Contract Outputs

Location: Siem Reap \ Soutr Nikom Budget Year: 2004

Angkor Chum    Angkor Thum    Banteay Srei    Chi Kraeng    Kralanh    Puok    Prasat Bakong    Siem Reab    Soutr Nikom    Srei Snam    Svay Leu    Varin   

Soutr Nikom, Chan Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171101/04/01 TSO Mao Luck Project Type Education 27,330,000
Chub 1 320 Brick school (general) 2.00 [ 2.00 ] School room 13,665,000 8.000 Length (m) 7.000 Width (m) 27,330,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,330,000

Soutr Nikom, Dam Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171102/04/01 TSO Mao Luck Project Type Irrigation 30,661,000
Trabaek 1 451 Small water gate 1.00 [ 1.00 ] Place 4,196,000 5.500 Length (m) 1.500 Height (m) 4,196,000
Krasar Tum 2 451 Small water gate 1.00 [ 1.00 ] Place 5,233,000 5.500 Length (m) 2.000 Height (m) 5,233,000
Krasar Tum 3 451 Small water gate 1.00 [ 1.00 ] Place 10,548,000 6.500 Length (m) 2.000 Height (m) 10,548,000
Ou Luh 4 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 10,684,000 2.000 Total span (m) 4.000 Width (m) 10,684,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,661,000
Contract ID 171102/04/02 TSO Mao Luck Project Type Rural Transport 6,145,000
Dam Daek Phsar 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,606,000 0.600 Diameter (m) 7.000 Length (m) 1,606,000
Dam Daek Phsar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,328,000 0.600 Diameter (m) 10.000 Length (m) 2,328,000
Dam Daek Phsar 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,211,000 0.600 Diameter (m) 9.000 Length (m) 2,211,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,145,000

Soutr Nikom, Dan Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171103/04/01 TSO Mao Luck Project Type Education 30,000,000
Veal 1 320 Brick school (general) 2.00 [ 2.00 ] School room 15,000,000 8.000 Length (m) 7.000 Width (m) 30,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,000,000

Soutr Nikom, Kampong Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171104/04/01 TSO Mao Luck Project Type Rural Transport 30,504,000
Mukh Voat 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 30,504,000 6.000 Total Span (m) 3.000 Width (m) 30,504,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,504,000

Soutr Nikom, Kien Sangkae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171105/04/01 TSO Mao Luck Project Type Education 30,160,000
Kouk Dei 1 320 Brick school (general) 2.00 [ 2.00 ] School room 15,080,000 8.000 Length (m) 7.000 Width (m) 30,160,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,160,000

Soutr Nikom, Khchas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171106/04/01 TSO Mao Luck Project Type Education 25,850,000
Yeang Tes 1 320 Brick school (general) 1.00 [ 1.00 ] School room 25,850,000 8.000 Length (m) 7.000 Width (m) 25,850,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,850,000

Soutr Nikom, Khnar Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171107/04/01 TSO Mao Luck Project Type Education 22,950,000
Rumdeng 1 320 Brick school (general) 1.00 [ 1.00 ] School room 22,950,000 8.000 Length (m) 7.000 Width (m) 22,950,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,950,000

Soutr Nikom, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171108/04/01 TSO Mao Luck Project Type Irrigation 24,000,000
Trapeang Trom 1 451 Small water gate 1.00 [ 1.00 ] Place 6,333,000 5.500 Length (m) 2.000 Height (m) 6,333,000
Prey Lean 2 451 Small water gate 1.00 [ 1.00 ] Place 6,333,000 5.500 Length (m) 2.000 Height (m) 6,333,000
Kriel Pong 3 451 Small water gate 1.00 [ 1.00 ] Place 6,333,000 5.500 Length (m) 2.000 Height (m) 6,333,000
Trapeang Phong 4 451 Small water gate 1.00 [ 1.00 ] Place 5,001,000 5.500 Length (m) 1.500 Height (m) 5,001,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,000,000

Soutr Nikom, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171109/04/01 TSO Mao Luck Project Type Rural Transport 25,300,000
Thnal Chaek 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 25,300,000 4.000 5.000 25,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,300,000

Soutr Nikom, Ta Yaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171110/04/01 TSO Mao Luck Project Type Education 19,750,000
Phka Rumchek 1 320 Brick school (general) 1.00 [ 1.00 ] School room 19,750,000 8.000 Length (m) 7.000 Width (m) 19,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,750,000
Contract ID 171110/04/02 TSO Mao Luck Project Type Irrigation 8,855,000
Ta Yaek 1 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 8,855,000 2.000 Diameter (m) 12.000 Width (m) 8,855,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,855,000