,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,714,698 |
Kamchay Mear, Krabau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140204/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
28,037,600 |
| Tboung Voat |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,300,000 |
| Pou |
2 |
211 |
Single pipe culvert |
5.00 [ 6.00 ] |
Place |
1,273,500 |
0.600 Diameter (m) |
5.000 Length (m) |
7,641,000 |
| Pou |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,750,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,750,000 |
| Phum Thmei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,146,600 |
1.000 Diameter (m) |
5.000 Length (m) |
3,146,600 |
| Krabau |
5 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Prey Tres |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Ta Ei |
7 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,900,000 |
| Kanlaeng Chrov |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,037,600 |
Kamchay Mear, Seang Khveang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140205/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
30,008,000 |
| Sangkae |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
19,039,200 |
4.000 Width (m) |
3,924.000 Earth fill m3 |
19,039,200 |
| Lvea |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
19,039,200 |
4.000 Width (m) |
1,962.000 Earth fill m3 |
9,519,600 |
| Lvea |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,449,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,449,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,008,000 |
Kamchay Mear, Smaong Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140206/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
35,200,000 |
| Prey Stor |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
35,200,000 |
6.000 Total Span (m) |
4.000 Width (m) |
35,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,200,000 |
Kamchay Mear, Smaong Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140207/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
33,140,500 |
| Prey Khlout |
1 |
201 |
Earth road |
1.65 [ 1.65 ] |
Km |
12,825,585 |
4.000 Width (m) |
6,337.000 Earth fill m3 |
21,162,215 |
| Kong |
2 |
201 |
Earth road |
0.91 [ 0.91 ] |
Km |
13,163,000 |
4.000 Width (m) |
4,278.000 Earth fill m3 |
11,978,330 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,140,545 |
Kamchay Mear, Trâbêk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140208/04/01 |
TSO |
Bunn Sam Ath |
Project Type |
Rural Transport |
52,238,300 |
| Doun Diev |
1 |
201 |
Earth road |
2.05 [ 2.05 ] |
Km |
4,464,800 |
4.000 Width (m) |
820.000 Earth fill m3 |
9,152,840 |
| Doun Diev |
2 |
202 |
Laterite road |
2.05 [ 2.05 ] |
Km |
8,929,605 |
4.000 Width (m) |
1,230.000 Earth fill m3 |
18,305,690 |
| Tralach Sa |
3 |
201 |
Earth road |
0.85 [ 0.85 ] |
Km |
4,464,800 |
4.000 Width (m) |
340.000 Earth fill m3 |
3,795,080 |
| Tralach Sa |
4 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
8,929,605 |
4.000 Width (m) |
510.000 Earth fill m3 |
7,590,164 |
| Trapeang Prich |
5 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
4,464,800 |
4.000 Width (m) |
360.000 Earth fill m3 |
4,018,320 |
| Trapeang Prich |
6 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
8,929,700 |
4.000 Width (m) |
540.000 Earth fill m3 |
8,036,730 |
| Trapeang Prei |
7 |
201 |
Earth road |
0.10 [ 0.10 ] |
Km |
4,464,800 |
4.000 Width (m) |
68.000 Earth fill m3 |
446,480 |
| Trapeang Prei |
8 |
202 |
Laterite road |
0.10 [ 0.10 ] |
Km |
8,929,700 |
4.000 Width (m) |
60.000 Earth fill m3 |
892,970 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,238,275 |
Kampong Trabaek, Ansaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140301/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
24,474,000 |
| Banteab Bos |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
20,395,000 |
4.000 Width (m) |
4,943.000 Earth fill m3 |
24,474,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,474,000 |
Kampong Trabaek, Cham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140302/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
31,620,000 |
| Ka Thum |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
19,762,500 |
4.000 Width (m) |
6,408.000 Earth fill m3 |
31,620,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,620,000 |
Kampong Trabaek, Cheang Daek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140303/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
30,700,000 |
| Cheang Daek |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
15,350,000 |
4.000 Width (m) |
6,454.000 Earth fill m3 |
30,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,700,000 |
Kampong Trabaek, Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140304/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
24,175,000 |
| Dak Por |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
15,109,375 |
3.500 Width (m) |
4,759.000 Earth fill m3 |
24,175,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,175,000 |
Kampong Trabaek, Kansaom Ak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140305/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
29,000,000 |
| Kansaom Ak |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
21,481,500 |
5.000 Width (m) |
6,043.000 Earth fill m3 |
29,000,025 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,000,025 |
Kampong Trabaek, Kou Khchak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140306/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
37,000,000 |
| Prey Snuol |
1 |
201 |
Earth road |
2.40 [ 2.40 ] |
Km |
15,416,667 |
3.500 Width (m) |
7,574.000 Earth fill m3 |
37,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,000,000 |
Kampong Trabaek, Kampong Trabaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140307/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
27,108,000 |
| Preaek Phdau |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
18,072,000 |
3.000 Width (m) |
5,020.000 Earth fill m3 |
27,108,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,108,000 |
Kampong Trabaek, Peam Montear
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140308/04/01 |
TSO |
Chea Sarim |
Project Type |
Irrigation |
30,300,000 |
| Dangkieb Kdam |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
30,300,000 |
1.500 Depth (m) |
9,751.000 Volume (m3) |
30,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,300,000 |
Kampong Trabaek, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140309/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
30,498,000 |
| Thkov |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
13,260,000 |
3.000 Width (m) |
4,137.000 Earth fill m3 |
18,564,000 |
| Phlong |
2 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
13,260,000 |
3.000 Width (m) |
4,569.000 Earth fill m3 |
11,934,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,498,000 |
Kampong Trabaek, Pratheat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140310/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
28,800,000 |
| Traok |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
18,000,000 |
4.000 Width (m) |
5,977.000 Earth fill m3 |
28,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,800,000 |
Kampong Trabaek, Prey Chhor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140311/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
24,799,800 |
| A Kreach |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
18,166,500 |
4.000 Width (m) |
4,605.000 Earth fill m3 |
21,799,800 |
| A Kreach |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,799,800 |
Kampong Trabaek, Prey Poun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140312/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
24,440,000 |
| Chi Peay |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
17,457,150 |
4.000 Width (m) |
5,082.000 Earth fill m3 |
24,440,010 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,440,010 |
Kampong Trabaek, Thkov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140313/04/01 |
TSO |
Chea Sarim |
Project Type |
Rural Transport |
23,780,000 |
| Thum |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
12,194,900 |
3.000 Width (m) |
1,695.000 Earth fill m3 |
6,707,195 |
| Pouthi Vongs |
2 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
12,194,800 |
3.000 Width (m) |
925.000 Earth fill m3 |
3,658,440 |
| Pou |
3 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
12,194,900 |
3.000 Width (m) |
3,392.000 Earth fill m3 |
13,414,390 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,780,025 |
Kanhchriech, Chong Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140401/04/01 |
TSO |
Ou Kolab |
Project Type |
Education |
69,560,000 |
| Prey Svay |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
18,980,000 |
24.000 Length (m) |
9.000 Width (m) |
56,940,000 |
| Prey Svay |
2 |
740 |
School furniture |
3.00 [ 3.00 ] |
School room |
1,020,000 |
60.000 Students |
0.000 |
3,060,000 |
| Prey Svay |
3 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
140,000 |
40.000 Students |
0.000 |
280,000 |
| Prey Svay |
4 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
4,200,000 |
16.000 Length (m) |
9.000 Width (m) |
8,400,000 |
| Prey Svay |
5 |
740 |
School furniture |
1.00 [ 1.00 ] |
School room |
880,000 |
40.000 Students |
0.000 |
880,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
69,560,000 |
Kanhchriech, Kanhchriech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140402/04/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
66,860,000 |
| Prasrae Mukh |
1 |
201 |
Earth road |
0.87 [ 0.87 ] |
Km |
11,769,540 |
4.500 Width (m) |
3,211.000 Earth fill m3 |
10,239,500 |
| Prasrae Lech |
2 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
11,769,808 |
4.500 Width (m) |
2,290.000 Earth fill m3 |
8,615,499 |
| Pou Mrenh |
3 |
201 |
Earth road |
1.02 [ 1.02 ] |
Km |
11,769,607 |
4.500 Width (m) |
4,133.000 Earth fill m3 |
12,004,999 |
| Prasrae Mukh |
4 |
211 |
Single pipe culvert |
3.00 [ 8.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
11,520,000 |
| Prasrae Lech |
5 |
211 |
Single pipe culvert |
2.00 [ 8.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
11,520,000 |
| Pou Mrenh |
6 |
211 |
Single pipe culvert |
1.00 [ 5.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,200,000 |
| Kanhchriech |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,440,000 |
| Chhnoeng Chumnir |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,440,000 |
| Ou Ta Thok |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,440,000 |
| Pou Tong |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,440,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,440,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
66,859,998 |
Kanhchriech, Kdoeang Reay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140403/04/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
51,262,700 |
| Peanea Phsar |
1 |
201 |
Earth road |
0.66 [ 0.66 ] |
Km |
8,320,151 |
4.500 Width (m) |
1,231.000 Earth fill m3 |
5,491,300 |
| Peanea Kandal |
2 |
201 |
Earth road |
0.84 [ 0.84 ] |
Km |
8,928,571 |
4.500 Width (m) |
3,349.000 Earth fill m3 |
7,500,000 |
| Peanea Chuor |
3 |
201 |
Earth road |
0.84 [ 0.84 ] |
Km |
11,785,714 |
4.500 Width (m) |
3,485.000 Earth fill m3 |
9,900,000 |
| Ta Nal |
4 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
16,483,333 |
4.500 Width (m) |
2,300.000 Earth fill m3 |
9,890,000 |
| Ta Nal |
5 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
15,222,000 |
3.500 Width (m) |
1,416.000 Earth fill m3 |
6,088,800 |
| Pou Touch |
6 |
201 |
Earth road |
0.77 [ 0.77 ] |
Km |
16,073,441 |
3.500 Width (m) |
2,882.000 Earth fill m3 |
12,392,623 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,262,722 |
Kanhchriech, Kouk Kong Kaeut
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140404/04/01 |
TSO |
Ou Kolab |
Project Type |
Education |
67,431,000 |
| Chrey Mreak |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
21,462,000 |
24.000 Length (m) |
9.000 Width (m) |
64,386,000 |
| Chrey Mreak |
2 |
740 |
School furniture |
3.00 [ 3.00 ] |
School room |
1,015,000 |
120.000 Students |
0.000 |
3,045,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
67,431,000 |
Kanhchriech, Kouk Kong Lech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140405/04/01 |
TSO |
Ou Kolab |
Project Type |
Irrigation |
24,275,800 |
| Kouk Kong Kandal |
1 |
251 |
Drift |
1.00 [ 1.00 ] |
Place |
8,981,800 |
15.000 Length (m) |
4.000 Width (m) |
8,981,800 |
| Kouk Kong Kandal |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
3,621,000 |
1.000 Diameter (m) |
5.000 Width (m) |
7,242,000 |
| Kouk Kong Kandal |
3 |
410 |
Earth dam |
0.09 [ 0.21 ] |
Km |
39,087,378 |
0.640 Max. height (m) |
445.000 Volume (m3) |
8,052,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,275,800 |
Kanhchriech, Preal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140406/04/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
49,245,900 |
| Trapeang Tuem |
1 |
201 |
Earth road |
0.69 [ 0.69 ] |
Km |
4,735,942 |
4.500 Width (m) |
2,328.000 Earth fill m3 |
3,267,800 |
| Svay |
2 |
201 |
Earth road |
0.84 [ 0.84 ] |
Km |
4,735,833 |
4.500 Width (m) |
1,768.000 Earth fill m3 |
3,978,100 |
| Svay |
3 |
212 |
Double pipe culvert |
5.00 [ 5.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
10,000,000 |
| Kouk Roka |
4 |
212 |
Double pipe culvert |
4.00 [ 5.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
10,000,000 |
| Prey Ta Prum |
5 |
212 |
Double pipe culvert |
8.00 [ 8.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
16,000,000 |
| Trapeang Kranh |
6 |
212 |
Double pipe culvert |
3.00 [ 3.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,245,900 |
| Contract ID |
140406/04/02 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
24,205,000 |
| Pouthi Proeks |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
4,800,000 |
4.000 Width (m) |
735.000 Earth fill m3 |
5,040,000 |
| Tuol Trach |
2 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
4,800,000 |
4.000 Width (m) |
1,285.000 Earth fill m3 |
5,520,000 |
| Trapeang Thlan Cheung |
3 |
201 |
Earth road |
0.15 [ 0.15 ] |
Km |
4,800,000 |
4.000 Width (m) |
236.000 Earth fill m3 |
720,000 |
| Pouthi Proeks |
4 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
5,500,000 |
3.500 Width (m) |
735.000 Earth fill m3 |
5,775,000 |
| Tuol Trach |
5 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
5,500,000 |
3.500 Width (m) |
805.000 Earth fill m3 |
6,325,000 |
| Trapeang Thlan Cheung |
6 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
5,500,000 |
3.500 Width (m) |
105.000 Earth fill m3 |
825,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,205,000 |
Kanhchriech, Thma Pun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140407/04/01 |
TSO |
Ou Kolab |
Project Type |
Education |
64,861,000 |
| Beng |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
20,605,333 |
24.000 Length (m) |
9.000 Width (m) |
61,815,999 |
| Beng |
2 |
740 |
School furniture |
3.00 [ 3.00 ] |
School room |
1,015,000 |
120.000 Students |
0.000 |
3,045,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,860,999 |
| Contract ID |
140407/04/02 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
14,780,800 |
| Prongeuy Muoy |
1 |
201 |
Earth road |
1.19 [ 1.19 ] |
Km |
12,400,000 |
4.000 Width (m) |
2,979.000 Earth fill m3 |
14,780,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,780,800 |
Kanhchriech, Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140408/04/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
10,334,600 |
| Khnay Kov |
1 |
201 |
Earth road |
1.36 [ 1.36 ] |
Km |
2,099,000 |
4.000 Width (m) |
1,339.000 Earth fill m3 |
2,854,640 |
| Khnay Kov |
2 |
202 |
Laterite road |
1.36 [ 1.36 ] |
Km |
5,500,000 |
3.500 Width (m) |
714.000 Earth fill m3 |
7,480,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,334,640 |
| Contract ID |
140408/04/02 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
54,802,800 |
| Svay Chek |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
8,278,476 |
4.000 Width (m) |
3,661.000 Earth fill m3 |
8,692,400 |
| Krala Meakh |
2 |
201 |
Earth road |
0.54 [ 0.54 ] |
Km |
7,537,777 |
4.000 Width (m) |
854.000 Earth fill m3 |
4,070,400 |
| Kok |
3 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
8,278,540 |
4.000 Width (m) |
3,483.000 Earth fill m3 |
9,528,600 |
| Khnay Kov |
4 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
13,025,334 |
4.000 Width (m) |
2,469.000 Earth fill m3 |
5,861,400 |
| Svay Chek |
5 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,800,000 |
| Svay Chek |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Khnay Kov |
7 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
8,700,000 |
| Krala Meakh |
8 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,800,000 |
| Kok |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,450,000 |
| Tnaot |
10 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,802,799 |
Me Sang, Angkor Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140501/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
29,700,000 |
| Angkor Sar |
1 |
321 |
Brick school with tile roof |
4.00 [ 4.00 ] |
School room |
7,425,000 |
32.000 Length (m) |
9.000 Width (m) |
29,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,700,000 |
Me Sang, Chres
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140502/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
34,755,600 |
| Toap Sdach |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
13,125,000 |
16.000 Length (m) |
9.000 Width (m) |
26,250,000 |
| Toap Sdach |
2 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
2,650,700 |
16.000 Length (m) |
9.000 Width (m) |
5,301,400 |
| Toap Sdach |
3 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,602,100 |
80.000 Students |
0.000 |
3,204,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,755,600 |
Me Sang, Chi Phok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140503/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
38,660,000 |
| Yeang Touch |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
19,330,000 |
16.000 Length (m) |
9.000 Width (m) |
38,660,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,660,000 |
Me Sang, Prey Khnes
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140504/04/01 |
TSO |
Sem Socheat |
Project Type |
Rural Transport |
35,470,000 |
| Kaev Sna |
1 |
201 |
Earth road |
1.34 [ 1.34 ] |
Km |
6,496,800 |
4.000 Width (m) |
1,796.000 Earth fill m3 |
8,705,712 |
| Kaev Sna |
2 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
5,750,000 |
| Kaev Sna |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,850,000 |
| Prey Khnes Ka |
4 |
201 |
Earth road |
1.78 [ 1.78 ] |
Km |
6,496,800 |
4.000 Width (m) |
2,500.000 Earth fill m3 |
11,564,304 |
| Prey Khnes Ka |
5 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
5,750,000 |
| Prey Khnes Ka |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,850,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,470,016 |
Me Sang, Prey Rumdeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140505/04/01 |
TSO |
Sem Socheat |
Project Type |
Irrigation |
50,782,000 |
| Kandal |
1 |
420 |
Canal |
0.80 [ 0.80 ] |
Km |
19,262,500 |
1.500 Depth (m) |
4,170.000 Volume (m3) |
15,410,000 |
| Kreul |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 2.00 ] |
Place |
4,680,000 |
1.000 Diameter (m) |
5.000 Width (m) |
9,360,000 |
| Kreul |
3 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
23,200,000 |
4.000 Length (m) |
2.000 Height (m) |
23,200,000 |
| Kandal |
4 |
420 |
Canal |
0.27 [ 0.27 ] |
Km |
10,414,815 |
1.000 Depth (m) |
760.000 Volume (m3) |
2,812,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,782,000 |
Me Sang, Prey Totueng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140506/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
30,861,400 |
| Angkor K'aot |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
11,500,000 |
16.000 Length (m) |
9.000 Width (m) |
23,000,000 |
| Angkor K'aot |
2 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
2,296,100 |
16.000 Length (m) |
9.000 Width (m) |
4,592,200 |
| Angkor K'aot |
3 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,634,600 |
80.000 Students |
0.000 |
3,269,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,861,400 |
Me Sang, Svay Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140507/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
34,505,600 |
| Sa Veang |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
13,000,000 |
16.000 Length (m) |
9.000 Width (m) |
26,000,000 |
| Sa Veang |
2 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
2,650,700 |
16.000 Length (m) |
9.000 Width (m) |
5,301,400 |
| Sa Veang |
3 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,602,100 |
80.000 Students |
0.000 |
3,204,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,505,600 |
Me Sang, Trapeang Srae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140508/04/01 |
TSO |
Sem Socheat |
Project Type |
Education |
38,610,000 |
| Prey Kuy |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
19,305,000 |
16.000 Length (m) |
9.000 Width (m) |
38,610,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,610,000 |
Peam Chor, Angkor Angk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140601/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
20,816,000 |
| Veal Robang Leu |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Veal Robang Leu |
2 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Veal Robang Kraom |
3 |
213 |
Triple pipe culvert |
2.00 [ 2.00 ] |
Place |
4,908,000 |
1.000 Diameter (m) |
5.000 Length (m) |
9,816,000 |
| Preaek Traeng |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,816,000 |
Peam Chor, Kampong Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140602/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
22,900,000 |
| Ta Huy |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Ta Huy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Ta Huy |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,600,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,600,000 |
| Ta Paeu |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,600,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,600,000 |
| Krang Krouch |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Krang Krouch |
6 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
5,000,000 |
| Kampong Prasat |
7 |
212 |
Double pipe culvert |
1.00 [ 2.00 ] |
Place |
3,600,000 |
1.000 Diameter (m) |
4.000 Length (m) |
7,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,900,000 |
Peam Chor, Kaoh Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140603/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
22,900,000 |
| Mean Chey |
1 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
5,100,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,100,000 |
| Kaoh Chek |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
3,850,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,700,000 |
| Spean |
3 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
5,100,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,100,000 |
| Kaoh Peam Reang |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,900,000 |
Peam Chor, Kaoh Roka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140604/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
23,528,500 |
| Kaoh Roka |
1 |
201 |
Earth road |
1.38 [ 1.92 ] |
Km |
12,254,427 |
5.000 Width (m) |
5,165.000 Earth fill m3 |
23,528,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,528,500 |
Peam Chor, Kaoh Sampov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140605/04/01 |
TSO |
Sok Sarunn |
Project Type |
Irrigation |
29,281,000 |
| Svay Andoung |
1 |
420 |
Canal |
0.89 [ 0.89 ] |
Km |
32,900,000 |
2.000 Depth (m) |
8,411.000 Volume (m3) |
29,281,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,281,000 |
Peam Chor, Krang Ta Yang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140606/04/01 |
TSO |
Sok Sarunn |
Project Type |
Irrigation |
36,260,000 |
| Chrey Otdam |
1 |
420 |
Canal |
0.36 [ 0.36 ] |
Km |
64,542,689 |
2.690 Depth (m) |
6,490.000 Volume (m3) |
23,235,368 |
| Chrey Otdam |
2 |
420 |
Canal |
1.04 [ 1.04 ] |
Km |
12,475,662 |
1.310 Depth (m) |
3,636.000 Volume (m3) |
13,024,591 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,259,959 |
Peam Chor, Preaek Krabau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140607/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
22,778,400 |
| Otdam |
1 |
201 |
Earth road |
1.74 [ 1.92 ] |
Km |
11,863,750 |
5.000 Width (m) |
5,769.000 Earth fill m3 |
22,778,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,778,400 |
Peam Chor, Preaek Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140608/04/01 |
TSO |
Sok Sarunn |
Project Type |
Irrigation |
18,821,800 |
| Sambuor |
1 |
452 |
Single pipe Culvert with gate |
4.00 [ 5.00 ] |
Place |
3,764,360 |
1.000 Diameter (m) |
4.000 Width (m) |
18,821,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,821,800 |
Peam Chor, Ruessei Srok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140609/04/01 |
TSO |
Sok Sarunn |
Project Type |
Irrigation |
32,865,000 |
| Chheu Teal |
1 |
420 |
Canal |
0.33 [ 0.33 ] |
Km |
29,580,303 |
2.100 Depth (m) |
2,789.000 Volume (m3) |
9,761,500 |
| Chheu Teal |
2 |
420 |
Canal |
1.62 [ 1.62 ] |
Km |
14,261,420 |
1.230 Depth (m) |
6,601.000 Volume (m3) |
23,103,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,865,000 |
Peam Chor, Svay Phluoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140610/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
19,048,500 |
| Sangkruoh |
1 |
201 |
Earth road |
2.10 [ 2.56 ] |
Km |
7,432,111 |
4.000 Width (m) |
4,590.000 Earth fill m3 |
19,048,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,048,500 |
| Contract ID |
140610/04/02 |
TSO |
Sok Sarunn |
Project Type |
Irrigation |
6,720,000 |
| Bang'aek |
1 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
6,720,000 |
1.000 Diameter (m) |
4.000 Width (m) |
6,720,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,720,000 |
Peam Ro, Ba Baong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140701/04/01 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
18,000,000 |
| Ba Baong |
1 |
420 |
Canal |
0.95 [ 0.95 ] |
Km |
17,684,200 |
0.760 Depth (m) |
4,060.000 Volume (m3) |
16,799,990 |
| Ba Baong |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.800 Diameter (m) |
10.000 Width (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,999,990 |
| Contract ID |
140701/04/02 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
3,500,000 |
| Chouk Chey |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.800 Diameter (m) |
4.000 Width (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,500,000 |
Peam Ro, Banlich Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140702/04/01 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
24,750,000 |
| Prasat Cheung |
1 |
420 |
Canal |
1.45 [ 1.45 ] |
Km |
17,068,965 |
1.290 Depth (m) |
7,781.000 Volume (m3) |
24,749,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,749,999 |
Peam Ro, Neak Loeang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140703/04/01 |
TSO |
Chou SoCheat |
Project Type |
Rural Transport |
25,108,100 |
| Neak Loeang |
1 |
201 |
Earth road |
1.33 [ 1.33 ] |
Km |
10,492,755 |
5.000 Width (m) |
4,237.000 Earth fill m3 |
13,902,900 |
| Preaek Ta Sa |
2 |
201 |
Earth road |
0.40 [ 0.63 ] |
Km |
11,141,600 |
5.000 Width (m) |
1,280.000 Earth fill m3 |
6,963,500 |
| Preaek Thum |
3 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
12,294,783 |
5.000 Width (m) |
1,293.000 Earth fill m3 |
4,241,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,108,101 |
Peam Ro, Peam Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140704/04/01 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
24,641,500 |
| Boeng Phsaot |
1 |
420 |
Canal |
0.73 [ 0.73 ] |
Km |
22,300,000 |
1.090 Depth (m) |
3,459.000 Volume (m3) |
16,167,500 |
| Chamkar Veaeng |
2 |
420 |
Canal |
0.38 [ 0.38 ] |
Km |
22,300,000 |
1.090 Depth (m) |
2,895.000 Volume (m3) |
8,474,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,641,500 |
Peam Ro, Peam Ro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140705/04/01 |
TSO |
Chou SoCheat |
Project Type |
Rural Transport |
3,160,000 |
| Peam Kaoh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,160,000 |
1.000 Diameter (m) |
10.000 Length (m) |
3,160,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,160,000 |
| Contract ID |
140705/04/02 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
19,100,000 |
| Chambak Prang |
2 |
420 |
Canal |
0.58 [ 0.58 ] |
Km |
30,260,800 |
1.220 Depth (m) |
4,483.000 Volume (m3) |
17,399,960 |
| Chambak Prang |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
1,700,000 |
1.000 Diameter (m) |
5.000 Width (m) |
1,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,099,960 |
Peam Ro, Preaek Khsay Ka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140706/04/01 |
TSO |
Chou SoCheat |
Project Type |
Rural Drainage and Flood Protection |
5,840,000 |
| Otdam |
1 |
540 |
Drainage |
1.00 [ 1.00 ] |
Line |
1,460,000 |
0.600 Length (m) |
9.000 Diameter (m) |
1,460,000 |
| Otdam |
2 |
540 |
Drainage |
3.00 [ 3.00 ] |
Line |
1,460,000 |
0.600 Length (m) |
7.000 Diameter (m) |
4,380,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,840,000 |
| Contract ID |
140706/04/02 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
22,140,000 |
| Preaek Khsay |
1 |
420 |
Canal |
1.99 [ 1.99 ] |
Km |
11,153,652 |
0.900 Depth (m) |
6,950.000 Volume (m3) |
22,139,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,139,999 |
Peam Ro, Preaek Khsay Kha
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140707/04/01 |
TSO |
Chou SoCheat |
Project Type |
Rural Transport |
30,405,700 |
| Phum Pir |
1 |
203 |
Gravel road |
0.20 [ 0.20 ] |
Km |
18,900,000 |
3.500 Width (m) |
105.000 Earth fill m3 |
3,780,000 |
| Phum Pram |
2 |
203 |
Gravel road |
0.50 [ 0.50 ] |
Km |
18,900,000 |
3.500 Width (m) |
262.000 Earth fill m3 |
9,450,000 |
| Phum Prammuoy |
3 |
203 |
Gravel road |
0.33 [ 0.33 ] |
Km |
18,900,000 |
3.500 Width (m) |
174.000 Earth fill m3 |
6,237,000 |
| Phum Pir |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,400,000 |
| Phum Pram |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,166,667 |
0.600 Diameter (m) |
7.000 Length (m) |
3,500,001 |
| Phum Pram |
6 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
30,193,500 |
4.000 Width (m) |
1,594.000 Earth fill m3 |
6,038,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,405,701 |
Peam Ro, Prey Kandieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140708/04/01 |
TSO |
Chou SoCheat |
Project Type |
Irrigation |
28,800,000 |
| Chan |
1 |
420 |
Canal |
0.85 [ 0.85 ] |
Km |
15,542,363 |
1.080 Depth (m) |
4,137.000 Volume (m3) |
13,257,636 |
| Prey Angkonh |
2 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
15,542,363 |
1.080 Depth (m) |
4,898.000 Volume (m3) |
15,542,363 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,799,999 |
Pea Reang, Kampong Popil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140801/04/01 |
TSO |
Huot Chhel |
Project Type |
Irrigation |
40,262,000 |
| Bat Santrea |
6 |
410 |
Earth dam |
0.65 [ 0.65 ] |
Km |
11,307,692 |
0.900 Max. height (m) |
3,235.000 Volume (m3) |
7,350,000 |
| Chumnik |
7 |
410 |
Earth dam |
0.65 [ 0.65 ] |
Km |
11,307,692 |
2.100 Max. height (m) |
3,841.000 Volume (m3) |
7,350,000 |
| Preaek Kamphleung |
8 |
410 |
Earth dam |
0.00 [ 0.25 ] |
Km |
19,272,000 |
1.650 Max. height (m) |
2,320.000 Volume (m3) |
4,818,000 |
| Khsom Cheung |
9 |
410 |
Earth dam |
0.00 [ 0.73 ] |
Km |
18,769,655 |
1.200 Max. height (m) |
6,552.000 Volume (m3) |
13,608,000 |
| Bat Santrea |
10 |
410 |
Earth dam |
0.00 [ 0.43 ] |
Km |
16,790,588 |
1.200 Max. height (m) |
3,436.000 Volume (m3) |
7,136,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,261,999 |
Pea Reang, Kanhcham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140802/04/01 |
TSO |
Lim Sokhanan |
Project Type |
Education |
57,865,000 |
| Tonle Chrey |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
13,333,333 |
0.000 Length (m) |
9.000 Width (m) |
40,000,000 |
| Tonle Chrey |
2 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
3,465,667 |
0.000 Length (m) |
9.000 Width (m) |
10,397,000 |
| Tonle Chrey |
3 |
740 |
School furniture |
4.00 [ 4.00 ] |
School room |
1,867,000 |
192.000 Students |
0.000 |
7,468,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
57,865,000 |
Pea Reang, Kampong Prang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140803/04/01 |
TSO |
Huot Chhel |
Project Type |
Rural Transport |
41,731,000 |
| Kampong Prang |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
6,470,600 |
4.500 Width (m) |
4,431.000 Earth fill m3 |
11,000,020 |
| Preaek Ta Roatn |
2 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
6,470,600 |
4.500 Width (m) |
4,185.000 Earth fill m3 |
9,705,900 |
| Preaek Chruk |
3 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
6,470,500 |
4.500 Width (m) |
568.000 Earth fill m3 |
1,294,100 |
| Preaek Chruk |
4 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
18,791,429 |
4.500 Width (m) |
8,235.000 Earth fill m3 |
19,731,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,731,020 |
Pea Reang, Kampong Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140804/04/01 |
TSO |
Huot Chhel |
Project Type |
Rural Transport |
50,566,300 |
| Sla |
1 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
12,083,333 |
5.000 Width (m) |
2,340.000 Earth fill m3 |
7,854,166 |
| Tnaot |
2 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
12,083,333 |
5.000 Width (m) |
4,296.000 Earth fill m3 |
11,479,166 |
| Prey Meas |
3 |
201 |
Earth road |
0.25 [ 0.25 ] |
Km |
12,083,333 |
5.000 Width (m) |
1,131.000 Earth fill m3 |
3,020,833 |
| Lvea |
4 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
12,083,333 |
5.000 Width (m) |
1,357.000 Earth fill m3 |
3,625,000 |
| Kampong Ruessei |
5 |
201 |
Earth road |
0.25 [ 0.25 ] |
Km |
12,083,333 |
5.000 Width (m) |
1,131.000 Earth fill m3 |
3,020,833 |
| Tnaot |
6 |
201 |
Earth road |
0.85 [ 0.85 ] |
Km |
25,372,118 |
5.000 Width (m) |
7,626.000 Earth fill m3 |
21,566,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,566,300 |
Pea Reang, Mesa Prachan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140805/04/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
48,381,000 |
| Andoung |
1 |
410 |
Earth dam |
0.70 [ 0.70 ] |
Km |
15,000,000 |
1.700 Max. height (m) |
4,957.000 Volume (m3) |
10,500,000 |
| Kampong trea |
2 |
410 |
Earth dam |
0.26 [ 0.26 ] |
Km |
15,000,000 |
1.700 Max. height (m) |
1,763.000 Volume (m3) |
3,840,000 |
| Mesa Prachan Kraom |
3 |
410 |
Earth dam |
1.45 [ 1.45 ] |
Km |
18,428,275 |
1.250 Max. height (m) |
9,978.000 Volume (m3) |
26,720,999 |
| Kampong trea |
4 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
1,830,000 |
1.000 Diameter (m) |
4.000 Width (m) |
3,660,000 |
| Mesa Prachan Kraom |
5 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
1,830,000 |
1.000 Diameter (m) |
4.000 Width (m) |
3,660,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,380,999 |
Pea Reang, Preaek Ta Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140806/04/01 |
TSO |
Huot Chhel |
Project Type |
Irrigation |
15,200,000 |
| Preaek Ta Sar |
1 |
410 |
Earth dam |
1.10 [ 1.10 ] |
Km |
12,000,000 |
0.900 Max. height (m) |
4,527.000 Volume (m3) |
13,200,000 |
| Preaek Ta Sar |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
6.000 Width (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,200,000 |
Pea Reang, Prey Sniet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140808/04/01 |
TSO |
Huot Chhel |
Project Type |
Rural Transport |
43,589,000 |
| Prey Sniet |
1 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Kampong Pou |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Tumpeang Chreus |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Prey Sniet |
5 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
14,533,150 |
4.000 Width (m) |
4,365.000 Earth fill m3 |
11,626,520 |
| Kampong Pou |
6 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
14,533,150 |
4.000 Width (m) |
2,889.000 Earth fill m3 |
7,266,575 |
| Tumpeang Chreus |
7 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
14,533,150 |
4.000 Width (m) |
1,442.000 Earth fill m3 |
4,359,945 |
| Me Loung |
8 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
14,533,300 |
4.000 Width (m) |
4,281.000 Earth fill m3 |
11,335,974 |
| Me Loung |
9 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,589,014 |
Pea Reang, Prey Sralet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140809/04/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
51,293,000 |
| Preah Mlu |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
10,800,000 |
4.000 Width (m) |
2,760.000 Earth fill m3 |
11,880,000 |
| Prohut |
2 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
10,800,000 |
4.000 Width (m) |
6,903.000 Earth fill m3 |
15,120,000 |
| Prohut |
3 |
201 |
Earth road |
1.90 [ 1.90 ] |
Km |
12,785,794 |
4.000 Width (m) |
8,695.000 Earth fill m3 |
24,293,009 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,293,009 |
Pea Reang, Roka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140811/04/01 |
TSO |
Huot Chhel |
Project Type |
Rural Transport |
52,045,300 |
| Tnaot |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
700,000 |
| Snay pol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
800,000 |
0.600 Diameter (m) |
7.000 Length (m) |
800,000 |
| Snay pol |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
8.000 Length (m) |
1,000,000 |
| Ruessei Chuk |
4 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Tnaot |
5 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
7,744,000 |
5.000 Width (m) |
2,575.000 Earth fill m3 |
5,420,800 |
| Trakiet |
6 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
7,744,000 |
3.500 Width (m) |
3,989.000 Earth fill m3 |
10,067,200 |
| Ruessei Chuk |
7 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
8,715,716 |
5.000 Width (m) |
3,241.000 Earth fill m3 |
6,815,690 |
| Ruessei Chuk |
8 |
201 |
Earth road |
2.34 [ 2.34 ] |
Km |
8,715,716 |
4.000 Width (m) |
8,508.000 Earth fill m3 |
20,403,491 |
| Trakiet |
9 |
201 |
Earth road |
0.38 [ 0.38 ] |
Km |
8,715,716 |
3.500 Width (m) |
1,199.000 Earth fill m3 |
3,338,119 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,045,300 |
Preah Sdach, Banteay Chakrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140902/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Transport |
37,067,000 |
| Kaoh Chuor Ti Muoy |
1 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Kaoh Chuor Ti Pir |
2 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Pou Riyum |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
973,000 |
| Ka Kou |
4 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,892,000 |
| Ngaek Ngak |
5 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,919,000 |
| Bos Roluoy |
6 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,919,000 |
| Pras Sva |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
973,000 |
| Sampoung |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
973,000 |
| Pou Chreaek |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
973,000 |
| Boeng Kampot |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
973,000 |
| Ampil |
11 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Ampil |
12 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,216,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,216,000 |
| Ruessei Chuk |
13 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,216,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,432,000 |
| Mrenh |
14 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
2.000 Total Span (m) |
4.000 Width(m) |
3,500,000 |
| Chey Ta |
15 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Muni Sela |
16 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
973,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Kaoh Chuor Ti Bei |
17 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,216,000 |
0.000 Diameter (m) |
5.000 Length (m) |
1,216,000 |
| Ping Pong |
18 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
973,000 |
0.000 Diameter (m) |
5.000 Length (m) |
1,946,000 |
| Mrenh |
19 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,216,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,216,000 |
| Pou Riyum |
20 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,216,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,216,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,067,000 |
Preah Sdach, Boeng Daol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140903/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
34,528,500 |
| Boeng Daol |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
6,904,762 |
3.500 Width (m) |
1,760.000 Earth fill m3 |
5,523,810 |
| Boeng Daol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Boeng Daol |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Sambuor |
4 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
6,904,762 |
3.500 Width (m) |
2,475.000 Earth fill m3 |
8,976,191 |
| Sambuor |
5 |
212 |
Double pipe culvert |
3.00 [ 3.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Kaoh Koun Satv |
6 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
16,142,777 |
4.000 Width (m) |
4,347.000 Earth fill m3 |
14,528,499 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,528,500 |
Preah Sdach, Chey Kampok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140904/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Transport |
28,560,000 |
| Kdei Skea |
1 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,808,000 |
| Pou |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Svay Toul |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Chey Kampok |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Snao |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
952,000 |
| Snao |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Tras |
7 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Tras |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Kampong Ba Srei |
9 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,808,000 |
| Ta Pung |
10 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Angk Svay Tu |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
952,000 |
0.000 Diameter (m) |
4.000 Length (m) |
952,000 |
| Angk Svay Tu |
12 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,904,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Tuol Lean |
13 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
952,000 |
| Tuol Lean |
14 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,904,000 |
0.000 Diameter (m) |
4.000 Length (m) |
1,904,000 |
| Pra Thma |
15 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
952,000 |
0.600 Diameter (m) |
4.000 Length (m) |
952,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,560,000 |
Preah Sdach, Kampong Soeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140905/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Transport |
32,972,400 |
| Srah Thkov |
1 |
201 |
Earth road |
0.52 [ 0.52 ] |
Km |
8,580,000 |
4.000 Width (m) |
2,018.000 Earth fill m3 |
4,461,600 |
| Srah Thkov |
2 |
203 |
Gravel road |
0.52 [ 0.52 ] |
Km |
7,400,000 |
4.000 Width (m) |
208.000 Earth fill m3 |
3,848,000 |
| Srah Thkov |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Ta Mau |
4 |
201 |
Earth road |
0.56 [ 0.56 ] |
Km |
8,827,143 |
4.000 Width (m) |
2,959.000 Earth fill m3 |
4,943,200 |
| Ta Mau |
5 |
203 |
Gravel road |
0.56 [ 0.56 ] |
Km |
7,400,000 |
4.000 Width (m) |
224.000 Earth fill m3 |
4,144,000 |
| Ta Mau |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Phniet |
7 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
8,100,372 |
3.500 Width (m) |
3,249.000 Earth fill m3 |
6,318,290 |
| Phniet |
8 |
203 |
Gravel road |
0.78 [ 0.78 ] |
Km |
9,304,244 |
3.500 Width (m) |
392.000 Earth fill m3 |
7,257,310 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,972,400 |
Preah Sdach, Krang Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140906/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Transport |
27,135,300 |
| Krang Svay |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.000 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Pou |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.000 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Pou |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Sonan Chai |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,225,606 |
0.000 Diameter (m) |
5.000 Length (m) |
1,225,606 |
| Sonan Chai |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.000 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Sonan Chai |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
1,225,606 |
| Peay Neay |
7 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.000 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Peay Neay |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Pring |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
1,225,606 |
| Pring |
10 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,800,000 |
| Kouk Sampov |
11 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.000 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Sdau |
12 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Sangkae Chong |
13 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
1,225,606 |
| Tuol Mean Kun |
14 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,225,606 |
0.600 Diameter (m) |
4.000 Length (m) |
2,451,212 |
| Srah Kaev |
15 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,225,706 |
0.600 Diameter (m) |
4.000 Length (m) |
1,225,706 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,135,399 |
Preah Sdach, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140907/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Transport |
29,250,400 |
| Prum Khsach |
1 |
201 |
Earth road |
0.50 [ 1.40 ] |
Km |
12,793,428 |
3.000 Width (m) |
1,120.000 Earth fill m3 |
17,910,799 |
| Prum Khsach |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Svay Kdieb |
3 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
9,342,286 |
3.000 Width (m) |
2,026.000 Earth fill m3 |
6,539,600 |
| Svay Kdieb |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Svay Kdieb |
5 |
220 |
Box culvert (general) |
1.00 [ 1.00 ] |
Place |
1,800,000 |
2.000 Total Span (m) |
4.000 Width(m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,250,399 |
Preah Sdach, Preah Sdach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140908/04/01 |
TSO |
Pol Sastra |
Project Type |
Irrigation |
34,528,500 |
| Phot |
1 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
51,000,000 |
2.940 Depth (m) |
10,320.000 Volume (m3) |
30,600,000 |
| Phot |
2 |
420 |
Canal |
0.35 [ 0.35 ] |
Km |
3,000,000 |
0.480 Depth (m) |
362.000 Volume (m3) |
1,050,000 |
| Phot |
3 |
420 |
Canal |
0.35 [ 0.35 ] |
Km |
3,984,286 |
0.600 Depth (m) |
443.000 Volume (m3) |
1,394,500 |
| Phot |
4 |
420 |
Canal |
0.15 [ 0.15 ] |
Km |
9,893,333 |
3.000 Depth (m) |
900.000 Volume (m3) |
1,484,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,528,500 |
Preah Sdach, Reathor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140909/04/01 |
TSO |
Sok Sarunn |
Project Type |
Rural Transport |
25,508,300 |
| Ta Hel Ka |
1 |
201 |
Earth road |
0.44 [ 0.44 ] |
Km |
8,504,000 |
3.000 Width (m) |
1,065.000 Earth fill m3 |
3,741,760 |
| Ta Hel Ka |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Ta Hel Kha |
3 |
201 |
Earth road |
0.96 [ 1.61 ] |
Km |
9,792,850 |
3.000 Width (m) |
2,513.000 Earth fill m3 |
15,766,489 |
| Ta Hel Kha |
4 |
212 |
Double pipe culvert |
1.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,508,249 |
Preah Sdach, Seena Reach Otdam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140911/04/01 |
TSO |
Pol Sastra |
Project Type |
Rural Domestic Water Supplies |
33,840,000 |
| Klaeng Kong |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Khla Kham |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Kdam Puk |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Kamrieng |
4 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Prasna Touch |
5 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Prasna Thum |
6 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Snao |
7 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Kamraol |
8 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Pring |
9 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Trea |
10 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Krasang Char |
11 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Trapeang Brabos |
12 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 3.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
2,820,000 |
| Ampil |
13 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Samnoy |
14 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Thnong |
15 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 3.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
2,820,000 |
| Chey a Khaol |
16 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Snay Prim |
17 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
940,000 |
52.000 Depth (m) |
100.000 Diameter (mm) |
1,880,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,840,000 |
Prey Veaeng, Angkor Tret
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141001/04/01 |
TSO |
Sun Davith |
Project Type |
Rural Transport |
18,822,000 |
| Ta Laeuk |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,840,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,840,000 |
| Ta Laeuk |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,204,700 |
0.600 Diameter (m) |
5.000 Length (m) |
2,409,400 |
| Angkor Tret |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,840,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,840,000 |
| Angkor Tret |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,204,700 |
0.600 Diameter (m) |
5.000 Length (m) |
2,409,400 |
| Trabaek Lech |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,675,000 |
0.600 Diameter (m) |
10.000 Length (m) |
1,675,000 |
| Trabaek Lech |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,421,400 |
0.600 Diameter (m) |
7.000 Length (m) |
1,421,400 |
| Ta Ream Kaeut |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,000 |
| Voat Trach |
9 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,204,700 |
0.600 Diameter (m) |
5.000 Length (m) |
2,409,400 |
| Kok |
10 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,204,700 |
0.600 Diameter (m) |
5.000 Length (m) |
2,409,400 |
| Kok |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,822,000 |
| Contract ID |
141001/04/02 |
TSO |
Sun Davith |
Project Type |
Irrigation |
7,120,000 |
| Angkor Tret |
1 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
7,120,000 |
1.000 Diameter (m) |
4.000 Width (m) |
7,120,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,120,000 |
Prey Veaeng, Chea Khlang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141002/04/01 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
14,904,000 |
| Thnong |
1 |
420 |
Canal |
1.73 [ 1.73 ] |
Km |
8,640,000 |
3.800 Depth (m) |
4,750.000 Volume (m3) |
14,904,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,904,000 |
| Contract ID |
141002/04/02 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
5,100,000 |
| Thnong |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,700,000 |
1.000 Diameter (m) |
4.000 Length (m) |
5,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,100,000 |
Prey Veaeng, Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141003/04/01 |
TSO |
Sun Davith |
Project Type |
Irrigation |
33,230,000 |
| Chrey Veal |
1 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
20,180,000 |
4.000 Length (m) |
1.500 Height (m) |
20,180,000 |
| Prey Ta Nan |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,700,000 |
0.800 Diameter (m) |
4.000 Width (m) |
3,700,000 |
| Prohear |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,700,000 |
0.800 Diameter (m) |
4.000 Width (m) |
3,700,000 |
| Svay Kun |
4 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
5,650,000 |
0.800 Diameter (m) |
4.000 Width (m) |
5,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,230,000 |
Prey Veaeng, Damrei Puon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141004/04/01 |
TSO |
Sun Davith |
Project Type |
Irrigation |
28,144,000 |
| Boeng Veaeng |
1 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
28,144,000 |
4.000 Length (m) |
1.200 Height (m) |
28,144,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,144,000 |
Prey Veaeng, Me Bon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141005/04/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
24,458,000 |
| Me Bon |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
18,813,850 |
4.000 Width (m) |
1,977.000 Earth fill m3 |
9,406,925 |
| Ha Bour |
2 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
18,813,850 |
4.000 Width (m) |
3,161.000 Earth fill m3 |
15,051,080 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,458,005 |
Prey Veaeng, Pean Roung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141006/04/01 |
TSO |
Sun Davith |
Project Type |
Rural Transport |
36,800,000 |
| Prey Voa |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
16,355,555 |
4.000 Width (m) |
1,721.000 Earth fill m3 |
11,448,889 |
| Prey Nokor Knong |
2 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
16,355,555 |
4.000 Width (m) |
3,075.000 Earth fill m3 |
15,537,777 |
| Chhnoeng Pos |
3 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
16,355,555 |
4.000 Width (m) |
2,334.000 Earth fill m3 |
9,813,333 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,799,999 |
Prey Veaeng, Popueus
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141007/04/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
20,660,000 |
| Thnal Chey |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
12,800,000 |
4.000 Width (m) |
3,071.000 Earth fill m3 |
16,000,000 |
| Thnal Chey |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,660,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,660,000 |
| Thnal Chey |
3 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,660,000 |
Prey Veaeng, Prey Khla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141008/04/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
21,780,000 |
| Veal |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
16,753,846 |
5.000 Width (m) |
3,861.000 Earth fill m3 |
18,429,231 |
| Krachab Ti Pir |
2 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
16,753,846 |
5.000 Width (m) |
702.000 Earth fill m3 |
3,350,769 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,780,000 |
Prey Veaeng, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141009/04/01 |
TSO |
Sun Davith |
Project Type |
Irrigation |
24,430,000 |
| Prohut |
1 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
24,430,000 |
4.000 Length (m) |
2.000 Height (m) |
24,430,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,430,000 |
Prey Veaeng, Svay Antor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141010/04/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
25,701,000 |
| Svay Antor Ti Muoy |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
19,770,000 |
4.000 Width (m) |
2,480.000 Earth fill m3 |
11,862,000 |
| Boeng |
2 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
19,770,000 |
4.000 Width (m) |
2,891.000 Earth fill m3 |
13,839,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,701,000 |
Kampong Leav, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141101/04/01 |
TSO |
Chin Vanna |
Project Type |
Education |
21,396,400 |
| Baray Lech |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
6,237,100 |
24.000 Length (m) |
8.800 Width (m) |
18,711,300 |
| Baray Lech |
2 |
171 |
Pour flush latrine with double waste tank system |
2.00 [ 2.00 ] |
Latrine room |
1,342,550 |
1.500 |
2.900 |
2,685,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,396,400 |
Kampong Leav, Cheung Tuek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141102/04/01 |
TSO |
Chin Vanna |
Project Type |
Rural Transport |
20,638,000 |
| Cheung Tuek Ka |
1 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
21,724,211 |
5.000 Width (m) |
4,354.000 Earth fill m3 |
20,638,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,638,000 |
Kampong Leav, Kampong Leav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141103/04/01 |
TSO |
Chin Vanna |
Project Type |
Rural Transport |
33,893,200 |
| Phum Muoy |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
14,500,000 |
5.000 Width (m) |
1,852.000 Earth fill m3 |
4,350,000 |
| Phum Pir |
2 |
201 |
Earth road |
0.16 [ 0.16 ] |
Km |
14,500,000 |
5.000 Width (m) |
305.000 Earth fill m3 |
2,247,500 |
| Phum Bei |
3 |
201 |
Earth road |
0.16 [ 0.16 ] |
Km |
14,500,000 |
5.000 Width (m) |
349.000 Earth fill m3 |
2,320,000 |
| Phum Buon |
4 |
201 |
Earth road |
0.24 [ 0.24 ] |
Km |
14,500,000 |
6.000 Width (m) |
598.000 Earth fill m3 |
3,480,000 |
| Phum Prammuoy |
5 |
201 |
Earth road |
0.42 [ 0.42 ] |
Km |
14,500,000 |
6.000 Width (m) |
1,212.000 Earth fill m3 |
6,075,500 |
| Phom 7 |
6 |
201 |
Earth road |
0.59 [ 0.59 ] |
Km |
14,500,000 |
6.000 Width (m) |
2,888.000 Earth fill m3 |
8,482,500 |
| Phom 8 |
7 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
15,417,110 |
6.000 Width (m) |
1,855.000 Earth fill m3 |
6,937,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,893,200 |
Kampong Leav, Pou Rieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141104/04/01 |
TSO |
Chin Vanna |
Project Type |
Rural Transport |
22,995,000 |
| Veal Prov |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
22,995,000 |
3.500 Width (m) |
4,691.000 Earth fill m3 |
22,995,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,995,000 |
Kampong Leav, Preaek Anteah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141105/04/01 |
TSO |
Chin Vanna |
Project Type |
Irrigation |
25,971,900 |
| Angkor Yos |
1 |
420 |
Canal |
1.30 [ 1.40 ] |
Km |
18,551,357 |
1.120 Depth (m) |
7,041.000 Volume (m3) |
25,971,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,971,900 |
Kampong Leav, Preaek Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141106/04/01 |
TSO |
Chin Vanna |
Project Type |
Rural Transport |
22,900,000 |
| Bak Daok |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
13,795,181 |
4.000 Width (m) |
3,325.000 Earth fill m3 |
15,174,699 |
| Anlong Trea |
2 |
201 |
Earth road |
0.56 [ 0.56 ] |
Km |
13,795,181 |
4.000 Width (m) |
1,701.000 Earth fill m3 |
7,725,301 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,900,000 |
Kampong Leav, Ta Kao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141108/04/01 |
TSO |
Chin Vanna |
Project Type |
Rural Transport |
22,418,000 |
| Tnaot Tret |
1 |
201 |
Earth road |
0.98 [ 0.98 ] |
Km |
15,500,000 |
5.000 Width (m) |
4,067.000 Earth fill m3 |
15,190,000 |
| Skor Dach |
2 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
15,500,000 |
4.000 Width (m) |
508.000 Earth fill m3 |
3,100,000 |
| Tnaot Tret |
3 |
201 |
Earth road |
0.31 [ 0.31 ] |
Km |
13,146,500 |
4.000 Width (m) |
1,032.000 Earth fill m3 |
4,128,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,418,001 |
Sithor Kandal, Ampil Krau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141201/04/01 |
TSO |
Lonh Saran |
Project Type |
Rural Transport |
66,856,000 |
| Ampil Krau |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
23,018,200 |
4.000 Width (m) |
4,580.000 Earth fill m3 |
23,018,200 |
| Tuol Chrey |
2 |
201 |
Earth road |
1.75 [ 1.79 ] |
Km |
23,093,743 |
4.000 Width (m) |
8,436.000 Earth fill m3 |
41,337,800 |
| Tuol Chrey |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
66,856,000 |
Sithor Kandal, Chrey Khmum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141202/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
58,689,000 |
| Prasat |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
19,563,000 |
24.000 Length (m) |
9.000 Width (m) |
58,689,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
58,689,000 |
Sithor Kandal, Lve
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141203/04/01 |
TSO |
Lonh Saran |
Project Type |
Rural Transport |
22,556,900 |
| Prum Muni |
1 |
201 |
Earth road |
0.45 [ 0.55 ] |
Km |
17,942,110 |
4.000 Width (m) |
2,244.000 Earth fill m3 |
9,868,161 |
| Kaong Tonle Leu |
2 |
201 |
Earth road |
0.54 [ 0.54 ] |
Km |
17,942,110 |
4.000 Width (m) |
2,034.000 Earth fill m3 |
9,688,739 |
| Kaong Tonle Leu |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,556,900 |
Sithor Kandal, Pnov Ti Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141204/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
43,161,000 |
| Banlich Svay |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
21,580,500 |
16.000 Length (m) |
9.000 Width (m) |
43,161,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,161,000 |
Sithor Kandal, Pnov Ti Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141205/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
43,160,000 |
| Sda Kdei |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
21,580,000 |
16.000 Length (m) |
9.000 Width (m) |
43,160,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,160,000 |
Sithor Kandal, Pou Ti
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141206/04/01 |
TSO |
Lonh Saran |
Project Type |
Irrigation |
39,655,000 |
| Trapeang Cham |
1 |
410 |
Earth dam |
1.25 [ 1.33 ] |
Km |
14,350,943 |
1.090 Max. height (m) |
5,591.000 Volume (m3) |
19,014,999 |
| Trapeang Cham |
2 |
452 |
Single pipe Culvert with gate |
3.00 [ 3.00 ] |
Place |
3,440,000 |
0.800 Diameter (m) |
4.000 Width (m) |
10,320,000 |
| Pou Ti |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 3.00 ] |
Place |
3,440,000 |
0.800 Diameter (m) |
4.000 Width (m) |
10,320,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,654,999 |
Sithor Kandal, Preaek Changkran
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141207/04/01 |
TSO |
Lonh Saran |
Project Type |
Rural Domestic Water Supplies |
23,715,000 |
| Preaek Sandaek |
1 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 3.00 ] |
Place |
1,317,500 |
55.000 Depth (m) |
100.000 Diameter (mm) |
3,952,500 |
| Preaek Changkran Leu |
2 |
121 |
Drilled well with VN no 6 pump |
6.00 [ 11.00 ] |
Place |
1,317,500 |
55.000 Depth (m) |
100.000 Diameter (mm) |
14,492,500 |
| Preaek Changkran Kraom |
3 |
121 |
Drilled well with VN no 6 pump |
5.00 [ 4.00 ] |
Place |
1,317,500 |
55.000 Depth (m) |
100.000 Diameter (mm) |
5,270,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,715,000 |
Sithor Kandal, Prey Daeum Thnoeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141208/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
14,900,000 |
| Prey Daeum Thnoeng Muoy |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
7,450,000 |
16.000 Length (m) |
9.000 Width (m) |
14,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,900,000 |
Sithor Kandal, Prey Tueng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141209/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
70,400,000 |
| Prey Totueng |
1 |
321 |
Brick school with tile roof |
4.00 [ 4.00 ] |
School room |
17,600,000 |
32.000 Length (m) |
9.000 Width (m) |
70,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,400,000 |
Sithor Kandal, Rumlech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141210/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
64,800,000 |
| Prey Pou |
1 |
321 |
Brick school with tile roof |
3.00 [ 3.00 ] |
School room |
21,600,000 |
24.000 Length (m) |
9.000 Width (m) |
64,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,800,000 |
Sithor Kandal, Ruessei Sanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141211/04/01 |
TSO |
Lonh Saran |
Project Type |
Education |
65,178,000 |
| Prey Chhieng |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
19,000,000 |
16.000 Length (m) |
9.000 Width (m) |
38,000,000 |
| Prey Chhieng |
2 |
171 |
Pour flush latrine with double waste tank system |
10.00 [ 10.00 ] |
Latrine room |
1,400,000 |
1.600 |
3.000 |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,000,000 |