Contract Outputs

Location: Prey Veng Budget Year: 2004

Ba Phnum    Kamchay Mear    Kampong Trabaek    Kanhchriech    Me Sang    Peam Chor    Peam Ro    Pea Reang    Preah Sdach    Prey Veaeng    Kampong Leav    Sithor Kandal   

Ba Phnum, Boeng Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140101/04/01 TSO Chea Sarin Project Type Rural Transport 89,430,000
Kandal 1 201 Earth road 1.16 [ 1.16 ] Km 9,288,800 4.000 Width (m) 4,067.000 Earth fill m3 10,793,586
Boeng Preah 2 201 Earth road 1.20 [ 1.20 ] Km 9,288,800 4.000 Width (m) 4,200.000 Earth fill m3 11,146,560
Ruessei K'aek 3 201 Earth road 1.30 [ 1.30 ] Km 9,288,800 4.000 Width (m) 4,656.250 Earth fill m3 12,075,440
Prasrae 4 201 Earth road 0.99 [ 1.76 ] Km 9,288,800 4.000 Width (m) 8,500.000 Earth fill m3 16,329,710
Kandal 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 700,000
Kandal 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 700,000
Ruessei K'aek 7 211 Single pipe culvert 1.00 [ 2.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Prasrae 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 700,000
Ta Ma 9 201 Earth road 1.37 [ 1.37 ] Km 13,034,750 4.000 Width (m) 7,310.000 Earth fill m3 17,792,434
Dei Thoy 10 201 Earth road 1.37 [ 1.37 ] Km 13,034,690 4.000 Width (m) 7,311.000 Earth fill m3 17,792,352
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  89,430,082

Ba Phnum, Cheung Phnum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140102/04/01 TSO Chea Sarin Project Type Rural Transport 68,693,000
Andoung 1 201 Earth road 0.95 [ 0.95 ] Km 2,475,393 4.000 Width (m) 1,178.000 Earth fill m3 2,351,623
Boeng Roka 2 201 Earth road 1.10 [ 1.10 ] Km 2,475,393 4.000 Width (m) 1,364.000 Earth fill m3 2,722,932
Phlov Roluos 3 201 Earth road 0.70 [ 0.70 ] Km 2,475,393 4.000 Width (m) 868.000 Earth fill m3 1,732,775
Pou Andaot 4 201 Earth road 1.70 [ 1.70 ] Km 2,475,393 4.000 Width (m) 2,125.000 Earth fill m3 4,208,168
Andoung 5 211 Single pipe culvert 4.00 [ 11.00 ] Place 2,027,700 0.800 Diameter (m) 5.000 Length (m) 22,304,700
Boeng Roka 6 211 Single pipe culvert 4.00 [ 6.00 ] Place 2,049,600 1.000 Diameter (m) 5.000 Length (m) 12,297,600
Phlov Roluos 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,226,000 1.000 Diameter (m) 5.000 Length (m) 2,226,000
Pou Andaot 8 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,226,000 1.000 Diameter (m) 5.000 Length (m) 4,452,000
Pou Andaot 9 211 Single pipe culvert 1.00 [ 8.00 ] Place 2,049,650 0.800 Diameter (m) 5.000 Length (m) 16,397,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  68,692,999

Ba Phnum, Chheu Kach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140103/04/01 TSO Chea Sarin Project Type Rural Transport 79,691,300
Chheu Kach 1 203 Gravel road 2.50 [ 2.50 ] Km 6,140,203 5.000 Width (m) 3,450.000 Earth fill m3 15,350,507
Khleang 2 203 Gravel road 1.15 [ 4.40 ] Km 6,140,203 5.000 Width (m) 6,072.000 Earth fill m3 27,016,892
Kandal 4 203 Gravel road 1.20 [ 4.45 ] Km 6,140,203 5.000 Width (m) 6,141.000 Earth fill m3 27,323,902
Chheu Kach 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Tnaot 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Kandal 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Trapeang Sala 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Khleang 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  79,691,300

Ba Phnum, Reaks Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140104/04/01 TSO Chea Sarin Project Type Education 32,122,400
Chheu Traeng 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 9,243,467 24.000 Length (m) 7.000 Width (m) 27,730,400
Chheu Traeng 2 740 School furniture 3.00 [ 3.00 ] School room 1,464,000 146.000 Students 0.000 4,392,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,122,400

Ba Phnum, Roung Damrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140105/04/01 TSO Chea Sarin Project Type Rural Transport 70,798,300
Voa Yeav 1 201 Earth road 0.75 [ 0.75 ] Km 11,062,234 4.000 Width (m) 1,685.250 Earth fill m3 8,296,676
Tnaot Svay 2 201 Earth road 1.00 [ 1.00 ] Km 11,062,234 4.000 Width (m) 2,247.000 Earth fill m3 11,062,234
Traok 3 201 Earth road 1.25 [ 1.25 ] Km 11,062,234 4.000 Width (m) 2,808.750 Earth fill m3 13,827,793
Tnaot Svay 4 203 Gravel road 1.00 [ 1.00 ] Km 11,062,234 4.000 Width (m) 600.000 Earth fill m3 11,062,234
Traok 5 203 Gravel road 1.25 [ 1.25 ] Km 11,062,234 4.000 Width (m) 750.000 Earth fill m3 13,827,793
Voa Yeav 6 203 Gravel road 0.75 [ 1.15 ] Km 11,062,234 4.000 Width (m) 690.000 Earth fill m3 12,721,570
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  70,798,300

Ba Phnum, Sdau Kaong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140106/04/01 TSO Chea Sarin Project Type Rural Transport 40,736,400
Ta Kouk 1 201 Earth road 0.56 [ 0.56 ] Km 3,448,276 5.000 Width (m) 1,909.000 Earth fill m3 1,931,034
Sempoli 2 201 Earth road 0.89 [ 0.89 ] Km 3,448,276 5.000 Width (m) 3,035.000 Earth fill m3 3,068,965
Ta Kouk 6 203 Gravel road 0.56 [ 2.36 ] Km 8,408,565 5.000 Width (m) 1,449.000 Earth fill m3 19,844,213
Sempoli 7 203 Gravel road 0.29 [ 1.89 ] Km 8,408,565 5.000 Width (m) 1,161.000 Earth fill m3 15,892,187
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,736,400
Contract ID 140106/04/02 TSO Chea Sarin Project Type Irrigation 7,000,000
Prey Phdau 1 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 7,000,000 1.000 Diameter (m) 5.000 Width (m) 7,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,000,000

Ba Phnum, Spueu Ka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140107/04/01 TSO Chea Sarin Project Type Rural Transport 28,245,900
Svay Pok 1 211 Single pipe culvert 2.00 [ 5.00 ] Place 907,700 1.000 Diameter (m) 5.000 Length (m) 4,538,500
Svay Pok 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 907,700 0.600 Diameter (m) 5.000 Length (m) 1,815,400
Kalei Cheung 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 842,000 0.800 Diameter (m) 5.000 Length (m) 1,684,000
Kalei Cheung 4 211 Single pipe culvert 1.00 [ 2.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 1,684,000
Kalei Tboung 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 842,000 0.800 Diameter (m) 5.000 Length (m) 842,000
Snuol 6 211 Single pipe culvert 2.00 [ 6.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 5,052,000
Krang 7 211 Single pipe culvert 3.00 [ 5.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 4,210,000
Ta Laon 8 211 Single pipe culvert 1.00 [ 2.00 ] Place 842,000 1.600 Diameter (m) 5.000 Length (m) 1,684,000
Sdau Kaong 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 842,000
Spueu Lech 10 211 Single pipe culvert 2.00 [ 3.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 2,526,000
Spueu Kaeut 11 211 Single pipe culvert 2.00 [ 4.00 ] Place 842,000 0.600 Diameter (m) 5.000 Length (m) 3,368,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,245,900

Ba Phnum, Spueu Kha

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140108/04/01 TSO Chea Sarin Project Type Irrigation 78,073,000
Prey Chamkar 1 420 Canal 0.80 [ 1.43 ] Km 17,090,975 1.500 Depth (m) 18,666.000 Volume (m3) 24,491,367
Thlok 2 420 Canal 0.70 [ 1.33 ] Km 17,090,900 1.500 Depth (m) 11,736.000 Volume (m3) 22,782,170
Chan Ra Ka 3 420 Canal 0.70 [ 1.33 ] Km 17,090,975 1.500 Depth (m) 11,735.000 Volume (m3) 22,799,361
Prey Chamkar 4 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Width (m) 4,000,000
Prey Chamkar 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Thlok 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Prey Chamkar 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Thlok 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  78,072,898

Ba Phnum, Theay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140109/04/01 TSO Chea Sarin Project Type Rural Transport 73,984,600
Angkal 1 201 Earth road 0.78 [ 0.78 ] Km 2,954,733 4.000 Width (m) 1,978.260 Earth fill m3 2,289,918
Snuol 2 201 Earth road 0.78 [ 2.83 ] Km 2,954,733 4.000 Width (m) 1,378.260 Earth fill m3 8,347,120
Krang 3 201 Earth road 1.25 [ 1.25 ] Km 10,878,892 4.000 Width (m) 2,223.000 Earth fill m3 13,598,615
Sdau 4 201 Earth road 1.25 [ 2.37 ] Km 10,878,892 4.000 Width (m) 2,223.000 Earth fill m3 25,815,611
Angkal 5 203 Gravel road 0.78 [ 0.78 ] Km 5,909,500 4.000 Width (m) 465.000 Earth fill m3 4,579,863
Snuol 6 203 Gravel road 0.78 [ 0.78 ] Km 5,909,500 4.000 Width (m) 465.000 Earth fill m3 4,579,863
Krang 7 203 Gravel road 1.25 [ 1.25 ] Km 5,909,465 4.000 Width (m) 750.000 Earth fill m3 7,386,831
Sdau 8 203 Gravel road 1.25 [ 1.25 ] Km 5,909,465 4.000 Width (m) 750.000 Earth fill m3 7,386,831
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  73,984,651

Kamchay Mear, Cheach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140201/04/01 TSO Bunn Sam Ath Project Type Rural Transport 32,693,900
Cheach Tboung 1 201 Earth road 2.32 [ 2.47 ] Km 13,252,492 4.000 Width (m) 6,764.000 Earth fill m3 32,693,898
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,693,898

Kamchay Mear, Doun Koeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140202/04/01 TSO Bunn Sam Ath Project Type Education 11,900,000
Pou Pir 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 4,365,000 16.000 Length (m) 9.000 Width (m) 8,730,000
Pou Pir 2 740 School furniture 2.00 [ 2.00 ] School room 1,400,000 80.000 Students 0.000 2,800,000
Pou Pir 3 740 School furniture 1.00 [ 1.00 ] School room 370,000 80.000 Students 0.000 370,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,900,000
Contract ID 140202/04/02 TSO Bunn Sam Ath Project Type Rural Transport 15,154,100
Doun Koeng 1 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,322,050 0.600 Diameter (m) 5.000 Length (m) 2,644,100
Thmei 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,390,000 0.600 Diameter (m) 5.000 Length (m) 2,780,000
Chuor Ph'av 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,390,000 0.600 Diameter (m) 5.000 Length (m) 2,780,000
Trapeang Danghet 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,390,000 0.600 Diameter (m) 5.000 Length (m) 2,780,000
Ta Dok 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,390,000 0.600 Diameter (m) 5.000 Length (m) 2,780,000
Svay Sokhom 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,390,000 0.800 Diameter (m) 5.000 Length (m) 1,390,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,154,100

Kamchay Mear, Kranhung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140203/04/01 TSO Bunn Sam Ath Project Type Rural Transport 32,714,700
Snuol 1 201 Earth road 1.34 [ 2.28 ] Km 12,056,496 4.000 Width (m) 8,310.000 Earth fill m3 27,464,698
Snuol 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Snuol 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Snuol 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,750,000 0.600 Diameter (m) 5.000 Length (m) 1,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,714,698

Kamchay Mear, Krabau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140204/04/01 TSO Bunn Sam Ath Project Type Rural Transport 28,037,600
Tboung Voat 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Pou 2 211 Single pipe culvert 5.00 [ 6.00 ] Place 1,273,500 0.600 Diameter (m) 5.000 Length (m) 7,641,000
Pou 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,750,000 0.600 Diameter (m) 5.000 Length (m) 1,750,000
Phum Thmei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,146,600 1.000 Diameter (m) 5.000 Length (m) 3,146,600
Krabau 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 5,000,000
Prey Tres 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Ta Ei 7 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Kanlaeng Chrov 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,037,600

Kamchay Mear, Seang Khveang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140205/04/01 TSO Bunn Sam Ath Project Type Rural Transport 30,008,000
Sangkae 1 201 Earth road 1.00 [ 1.00 ] Km 19,039,200 4.000 Width (m) 3,924.000 Earth fill m3 19,039,200
Lvea 2 201 Earth road 0.50 [ 0.50 ] Km 19,039,200 4.000 Width (m) 1,962.000 Earth fill m3 9,519,600
Lvea 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,449,200 0.600 Diameter (m) 5.000 Length (m) 1,449,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,008,000

Kamchay Mear, Smaong Cheung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140206/04/01 TSO Bunn Sam Ath Project Type Rural Transport 35,200,000
Prey Stor 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 35,200,000 6.000 Total Span (m) 4.000 Width (m) 35,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,200,000

Kamchay Mear, Smaong Tboung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140207/04/01 TSO Bunn Sam Ath Project Type Rural Transport 33,140,500
Prey Khlout 1 201 Earth road 1.65 [ 1.65 ] Km 12,825,585 4.000 Width (m) 6,337.000 Earth fill m3 21,162,215
Kong 2 201 Earth road 0.91 [ 0.91 ] Km 13,163,000 4.000 Width (m) 4,278.000 Earth fill m3 11,978,330
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,140,545

Kamchay Mear, Trâbêk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140208/04/01 TSO Bunn Sam Ath Project Type Rural Transport 52,238,300
Doun Diev 1 201 Earth road 2.05 [ 2.05 ] Km 4,464,800 4.000 Width (m) 820.000 Earth fill m3 9,152,840
Doun Diev 2 202 Laterite road 2.05 [ 2.05 ] Km 8,929,605 4.000 Width (m) 1,230.000 Earth fill m3 18,305,690
Tralach Sa 3 201 Earth road 0.85 [ 0.85 ] Km 4,464,800 4.000 Width (m) 340.000 Earth fill m3 3,795,080
Tralach Sa 4 202 Laterite road 0.85 [ 0.85 ] Km 8,929,605 4.000 Width (m) 510.000 Earth fill m3 7,590,164
Trapeang Prich 5 201 Earth road 0.90 [ 0.90 ] Km 4,464,800 4.000 Width (m) 360.000 Earth fill m3 4,018,320
Trapeang Prich 6 202 Laterite road 0.90 [ 0.90 ] Km 8,929,700 4.000 Width (m) 540.000 Earth fill m3 8,036,730
Trapeang Prei 7 201 Earth road 0.10 [ 0.10 ] Km 4,464,800 4.000 Width (m) 68.000 Earth fill m3 446,480
Trapeang Prei 8 202 Laterite road 0.10 [ 0.10 ] Km 8,929,700 4.000 Width (m) 60.000 Earth fill m3 892,970
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,238,275

Kampong Trabaek, Ansaong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140301/04/01 TSO Chea Sarim Project Type Rural Transport 24,474,000
Banteab Bos 1 201 Earth road 1.20 [ 1.20 ] Km 20,395,000 4.000 Width (m) 4,943.000 Earth fill m3 24,474,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,474,000

Kampong Trabaek, Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140302/04/01 TSO Chea Sarim Project Type Rural Transport 31,620,000
Ka Thum 1 201 Earth road 1.60 [ 1.60 ] Km 19,762,500 4.000 Width (m) 6,408.000 Earth fill m3 31,620,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,620,000

Kampong Trabaek, Cheang Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140303/04/01 TSO Chea Sarim Project Type Rural Transport 30,700,000
Cheang Daek 1 201 Earth road 2.00 [ 2.00 ] Km 15,350,000 4.000 Width (m) 6,454.000 Earth fill m3 30,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,700,000

Kampong Trabaek, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140304/04/01 TSO Chea Sarim Project Type Rural Transport 24,175,000
Dak Por 1 201 Earth road 1.60 [ 1.60 ] Km 15,109,375 3.500 Width (m) 4,759.000 Earth fill m3 24,175,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,175,000

Kampong Trabaek, Kansaom Ak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140305/04/01 TSO Chea Sarim Project Type Rural Transport 29,000,000
Kansaom Ak 1 201 Earth road 1.35 [ 1.35 ] Km 21,481,500 5.000 Width (m) 6,043.000 Earth fill m3 29,000,025
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,000,025

Kampong Trabaek, Kou Khchak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140306/04/01 TSO Chea Sarim Project Type Rural Transport 37,000,000
Prey Snuol 1 201 Earth road 2.40 [ 2.40 ] Km 15,416,667 3.500 Width (m) 7,574.000 Earth fill m3 37,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,000,000

Kampong Trabaek, Kampong Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140307/04/01 TSO Chea Sarim Project Type Rural Transport 27,108,000
Preaek Phdau 1 201 Earth road 1.50 [ 1.50 ] Km 18,072,000 3.000 Width (m) 5,020.000 Earth fill m3 27,108,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,108,000

Kampong Trabaek, Peam Montear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140308/04/01 TSO Chea Sarim Project Type Irrigation 30,300,000
Dangkieb Kdam 1 420 Canal 1.00 [ 1.00 ] Km 30,300,000 1.500 Depth (m) 9,751.000 Volume (m3) 30,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,300,000

Kampong Trabaek, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140309/04/01 TSO Chea Sarim Project Type Rural Transport 30,498,000
Thkov 1 201 Earth road 1.40 [ 1.40 ] Km 13,260,000 3.000 Width (m) 4,137.000 Earth fill m3 18,564,000
Phlong 2 201 Earth road 0.90 [ 0.90 ] Km 13,260,000 3.000 Width (m) 4,569.000 Earth fill m3 11,934,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,498,000

Kampong Trabaek, Pratheat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140310/04/01 TSO Chea Sarim Project Type Rural Transport 28,800,000
Traok 1 201 Earth road 1.60 [ 1.60 ] Km 18,000,000 4.000 Width (m) 5,977.000 Earth fill m3 28,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,800,000

Kampong Trabaek, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140311/04/01 TSO Chea Sarim Project Type Rural Transport 24,799,800
A Kreach 1 201 Earth road 1.20 [ 1.20 ] Km 18,166,500 4.000 Width (m) 4,605.000 Earth fill m3 21,799,800
A Kreach 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 4.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,799,800

Kampong Trabaek, Prey Poun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140312/04/01 TSO Chea Sarim Project Type Rural Transport 24,440,000
Chi Peay 1 201 Earth road 1.40 [ 1.40 ] Km 17,457,150 4.000 Width (m) 5,082.000 Earth fill m3 24,440,010
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,440,010

Kampong Trabaek, Thkov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140313/04/01 TSO Chea Sarim Project Type Rural Transport 23,780,000
Thum 1 201 Earth road 0.55 [ 0.55 ] Km 12,194,900 3.000 Width (m) 1,695.000 Earth fill m3 6,707,195
Pouthi Vongs 2 201 Earth road 0.30 [ 0.30 ] Km 12,194,800 3.000 Width (m) 925.000 Earth fill m3 3,658,440
Pou 3 201 Earth road 1.10 [ 1.10 ] Km 12,194,900 3.000 Width (m) 3,392.000 Earth fill m3 13,414,390
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,780,025

Kanhchriech, Chong Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140401/04/01 TSO Ou Kolab Project Type Education 69,560,000
Prey Svay 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 18,980,000 24.000 Length (m) 9.000 Width (m) 56,940,000
Prey Svay 2 740 School furniture 3.00 [ 3.00 ] School room 1,020,000 60.000 Students 0.000 3,060,000
Prey Svay 3 740 School furniture 2.00 [ 2.00 ] School room 140,000 40.000 Students 0.000 280,000
Prey Svay 4 321 Brick school with tile roof 2.00 [ 2.00 ] School room 4,200,000 16.000 Length (m) 9.000 Width (m) 8,400,000
Prey Svay 5 740 School furniture 1.00 [ 1.00 ] School room 880,000 40.000 Students 0.000 880,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  69,560,000

Kanhchriech, Kanhchriech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140402/04/01 TSO Ou Kolab Project Type Rural Transport 66,860,000
Prasrae Mukh 1 201 Earth road 0.87 [ 0.87 ] Km 11,769,540 4.500 Width (m) 3,211.000 Earth fill m3 10,239,500
Prasrae Lech 2 201 Earth road 0.73 [ 0.73 ] Km 11,769,808 4.500 Width (m) 2,290.000 Earth fill m3 8,615,499
Pou Mrenh 3 201 Earth road 1.02 [ 1.02 ] Km 11,769,607 4.500 Width (m) 4,133.000 Earth fill m3 12,004,999
Prasrae Mukh 4 211 Single pipe culvert 3.00 [ 8.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 11,520,000
Prasrae Lech 5 211 Single pipe culvert 2.00 [ 8.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 11,520,000
Pou Mrenh 6 211 Single pipe culvert 1.00 [ 5.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 7,200,000
Kanhchriech 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 1,440,000
Chhnoeng Chumnir 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 1,440,000
Ou Ta Thok 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 1,440,000
Pou Tong 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,440,000 0.600 Diameter (m) 5.000 Length (m) 1,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  66,859,998

Kanhchriech, Kdoeang Reay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140403/04/01 TSO Ou Kolab Project Type Rural Transport 51,262,700
Peanea Phsar 1 201 Earth road 0.66 [ 0.66 ] Km 8,320,151 4.500 Width (m) 1,231.000 Earth fill m3 5,491,300
Peanea Kandal 2 201 Earth road 0.84 [ 0.84 ] Km 8,928,571 4.500 Width (m) 3,349.000 Earth fill m3 7,500,000
Peanea Chuor 3 201 Earth road 0.84 [ 0.84 ] Km 11,785,714 4.500 Width (m) 3,485.000 Earth fill m3 9,900,000
Ta Nal 4 201 Earth road 0.60 [ 0.60 ] Km 16,483,333 4.500 Width (m) 2,300.000 Earth fill m3 9,890,000
Ta Nal 5 201 Earth road 0.40 [ 0.40 ] Km 15,222,000 3.500 Width (m) 1,416.000 Earth fill m3 6,088,800
Pou Touch 6 201 Earth road 0.77 [ 0.77 ] Km 16,073,441 3.500 Width (m) 2,882.000 Earth fill m3 12,392,623
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,262,722

Kanhchriech, Kouk Kong Kaeut

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140404/04/01 TSO Ou Kolab Project Type Education 67,431,000
Chrey Mreak 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 21,462,000 24.000 Length (m) 9.000 Width (m) 64,386,000
Chrey Mreak 2 740 School furniture 3.00 [ 3.00 ] School room 1,015,000 120.000 Students 0.000 3,045,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  67,431,000

Kanhchriech, Kouk Kong Lech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140405/04/01 TSO Ou Kolab Project Type Irrigation 24,275,800
Kouk Kong Kandal 1 251 Drift 1.00 [ 1.00 ] Place 8,981,800 15.000 Length (m) 4.000 Width (m) 8,981,800
Kouk Kong Kandal 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,621,000 1.000 Diameter (m) 5.000 Width (m) 7,242,000
Kouk Kong Kandal 3 410 Earth dam 0.09 [ 0.21 ] Km 39,087,378 0.640 Max. height (m) 445.000 Volume (m3) 8,052,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,275,800

Kanhchriech, Preal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140406/04/01 TSO Ou Kolab Project Type Rural Transport 49,245,900
Trapeang Tuem 1 201 Earth road 0.69 [ 0.69 ] Km 4,735,942 4.500 Width (m) 2,328.000 Earth fill m3 3,267,800
Svay 2 201 Earth road 0.84 [ 0.84 ] Km 4,735,833 4.500 Width (m) 1,768.000 Earth fill m3 3,978,100
Svay 3 212 Double pipe culvert 5.00 [ 5.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 10,000,000
Kouk Roka 4 212 Double pipe culvert 4.00 [ 5.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 10,000,000
Prey Ta Prum 5 212 Double pipe culvert 8.00 [ 8.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 16,000,000
Trapeang Kranh 6 212 Double pipe culvert 3.00 [ 3.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  49,245,900
Contract ID 140406/04/02 TSO Ou Kolab Project Type Rural Transport 24,205,000
Pouthi Proeks 1 201 Earth road 1.05 [ 1.05 ] Km 4,800,000 4.000 Width (m) 735.000 Earth fill m3 5,040,000
Tuol Trach 2 201 Earth road 1.15 [ 1.15 ] Km 4,800,000 4.000 Width (m) 1,285.000 Earth fill m3 5,520,000
Trapeang Thlan Cheung 3 201 Earth road 0.15 [ 0.15 ] Km 4,800,000 4.000 Width (m) 236.000 Earth fill m3 720,000
Pouthi Proeks 4 202 Laterite road 1.05 [ 1.05 ] Km 5,500,000 3.500 Width (m) 735.000 Earth fill m3 5,775,000
Tuol Trach 5 202 Laterite road 1.15 [ 1.15 ] Km 5,500,000 3.500 Width (m) 805.000 Earth fill m3 6,325,000
Trapeang Thlan Cheung 6 202 Laterite road 0.15 [ 0.15 ] Km 5,500,000 3.500 Width (m) 105.000 Earth fill m3 825,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,205,000

Kanhchriech, Thma Pun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140407/04/01 TSO Ou Kolab Project Type Education 64,861,000
Beng 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 20,605,333 24.000 Length (m) 9.000 Width (m) 61,815,999
Beng 2 740 School furniture 3.00 [ 3.00 ] School room 1,015,000 120.000 Students 0.000 3,045,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  64,860,999
Contract ID 140407/04/02 TSO Ou Kolab Project Type Rural Transport 14,780,800
Prongeuy Muoy 1 201 Earth road 1.19 [ 1.19 ] Km 12,400,000 4.000 Width (m) 2,979.000 Earth fill m3 14,780,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,780,800

Kanhchriech, Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140408/04/01 TSO Ou Kolab Project Type Rural Transport 10,334,600
Khnay Kov 1 201 Earth road 1.36 [ 1.36 ] Km 2,099,000 4.000 Width (m) 1,339.000 Earth fill m3 2,854,640
Khnay Kov 2 202 Laterite road 1.36 [ 1.36 ] Km 5,500,000 3.500 Width (m) 714.000 Earth fill m3 7,480,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,334,640
Contract ID 140408/04/02 TSO Ou Kolab Project Type Rural Transport 54,802,800
Svay Chek 1 201 Earth road 1.05 [ 1.05 ] Km 8,278,476 4.000 Width (m) 3,661.000 Earth fill m3 8,692,400
Krala Meakh 2 201 Earth road 0.54 [ 0.54 ] Km 7,537,777 4.000 Width (m) 854.000 Earth fill m3 4,070,400
Kok 3 201 Earth road 1.15 [ 1.15 ] Km 8,278,540 4.000 Width (m) 3,483.000 Earth fill m3 9,528,600
Khnay Kov 4 201 Earth road 0.45 [ 0.45 ] Km 13,025,334 4.000 Width (m) 2,469.000 Earth fill m3 5,861,400
Svay Chek 5 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 5,800,000
Svay Chek 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Khnay Kov 7 211 Single pipe culvert 6.00 [ 6.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 8,700,000
Krala Meakh 8 211 Single pipe culvert 2.00 [ 4.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 5,800,000
Kok 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 1,450,000
Tnaot 10 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 2,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  54,802,799

Me Sang, Angkor Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140501/04/01 TSO Sem Socheat Project Type Education 29,700,000
Angkor Sar 1 321 Brick school with tile roof 4.00 [ 4.00 ] School room 7,425,000 32.000 Length (m) 9.000 Width (m) 29,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,700,000

Me Sang, Chres

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140502/04/01 TSO Sem Socheat Project Type Education 34,755,600
Toap Sdach 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 13,125,000 16.000 Length (m) 9.000 Width (m) 26,250,000
Toap Sdach 2 321 Brick school with tile roof 2.00 [ 2.00 ] School room 2,650,700 16.000 Length (m) 9.000 Width (m) 5,301,400
Toap Sdach 3 740 School furniture 2.00 [ 2.00 ] School room 1,602,100 80.000 Students 0.000 3,204,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,755,600

Me Sang, Chi Phok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140503/04/01 TSO Sem Socheat Project Type Education 38,660,000
Yeang Touch 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 19,330,000 16.000 Length (m) 9.000 Width (m) 38,660,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,660,000

Me Sang, Prey Khnes

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140504/04/01 TSO Sem Socheat Project Type Rural Transport 35,470,000
Kaev Sna 1 201 Earth road 1.34 [ 1.34 ] Km 6,496,800 4.000 Width (m) 1,796.000 Earth fill m3 8,705,712
Kaev Sna 2 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,150,000 0.600 Diameter (m) 4.000 Length (m) 5,750,000
Kaev Sna 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,850,000 0.600 Diameter (m) 4.000 Length (m) 1,850,000
Prey Khnes Ka 4 201 Earth road 1.78 [ 1.78 ] Km 6,496,800 4.000 Width (m) 2,500.000 Earth fill m3 11,564,304
Prey Khnes Ka 5 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,150,000 0.600 Diameter (m) 4.000 Length (m) 5,750,000
Prey Khnes Ka 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,850,000 0.600 Diameter (m) 4.000 Length (m) 1,850,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,470,016

Me Sang, Prey Rumdeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140505/04/01 TSO Sem Socheat Project Type Irrigation 50,782,000
Kandal 1 420 Canal 0.80 [ 0.80 ] Km 19,262,500 1.500 Depth (m) 4,170.000 Volume (m3) 15,410,000
Kreul 2 452 Single pipe Culvert with gate 1.00 [ 2.00 ] Place 4,680,000 1.000 Diameter (m) 5.000 Width (m) 9,360,000
Kreul 3 451 Small water gate 1.00 [ 1.00 ] Place 23,200,000 4.000 Length (m) 2.000 Height (m) 23,200,000
Kandal 4 420 Canal 0.27 [ 0.27 ] Km 10,414,815 1.000 Depth (m) 760.000 Volume (m3) 2,812,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,782,000

Me Sang, Prey Totueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140506/04/01 TSO Sem Socheat Project Type Education 30,861,400
Angkor K'aot 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 11,500,000 16.000 Length (m) 9.000 Width (m) 23,000,000
Angkor K'aot 2 321 Brick school with tile roof 2.00 [ 2.00 ] School room 2,296,100 16.000 Length (m) 9.000 Width (m) 4,592,200
Angkor K'aot 3 740 School furniture 2.00 [ 2.00 ] School room 1,634,600 80.000 Students 0.000 3,269,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,861,400

Me Sang, Svay Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140507/04/01 TSO Sem Socheat Project Type Education 34,505,600
Sa Veang 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 13,000,000 16.000 Length (m) 9.000 Width (m) 26,000,000
Sa Veang 2 321 Brick school with tile roof 2.00 [ 2.00 ] School room 2,650,700 16.000 Length (m) 9.000 Width (m) 5,301,400
Sa Veang 3 740 School furniture 2.00 [ 2.00 ] School room 1,602,100 80.000 Students 0.000 3,204,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,505,600

Me Sang, Trapeang Srae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140508/04/01 TSO Sem Socheat Project Type Education 38,610,000
Prey Kuy 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 19,305,000 16.000 Length (m) 9.000 Width (m) 38,610,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,610,000

Peam Chor, Angkor Angk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140601/04/01 TSO Sok Sarunn Project Type Rural Transport 20,816,000
Veal Robang Leu 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Veal Robang Leu 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 5.000 Length (m) 5,000,000
Veal Robang Kraom 3 213 Triple pipe culvert 2.00 [ 2.00 ] Place 4,908,000 1.000 Diameter (m) 5.000 Length (m) 9,816,000
Preaek Traeng 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,816,000

Peam Chor, Kampong Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140602/04/01 TSO Sok Sarunn Project Type Rural Transport 22,900,000
Ta Huy 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Ta Huy 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.800 Diameter (m) 4.000 Length (m) 1,500,000
Ta Huy 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,600,000 1.000 Diameter (m) 4.000 Length (m) 3,600,000
Ta Paeu 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,600,000 1.000 Diameter (m) 4.000 Length (m) 3,600,000
Krang Krouch 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Krang Krouch 6 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 4.000 Length (m) 5,000,000
Kampong Prasat 7 212 Double pipe culvert 1.00 [ 2.00 ] Place 3,600,000 1.000 Diameter (m) 4.000 Length (m) 7,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,900,000

Peam Chor, Kaoh Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140603/04/01 TSO Sok Sarunn Project Type Rural Transport 22,900,000
Mean Chey 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,100,000 1.000 Diameter (m) 5.000 Length (m) 5,100,000
Kaoh Chek 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,850,000 1.000 Diameter (m) 5.000 Length (m) 7,700,000
Spean 3 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,100,000 1.000 Diameter (m) 5.000 Length (m) 5,100,000
Kaoh Peam Reang 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 5.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,900,000

Peam Chor, Kaoh Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140604/04/01 TSO Sok Sarunn Project Type Rural Transport 23,528,500
Kaoh Roka 1 201 Earth road 1.38 [ 1.92 ] Km 12,254,427 5.000 Width (m) 5,165.000 Earth fill m3 23,528,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,528,500

Peam Chor, Kaoh Sampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140605/04/01 TSO Sok Sarunn Project Type Irrigation 29,281,000
Svay Andoung 1 420 Canal 0.89 [ 0.89 ] Km 32,900,000 2.000 Depth (m) 8,411.000 Volume (m3) 29,281,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,281,000

Peam Chor, Krang Ta Yang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140606/04/01 TSO Sok Sarunn Project Type Irrigation 36,260,000
Chrey Otdam 1 420 Canal 0.36 [ 0.36 ] Km 64,542,689 2.690 Depth (m) 6,490.000 Volume (m3) 23,235,368
Chrey Otdam 2 420 Canal 1.04 [ 1.04 ] Km 12,475,662 1.310 Depth (m) 3,636.000 Volume (m3) 13,024,591
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,259,959

Peam Chor, Preaek Krabau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140607/04/01 TSO Sok Sarunn Project Type Rural Transport 22,778,400
Otdam 1 201 Earth road 1.74 [ 1.92 ] Km 11,863,750 5.000 Width (m) 5,769.000 Earth fill m3 22,778,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,778,400

Peam Chor, Preaek Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140608/04/01 TSO Sok Sarunn Project Type Irrigation 18,821,800
Sambuor 1 452 Single pipe Culvert with gate 4.00 [ 5.00 ] Place 3,764,360 1.000 Diameter (m) 4.000 Width (m) 18,821,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,821,800

Peam Chor, Ruessei Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140609/04/01 TSO Sok Sarunn Project Type Irrigation 32,865,000
Chheu Teal 1 420 Canal 0.33 [ 0.33 ] Km 29,580,303 2.100 Depth (m) 2,789.000 Volume (m3) 9,761,500
Chheu Teal 2 420 Canal 1.62 [ 1.62 ] Km 14,261,420 1.230 Depth (m) 6,601.000 Volume (m3) 23,103,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,865,000

Peam Chor, Svay Phluoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140610/04/01 TSO Sok Sarunn Project Type Rural Transport 19,048,500
Sangkruoh 1 201 Earth road 2.10 [ 2.56 ] Km 7,432,111 4.000 Width (m) 4,590.000 Earth fill m3 19,048,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,048,500
Contract ID 140610/04/02 TSO Sok Sarunn Project Type Irrigation 6,720,000
Bang'aek 1 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 6,720,000 1.000 Diameter (m) 4.000 Width (m) 6,720,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,720,000

Peam Ro, Ba Baong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140701/04/01 TSO Chou SoCheat Project Type Irrigation 18,000,000
Ba Baong 1 420 Canal 0.95 [ 0.95 ] Km 17,684,200 0.760 Depth (m) 4,060.000 Volume (m3) 16,799,990
Ba Baong 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 1,200,000 0.800 Diameter (m) 10.000 Width (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,999,990
Contract ID 140701/04/02 TSO Chou SoCheat Project Type Irrigation 3,500,000
Chouk Chey 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,500,000 0.800 Diameter (m) 4.000 Width (m) 3,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,500,000

Peam Ro, Banlich Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140702/04/01 TSO Chou SoCheat Project Type Irrigation 24,750,000
Prasat Cheung 1 420 Canal 1.45 [ 1.45 ] Km 17,068,965 1.290 Depth (m) 7,781.000 Volume (m3) 24,749,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,749,999

Peam Ro, Neak Loeang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140703/04/01 TSO Chou SoCheat Project Type Rural Transport 25,108,100
Neak Loeang 1 201 Earth road 1.33 [ 1.33 ] Km 10,492,755 5.000 Width (m) 4,237.000 Earth fill m3 13,902,900
Preaek Ta Sa 2 201 Earth road 0.40 [ 0.63 ] Km 11,141,600 5.000 Width (m) 1,280.000 Earth fill m3 6,963,500
Preaek Thum 3 201 Earth road 0.35 [ 0.35 ] Km 12,294,783 5.000 Width (m) 1,293.000 Earth fill m3 4,241,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,108,101

Peam Ro, Peam Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140704/04/01 TSO Chou SoCheat Project Type Irrigation 24,641,500
Boeng Phsaot 1 420 Canal 0.73 [ 0.73 ] Km 22,300,000 1.090 Depth (m) 3,459.000 Volume (m3) 16,167,500
Chamkar Veaeng 2 420 Canal 0.38 [ 0.38 ] Km 22,300,000 1.090 Depth (m) 2,895.000 Volume (m3) 8,474,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,641,500

Peam Ro, Peam Ro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140705/04/01 TSO Chou SoCheat Project Type Rural Transport 3,160,000
Peam Kaoh 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,160,000 1.000 Diameter (m) 10.000 Length (m) 3,160,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,160,000
Contract ID 140705/04/02 TSO Chou SoCheat Project Type Irrigation 19,100,000
Chambak Prang 2 420 Canal 0.58 [ 0.58 ] Km 30,260,800 1.220 Depth (m) 4,483.000 Volume (m3) 17,399,960
Chambak Prang 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 1,700,000 1.000 Diameter (m) 5.000 Width (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,099,960

Peam Ro, Preaek Khsay Ka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140706/04/01 TSO Chou SoCheat Project Type Rural Drainage and Flood Protection 5,840,000
Otdam 1 540 Drainage 1.00 [ 1.00 ] Line 1,460,000 0.600 Length (m) 9.000 Diameter (m) 1,460,000
Otdam 2 540 Drainage 3.00 [ 3.00 ] Line 1,460,000 0.600 Length (m) 7.000 Diameter (m) 4,380,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,840,000
Contract ID 140706/04/02 TSO Chou SoCheat Project Type Irrigation 22,140,000
Preaek Khsay 1 420 Canal 1.99 [ 1.99 ] Km 11,153,652 0.900 Depth (m) 6,950.000 Volume (m3) 22,139,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,139,999

Peam Ro, Preaek Khsay Kha

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140707/04/01 TSO Chou SoCheat Project Type Rural Transport 30,405,700
Phum Pir 1 203 Gravel road 0.20 [ 0.20 ] Km 18,900,000 3.500 Width (m) 105.000 Earth fill m3 3,780,000
Phum Pram 2 203 Gravel road 0.50 [ 0.50 ] Km 18,900,000 3.500 Width (m) 262.000 Earth fill m3 9,450,000
Phum Prammuoy 3 203 Gravel road 0.33 [ 0.33 ] Km 18,900,000 3.500 Width (m) 174.000 Earth fill m3 6,237,000
Phum Pir 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 7.000 Length (m) 1,400,000
Phum Pram 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,166,667 0.600 Diameter (m) 7.000 Length (m) 3,500,001
Phum Pram 6 201 Earth road 0.20 [ 0.20 ] Km 30,193,500 4.000 Width (m) 1,594.000 Earth fill m3 6,038,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,405,701

Peam Ro, Prey Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140708/04/01 TSO Chou SoCheat Project Type Irrigation 28,800,000
Chan 1 420 Canal 0.85 [ 0.85 ] Km 15,542,363 1.080 Depth (m) 4,137.000 Volume (m3) 13,257,636
Prey Angkonh 2 420 Canal 1.00 [ 1.00 ] Km 15,542,363 1.080 Depth (m) 4,898.000 Volume (m3) 15,542,363
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,799,999

Pea Reang, Kampong Popil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140801/04/01 TSO Huot Chhel Project Type Irrigation 40,262,000
Bat Santrea 6 410 Earth dam 0.65 [ 0.65 ] Km 11,307,692 0.900 Max. height (m) 3,235.000 Volume (m3) 7,350,000
Chumnik 7 410 Earth dam 0.65 [ 0.65 ] Km 11,307,692 2.100 Max. height (m) 3,841.000 Volume (m3) 7,350,000
Preaek Kamphleung 8 410 Earth dam 0.00 [ 0.25 ] Km 19,272,000 1.650 Max. height (m) 2,320.000 Volume (m3) 4,818,000
Khsom Cheung 9 410 Earth dam 0.00 [ 0.73 ] Km 18,769,655 1.200 Max. height (m) 6,552.000 Volume (m3) 13,608,000
Bat Santrea 10 410 Earth dam 0.00 [ 0.43 ] Km 16,790,588 1.200 Max. height (m) 3,436.000 Volume (m3) 7,136,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,261,999

Pea Reang, Kanhcham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140802/04/01 TSO Lim Sokhanan Project Type Education 57,865,000
Tonle Chrey 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 13,333,333 0.000 Length (m) 9.000 Width (m) 40,000,000
Tonle Chrey 2 321 Brick school with tile roof 3.00 [ 3.00 ] School room 3,465,667 0.000 Length (m) 9.000 Width (m) 10,397,000
Tonle Chrey 3 740 School furniture 4.00 [ 4.00 ] School room 1,867,000 192.000 Students 0.000 7,468,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  57,865,000

Pea Reang, Kampong Prang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140803/04/01 TSO Huot Chhel Project Type Rural Transport 41,731,000
Kampong Prang 1 201 Earth road 1.70 [ 1.70 ] Km 6,470,600 4.500 Width (m) 4,431.000 Earth fill m3 11,000,020
Preaek Ta Roatn 2 201 Earth road 1.50 [ 1.50 ] Km 6,470,600 4.500 Width (m) 4,185.000 Earth fill m3 9,705,900
Preaek Chruk 3 201 Earth road 0.20 [ 0.20 ] Km 6,470,500 4.500 Width (m) 568.000 Earth fill m3 1,294,100
Preaek Chruk 4 201 Earth road 1.05 [ 1.05 ] Km 18,791,429 4.500 Width (m) 8,235.000 Earth fill m3 19,731,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,731,020

Pea Reang, Kampong Ruessei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140804/04/01 TSO Huot Chhel Project Type Rural Transport 50,566,300
Sla 1 201 Earth road 0.65 [ 0.65 ] Km 12,083,333 5.000 Width (m) 2,340.000 Earth fill m3 7,854,166
Tnaot 2 201 Earth road 0.95 [ 0.95 ] Km 12,083,333 5.000 Width (m) 4,296.000 Earth fill m3 11,479,166
Prey Meas 3 201 Earth road 0.25 [ 0.25 ] Km 12,083,333 5.000 Width (m) 1,131.000 Earth fill m3 3,020,833
Lvea 4 201 Earth road 0.30 [ 0.30 ] Km 12,083,333 5.000 Width (m) 1,357.000 Earth fill m3 3,625,000
Kampong Ruessei 5 201 Earth road 0.25 [ 0.25 ] Km 12,083,333 5.000 Width (m) 1,131.000 Earth fill m3 3,020,833
Tnaot 6 201 Earth road 0.85 [ 0.85 ] Km 25,372,118 5.000 Width (m) 7,626.000 Earth fill m3 21,566,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,566,300

Pea Reang, Mesa Prachan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140805/04/01 TSO Lim Sokhanan Project Type Irrigation 48,381,000
Andoung 1 410 Earth dam 0.70 [ 0.70 ] Km 15,000,000 1.700 Max. height (m) 4,957.000 Volume (m3) 10,500,000
Kampong trea 2 410 Earth dam 0.26 [ 0.26 ] Km 15,000,000 1.700 Max. height (m) 1,763.000 Volume (m3) 3,840,000
Mesa Prachan Kraom 3 410 Earth dam 1.45 [ 1.45 ] Km 18,428,275 1.250 Max. height (m) 9,978.000 Volume (m3) 26,720,999
Kampong trea 4 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 1,830,000 1.000 Diameter (m) 4.000 Width (m) 3,660,000
Mesa Prachan Kraom 5 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 1,830,000 1.000 Diameter (m) 4.000 Width (m) 3,660,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,380,999

Pea Reang, Preaek Ta Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140806/04/01 TSO Huot Chhel Project Type Irrigation 15,200,000
Preaek Ta Sar 1 410 Earth dam 1.10 [ 1.10 ] Km 12,000,000 0.900 Max. height (m) 4,527.000 Volume (m3) 13,200,000
Preaek Ta Sar 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 6.000 Width (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,200,000

Pea Reang, Prey Sniet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140808/04/01 TSO Huot Chhel Project Type Rural Transport 43,589,000
Prey Sniet 1 211 Single pipe culvert 2.00 [ 4.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 4,000,000
Kampong Pou 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Tumpeang Chreus 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Prey Sniet 5 201 Earth road 0.80 [ 0.80 ] Km 14,533,150 4.000 Width (m) 4,365.000 Earth fill m3 11,626,520
Kampong Pou 6 201 Earth road 0.50 [ 0.50 ] Km 14,533,150 4.000 Width (m) 2,889.000 Earth fill m3 7,266,575
Tumpeang Chreus 7 201 Earth road 0.30 [ 0.30 ] Km 14,533,150 4.000 Width (m) 1,442.000 Earth fill m3 4,359,945
Me Loung 8 201 Earth road 0.78 [ 0.78 ] Km 14,533,300 4.000 Width (m) 4,281.000 Earth fill m3 11,335,974
Me Loung 9 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,589,014

Pea Reang, Prey Sralet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140809/04/01 TSO Lim Sokhanan Project Type Rural Transport 51,293,000
Preah Mlu 1 201 Earth road 1.10 [ 1.10 ] Km 10,800,000 4.000 Width (m) 2,760.000 Earth fill m3 11,880,000
Prohut 2 201 Earth road 1.40 [ 1.40 ] Km 10,800,000 4.000 Width (m) 6,903.000 Earth fill m3 15,120,000
Prohut 3 201 Earth road 1.90 [ 1.90 ] Km 12,785,794 4.000 Width (m) 8,695.000 Earth fill m3 24,293,009
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,293,009

Pea Reang, Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140811/04/01 TSO Huot Chhel Project Type Rural Transport 52,045,300
Tnaot 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 700,000
Snay pol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 7.000 Length (m) 800,000
Snay pol 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 8.000 Length (m) 1,000,000
Ruessei Chuk 4 211 Single pipe culvert 5.00 [ 5.00 ] Place 700,000 0.600 Diameter (m) 5.000 Length (m) 3,500,000
Tnaot 5 201 Earth road 0.70 [ 0.70 ] Km 7,744,000 5.000 Width (m) 2,575.000 Earth fill m3 5,420,800
Trakiet 6 201 Earth road 1.30 [ 1.30 ] Km 7,744,000 3.500 Width (m) 3,989.000 Earth fill m3 10,067,200
Ruessei Chuk 7 201 Earth road 0.78 [ 0.78 ] Km 8,715,716 5.000 Width (m) 3,241.000 Earth fill m3 6,815,690
Ruessei Chuk 8 201 Earth road 2.34 [ 2.34 ] Km 8,715,716 4.000 Width (m) 8,508.000 Earth fill m3 20,403,491
Trakiet 9 201 Earth road 0.38 [ 0.38 ] Km 8,715,716 3.500 Width (m) 1,199.000 Earth fill m3 3,338,119
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,045,300

Preah Sdach, Banteay Chakrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140902/04/01 TSO Pol Sastra Project Type Rural Transport 37,067,000
Kaoh Chuor Ti Muoy 1 211 Single pipe culvert 1.00 [ 2.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 1,946,000
Kaoh Chuor Ti Pir 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 1,946,000
Pou Riyum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 973,000
Ka Kou 4 211 Single pipe culvert 2.00 [ 4.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 3,892,000
Ngaek Ngak 5 211 Single pipe culvert 2.00 [ 3.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 2,919,000
Bos Roluoy 6 211 Single pipe culvert 2.00 [ 3.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 2,919,000
Pras Sva 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 973,000
Sampoung 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 973,000
Pou Chreaek 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 973,000
Boeng Kampot 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 973,000
Ampil 11 211 Single pipe culvert 1.00 [ 2.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 1,946,000
Ampil 12 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,216,000 0.600 Diameter (m) 5.000 Length (m) 1,216,000
Ruessei Chuk 13 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,216,000 0.600 Diameter (m) 5.000 Length (m) 2,432,000
Mrenh 14 221 Single cell box culvert 1.00 [ 1.00 ] Place 3,500,000 2.000 Total Span (m) 4.000 Width(m) 3,500,000
Chey Ta 15 211 Single pipe culvert 2.00 [ 2.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 1,946,000
Muni Sela 16 211 Single pipe culvert 2.00 [ 2.00 ] Place 973,000 0.600 Diameter (m) 5.000 Length (m) 1,946,000
Kaoh Chuor Ti Bei 17 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,216,000 0.000 Diameter (m) 5.000 Length (m) 1,216,000
Ping Pong 18 211 Single pipe culvert 2.00 [ 2.00 ] Place 973,000 0.000 Diameter (m) 5.000 Length (m) 1,946,000
Mrenh 19 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,216,000 0.600 Diameter (m) 5.000 Length (m) 1,216,000
Pou Riyum 20 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,216,000 0.600 Diameter (m) 5.000 Length (m) 1,216,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,067,000

Preah Sdach, Boeng Daol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140903/04/01 TSO Sok Sarunn Project Type Rural Transport 34,528,500
Boeng Daol 1 201 Earth road 0.80 [ 0.80 ] Km 6,904,762 3.500 Width (m) 1,760.000 Earth fill m3 5,523,810
Boeng Daol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Boeng Daol 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.800 Diameter (m) 4.000 Length (m) 1,500,000
Sambuor 4 201 Earth road 1.30 [ 1.30 ] Km 6,904,762 3.500 Width (m) 2,475.000 Earth fill m3 8,976,191
Sambuor 5 212 Double pipe culvert 3.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 3,000,000
Kaoh Koun Satv 6 201 Earth road 0.90 [ 0.90 ] Km 16,142,777 4.000 Width (m) 4,347.000 Earth fill m3 14,528,499
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,528,500

Preah Sdach, Chey Kampok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140904/04/01 TSO Pol Sastra Project Type Rural Transport 28,560,000
Kdei Skea 1 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 3,808,000
Pou 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Svay Toul 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Chey Kampok 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Snao 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 952,000
Snao 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Tras 7 211 Single pipe culvert 1.00 [ 2.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Tras 8 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Kampong Ba Srei 9 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 3,808,000
Ta Pung 10 211 Single pipe culvert 2.00 [ 2.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Angk Svay Tu 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 952,000 0.000 Diameter (m) 4.000 Length (m) 952,000
Angk Svay Tu 12 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,904,000 0.600 Diameter (m) 4.000 Length (m) 1,904,000
Tuol Lean 13 211 Single pipe culvert 1.00 [ 1.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 952,000
Tuol Lean 14 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,904,000 0.000 Diameter (m) 4.000 Length (m) 1,904,000
Pra Thma 15 211 Single pipe culvert 1.00 [ 1.00 ] Place 952,000 0.600 Diameter (m) 4.000 Length (m) 952,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,560,000

Preah Sdach, Kampong Soeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140905/04/01 TSO Pol Sastra Project Type Rural Transport 32,972,400
Srah Thkov 1 201 Earth road 0.52 [ 0.52 ] Km 8,580,000 4.000 Width (m) 2,018.000 Earth fill m3 4,461,600
Srah Thkov 2 203 Gravel road 0.52 [ 0.52 ] Km 7,400,000 4.000 Width (m) 208.000 Earth fill m3 3,848,000
Srah Thkov 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Ta Mau 4 201 Earth road 0.56 [ 0.56 ] Km 8,827,143 4.000 Width (m) 2,959.000 Earth fill m3 4,943,200
Ta Mau 5 203 Gravel road 0.56 [ 0.56 ] Km 7,400,000 4.000 Width (m) 224.000 Earth fill m3 4,144,000
Ta Mau 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Phniet 7 201 Earth road 0.78 [ 0.78 ] Km 8,100,372 3.500 Width (m) 3,249.000 Earth fill m3 6,318,290
Phniet 8 203 Gravel road 0.78 [ 0.78 ] Km 9,304,244 3.500 Width (m) 392.000 Earth fill m3 7,257,310
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,972,400

Preah Sdach, Krang Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140906/04/01 TSO Pol Sastra Project Type Rural Transport 27,135,300
Krang Svay 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.000 Diameter (m) 4.000 Length (m) 2,451,212
Pou 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.000 Diameter (m) 4.000 Length (m) 1,500,000
Pou 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 2,451,212
Sonan Chai 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,225,606 0.000 Diameter (m) 5.000 Length (m) 1,225,606
Sonan Chai 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.000 Diameter (m) 5.000 Length (m) 1,500,000
Sonan Chai 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 1,225,606
Peay Neay 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.000 Diameter (m) 4.000 Length (m) 2,451,212
Peay Neay 8 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 4.000 Length (m) 1,500,000
Pring 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 1,225,606
Pring 10 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 4.000 Length (m) 1,800,000
Kouk Sampov 11 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.000 Diameter (m) 4.000 Length (m) 2,451,212
Sdau 12 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 2,451,212
Sangkae Chong 13 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 1,225,606
Tuol Mean Kun 14 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,225,606 0.600 Diameter (m) 4.000 Length (m) 2,451,212
Srah Kaev 15 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,225,706 0.600 Diameter (m) 4.000 Length (m) 1,225,706
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,135,399

Preah Sdach, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140907/04/01 TSO Pol Sastra Project Type Rural Transport 29,250,400
Prum Khsach 1 201 Earth road 0.50 [ 1.40 ] Km 12,793,428 3.000 Width (m) 1,120.000 Earth fill m3 17,910,799
Prum Khsach 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 4.000 Length (m) 2,000,000
Svay Kdieb 3 201 Earth road 0.70 [ 0.70 ] Km 9,342,286 3.000 Width (m) 2,026.000 Earth fill m3 6,539,600
Svay Kdieb 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Svay Kdieb 5 220 Box culvert (general) 1.00 [ 1.00 ] Place 1,800,000 2.000 Total Span (m) 4.000 Width(m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,250,399

Preah Sdach, Preah Sdach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140908/04/01 TSO Pol Sastra Project Type Irrigation 34,528,500
Phot 1 420 Canal 0.60 [ 0.60 ] Km 51,000,000 2.940 Depth (m) 10,320.000 Volume (m3) 30,600,000
Phot 2 420 Canal 0.35 [ 0.35 ] Km 3,000,000 0.480 Depth (m) 362.000 Volume (m3) 1,050,000
Phot 3 420 Canal 0.35 [ 0.35 ] Km 3,984,286 0.600 Depth (m) 443.000 Volume (m3) 1,394,500
Phot 4 420 Canal 0.15 [ 0.15 ] Km 9,893,333 3.000 Depth (m) 900.000 Volume (m3) 1,484,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,528,500

Preah Sdach, Reathor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140909/04/01 TSO Sok Sarunn Project Type Rural Transport 25,508,300
Ta Hel Ka 1 201 Earth road 0.44 [ 0.44 ] Km 8,504,000 3.000 Width (m) 1,065.000 Earth fill m3 3,741,760
Ta Hel Ka 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 4.000 Length (m) 3,000,000
Ta Hel Kha 3 201 Earth road 0.96 [ 1.61 ] Km 9,792,850 3.000 Width (m) 2,513.000 Earth fill m3 15,766,489
Ta Hel Kha 4 212 Double pipe culvert 1.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 4.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,508,249

Preah Sdach, Seena Reach Otdam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140911/04/01 TSO Pol Sastra Project Type Rural Domestic Water Supplies 33,840,000
Klaeng Kong 1 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Khla Kham 2 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Kdam Puk 3 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Kamrieng 4 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Prasna Touch 5 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Prasna Thum 6 121 Drilled well with VN no 6 pump 2.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Snao 7 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Kamraol 8 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Pring 9 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Trea 10 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Krasang Char 11 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Trapeang Brabos 12 121 Drilled well with VN no 6 pump 1.00 [ 3.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 2,820,000
Ampil 13 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Samnoy 14 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Thnong 15 121 Drilled well with VN no 6 pump 1.00 [ 3.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 2,820,000
Chey a Khaol 16 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Snay Prim 17 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 940,000 52.000 Depth (m) 100.000 Diameter (mm) 1,880,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,840,000

Prey Veaeng, Angkor Tret

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141001/04/01 TSO Sun Davith Project Type Rural Transport 18,822,000
Ta Laeuk 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,840,000 0.600 Diameter (m) 5.000 Length (m) 1,840,000
Ta Laeuk 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,204,700 0.600 Diameter (m) 5.000 Length (m) 2,409,400
Angkor Tret 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,840,000 0.600 Diameter (m) 5.000 Length (m) 1,840,000
Angkor Tret 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,204,700 0.600 Diameter (m) 5.000 Length (m) 2,409,400
Trabaek Lech 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,675,000 0.600 Diameter (m) 10.000 Length (m) 1,675,000
Trabaek Lech 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,421,400 0.600 Diameter (m) 7.000 Length (m) 1,421,400
Ta Ream Kaeut 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,204,000 0.600 Diameter (m) 5.000 Length (m) 1,204,000
Voat Trach 9 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,204,700 0.600 Diameter (m) 5.000 Length (m) 2,409,400
Kok 10 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,204,700 0.600 Diameter (m) 5.000 Length (m) 2,409,400
Kok 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,204,000 0.600 Diameter (m) 5.000 Length (m) 1,204,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,822,000
Contract ID 141001/04/02 TSO Sun Davith Project Type Irrigation 7,120,000
Angkor Tret 1 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 7,120,000 1.000 Diameter (m) 4.000 Width (m) 7,120,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,120,000

Prey Veaeng, Chea Khlang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141002/04/01 TSO Ly Sethy Project Type Irrigation 14,904,000
Thnong 1 420 Canal 1.73 [ 1.73 ] Km 8,640,000 3.800 Depth (m) 4,750.000 Volume (m3) 14,904,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,904,000
Contract ID 141002/04/02 TSO Ly Sethy Project Type Rural Transport 5,100,000
Thnong 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,700,000 1.000 Diameter (m) 4.000 Length (m) 5,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,100,000

Prey Veaeng, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141003/04/01 TSO Sun Davith Project Type Irrigation 33,230,000
Chrey Veal 1 451 Small water gate 1.00 [ 1.00 ] Place 20,180,000 4.000 Length (m) 1.500 Height (m) 20,180,000
Prey Ta Nan 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,700,000 0.800 Diameter (m) 4.000 Width (m) 3,700,000
Prohear 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,700,000 0.800 Diameter (m) 4.000 Width (m) 3,700,000
Svay Kun 4 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 5,650,000 0.800 Diameter (m) 4.000 Width (m) 5,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,230,000

Prey Veaeng, Damrei Puon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141004/04/01 TSO Sun Davith Project Type Irrigation 28,144,000
Boeng Veaeng 1 451 Small water gate 1.00 [ 1.00 ] Place 28,144,000 4.000 Length (m) 1.200 Height (m) 28,144,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,144,000

Prey Veaeng, Me Bon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141005/04/01 TSO Ly Sethy Project Type Rural Transport 24,458,000
Me Bon 1 201 Earth road 0.50 [ 0.50 ] Km 18,813,850 4.000 Width (m) 1,977.000 Earth fill m3 9,406,925
Ha Bour 2 201 Earth road 0.80 [ 0.80 ] Km 18,813,850 4.000 Width (m) 3,161.000 Earth fill m3 15,051,080
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,458,005

Prey Veaeng, Pean Roung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141006/04/01 TSO Sun Davith Project Type Rural Transport 36,800,000
Prey Voa 1 201 Earth road 0.70 [ 0.70 ] Km 16,355,555 4.000 Width (m) 1,721.000 Earth fill m3 11,448,889
Prey Nokor Knong 2 201 Earth road 0.95 [ 0.95 ] Km 16,355,555 4.000 Width (m) 3,075.000 Earth fill m3 15,537,777
Chhnoeng Pos 3 201 Earth road 0.60 [ 0.60 ] Km 16,355,555 4.000 Width (m) 2,334.000 Earth fill m3 9,813,333
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,799,999

Prey Veaeng, Popueus

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141007/04/01 TSO Ly Sethy Project Type Rural Transport 20,660,000
Thnal Chey 1 201 Earth road 1.25 [ 1.25 ] Km 12,800,000 4.000 Width (m) 3,071.000 Earth fill m3 16,000,000
Thnal Chey 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,660,000 0.800 Diameter (m) 5.000 Length (m) 1,660,000
Thnal Chey 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,660,000

Prey Veaeng, Prey Khla

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141008/04/01 TSO Ly Sethy Project Type Rural Transport 21,780,000
Veal 1 201 Earth road 1.10 [ 1.10 ] Km 16,753,846 5.000 Width (m) 3,861.000 Earth fill m3 18,429,231
Krachab Ti Pir 2 201 Earth road 0.20 [ 0.20 ] Km 16,753,846 5.000 Width (m) 702.000 Earth fill m3 3,350,769
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,780,000

Prey Veaeng, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141009/04/01 TSO Sun Davith Project Type Irrigation 24,430,000
Prohut 1 451 Small water gate 1.00 [ 1.00 ] Place 24,430,000 4.000 Length (m) 2.000 Height (m) 24,430,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,430,000

Prey Veaeng, Svay Antor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141010/04/01 TSO Ly Sethy Project Type Rural Transport 25,701,000
Svay Antor Ti Muoy 1 201 Earth road 0.60 [ 0.60 ] Km 19,770,000 4.000 Width (m) 2,480.000 Earth fill m3 11,862,000
Boeng 2 201 Earth road 0.70 [ 0.70 ] Km 19,770,000 4.000 Width (m) 2,891.000 Earth fill m3 13,839,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,701,000

Kampong Leav, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141101/04/01 TSO Chin Vanna Project Type Education 21,396,400
Baray Lech 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 6,237,100 24.000 Length (m) 8.800 Width (m) 18,711,300
Baray Lech 2 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 1,342,550 1.500 2.900 2,685,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,396,400

Kampong Leav, Cheung Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141102/04/01 TSO Chin Vanna Project Type Rural Transport 20,638,000
Cheung Tuek Ka 1 201 Earth road 0.95 [ 0.95 ] Km 21,724,211 5.000 Width (m) 4,354.000 Earth fill m3 20,638,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,638,000

Kampong Leav, Kampong Leav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141103/04/01 TSO Chin Vanna Project Type Rural Transport 33,893,200
Phum Muoy 1 201 Earth road 0.30 [ 0.30 ] Km 14,500,000 5.000 Width (m) 1,852.000 Earth fill m3 4,350,000
Phum Pir 2 201 Earth road 0.16 [ 0.16 ] Km 14,500,000 5.000 Width (m) 305.000 Earth fill m3 2,247,500
Phum Bei 3 201 Earth road 0.16 [ 0.16 ] Km 14,500,000 5.000 Width (m) 349.000 Earth fill m3 2,320,000
Phum Buon 4 201 Earth road 0.24 [ 0.24 ] Km 14,500,000 6.000 Width (m) 598.000 Earth fill m3 3,480,000
Phum Prammuoy 5 201 Earth road 0.42 [ 0.42 ] Km 14,500,000 6.000 Width (m) 1,212.000 Earth fill m3 6,075,500
Phom 7 6 201 Earth road 0.59 [ 0.59 ] Km 14,500,000 6.000 Width (m) 2,888.000 Earth fill m3 8,482,500
Phom 8 7 201 Earth road 0.45 [ 0.45 ] Km 15,417,110 6.000 Width (m) 1,855.000 Earth fill m3 6,937,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,893,200

Kampong Leav, Pou Rieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141104/04/01 TSO Chin Vanna Project Type Rural Transport 22,995,000
Veal Prov 1 201 Earth road 1.00 [ 1.00 ] Km 22,995,000 3.500 Width (m) 4,691.000 Earth fill m3 22,995,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,995,000

Kampong Leav, Preaek Anteah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141105/04/01 TSO Chin Vanna Project Type Irrigation 25,971,900
Angkor Yos 1 420 Canal 1.30 [ 1.40 ] Km 18,551,357 1.120 Depth (m) 7,041.000 Volume (m3) 25,971,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,971,900

Kampong Leav, Preaek Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141106/04/01 TSO Chin Vanna Project Type Rural Transport 22,900,000
Bak Daok 1 201 Earth road 1.10 [ 1.10 ] Km 13,795,181 4.000 Width (m) 3,325.000 Earth fill m3 15,174,699
Anlong Trea 2 201 Earth road 0.56 [ 0.56 ] Km 13,795,181 4.000 Width (m) 1,701.000 Earth fill m3 7,725,301
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,900,000

Kampong Leav, Ta Kao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141108/04/01 TSO Chin Vanna Project Type Rural Transport 22,418,000
Tnaot Tret 1 201 Earth road 0.98 [ 0.98 ] Km 15,500,000 5.000 Width (m) 4,067.000 Earth fill m3 15,190,000
Skor Dach 2 201 Earth road 0.20 [ 0.20 ] Km 15,500,000 4.000 Width (m) 508.000 Earth fill m3 3,100,000
Tnaot Tret 3 201 Earth road 0.31 [ 0.31 ] Km 13,146,500 4.000 Width (m) 1,032.000 Earth fill m3 4,128,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,418,001

Sithor Kandal, Ampil Krau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141201/04/01 TSO Lonh Saran Project Type Rural Transport 66,856,000
Ampil Krau 1 201 Earth road 1.00 [ 1.00 ] Km 23,018,200 4.000 Width (m) 4,580.000 Earth fill m3 23,018,200
Tuol Chrey 2 201 Earth road 1.75 [ 1.79 ] Km 23,093,743 4.000 Width (m) 8,436.000 Earth fill m3 41,337,800
Tuol Chrey 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  66,856,000

Sithor Kandal, Chrey Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141202/04/01 TSO Lonh Saran Project Type Education 58,689,000
Prasat 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 19,563,000 24.000 Length (m) 9.000 Width (m) 58,689,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  58,689,000

Sithor Kandal, Lve

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141203/04/01 TSO Lonh Saran Project Type Rural Transport 22,556,900
Prum Muni 1 201 Earth road 0.45 [ 0.55 ] Km 17,942,110 4.000 Width (m) 2,244.000 Earth fill m3 9,868,161
Kaong Tonle Leu 2 201 Earth road 0.54 [ 0.54 ] Km 17,942,110 4.000 Width (m) 2,034.000 Earth fill m3 9,688,739
Kaong Tonle Leu 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,556,900

Sithor Kandal, Pnov Ti Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141204/04/01 TSO Lonh Saran Project Type Education 43,161,000
Banlich Svay 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 21,580,500 16.000 Length (m) 9.000 Width (m) 43,161,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,161,000

Sithor Kandal, Pnov Ti Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141205/04/01 TSO Lonh Saran Project Type Education 43,160,000
Sda Kdei 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 21,580,000 16.000 Length (m) 9.000 Width (m) 43,160,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,160,000

Sithor Kandal, Pou Ti

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141206/04/01 TSO Lonh Saran Project Type Irrigation 39,655,000
Trapeang Cham 1 410 Earth dam 1.25 [ 1.33 ] Km 14,350,943 1.090 Max. height (m) 5,591.000 Volume (m3) 19,014,999
Trapeang Cham 2 452 Single pipe Culvert with gate 3.00 [ 3.00 ] Place 3,440,000 0.800 Diameter (m) 4.000 Width (m) 10,320,000
Pou Ti 3 452 Single pipe Culvert with gate 1.00 [ 3.00 ] Place 3,440,000 0.800 Diameter (m) 4.000 Width (m) 10,320,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,654,999

Sithor Kandal, Preaek Changkran

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141207/04/01 TSO Lonh Saran Project Type Rural Domestic Water Supplies 23,715,000
Preaek Sandaek 1 121 Drilled well with VN no 6 pump 2.00 [ 3.00 ] Place 1,317,500 55.000 Depth (m) 100.000 Diameter (mm) 3,952,500
Preaek Changkran Leu 2 121 Drilled well with VN no 6 pump 6.00 [ 11.00 ] Place 1,317,500 55.000 Depth (m) 100.000 Diameter (mm) 14,492,500
Preaek Changkran Kraom 3 121 Drilled well with VN no 6 pump 5.00 [ 4.00 ] Place 1,317,500 55.000 Depth (m) 100.000 Diameter (mm) 5,270,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,715,000

Sithor Kandal, Prey Daeum Thnoeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141208/04/01 TSO Lonh Saran Project Type Education 14,900,000
Prey Daeum Thnoeng Muoy 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 7,450,000 16.000 Length (m) 9.000 Width (m) 14,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,900,000

Sithor Kandal, Prey Tueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141209/04/01 TSO Lonh Saran Project Type Education 70,400,000
Prey Totueng 1 321 Brick school with tile roof 4.00 [ 4.00 ] School room 17,600,000 32.000 Length (m) 9.000 Width (m) 70,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  70,400,000

Sithor Kandal, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141210/04/01 TSO Lonh Saran Project Type Education 64,800,000
Prey Pou 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 21,600,000 24.000 Length (m) 9.000 Width (m) 64,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  64,800,000

Sithor Kandal, Ruessei Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141211/04/01 TSO Lonh Saran Project Type Education 65,178,000
Prey Chhieng 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 19,000,000 16.000 Length (m) 9.000 Width (m) 38,000,000
Prey Chhieng 2 171 Pour flush latrine with double waste tank system 10.00 [ 10.00 ] Latrine room 1,400,000 1.600 3.000 14,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,000,000