Contract Outputs

Location: Battambang Budget Year: 2004

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Banan, Kantueu Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020101/04/01 TSO Sar Sarin Project Type Rural Transport 21,307,600
Svay Prey 1 202 Laterite road 1.68 [ 1.86 ] Km 11,431,116 3.000 Width (m) 150.000 Earth fill m3 21,307,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,307,600

Banan, Kantueu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020102/04/01 TSO Sar Sarin Project Type Rural Domestic Water Supplies 22,055,400
Kampang Kaeut 1 141 Pond with no filter 2.00 [ 2.00 ] Place 7,453,250 3.000 Depth (m) 5,922.000 Volume (m3) 14,906,500
Banan 2 141 Pond with no filter 1.00 [ 1.00 ] Place 7,148,900 2.830 Depth (m) 2,627.000 Volume (m3) 7,148,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,055,400

Banan, Bay Damram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020103/04/01 TSO Sar Sarin Project Type Rural Transport 23,586,000
Prey Totueng 1 202 Laterite road 1.60 [ 1.81 ] Km 11,992,265 3.000 Width (m) 150.000 Earth fill m3 21,706,000
Prey Totueng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 940,000 0.600 Diameter (m) 5.000 Length (m) 1,880,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,586,000

Banan, Chheu Teal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020104/04/01 TSO Sar Sarin Project Type Rural Transport 23,325,200
Anlok Kaong 1 201 Earth road 1.54 [ 2.31 ] Km 8,797,577 4.000 Width (m) 9,384.000 Earth fill m3 20,331,200
Anlok Kaong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,497,000 0.800 Diameter (m) 5.000 Length (m) 2,994,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,325,200
Contract ID 020104/04/02 TSO Sar Sarin Project Type Rural Transport 10,806,000
Anlong Ta Mei 1 202 Laterite road 1.10 [ 1.10 ] Km 6,452,727 3.000 Width (m) 150.000 Earth fill m3 7,098,000
Anlong Ta Mei 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 927,000 0.600 Diameter (m) 5.000 Length (m) 3,708,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,806,000

Banan, Chaeng Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020105/04/01 TSO Sar Sarin Project Type Rural Transport 23,496,400
Rung 1 201 Earth road 3.12 [ 3.72 ] Km 4,816,039 4.000 Width (m) 9,305.000 Earth fill m3 17,896,400
Rung 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Rung 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 4,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,496,400

Banan, Phnum Sampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020106/04/01 TSO Sar Sarin Project Type Rural Transport 31,807,100
Kdaong 1 201 Earth road 2.00 [ 2.74 ] Km 6,986,898 4.000 Width (m) 9,568.000 Earth fill m3 19,144,100
Kdaong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,497,000 0.800 Diameter (m) 5.000 Length (m) 2,994,000
Kouk Ampil 3 201 Earth road 0.80 [ 0.80 ] Km 6,985,000 4.000 Width (m) 2,152.000 Earth fill m3 5,588,000
Kouk Ampil 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,497,000 0.800 Diameter (m) 5.000 Length (m) 1,497,000
Krapeu Cheung 5 201 Earth road 0.37 [ 0.37 ] Km 6,983,784 4.000 Width (m) 643.000 Earth fill m3 2,584,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,807,100

Banan, Snoeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020107/04/01 TSO Sar Sarin Project Type Rural Transport 35,303,200
Snoeng Lech 1 201 Earth road 1.33 [ 1.33 ] Km 7,549,475 4.000 Width (m) 3,239.000 Earth fill m3 10,071,000
Snoeng Lech 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 968,667 0.600 Diameter (m) 5.000 Length (m) 2,906,000
Snoeng Lech 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,554,000 0.800 Diameter (m) 5.000 Length (m) 1,554,000
Samraong 4 201 Earth road 1.08 [ 1.71 ] Km 9,370,292 4.000 Width (m) 4,345.000 Earth fill m3 16,023,200
Samraong 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 968,500 0.600 Diameter (m) 5.000 Length (m) 1,937,000
Samraong 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,812,000 0.800 Diameter (m) 5.000 Length (m) 2,812,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,303,200

Banan, Ta Kream

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020108/04/01 TSO Sar Sarin Project Type Rural Transport 19,500,000
Slab Pang 1 202 Laterite road 3.33 [ 3.33 ] Km 4,954,955 3.000 Width (m) 150.000 Earth fill m3 16,500,000
Slab Pang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,500,000
Contract ID 020108/04/02 TSO Sar Sarin Project Type Rural Transport 19,006,500
Prey Phdau 1 201 Earth road 0.61 [ 0.61 ] Km 10,165,574 4.000 Width (m) 2,898.000 Earth fill m3 6,201,000
Prey Phdau 2 201 Earth road 0.96 [ 1.57 ] Km 6,286,618 4.000 Width (m) 4,597.000 Earth fill m3 9,841,700
Prey Phdau 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,481,900 0.800 Diameter (m) 5.000 Length (m) 2,963,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,006,500

Thma Koul, Ta Pung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020201/04/01 TSO Vay Sokunthea Project Type Irrigation 33,191,800
Kouk Kduoch 1 420 Canal 3.75 [ 4.49 ] Km 6,725,999 1.000 Depth (m) 9,232.000 Volume (m3) 30,213,188
Paoy Yong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,489,306 0.800 Diameter (m) 5.000 Length (m) 2,978,612
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,191,800

Thma Koul, Ta Meun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020202/04/01 TSO Vay Sokunthea Project Type Irrigation 35,733,800
Tumneab 1 420 Canal 2.35 [ 3.41 ] Km 6,383,185 1.000 Depth (m) 5,907.000 Volume (m3) 21,753,896
Chrouy Mtes 2 420 Canal 3.00 [ 3.00 ] Km 4,659,968 1.000 Depth (m) 5,207.000 Volume (m3) 13,979,904
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,733,800

Thma Koul, Ou Ta Ki

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020203/04/01 TSO Vay Sokunthea Project Type Irrigation 34,809,900
Ou Ta Ki 1 420 Canal 6.77 [ 8.70 ] Km 4,000,218 1.000 Depth (m) 10,750.000 Volume (m3) 34,809,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,809,900

Thma Koul, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020204/04/01 TSO Vay Sokunthea Project Type Rural Transport 32,055,600
Anlong Run 1 201 Earth road 2.48 [ 2.68 ] Km 8,852,612 4.000 Width (m) 10,233.000 Earth fill m3 23,725,000
Popeal Khae 2 211 Single pipe culvert 3.00 [ 8.00 ] Place 1,041,325 0.600 Diameter (m) 5.000 Length (m) 8,330,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,055,600

Thma Koul, Anlong Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020205/04/01 TSO Vay Sokunthea Project Type Rural Transport 20,443,400
Char 1 202 Laterite road 2.70 [ 3.19 ] Km 6,406,581 3.000 Width (m) 150.000 Earth fill m3 20,443,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,443,400

Thma Koul, Chrouy Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020206/04/01 TSO Vay Sokunthea Project Type Rural Transport 27,467,000
Chrouy Sdau 1 202 Laterite road 2.68 [ 2.98 ] Km 9,217,114 4.000 Width (m) 150.000 Earth fill m3 27,467,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,467,000

Thma Koul, Boeng Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020207/04/01 TSO Vay Sokunthea Project Type Irrigation 7,273,600
Boeng Pring 1 420 Canal 1.14 [ 1.34 ] Km 5,419,970 1.000 Depth (m) 2,248.000 Volume (m3) 7,273,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,273,600
Contract ID 020207/04/02 TSO Vay Sokunthea Project Type Rural Transport 19,996,700
Snuol Krasang 1 202 Laterite road 2.17 [ 2.41 ] Km 8,307,727 3.000 Width (m) 150.000 Earth fill m3 19,996,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,996,700

Thma Koul, Kouk Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020208/04/01 TSO Vay Sokunthea Project Type Rural Transport 5,394,700
Chhkae Koun 1 201 Earth road 0.38 [ 0.46 ] Km 8,067,031 5.000 Width (m) 1,334.000 Earth fill m3 3,694,700
Chhkae Koun 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,394,700
Contract ID 020208/04/02 TSO Vay Sokunthea Project Type Rural Transport 24,067,400
Kien Kaes Muoy 1 202 Laterite road 2.21 [ 2.48 ] Km 9,724,202 3.000 Width (m) 150.000 Earth fill m3 24,067,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,067,400

Thma Koul, Bansay Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020209/04/01 TSO Vay Sokunthea Project Type Irrigation 27,672,000
Tuol Ta Sokh 1 420 Canal 1.80 [ 1.80 ] Km 5,133,503 1.000 Depth (m) 2,235.000 Volume (m3) 9,240,305
Spean 2 420 Canal 2.12 [ 2.90 ] Km 5,337,853 2.000 Depth (m) 5,272.000 Volume (m3) 15,453,083
Tuol Ta Sokh 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,489,306 0.800 Diameter (m) 5.000 Length (m) 2,978,612
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,672,000

Thma Koul, Rung Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020210/04/01 TSO Vay Sokunthea Project Type Irrigation 17,777,100
Prakeab 1 420 Canal 3.00 [ 3.59 ] Km 4,954,599 1.000 Depth (m) 5,530.000 Volume (m3) 17,777,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,777,100
Contract ID 020210/04/02 TSO Vay Sokunthea Project Type Rural Transport 11,820,000
Prakeab 1 201 Earth road 1.44 [ 1.73 ] Km 6,852,174 4.000 Width (m) 4,434.000 Earth fill m3 11,820,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,820,000

Battambang, Tuol Ta Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020301/04/01 TSO Mey Savuth Project Type Rural Transport 33,588,300
Ou Ta Kam Muoy 1 202 Laterite road 0.45 [ 0.45 ] Km 12,293,111 5.000 Width (m) 150.000 Earth fill m3 5,531,900
Ou Ta Kam Bei 2 202 Laterite road 1.15 [ 1.60 ] Km 10,386,617 4.000 Width (m) 150.000 Earth fill m3 16,608,200
Tuol Ta Aek 3 202 Laterite road 1.05 [ 1.05 ] Km 7,372,217 3.000 Width (m) 150.000 Earth fill m3 7,748,200
Ou Ta Kam Muoy 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 7.000 Length (m) 1,000,000
Ou Ta Kam Bei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 8.000 Length (m) 1,300,000
Tuol Ta Aek 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.800 Diameter (m) 4.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,588,300

Battambang, Preaek Preah Sdach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020302/04/01 TSO Mey Savuth Project Type Rural Transport 25,575,100
Preaek Preah Sdach 1 202 Laterite road 1.06 [ 1.38 ] Km 8,078,043 3.000 Width (m) 150.000 Earth fill m3 11,147,700
Num Krieb 2 202 Laterite road 0.90 [ 1.03 ] Km 9,807,849 4.000 Width (m) 150.000 Earth fill m3 10,121,700
La Edth 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,107,800 0.600 Diameter (m) 7.000 Length (m) 3,323,400
La Edth 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 982,296 0.600 Diameter (m) 5.000 Length (m) 982,296
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,575,096
Contract ID 020302/04/02 TSO Mey Savuth Project Type Urban Drainage and Flood Protection 6,600,000
Dabbei Meakkakra 1 420 Canal 0.50 [ 0.50 ] Km 4,908,000 1.000 Depth (m) 1.000 Volume (m3) 2,454,000
Dabbei Meakkakra 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,073,000 0.800 Diameter (m) 7.000 Length (m) 4,146,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,600,000

Battambang, Rotanak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020303/04/01 TSO Mey Savuth Project Type Rural Transport 15,231,700
Rumchek Pram 1 201 Earth road 0.75 [ 0.75 ] Km 13,447,517 5.000 Width (m) 500.000 Earth fill m3 10,018,400
Rumchek Pram 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,047,574 0.800 Diameter (m) 9.000 Length (m) 2,047,574
Rotanak 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,992,574 0.800 Diameter (m) 7.000 Length (m) 1,992,574
Souphi Pir 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,173,100 0.500 Diameter (m) 9.000 Length (m) 1,173,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,231,648
Contract ID 020303/04/02 TSO Mey Savuth Project Type Rural Transport 8,000,000
Rumchek Muoy 1 202 Laterite road 0.34 [ 0.34 ] Km 9,415,224 2.500 Width (m) 150.000 Earth fill m3 3,154,100
Rotanak 2 202 Laterite road 0.32 [ 0.32 ] Km 15,286,751 5.000 Width (m) 150.000 Earth fill m3 4,845,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,000,000
Contract ID 020303/04/03 TSO Mey Savuth Project Type Urban Drainage and Flood Protection 10,680,000
Rotanak 1 540 Drainage 2.00 [ 2.00 ] Line 5,340,000 0.229 Length (m) 500.000 Diameter (m) 10,680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,680,000

Battambang, Chamkar Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020304/04/01 TSO Mey Savuth Project Type Urban Drainage and Flood Protection 21,024,900
Voat Lieb 1 420 Canal 0.30 [ 0.30 ] Km 2,958,000 0.700 Depth (m) 2.000 Volume (m3) 887,400
Voat Rumduol 2 420 Canal 0.50 [ 0.50 ] Km 2,394,000 0.700 Depth (m) 500.000 Volume (m3) 1,197,000
Phka Sla 3 420 Canal 2.42 [ 4.08 ] Km 2,672,988 0.700 Depth (m) 1.000 Volume (m3) 10,895,100
Voat Rumduol 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,790,624 0.800 Diameter (m) 6.000 Length (m) 3,581,248
Voat Lieb 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,083,210 0.600 Diameter (m) 7.000 Length (m) 2,166,420
Phka Sla 6 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,148,900 0.600 Diameter (m) 5.000 Length (m) 2,297,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,024,968
Contract ID 020304/04/02 TSO Mey Savuth Project Type Irrigation 13,200,000
Chamkar Samraong Pir 1 420 Canal 2.00 [ 2.00 ] Km 5,600,000 1.000 Depth (m) 3.000 Volume (m3) 11,200,000
Chamkar Samraong Pir 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 666,667 0.600 Diameter (m) 7.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,200,000

Battambang, Sla Kaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020305/04/01 TSO Mey Savuth Project Type Rural Transport 24,538,700
Dam Spey 1 202 Laterite road 0.80 [ 0.80 ] Km 12,465,000 4.000 Width (m) 150.000 Earth fill m3 9,972,000
Chrey Kaong 2 202 Laterite road 1.12 [ 2.06 ] Km 5,606,738 3.000 Width (m) 150.000 Earth fill m3 11,566,700
Dam Spey 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 7.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,538,700

Battambang, Kdol Doun Teav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020306/04/01 TSO Mey Savuth Project Type Rural Transport 25,702,600
Kdol 1 202 Laterite road 2.88 [ 3.61 ] Km 7,119,834 3.000 Width (m) 150.000 Earth fill m3 25,702,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,702,600

Battambang, Ou Mal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020307/04/01 TSO Mey Savuth Project Type Irrigation 27,848,100
Voat Roka 1 420 Canal 2.74 [ 3.50 ] Km 7,475,157 1.000 Depth (m) 4.000 Volume (m3) 26,148,100
Ou Mal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 1.000 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,848,100

Battambang, Voat Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020308/04/01 TSO Mey Savuth Project Type Rural Transport 34,847,000
Kampong Seima 1 202 Laterite road 4.03 [ 4.03 ] Km 6,411,776 3.000 Width (m) 150.000 Earth fill m3 25,807,400
Chrab Krasang 2 202 Laterite road 0.45 [ 1.69 ] Km 5,343,525 2.500 Width (m) 150.000 Earth fill m3 9,035,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,843,300

Battambang, Ou Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020309/04/01 TSO Mey Savuth Project Type Rural Transport 16,000,000
Kab Kou Thmei 1 201 Earth road 0.43 [ 0.43 ] Km 12,955,529 3.000 Width (m) 600.000 Earth fill m3 5,506,100
Andoung Chenh 2 201 Earth road 0.81 [ 0.81 ] Km 12,955,432 4.000 Width (m) 600.000 Earth fill m3 10,493,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,000,000
Contract ID 020309/04/02 TSO Mey Savuth Project Type Rural Transport 5,800,000
Kab Kou Thmei 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,369,000 0.600 Diameter (m) 13.000 Length (m) 1,369,000
Anhchanh 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,017,800 0.600 Diameter (m) 7.000 Length (m) 1,017,800
Andoung Chenh 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 804,000 0.600 Diameter (m) 4.000 Length (m) 1,608,000
Andoung Chenh 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 902,600 0.600 Diameter (m) 5.000 Length (m) 1,805,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,800,000
Contract ID 020309/04/03 TSO Mey Savuth Project Type Rural Transport 11,696,300
Ou Char 1 202 Laterite road 0.35 [ 0.35 ] Km 7,413,714 3.000 Width (m) 150.000 Earth fill m3 2,594,800
Kab Kou Thmei 2 202 Laterite road 0.43 [ 0.78 ] Km 8,316,046 3.000 Width (m) 150.000 Earth fill m3 6,478,200
Kab Kou Thmei 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,623,300 1.000 Diameter (m) 6.000 Length (m) 2,623,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,696,300
Contract ID 020309/04/04 TSO Mey Savuth Project Type Education 1,500,000
Ou Char 1 303 School yard 1.00 [ 1.00 ] Place 1,500,000 288.000 600.000 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,500,000

Battambang, Svay Pao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020310/04/01 TSO Mey Savuth Project Type Rural Transport 21,000,000
Kammeakkar 1 202 Laterite road 1.97 [ 1.97 ] Km 10,659,898 4.000 Width (m) 150.000 Earth fill m3 21,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,000,000
Contract ID 020310/04/02 TSO Mey Savuth Project Type Rural Transport 4,335,000
Kammeakkar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,017,800 0.600 Diameter (m) 10.000 Length (m) 1,017,800
Preaek Moha Tep 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,105,750 0.600 Diameter (m) 10.000 Length (m) 2,211,500
Mphey Osakphea 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,105,700 0.600 Diameter (m) 7.000 Length (m) 1,105,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,335,000
Contract ID 020310/04/03 TSO Mey Savuth Project Type Urban Drainage and Flood Protection 12,385,700
Kammeakkar 1 420 Canal 0.35 [ 1.20 ] Km 5,316,986 1.000 Depth (m) 2.000 Volume (m3) 6,385,700
Kammeakkar 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,000,000 0.800 Diameter (m) 7.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,385,700

Bavel, Bavel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020401/04/01 TSO Choeum Yon Project Type Rural Transport 21,653,700
Dach Proat 1 202 Laterite road 0.70 [ 0.70 ] Km 7,689,143 3.500 Width (m) 150.000 Earth fill m3 5,382,400
Samaki 2 202 Laterite road 1.16 [ 1.16 ] Km 6,603,610 3.000 Width (m) 150.000 Earth fill m3 7,686,602
Prey Totueng Pir 3 202 Laterite road 1.30 [ 1.30 ] Km 6,603,610 3.000 Width (m) 150.000 Earth fill m3 8,584,693
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,653,695
Contract ID 020401/04/02 TSO Choeum Yon Project Type Rural Transport 23,517,900
Kampong Chhnang Pir 1 201 Earth road 0.35 [ 0.55 ] Km 5,998,349 4.000 Width (m) 776.050 Earth fill m3 3,269,100
Kouk 2 201 Earth road 0.25 [ 0.25 ] Km 5,851,600 4.000 Width (m) 618.150 Earth fill m3 1,462,900
Sla Khlanh 3 201 Earth road 0.40 [ 1.07 ] Km 5,926,213 4.000 Width (m) 869.300 Earth fill m3 6,352,900
Peam 4 201 Earth road 0.60 [ 0.90 ] Km 5,940,556 4.000 Width (m) 1,448.350 Earth fill m3 5,346,500
Peam 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 880,000 0.600 Diameter (m) 5.000 Length (m) 880,000
Bavel Pir 6 201 Earth road 0.35 [ 0.45 ] Km 6,029,333 4.000 Width (m) 78,025.000 Earth fill m3 2,713,200
Sangkae Vear 7 201 Earth road 0.25 [ 0.43 ] Km 6,035,335 4.000 Width (m) 649.400 Earth fill m3 2,613,300
Kampong Chhnang Pir 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 880,000 0.600 Diameter (m) 5.000 Length (m) 880,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,517,900

Bavel, Khnach Romeas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020402/04/01 TSO Choeum Yon Project Type Rural Transport 10,222,000
Svay Sa 1 202 Laterite road 1.26 [ 1.26 ] Km 8,112,698 3.000 Width (m) 150.000 Earth fill m3 10,222,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,222,000
Contract ID 020402/04/02 TSO Choeum Yon Project Type Rural Transport 18,794,100
Chroy Sna 1 201 Earth road 1.82 [ 2.52 ] Km 6,704,008 4.000 Width (m) 4,601.850 Earth fill m3 16,894,100
Chroy Sna 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 950,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,794,100

Bavel, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020403/04/01 TSO Choeum Yon Project Type Rural Transport 11,893,600
Lvea 1 202 Laterite road 1.13 [ 1.13 ] Km 9,692,089 3.000 Width (m) 150.000 Earth fill m3 10,903,600
Lvea 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 990,000 0.600 Diameter (m) 5.000 Length (m) 990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,893,600
Contract ID 020403/04/02 TSO Choeum Yon Project Type Rural Transport 15,723,800
Boeng Samraong 1 201 Earth road 2.00 [ 2.49 ] Km 5,154,260 4.000 Width (m) 3,992.400 Earth fill m3 12,823,800
Boeng Samraong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Boeng Samraong 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,723,800

Bavel, Prey Khpos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020404/04/01 TSO Choeum Yon Project Type Rural Transport 10,385,700
Prey Khpos 1 201 Earth road 0.50 [ 0.53 ] Km 9,223,764 4.000 Width (m) 2,131.000 Earth fill m3 4,851,700
Kbal Thnal 2 201 Earth road 0.60 [ 0.60 ] Km 9,223,333 4.000 Width (m) 1,902.420 Earth fill m3 5,534,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,385,700
Contract ID 020404/04/02 TSO Choeum Yon Project Type Irrigation 8,038,200
Meakkloea 1 410 Earth dam 0.06 [ 0.12 ] Km 17,695,000 1.000 Max. height (m) 502.610 Volume (m3) 2,123,400
Dangkao Pen 2 410 Earth dam 0.06 [ 0.20 ] Km 13,802,000 1.000 Max. height (m) 499.980 Volume (m3) 2,760,400
Ta Mat 3 410 Earth dam 0.16 [ 0.22 ] Km 14,338,182 1.000 Max. height (m) 818.700 Volume (m3) 3,154,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,038,200
Contract ID 020404/04/03 TSO Choeum Yon Project Type Rural Transport 11,340,000
Prey Khpos 1 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,780,000 0.800 Diameter (m) 5.000 Length (m) 5,340,000
Prey Khpos 2 211 Single pipe culvert 1.00 [ 5.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,340,000

Bavel, Ampil Pram Daeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020405/04/01 TSO Choeum Yon Project Type Rural Transport 25,069,200
Sthapor 1 201 Earth road 0.30 [ 0.30 ] Km 9,104,000 4.000 Width (m) 911.250 Earth fill m3 2,731,200
Dangkao Kramang 2 201 Earth road 1.70 [ 2.15 ] Km 8,872,067 4.000 Width (m) 5,821.750 Earth fill m3 19,057,200
Siem 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,093,600 0.600 Diameter (m) 5.000 Length (m) 3,280,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,069,200

Bavel, Kdol Tahen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020406/04/01 TSO Choeum Yon Project Type Rural Transport 40,320,400
Boeung Sanke 1 202 Laterite road 2.00 [ 2.00 ] Km 5,750,600 3.500 Width (m) 0.150 Earth fill m3 11,501,200
Tomnob Takoun 2 202 Laterite road 3.28 [ 3.28 ] Km 5,735,000 3.500 Width (m) 0.150 Earth fill m3 18,810,800
Toul Snal 3 202 Laterite road 1.00 [ 1.37 ] Km 5,685,599 3.500 Width (m) 0.150 Earth fill m3 7,777,900
Tomnob Takoun 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,115,250 0.600 Diameter (m) 5.000 Length (m) 2,230,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,320,400

Aek Phnum, Preaek Norint

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020501/04/01 TSO Chea Tem Project Type Rural Transport 22,170,000
Ansang Sak 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 22,170,000 6.000 4.000 22,170,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,170,000
Contract ID 020501/04/02 TSO Chea Tem Project Type Rural Transport 8,130,500
Reach Doun Kaev 1 202 Laterite road 0.58 [ 0.58 ] Km 13,120,451 3.000 Width (m) 150.000 Earth fill m3 7,570,500
Reach Doun Kaev 2 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 560,000 4.000 3.000 560,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,130,500

Aek Phnum, Samraong Knong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020502/04/01 TSO Chea Tem Project Type Rural Transport 28,786,400
Samraong Ta Kok 1 202 Laterite road 0.96 [ 0.96 ] Km 6,105,833 2.500 Width (m) 150.000 Earth fill m3 5,861,600
Samraong Ta Kok 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,300,000 1.000 Diameter (m) 5.000 Length (m) 2,300,000
Samraong Ta Kok 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 940,000 0.600 Diameter (m) 5.000 Length (m) 940,000
Samraong Ou Trea 4 202 Laterite road 0.46 [ 0.46 ] Km 6,105,870 2.500 Width (m) 150.000 Earth fill m3 2,808,700
Samraong Snao 5 202 Laterite road 0.70 [ 0.70 ] Km 6,105,857 2.500 Width (m) 150.000 Earth fill m3 4,274,100
Samraong Snao 6 202 Laterite road 1.68 [ 1.68 ] Km 7,483,373 3.000 Width (m) 150.000 Earth fill m3 12,602,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,786,400

Aek Phnum, Preaek Khpob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020503/04/01 TSO Chea Tem Project Type Rural Transport 16,380,000
Sna Pi Mukh 1 202 Laterite road 0.70 [ 0.70 ] Km 10,497,714 3.000 Width (m) 150.000 Earth fill m3 7,348,400
Sna Pi Mukh 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.800 Diameter (m) 5.000 Length (m) 1,300,000
Khvet 3 202 Laterite road 0.27 [ 0.27 ] Km 10,685,283 3.000 Width (m) 150.000 Earth fill m3 2,831,600
Khvet 4 211 Single pipe culvert 1.00 [ 2.00 ] Place 2,450,000 1.000 Diameter (m) 5.000 Length (m) 4,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,380,000
Contract ID 020503/04/02 TSO Chea Tem Project Type Rural Transport 8,346,200
Preaek Khpos 1 201 Earth road 0.70 [ 0.70 ] Km 12,008,921 5.000 Width (m) 3,619.250 Earth fill m3 8,346,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,346,200

Aek Phnum, Preaek Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020504/04/01 TSO Chea Tem Project Type Rural Transport 26,559,500
Doun Ent 1 202 Laterite road 2.42 [ 2.42 ] Km 9,325,961 3.000 Width (m) 150.000 Earth fill m3 22,559,500
Rohal Suong 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 6.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,559,500

Aek Phnum, Peam Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020505/04/01 TSO Chea Tem Project Type Rural Transport 8,621,700
Kong Tum 1 202 Laterite road 0.76 [ 0.87 ] Km 7,814,089 3.000 Width (m) 150.000 Earth fill m3 6,821,700
Preaek Chdaor 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 6.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,621,700
Contract ID 020505/04/02 TSO Chea Tem Project Type Irrigation 22,356,600
Ta Kom 1 420 Canal 3.37 [ 4.24 ] Km 5,272,783 1.000 Depth (m) 6,961.450 Volume (m3) 22,356,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,356,600

Aek Phnum, Prey Chas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020506/04/01 TSO Chea Tem Project Type Education 20,016,000
Anlong Sandan 1 310 Wooden school (general) 2.00 [ 2.00 ] School room 10,008,000 16.000 Length (m) 8.000 Width (m) 20,016,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,016,000

Aek Phnum, Kaoh Chiveang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020507/04/01 TSO Chea Tem Project Type Culture and Religion 27,345,500
Thvang 1 361 Resource centre 1.00 [ 1.00 ] Building 27,345,500 15.000 Length (m) 7.000 Width (m) 27,345,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,345,500

Moung Ruessei, Moung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020601/04/01 TSO Ma Sareun Project Type Rural Transport 33,740,700
Kansai Banteay 1 202 Laterite road 1.30 [ 1.30 ] Km 12,566,462 4.000 Width (m) 150.000 Earth fill m3 16,336,400
Ta Tok Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,800,000 1.000 Diameter (m) 10.000 Length (m) 2,800,000
Ta Tok Muoy 3 202 Laterite road 1.39 [ 2.13 ] Km 6,856,479 3.000 Width (m) 150.000 Earth fill m3 14,604,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,740,700

Moung Ruessei, Kear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020602/04/01 TSO Ma Sareun Project Type Irrigation 7,680,000
Ta Nak 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 7,680,000 1.000 Total span (m) 4.000 Width (m) 7,680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,680,000
Contract ID 020602/04/02 TSO Ma Sareun Project Type Rural Transport 20,588,700
Roka Chhmoul 1 201 Earth road 2.13 [ 3.20 ] Km 5,247,954 5.000 Width (m) 4,747.260 Earth fill m3 16,798,700
Roka Chhmoul 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 935,000 0.600 Diameter (m) 5.000 Length (m) 2,805,000
Roka Chhmoul 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 985,000 0.600 Diameter (m) 10.000 Length (m) 985,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,588,700
Contract ID 020602/04/03 TSO Ma Sareun Project Type Irrigation 7,050,000
Roka Chhmoul 1 420 Canal 1.43 [ 1.43 ] Km 4,947,368 2.000 Depth (m) 2,417.000 Volume (m3) 7,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,050,000

Moung Ruessei, Prey Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020603/04/01 TSO Ma Sareun Project Type Rural Transport 32,831,200
Kor 1 202 Laterite road 5.19 [ 5.19 ] Km 6,330,737 3.000 Width (m) 150.000 Earth fill m3 32,831,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,831,200

Moung Ruessei, Ruessei Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020604/04/01 TSO Ma Sareun Project Type Rural Transport 31,506,700
Thnal Bat 1 202 Laterite road 3.32 [ 3.32 ] Km 9,498,553 3.000 Width (m) 150.000 Earth fill m3 31,506,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,506,700

Moung Ruessei, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020605/04/01 TSO Ma Sareun Project Type Rural Transport 29,623,800
Angkrong 1 202 Laterite road 2.98 [ 3.54 ] Km 7,949,067 3.000 Width (m) 150.000 Earth fill m3 28,123,800
Angkrong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 10.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,623,800

Moung Ruessei, Ta Loas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020606/04/01 TSO Ma Sareun Project Type Irrigation 12,240,000
Chong Pralay 1 420 Canal 2.55 [ 2.55 ] Km 3,473,477 1.000 Depth (m) 3,288.000 Volume (m3) 8,840,000
Tras 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Tras 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 900,000 0.600 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,240,000
Contract ID 020606/04/02 TSO Ma Sareun Project Type Rural Transport 13,318,400
Tras 1 202 Laterite road 0.99 [ 1.30 ] Km 9,007,225 3.000 Width (m) 150.000 Earth fill m3 11,718,400
Tras 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,318,400

Moung Ruessei, Kakaoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020607/04/01 TSO Ly Oubol Project Type Rural Transport 29,491,900
Chak Thum 1 202 Laterite road 3.76 [ 4.43 ] Km 6,664,836 3.000 Width (m) 150.000 Earth fill m3 29,491,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,491,900

Moung Ruessei, Prey Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020608/04/01 TSO Ly Oubol Project Type Rural Transport 26,334,000
Prey Touch 1 201 Earth road 1.55 [ 2.49 ] Km 8,581,657 5.000 Width (m) 4,485.000 Earth fill m3 21,334,000
Prey Touch 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 3,200,000
Prey Touch 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 900,000 0.600 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,334,000

Moung Ruessei, Robas Mongkol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020609/04/01 TSO Ma Sareun Project Type Rural Transport 17,810,200
Kuoy Chik Dei 1 201 Earth road 1.98 [ 2.54 ] Km 7,003,618 5.000 Width (m) 6,196.000 Earth fill m3 17,810,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,810,200
Contract ID 020609/04/02 TSO Ma Sareun Project Type Rural Transport 11,533,500
Kuoy Chik Dei 1 251 Drift 1.00 [ 1.00 ] Place 5,302,600 20.000 Length (m) 4.500 Width (m) 5,302,600
Preaek Am 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,885,000 1.000 Diameter (m) 5.000 Length (m) 2,885,000
Preaek Am 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,518,900 0.800 Diameter (m) 5.000 Length (m) 1,518,900
Preaek Am 4 211 Single pipe culvert 1.00 [ 2.00 ] Place 913,500 0.600 Diameter (m) 5.000 Length (m) 1,827,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,533,500

Moung Ruessei, Prek Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020610/04/01 TSO Ma Sareun Project Type Rural Transport 27,776,000
Prek Ta Ven 1 202 Laterite road 4.28 [ 4.28 ] Km 6,497,310 3.500 Width (m) 150.000 Earth fill m3 27,776,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,776,000

Moung Ruessei, Prey Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020611/04/01 TSO Ma Sareun Project Type Rural Transport 33,110,000
Toul Koki 1 201 Earth road 3.39 [ 4.23 ] Km 7,829,274 5.000 Width (m) 11,621.000 Earth fill m3 33,110,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,110,000
Contract ID 020611/04/02 TSO Ma Sareun Project Type Rural Transport 7,300,000
Toul Koki 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 3,300,000
Toul Koki 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,300,000

Rotonak Mondol, Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020701/04/01 TSO Hin Dara Project Type Rural Domestic Water Supplies 18,279,000
Banang 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,780,000 30.000 Depth (m) 0.100 Diameter (mm) 4,780,000
Pich Chanva 2 123 Drilled well with Afridev pump 1.00 [ 2.00 ] Place 4,359,500 30.000 Depth (m) 0.100 Diameter (mm) 8,719,000
Sdau 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,780,000 30.000 Depth (m) 0.100 Diameter (mm) 4,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,279,000
Contract ID 020701/04/02 TSO Hin Dara Project Type Rural Transport 13,342,000
Sdau 1 202 Laterite road 0.53 [ 0.53 ] Km 5,440,454 3.000 Width (m) 150.000 Earth fill m3 2,878,000
Banang 2 202 Laterite road 0.35 [ 0.35 ] Km 5,438,286 3.000 Width (m) 150.000 Earth fill m3 1,903,400
Sdau 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,726,700 0.800 Diameter (m) 5.000 Length (m) 3,453,400
Banang 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,066,300 0.600 Diameter (m) 5.000 Length (m) 1,066,300
Banang 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,748,300 0.600 Diameter (m) 5.000 Length (m) 1,748,300
Sdau 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 80,000 0.300 Diameter (m) 5.000 Length (m) 160,000
Banang 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,066,300 0.600 Diameter (m) 5.000 Length (m) 2,132,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,342,000

Rotonak Mondol, Andaeuk Haeb

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020702/04/01 TSO Hin Dara Project Type Rural Transport 20,322,900
Svay Chuor 1 201 Earth road 1.18 [ 1.85 ] Km 8,081,489 4.000 Width (m) 5,280.000 Earth fill m3 14,975,000
Serei Voan 2 212 Double pipe culvert 2.00 [ 4.00 ] Place 1,336,975 0.600 Diameter (m) 5.000 Length (m) 5,347,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,322,900

Rotonak Mondol, Phlov Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020703/04/01 TSO Hin Dara Project Type Rural Transport 20,048,000
Phlov Meas 1 201 Earth road 3.51 [ 4.82 ] Km 3,197,014 4.000 Width (m) 4,921.000 Earth fill m3 15,416,000
Ou Lmun 2 212 Double pipe culvert 2.00 [ 3.00 ] Place 1,544,000 0.600 Diameter (m) 5.000 Length (m) 4,632,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,048,000

Rotonak Mondol, Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020704/04/01 TSO Hin Dara Project Type Rural Domestic Water Supplies 19,120,000
Kilou 1 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 4,780,000 30.000 Depth (m) 0.100 Diameter (mm) 9,560,000
Phcheav 2 123 Drilled well with Afridev pump 1.00 [ 2.00 ] Place 4,780,000 30.000 Depth (m) 0.100 Diameter (mm) 9,560,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,120,000
Contract ID 020704/04/02 TSO Hin Dara Project Type Rural Domestic Water Supplies 6,400,000
Phcheav 1 141 Pond with no filter 1.00 [ 1.00 ] Place 6,400,000 3.000 Depth (m) 2,484.000 Volume (m3) 6,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,400,000

Sangkae, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020801/04/01 TSO Oum Naram Project Type Rural Transport 36,361,000
Ou Muni Muoy 1 202 Laterite road 1.20 [ 1.20 ] Km 6,151,667 3.000 Width (m) 495.000 Earth fill m3 7,382,000
Anlong Vil 2 202 Laterite road 2.14 [ 2.84 ] Km 9,577,559 4.000 Width (m) 0.150 Earth fill m3 27,229,000
Svay Kang 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,750,000 0.800 Diameter (m) 5.000 Length (m) 1,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,361,000

Sangkae, Norea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020802/04/01 TSO Oum Naram Project Type Rural Transport 14,309,800
Balat 1 202 Laterite road 1.40 [ 1.40 ] Km 7,141,243 3.000 Width (m) 150.000 Earth fill m3 9,962,034
Norea Pir 2 202 Laterite road 0.20 [ 0.61 ] Km 7,139,189 3.000 Width (m) 150.000 Earth fill m3 4,347,766
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,309,800
Contract ID 020802/04/02 TSO Oum Naram Project Type Rural Transport 7,400,000
Ta Kok 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,207,500 0.800 Diameter (m) 5.000 Length (m) 2,207,500
Balat 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 995,000 0.600 Diameter (m) 5.000 Length (m) 2,985,000
Norea Pir 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,207,500 0.800 Diameter (m) 5.000 Length (m) 2,207,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,400,000

Sangkae, Ta Pon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020803/04/01 TSO Oum Naram Project Type Rural Transport 31,324,400
Ta Pon 1 202 Laterite road 1.26 [ 1.36 ] Km 8,809,412 3.000 Width (m) 150.000 Earth fill m3 11,980,800
Ta Pon 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Basaet 5 202 Laterite road 1.05 [ 1.38 ] Km 8,808,289 3.000 Width (m) 150.000 Earth fill m3 12,155,439
Samdach 6 202 Laterite road 0.60 [ 0.62 ] Km 8,809,360 3.000 Width (m) 150.000 Earth fill m3 5,488,231
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,324,470

Sangkae, Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020804/04/01 TSO Oum Naram Project Type Rural Transport 25,367,800
Chhung Tradak 1 202 Laterite road 1.96 [ 1.96 ] Km 8,181,276 3.000 Width (m) 150.000 Earth fill m3 16,035,300
Pou Batdambang 2 202 Laterite road 0.54 [ 1.01 ] Km 8,182,546 3.000 Width (m) 150.000 Earth fill m3 8,272,554
Chhung Tradak 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,060,000 0.600 Diameter (m) 8.000 Length (m) 1,060,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,367,854

Sangkae, Kampong Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020805/04/01 TSO Oum Naram Project Type Rural Transport 26,340,200
Srah Kaev 1 202 Laterite road 2.55 [ 2.85 ] Km 8,914,105 3.000 Width (m) 150.000 Earth fill m3 25,405,200
Kampong Preah 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 935,000 0.600 Diameter (m) 5.000 Length (m) 935,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,340,200

Sangkae, Kampong Preang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020806/04/01 TSO Oum Naram Project Type Rural Transport 26,905,700
Kbal Thnal 1 202 Laterite road 0.30 [ 0.30 ] Km 9,800,000 3.000 Width (m) 150.000 Earth fill m3 2,940,000
Thmei 2 202 Laterite road 1.45 [ 1.45 ] Km 9,772,966 3.000 Width (m) 150.000 Earth fill m3 14,170,800
Sambok Ak 3 202 Laterite road 0.63 [ 1.00 ] Km 9,834,237 3.000 Width (m) 0.150 Earth fill m3 9,794,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,905,700

Sangkae, Reang Kesei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020807/04/01 TSO Oum Naram Project Type Rural Transport 24,505,700
Voat Kandal 1 202 Laterite road 1.35 [ 1.35 ] Km 9,936,985 3.000 Width (m) 150.000 Earth fill m3 13,414,930
Svay Cheat 2 202 Laterite road 0.71 [ 1.12 ] Km 9,929,069 3.000 Width (m) 0.150 Earth fill m3 11,090,770
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,505,700

Sangkae, Ou Dambang Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020808/04/01 TSO Oum Naram Project Type Rural Transport 32,192,600
Samraong Kaong 1 202 Laterite road 1.20 [ 1.20 ] Km 8,252,250 3.000 Width (m) 150.000 Earth fill m3 9,902,700
Ou Sralau 2 202 Laterite road 1.49 [ 1.49 ] Km 8,252,253 3.000 Width (m) 150.000 Earth fill m3 12,271,100
Voat Chaeng 3 202 Laterite road 0.26 [ 0.90 ] Km 8,252,280 3.000 Width (m) 150.000 Earth fill m3 7,418,800
Ou Sralau 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Samraong Kaong 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,192,600

Sangkae, Ou Dambang Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020809/04/01 TSO Oum Naram Project Type Rural Transport 29,486,800
Tuol Lvieng 1 201 Earth road 2.35 [ 2.82 ] Km 9,469,642 4.000 Width (m) 500.000 Earth fill m3 26,732,800
Tuol Lvieng 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 918,000 0.600 Diameter (m) 5.000 Length (m) 2,754,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,486,800

Sangkae, Voat Ta Muem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020810/04/01 TSO Oum Naram Project Type Rural Transport 18,965,400
Kampong Chlang 1 202 Laterite road 1.50 [ 1.54 ] Km 7,908,523 3.000 Width (m) 150.000 Earth fill m3 12,155,400
Ou Sralau 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Kampong Chlang 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,022,000 0.600 Diameter (m) 5.000 Length (m) 1,022,000
Kampong Ampil 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,022,000 0.600 Diameter (m) 5.000 Length (m) 1,022,000
Ou Khcheay 5 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,022,000 0.600 Diameter (m) 5.000 Length (m) 2,044,000
Sla Kram 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,022,000 0.600 Diameter (m) 5.000 Length (m) 1,022,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,965,400
Contract ID 020810/04/02 TSO Oum Naram Project Type Irrigation 14,995,700
Kampong Chlang 1 452 Single pipe Culvert with gate 3.00 [ 3.00 ] Place 2,133,500 0.600 Diameter (m) 3.000 Width (m) 6,400,500
Kampong Chlang 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 2,341,500 0.600 Diameter (m) 5.000 Width (m) 4,683,000
Kampong Chlang 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,912,200 0.600 Diameter (m) 5.000 Width (m) 3,912,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,995,700

Samlout, Ta Taok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020901/04/01 TSO Keo Veasna Project Type Rural Transport 18,269,000
Phnum Rai 1 203 Gravel road 1.13 [ 1.14 ] Km 7,937,401 3.000 Width (m) 150.000 Earth fill m3 9,040,700
Ou Kroach 2 203 Gravel road 0.80 [ 0.80 ] Km 7,967,125 3.000 Width (m) 150.000 Earth fill m3 6,373,700
Phnum Rai 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,427,300 0.600 Diameter (m) 5.000 Length (m) 2,854,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,269,000

Samlout, Ou Samrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020902/04/01 TSO Keo Veasna Project Type Rural Transport 18,871,700
Ou Samrael Leu 1 201 Earth road 1.70 [ 1.71 ] Km 6,901,232 4.000 Width (m) 4,317.000 Earth fill m3 11,766,600
Ou Rumchek Kraom 2 201 Earth road 0.57 [ 0.57 ] Km 6,901,573 4.000 Width (m) 1,557.000 Earth fill m3 3,947,700
Ou Samrael Leu 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,226,400 0.600 Diameter (m) 5.000 Length (m) 1,226,400
Ou Samrael Kraom 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,931,000 0.600 Diameter (m) 5.000 Length (m) 1,931,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,871,700

Samlout, Kampong Lpou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020903/04/01 TSO Keo Veasna Project Type Rural Transport 19,273,400
Svay Chrum 1 203 Gravel road 0.83 [ 0.85 ] Km 6,889,953 3.000 Width (m) 150.000 Earth fill m3 5,828,900
Ou Choam Leu 2 203 Gravel road 0.85 [ 0.85 ] Km 6,889,294 3.000 Width (m) 150.000 Earth fill m3 5,855,900
Ou Choam Kraom 3 203 Gravel road 1.11 [ 1.11 ] Km 6,867,511 3.000 Width (m) 150.000 Earth fill m3 7,588,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,273,400

Samlout, Mean Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020904/04/01 TSO Keo Veasna Project Type Rural Transport 19,856,000
Kampong Touk 1 201 Earth road 2.40 [ 2.42 ] Km 7,266,625 4.000 Width (m) 6,597.000 Earth fill m3 17,548,900
Kampong Touk 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,153,400 0.600 Diameter (m) 5.000 Length (m) 2,306,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,855,700

Samlout, Samlout

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020905/04/01 TSO Keo Veasna Project Type Rural Transport 20,130,000
Ou Chrab 1 203 Gravel road 1.83 [ 1.83 ] Km 9,783,880 4.000 Width (m) 150.000 Earth fill m3 17,904,500
Ou Chrab 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,225,500 0.800 Diameter (m) 5.000 Length (m) 2,225,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,130,000

Samlout, Sung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020906/04/01 TSO Keo Veasna Project Type Rural Transport 17,913,000
Chamkar Chek 1 203 Gravel road 0.71 [ 0.72 ] Km 7,583,149 3.000 Width (m) 150.000 Earth fill m3 5,490,200
Shuong Pir 2 203 Gravel road 1.45 [ 1.45 ] Km 7,583,103 3.000 Width (m) 150.000 Earth fill m3 10,995,500
Shuong Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,427,300 0.600 Diameter (m) 5.000 Length (m) 1,427,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,913,000

Samlout, Ta Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020907/04/01 TSO Keo Veasna Project Type Rural Transport 21,097,500
Prey Rumchek 1 201 Earth road 1.46 [ 1.46 ] Km 7,533,949 4.000 Width (m) 4,078.000 Earth fill m3 11,007,100
Prey Rumchek 2 201 Earth road 1.03 [ 1.03 ] Km 7,556,893 4.000 Width (m) 2,959.000 Earth fill m3 7,783,600
Prey Rumchek 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,153,400 0.600 Diameter (m) 5.000 Length (m) 2,306,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,097,500

Sampov Lun, Sampou Lun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021001/04/01 TSO Hor Hak Project Type Rural Transport 16,611,800
Thnal Bat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,290,000 0.600 Diameter (m) 6.000 Length (m) 1,290,000
Thnal Bat 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 2,416,000
Thnal Bambaek 4 203 Gravel road 1.08 [ 1.14 ] Km 11,291,164 4.000 Width (m) 150.000 Earth fill m3 12,905,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,611,800

Sampov Lun, Angkor Ban

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021002/04/01 TSO Hor Hak Project Type Rural Transport 16,656,500
Andoung Pir 1 203 Gravel road 0.44 [ 0.44 ] Km 11,762,545 4.000 Width (m) 150.000 Earth fill m3 5,175,520
Andoung Pir 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,209,000 0.600 Diameter (m) 5.000 Length (m) 2,418,000
Tuek Phos 3 203 Gravel road 0.64 [ 0.67 ] Km 11,670,134 4.000 Width (m) 150.000 Earth fill m3 7,854,000
Tuek Phos 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,209,000 0.600 Diameter (m) 5.000 Length (m) 1,209,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,656,520

Sampov Lun, Ta Sda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021003/04/01 TSO Hor Hak Project Type Rural Transport 18,252,700
Veal Vong 1 203 Gravel road 1.20 [ 1.21 ] Km 12,415,111 4.000 Width (m) 150.000 Earth fill m3 15,034,700
Veal Vong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 1,208,000
Veal Vong 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,010,000 0.600 Diameter (m) 5.000 Length (m) 2,010,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,252,700

Sampov Lun, Santepheap

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021004/04/01 TSO Hor Hak Project Type Rural Transport 20,843,000
Ou 1 203 Gravel road 1.10 [ 1.12 ] Km 12,061,662 4.000 Width (m) 150.000 Earth fill m3 13,497,000
Ou 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 2,416,000
Ou 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,010,000 0.600 Diameter (m) 5.000 Length (m) 2,010,000
Ou 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,920,000 0.800 Diameter (m) 5.000 Length (m) 2,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,843,000

Sampov Lun, Serei Maen Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021005/04/01 TSO Hor Hak Project Type Rural Transport 19,825,500
Chheu Teal 1 203 Gravel road 1.25 [ 1.27 ] Km 11,620,079 4.000 Width (m) 150.000 Earth fill m3 14,757,500
Chheu Teal 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,208,000 1.000 Diameter (m) 5.000 Length (m) 1,208,000
Chheu Teal 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,860,000 0.600 Diameter (m) 5.000 Length (m) 3,860,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,825,500

Sampov Lun, Chrey Sema

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021006/04/01 TSO Hor Hak Project Type Rural Transport 18,273,300
Chambak 1 203 Gravel road 1.13 [ 1.15 ] Km 11,633,217 4.000 Width (m) 150.000 Earth fill m3 13,343,300
Chambak 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,920,000 0.600 Diameter (m) 5.000 Length (m) 2,920,000
Chambak 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,010,000 0.800 Diameter (m) 5.000 Length (m) 2,010,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,273,300

Phnum Proek, Phnum Proek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021101/04/01 TSO Hul Sina Project Type Rural Transport 19,072,600
Kokir 1 203 Gravel road 1.61 [ 1.63 ] Km 9,098,865 4.000 Width (m) 150.000 Earth fill m3 14,826,600
Kokir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,830,000 0.800 Diameter (m) 5.000 Length (m) 1,830,000
Kokir 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 2,416,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,072,600

Phnum Proek, Pech Chenda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021102/04/01 TSO Hul Sina Project Type Rural Transport 20,606,200
Ou 1 203 Gravel road 1.51 [ 1.62 ] Km 10,098,889 4.000 Width (m) 150.000 Earth fill m3 16,360,200
Ou 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,830,000 0.800 Diameter (m) 5.000 Length (m) 1,830,000
Ou 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 2,416,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,606,200

Phnum Proek, Chakrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021103/04/01 TSO Hul Sina Project Type Rural Transport 33,031,000
Chakrei 1 203 Gravel road 3.09 [ 3.13 ] Km 9,211,200 4.000 Width (m) 150.000 Earth fill m3 28,785,000
Chakrei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,830,000 0.800 Diameter (m) 5.000 Length (m) 1,830,000
Chakrei 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 2,416,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,031,000

Phnum Proek, Barang Thleak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021104/04/01 TSO Hul Sina Project Type Rural Transport 19,837,800
Barang Thleak 1 203 Gravel road 1.71 [ 1.90 ] Km 8,499,895 4.000 Width (m) 150.000 Earth fill m3 16,149,800
Barang Thleak 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,480,000 1.000 Diameter (m) 5.000 Length (m) 2,480,000
Barang Thleak 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,208,000 0.600 Diameter (m) 5.000 Length (m) 1,208,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,837,800

Phnum Proek, Ou Rumduol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021105/04/01 TSO Hul Sina Project Type Rural Transport 17,820,000
Oulahong 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 17,820,000 0.000 0.000 17,820,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,820,000

Kamrieng, Kamrieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021201/04/01 TSO Mout Roun Project Type Rural Transport 21,229,000
Bangorchang 1 203 Gravel road 3.70 [ 3.70 ] Km 5,248,378 4.000 Width (m) 300.000 Earth fill m3 19,419,000
Bangorchang 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,810,000 0.800 Diameter (m) 5.000 Length (m) 1,810,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,229,000

Kamrieng, Boeng Reang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021202/04/01 TSO Mout Roun Project Type Rural Transport 22,448,900
Prahpout 1 203 Gravel road 1.00 [ 1.00 ] Km 7,516,080 3.000 Width (m) 150.000 Earth fill m3 7,478,500
Doung 2 203 Gravel road 1.40 [ 1.43 ] Km 7,516,000 3.000 Width (m) 150.000 Earth fill m3 10,740,364
Prahpout 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,810,000 0.800 Diameter (m) 5.000 Length (m) 1,810,000
Doung 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,210,000 0.600 Diameter (m) 5.000 Length (m) 2,420,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,448,864

Kamrieng, Ou Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021203/04/01 TSO Mout Roun Project Type Rural Transport 12,543,000
Samroung 1 201 Earth road 2.69 [ 2.74 ] Km 4,572,731 4.000 Width (m) 300.000 Earth fill m3 12,543,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,543,000
Contract ID 021203/04/02 TSO Mout Roun Project Type Rural Transport 8,550,000
Lamphat 1 203 Gravel road 1.00 [ 1.00 ] Km 7,340,000 3.000 Width (m) 150.000 Earth fill m3 7,340,000
Lamphat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,210,000 0.600 Diameter (m) 5.000 Length (m) 1,210,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,550,000

Kamrieng, Trang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021204/04/01 TSO Mout Roun Project Type Rural Transport 21,892,200
Kandal 1 203 Gravel road 3.54 [ 3.57 ] Km 6,128,835 4.000 Width (m) 150.000 Earth fill m3 21,892,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,892,200

Kamrieng, Ta Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021205/04/01 TSO Mout Roun Project Type Rural Transport 19,705,000
Ou Anlok 1 203 Gravel road 0.82 [ 0.84 ] Km 9,650,000 4.000 Width (m) 150.000 Earth fill m3 8,096,350
Ou Chamlang 2 203 Gravel road 0.89 [ 0.89 ] Km 9,650,000 4.000 Width (m) 150.000 Earth fill m3 8,588,500
Ou Anlok 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,810,000 0.800 Diameter (m) 5.000 Length (m) 1,810,000
Ou Chamlang 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,210,200 0.600 Diameter (m) 5.000 Length (m) 1,210,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,705,050

Kamrieng, Ta Krai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021206/04/01 TSO Mout Roun Project Type Rural Transport 18,617,700
Sras Kampot 1 201 Earth road 0.50 [ 0.50 ] Km 6,870,000 4.000 Width (m) 400.000 Earth fill m3 3,435,000
Ta Krai 2 201 Earth road 1.21 [ 1.21 ] Km 6,870,000 4.000 Width (m) 400.000 Earth fill m3 8,312,700
Sam Sip 3 201 Earth road 1.00 [ 1.00 ] Km 6,870,000 4.000 Width (m) 400.000 Earth fill m3 6,870,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,617,700
Contract ID 021206/04/02 TSO Mout Roun Project Type Rural Transport 6,397,500
Kampong Chamlong Loeu 1 203 Gravel road 1.00 [ 1.05 ] Km 6,098,665 3.000 Width (m) 150.000 Earth fill m3 6,397,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,397,500

Koas Krala, Thipakdei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021301/04/01 TSO Ly Oubol Project Type Rural Transport 27,395,900
Tuol Mtes 1 202 Laterite road 3.20 [ 4.25 ] Km 5,395,484 3.000 Width (m) 150.000 Earth fill m3 22,941,600
Tuol Mtes 2 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,113,575 0.600 Diameter (m) 5.000 Length (m) 4,454,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,395,900

Koas Krala, Koas Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021302/04/01 TSO Ly Oubol Project Type Rural Domestic Water Supplies 6,800,000
Tuol Balangk 1 141 Pond with no filter 1.00 [ 1.00 ] Place 6,800,000 3.000 Depth (m) 1.000 Volume (m3) 6,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,800,000
Contract ID 021302/04/02 TSO Ly Oubol Project Type Rural Transport 13,198,500
Koas Krala 1 202 Laterite road 1.00 [ 1.16 ] Km 5,159,914 3.000 Width (m) 150.000 Earth fill m3 5,985,500
Koas Krala 2 211 Single pipe culvert 3.00 [ 6.00 ] Place 1,202,167 0.600 Diameter (m) 5.000 Length (m) 7,213,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,198,500

Koas Krala, Hab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021303/04/01 TSO Ly Oubol Project Type Rural Transport 18,969,500
Trapeang Dang Tuek 1 202 Laterite road 3.06 [ 3.23 ] Km 5,502,416 3.000 Width (m) 150.000 Earth fill m3 17,767,300
Trapeang Dang Tuek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,202,200 0.600 Diameter (m) 5.000 Length (m) 1,202,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,969,500

Koas Krala, Doun Ba

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021304/04/01 TSO Ly Oubol Project Type Rural Transport 18,750,100
Doun Ba 1 202 Laterite road 1.86 [ 1.97 ] Km 7,470,696 4.000 Width (m) 150.000 Earth fill m3 14,709,800
Doun Ba 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,825,500 0.800 Diameter (m) 5.000 Length (m) 2,825,500
Doun Ba 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,214,800 0.600 Diameter (m) 5.000 Length (m) 1,214,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,750,100

Koas Krala, Preah Phos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021305/04/01 TSO Ly Oubol Project Type Rural Transport 18,081,600
Prey Chak 1 201 Earth road 1.62 [ 2.11 ] Km 7,442,972 4.000 Width (m) 5,684.000 Earth fill m3 15,727,000
Ta Nuot 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,354,600 0.800 Diameter (m) 5.000 Length (m) 2,354,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,081,600

Koas Krala, Chhnal Moan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021306/04/01 TSO Ly Oubol Project Type Rural Transport 18,315,400
Ruessei Preah 1 201 Earth road 0.89 [ 0.89 ] Km 5,847,700 4.000 Width (m) 1,548.000 Earth fill m3 5,175,215
Chnal Mean 2 201 Earth road 0.70 [ 1.00 ] Km 5,847,700 4.000 Width (m) 3,496.000 Earth fill m3 5,841,852
Chnal Mean 3 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,633,200 0.800 Diameter (m) 5.000 Length (m) 4,899,600
Ruessei Preah 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,398,800 0.800 Diameter (m) 5.000 Length (m) 2,398,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,315,467