Contract Outputs
Location: Svay Rieng Budget Year: 2004
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Chantrea, Bati
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200101/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
17,588,000 |
| Thnal Kaeng |
1 |
201 |
Earth road |
1.51 [ 1.51 ] |
Km |
11,655,401 |
5.000 Width (m) |
3,923.000 Earth fill m3 |
17,588,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,588,000 |
| Contract ID |
200101/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
12,743,600 |
| Trapeang Phlong |
1 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
13,485,291 |
4.000 Width (m) |
2,228.000 Earth fill m3 |
12,743,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,743,600 |
| Contract ID |
200101/04/03 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
4,890,000 |
| Thnal Kaeng |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,240,000 |
0.800 Diameter (m) |
6.000 Length (m) |
2,240,000 |
| Trapeang Phlong |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,325,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,890,000 |
Chantrea, Bavet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200102/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
28,541,600 |
| Chrak Leav |
1 |
201 |
Earth road |
2.05 [ 2.05 ] |
Km |
13,922,732 |
5.000 Width (m) |
5,743.000 Earth fill m3 |
28,541,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,541,600 |
Chantrea, Chantrea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200103/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
23,945,200 |
| Saenta |
1 |
201 |
Earth road |
2.96 [ 2.96 ] |
Km |
8,078,677 |
4.000 Width (m) |
4,424.000 Earth fill m3 |
23,945,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,945,200 |
| Contract ID |
200103/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Irrigation |
16,384,000 |
| Saenta |
1 |
420 |
Canal |
0.64 [ 0.64 ] |
Km |
25,600,000 |
2.960 Depth (m) |
9,093.000 Volume (m3) |
16,384,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,384,000 |
Chantrea, Chres
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200104/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
14,094,000 |
| Trapeang Thlok |
1 |
201 |
Earth road |
1.47 [ 1.47 ] |
Km |
9,568,228 |
4.000 Width (m) |
2,875.000 Earth fill m3 |
14,094,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,094,000 |
| Contract ID |
200104/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
2,670,000 |
| Trapeang Thlok |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,335,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,670,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,670,000 |
| Contract ID |
200104/04/03 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
20,061,400 |
| Banla S'et |
1 |
201 |
Earth road |
1.32 [ 1.32 ] |
Km |
15,152,115 |
4.000 Width (m) |
3,611.000 Earth fill m3 |
20,061,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,061,400 |
Chantrea, Me Sa Thngak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200105/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
18,879,700 |
| Baray |
1 |
201 |
Earth road |
1.29 [ 1.29 ] |
Km |
14,635,426 |
4.000 Width (m) |
3,373.000 Earth fill m3 |
18,879,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,879,700 |
| Contract ID |
200105/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
2,640,000 |
| Baray |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,320,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,320,000 |
| Svay Kuy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,320,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,320,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,640,000 |
Chantrea, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200106/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
14,000,000 |
| Kandal |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
13,333,333 |
5.000 Width (m) |
14,998.000 Earth fill m3 |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,000,000 |
| Contract ID |
200106/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
2,224,100 |
| Kandal |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,224,100 |
0.800 Diameter (m) |
6.000 Length (m) |
2,224,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,224,100 |
Chantrea, Prey Angkunh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200107/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
18,403,700 |
| Kouk Lvieng |
1 |
201 |
Earth road |
1.51 [ 1.51 ] |
Km |
12,204,045 |
4.000 Width (m) |
3,602.000 Earth fill m3 |
18,403,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,403,700 |
Chantrea, Prey Kokir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200108/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
16,774,234 |
| Trapeang Bon |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
15,975,429 |
4.000 Width (m) |
2,384.000 Earth fill m3 |
16,774,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,774,200 |
| Contract ID |
200108/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,310,000 |
| Trapeang Bon |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,310,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,310,000 |
Chantrea, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200109/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
16,106,000 |
| Kaoh Kban Kandal |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
16,106,000 |
4.000 Width (m) |
3,171.000 Earth fill m3 |
16,106,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,106,000 |
| Contract ID |
200109/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
19,383,800 |
| Kaoh Kban Kandal |
1 |
201 |
Earth road |
1.26 [ 1.26 ] |
Km |
15,359,588 |
4.000 Width (m) |
3,469.000 Earth fill m3 |
19,383,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,383,800 |
| Contract ID |
200109/04/03 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
5,439,700 |
| Kaoh Kban Kandal |
1 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,359,920 |
0.600 Diameter (m) |
5.000 Length (m) |
5,439,680 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,439,680 |
Chantrea, Tuol Sdei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200110/04/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Irrigation |
16,955,800 |
| Tuol Sdei |
1 |
420 |
Canal |
0.92 [ 1.15 ] |
Km |
14,744,174 |
1.990 Depth (m) |
8,771.000 Volume (m3) |
16,955,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,955,800 |
| Contract ID |
200110/04/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
3,900,000 |
| Tuol Sdei |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,900,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,900,000 |
Kampong Rou, Banteay Krang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200201/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
19,840,000 |
| Pou Krouch |
1 |
201 |
Earth road |
0.90 [ 1.24 ] |
Km |
16,000,000 |
4.000 Width (m) |
6,006.000 Earth fill m3 |
19,840,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,840,000 |
Kampong Rou, Nhor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200202/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
16,625,000 |
| Trapeang Trav |
1 |
201 |
Earth road |
1.75 [ 1.75 ] |
Km |
9,500,000 |
4.000 Width (m) |
4,639.000 Earth fill m3 |
16,625,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,625,000 |
| Contract ID |
200202/04/02 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
2,986,600 |
| Svay anat |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,190,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,190,200 |
| Trapeang Trav |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,796,400 |
0.800 Diameter (m) |
5.000 Length (m) |
1,796,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,986,600 |
Kampong Rou, Ksetr
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200203/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
25,500,000 |
| Srama |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
12,750,000 |
4.000 Width (m) |
5,283.000 Earth fill m3 |
25,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,500,000 |
Kampong Rou, Preah Ponlea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200204/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
17,216,000 |
| Traok |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,395,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,790,000 |
| Ou Doun am |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Angk Kduoch |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Tradaet |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Trapeang Leach |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,580,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,580,000 |
| Pring Chrum |
6 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Preah Ponlea |
7 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Trapeang Run |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,580,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,580,000 |
| Preah Ponlea |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,183,000 |
| Pring Chrum |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,183,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,216,000 |
Kampong Rou, Prey Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200205/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Irrigation |
14,000,000 |
| Ta Koeng |
1 |
420 |
Canal |
1.60 [ 1.60 ] |
Km |
8,750,000 |
1.700 Depth (m) |
9,564.000 Volume (m3) |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,000,000 |
Kampong Rou, Reach Montir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200206/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
14,000,000 |
| Phnum Srov |
1 |
201 |
Earth road |
1.75 [ 1.75 ] |
Km |
8,000,000 |
4.000 Width (m) |
4,066.000 Earth fill m3 |
14,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,000,000 |
| Contract ID |
200206/04/02 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
1,780,000 |
| Daek Phleung |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,780,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,780,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,780,000 |
Kampong Rou, Samlei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200207/04/01 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
10,366,500 |
| Svay |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,334,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,334,500 |
| Svay Chek |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,334,500 |
0.600 Diameter (m) |
5.000 Length (m) |
2,669,000 |
| Ta Pao |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,334,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,334,500 |
| Ta Pao |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,847,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,847,000 |
| Samlei Khang Cheung |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,334,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,334,500 |
| Prey Phniet |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,847,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,847,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,366,500 |
| Contract ID |
200207/04/02 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
12,887,000 |
| Prey Mnoas |
1 |
201 |
Earth road |
1.32 [ 1.32 ] |
Km |
9,800,000 |
4.000 Width (m) |
2,580.000 Earth fill m3 |
12,887,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,887,000 |
Kampong Rou, Samyaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200208/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Irrigation |
13,000,000 |
| Samyaong |
1 |
420 |
Canal |
1.10 [ 1.10 ] |
Km |
11,818,182 |
2.300 Depth (m) |
8,908.000 Volume (m3) |
13,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,000,000 |
Kampong Rou, Svay Ta Yean
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200209/04/01 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
22,535,000 |
| Ream Chou |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,720,000 |
| Prey Praeus |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,720,000 |
| Sek Chrum |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
6.000 Length (m) |
4,080,000 |
| Prey Thlok |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,360,000 |
| Trapeang Trach |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,460,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,460,000 |
| Prey Stieng |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,460,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,460,000 |
| Prey Thlok |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,460,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,460,000 |
| Svay Ta Yean |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,360,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,360,000 |
| Trapeang Trach |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,183,000 |
| Bos |
10 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,366,000 |
| Pou Thmei |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,183,000 |
| Daeum Pou |
12 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,183,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,183,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,535,000 |
Kampong Rou, Svay Toea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200210/04/01 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
17,779,600 |
| Svay Toea |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
17,779,600 |
4.000 |
4.000 |
17,779,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,779,600 |
Kampong Rou, Thmei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200211/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
11,680,000 |
| Veal M'am |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
14,600,000 |
4.000 Width (m) |
2,391.000 Earth fill m3 |
11,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,680,000 |
| Contract ID |
200211/04/02 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
6,854,000 |
| Veal M'am |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,904,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,904,000 |
| Veal M'am |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,950,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,950,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,854,000 |
Kampong Rou, Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200212/04/01 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
16,599,000 |
| Bon |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
12,768,462 |
4.000 Width (m) |
3,321.000 Earth fill m3 |
16,599,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,599,000 |
| Contract ID |
200212/04/02 |
TSO |
Sao Sam Oeun |
Project Type |
Rural Transport |
4,871,800 |
| Bon |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,349,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,698,400 |
| Pou M'am |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,173,400 |
0.800 Diameter (m) |
6.000 Length (m) |
2,173,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,871,800 |
Rumduol, Bos Mon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200301/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
4,921,400 |
| Bos Phlang |
1 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,230,340 |
0.600 Diameter (m) |
5.000 Length (m) |
4,921,360 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,921,360 |
| Contract ID |
200301/04/02 |
TSO |
On Yanna |
Project Type |
Rural Transport |
19,226,600 |
| Bos Phlang |
1 |
201 |
Earth road |
1.70 [ 2.34 ] |
Km |
8,220,009 |
4.000 Width (m) |
4,875.000 Earth fill m3 |
19,226,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,226,600 |
Rumduol, Thmea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200302/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
16,836,300 |
| Thmea |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,263,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,526,400 |
| Trapeang Poun |
2 |
212 |
Double pipe culvert |
2.00 [ 3.00 ] |
Place |
3,085,700 |
0.800 Diameter (m) |
5.000 Length (m) |
9,257,100 |
| Boeng Kaek |
3 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,263,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,526,400 |
| Preaek Tnaot |
4 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,263,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,526,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,836,300 |
| Contract ID |
200302/04/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
13,780,000 |
| Trapeang Poun |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
10,600,000 |
4.000 Width (m) |
3,461.000 Earth fill m3 |
13,780,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,780,000 |
Rumduol, Chak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200303/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
20,248,000 |
| Chak |
1 |
211 |
Single pipe culvert |
4.00 [ 6.00 ] |
Place |
1,124,900 |
0.600 Diameter (m) |
5.000 Length (m) |
6,749,400 |
| Svay Rung |
2 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,124,884 |
0.600 Diameter (m) |
5.000 Length (m) |
3,374,652 |
| Chh'oeng Pos |
3 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,124,884 |
0.600 Diameter (m) |
5.000 Length (m) |
3,374,652 |
| Prey Keav |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,124,884 |
0.600 Diameter (m) |
5.000 Length (m) |
2,249,768 |
| Leak Chea |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,124,884 |
0.600 Diameter (m) |
5.000 Length (m) |
2,249,768 |
| Chambak Kaong |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,124,884 |
0.600 Diameter (m) |
5.000 Length (m) |
2,249,768 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,248,008 |
Rumduol, Chrung Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200304/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
22,193,000 |
| Trapeang Kruos |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
2,220,200 |
| Trapeang Kraet |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,215,700 |
0.800 Diameter (m) |
5.000 Length (m) |
2,215,700 |
| Preah Angk Kaev |
3 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
2,220,200 |
| Tuol Trea |
4 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
4,440,400 |
| Tuol Sala |
5 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
3,330,300 |
| Krouch |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
2,220,200 |
| Neang Chan |
7 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,110,100 |
0.600 Diameter (m) |
5.000 Length (m) |
3,330,300 |
| Krouch |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,215,700 |
0.800 Diameter (m) |
5.000 Length (m) |
2,215,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,193,000 |
Rumduol, Kampong Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200305/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
18,270,300 |
| Tuol Chres |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,258,287 |
0.600 Diameter (m) |
5.000 Length (m) |
1,258,287 |
| Svay Rolum |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,258,287 |
0.600 Diameter (m) |
5.000 Length (m) |
2,516,574 |
| Kampong Ampil |
3 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,258,287 |
0.600 Diameter (m) |
5.000 Length (m) |
3,774,861 |
| Trapeang Damrei |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,258,287 |
0.600 Diameter (m) |
5.000 Length (m) |
2,516,574 |
| Ta Sak |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,258,250 |
0.600 Diameter (m) |
5.000 Length (m) |
2,516,500 |
| Ta Sak |
6 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,895,800 |
0.800 Diameter (m) |
5.000 Length (m) |
5,687,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,270,196 |
Rumduol, Meun Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200306/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
32,152,400 |
| Haek Samnanh |
1 |
201 |
Earth road |
2.30 [ 3.50 ] |
Km |
9,186,400 |
4.000 Width (m) |
7,284.000 Earth fill m3 |
32,152,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,152,400 |
| Contract ID |
200306/04/02 |
TSO |
On Yanna |
Project Type |
Rural Transport |
10,200,000 |
| Haek Samnanh |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Prey Boeng |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Trapeang Kandal |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Meun Chey |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Chong Preaek |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,200,000 |
Rumduol, Pong Tuek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200307/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
17,882,900 |
| Tuol Ta Kaev |
1 |
201 |
Earth road |
2.18 [ 2.98 ] |
Km |
6,000,973 |
4.000 Width (m) |
3,980.000 Earth fill m3 |
17,882,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,882,900 |
| Contract ID |
200307/04/02 |
TSO |
On Yanna |
Project Type |
Rural Transport |
7,273,600 |
| Tuol Ta Kaev |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,818,400 |
0.800 Diameter (m) |
5.000 Length (m) |
1,818,400 |
| Preysrakoum |
2 |
211 |
Single pipe culvert |
3.00 [ 1.00 ] |
Place |
1,818,400 |
0.800 Diameter (m) |
5.000 Length (m) |
1,818,400 |
| Andoung Krasang |
3 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,818,400 |
0.800 Diameter (m) |
5.000 Length (m) |
3,636,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,273,600 |
Rumduol, Sangkae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200308/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
18,144,400 |
| Svay Rumpea |
1 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
4,269,276 |
| Poun |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
1,067,319 |
| Ta Chou |
3 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
3,201,957 |
| Ta Naeng |
4 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
4,269,276 |
| Tuol Chambak |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
1,067,319 |
| Trapeang Run |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
1,067,319 |
| Ta Paong |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
1,067,319 |
| Kouk Srama |
8 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,067,319 |
0.600 Diameter (m) |
4.000 Length (m) |
2,134,638 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,144,423 |
Rumduol, Svay Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200309/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
32,124,300 |
| Svay Chek |
1 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,125,100 |
0.600 Diameter (m) |
4.000 Length (m) |
4,500,400 |
| Anlong Spean |
2 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,125,100 |
0.600 Diameter (m) |
4.000 Length (m) |
4,500,400 |
| Thmei |
3 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,214,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,643,500 |
| Roung Damrei |
4 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,125,100 |
0.600 Diameter (m) |
4.000 Length (m) |
4,500,400 |
| Ba Krong |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,125,100 |
0.600 Diameter (m) |
4.000 Length (m) |
3,375,300 |
| Kandal |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,300,900 |
0.600 Diameter (m) |
6.000 Length (m) |
3,902,700 |
| Thmei |
7 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,688,100 |
0.800 Diameter (m) |
5.000 Length (m) |
2,688,100 |
| Popul |
8 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,899,500 |
0.800 Diameter (m) |
5.000 Length (m) |
3,799,000 |
| Popul |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,214,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,214,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,124,300 |
| Contract ID |
200309/04/02 |
TSO |
On Yanna |
Project Type |
Rural Transport |
20,990,000 |
| Thmei |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
20,990,000 |
4.000 Total Span (m) |
4.000 Width (m) |
20,990,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,990,000 |
Rumduol, Thna Thnong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200310/04/01 |
TSO |
On Yanna |
Project Type |
Rural Transport |
20,516,600 |
| Trapeang Thma |
1 |
201 |
Earth road |
2.41 [ 3.41 ] |
Km |
6,016,598 |
4.000 Width (m) |
4,652.000 Earth fill m3 |
20,516,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,516,600 |
| Contract ID |
200310/04/02 |
TSO |
On Yanna |
Project Type |
Rural Transport |
17,767,500 |
| Chamnat Trach |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,184,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,553,500 |
| Thmei |
2 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,184,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,553,500 |
| Thnong |
3 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,184,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,553,500 |
| Thna |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,184,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,553,500 |
| Trapeang Thma |
5 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,184,500 |
0.600 Diameter (m) |
5.000 Length (m) |
3,553,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,767,500 |
Romeas Haek, Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200401/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
9,250,000 |
| Trapeang Bei |
1 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
4,625,000 |
1.000 Diameter (m) |
5.000 Length (m) |
9,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,250,000 |
| Contract ID |
200401/04/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
11,662,200 |
| Traok |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
11,662,200 |
5.000 Total Span (m) |
4.000 Width (m) |
11,662,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,662,200 |
Romeas Haek, Andoung Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200402/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
23,180,000 |
| Trapeang Bos |
1 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,440,000 |
| Thmei |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,660,000 |
| Trapeang Tbal |
3 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
4,880,000 |
| Roung Snao |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,660,000 |
| Ream Sena |
5 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,660,000 |
| Trapeang Choar |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,440,000 |
| Bos Kokir |
7 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,440,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,180,000 |
Romeas Haek, Andoung Trabaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200403/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
20,887,000 |
| Tuol |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,520,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,520,000 |
| Tuol |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
4,040,000 |
1.000 Diameter (m) |
5.000 Length (m) |
8,080,000 |
| Chik Dei |
3 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
11,287,000 |
2.000 Total Span (m) |
5.000 Width(m) |
11,287,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,887,000 |
Romeas Haek, Angk Prasrae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200404/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
21,025,000 |
| Trapeang Thum |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
14,500,000 |
4.000 Width (m) |
4,007.000 Earth fill m3 |
21,025,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,025,000 |
| Contract ID |
200404/04/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
26,240,800 |
| K'am |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
26,240,800 |
6.000 Total Span (m) |
4.000 Width (m) |
26,240,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,240,800 |
Romeas Haek, Chantrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200405/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
23,250,000 |
| Balangk Chea |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
15,000,000 |
4.000 Width (m) |
4,600.000 Earth fill m3 |
23,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,250,000 |
| Contract ID |
200405/04/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
5,961,900 |
| Prey Roluos |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,490,500 |
0.600 Diameter (m) |
5.000 Length (m) |
2,981,000 |
| Prey Totueng |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,490,450 |
0.600 Diameter (m) |
5.000 Length (m) |
2,980,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,961,900 |
Romeas Haek, Chrey Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200406/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
24,650,000 |
| Sandao |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
17,000,000 |
4.000 Width (m) |
5,224.000 Earth fill m3 |
24,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,650,000 |
Romeas Haek, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200407/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
30,940,000 |
| Poun |
1 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Svay Pok |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Trapeang Thum |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,194,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,194,000 |
| Trapeang Phlong |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,194,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,194,000 |
| Poun |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,194,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,582,000 |
| Trapeang Kralanh |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,194,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,388,000 |
| Svay Pok |
7 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,194,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,582,000 |
| Trapeang Svay |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Thmei |
9 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,940,000 |
Romeas Haek, Kampong Trach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200408/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
33,532,900 |
| Kampong Trach |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
1,575,450 |
| Ta Hang |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
4,726,350 |
| Chong Ou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
1,575,450 |
| Prey Khcheay |
4 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
6,301,800 |
| Pramat Pram |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,575,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,575,500 |
| Prey Kralanh |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
4,726,350 |
| Khla Lout |
7 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
3,150,900 |
| Chheu Phleung |
8 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,575,450 |
0.600 Diameter (m) |
5.000 Length (m) |
4,726,350 |
| Ta Trav |
9 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,725,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,725,000 |
| Ta Khob |
10 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,725,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,450,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,533,150 |
Romeas Haek, Kokir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200409/04/01 |
TSO |
Soem Saravuth |
Project Type |
Education |
18,269,100 |
| Kokir |
1 |
320 |
Brick school (general) |
3.00 [ 3.00 ] |
School room |
6,089,700 |
24.000 Length (m) |
9.000 Width (m) |
18,269,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,269,100 |
Romeas Haek, Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200410/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
23,900,000 |
| Ta Menh |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
11,950,000 |
4.000 Width (m) |
4,320.000 Earth fill m3 |
23,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,900,000 |
| Contract ID |
200410/04/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
27,232,200 |
| Prey Phtiek |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,025,800 |
| Thmei |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,025,800 |
| Smach |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,025,800 |
| Thnong |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,512,900 |
| Thlok Veay Ti Muoy |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,025,800 |
| Thlok Veay Ti Pir |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,512,900 |
| Trapeang Chrey |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,512,900 |
| Ta Menh |
8 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
6,051,600 |
| Krasang |
9 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,512,900 |
0.600 Diameter (m) |
5.000 Length (m) |
4,538,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,232,200 |
Romeas Haek, Mukh Da
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200411/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
22,540,000 |
| Mukh Da |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
12,702,152 |
4.000 Width (m) |
3,010.000 Earth fill m3 |
15,877,690 |
| Bos Kabbas |
2 |
201 |
Earth road |
1.22 [ 1.22 ] |
Km |
5,460,902 |
4.000 Width (m) |
1,263.000 Earth fill m3 |
6,662,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,539,990 |
| Contract ID |
200411/04/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
21,096,000 |
| Mukh Da |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
21,096,000 |
1.000 Total Span (m) |
4.000 Width (m) |
21,096,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,096,000 |
Romeas Haek, Mream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200412/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
26,700,000 |
| Boeng Phe |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,600,000 |
| Mream Khang Cheung |
2 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,900,000 |
| Trapeang Choar |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Chrung Popel |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Tralach |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,600,000 |
| Ta Tru |
6 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,900,000 |
| Chrung Popel |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,100,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,100,000 |
| Chrung Popel |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
9,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
9,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,700,000 |
Romeas Haek, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200413/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
18,607,700 |
| Preaek Tnaot |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,364,350 |
0.600 Diameter (m) |
5.000 Length (m) |
4,093,050 |
| Souphi |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,364,350 |
0.600 Diameter (m) |
5.000 Length (m) |
1,364,350 |
| Traok |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,364,350 |
0.600 Diameter (m) |
5.000 Length (m) |
2,728,700 |
| Prey Kur |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,364,350 |
0.600 Diameter (m) |
5.000 Length (m) |
4,093,050 |
| Prich |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,364,350 |
0.600 Diameter (m) |
5.000 Length (m) |
2,728,700 |
| Preaek Tnaot |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,607,850 |
Romeas Haek, Sambatt Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200414/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
18,975,000 |
| Tuol Srama |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
17,250,000 |
4.000 Width (m) |
4,190.000 Earth fill m3 |
18,975,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,975,000 |
| Contract ID |
200414/04/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
24,450,000 |
| Tuol Srama |
1 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
1,542,000 |
0.600 Diameter (m) |
5.000 Length (m) |
9,252,000 |
| Bet Ting |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,542,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,084,000 |
| Lbaeuk |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,542,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,084,000 |
| Lbaeuk |
4 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
9,030,000 |
3.000 Total Span (m) |
5.000 Width(m) |
9,030,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,450,000 |
Romeas Haek, Trapeang Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200415/04/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
25,154,500 |
| Svay Tontuem |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
18,632,963 |
4.000 Width (m) |
4,876.000 Earth fill m3 |
25,154,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,154,500 |
Romeas Haek, Tras
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200416/04/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
24,811,900 |
| Tras |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Ta Suos |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Popel |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Veal Veaeng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Veal Tmat |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Bos |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Serei Ao |
7 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Mreaks Teab |
8 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
12,311,900 |
2.000 Total Span (m) |
5.000 Width(m) |
12,311,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,811,900 |
| Contract ID |
200416/04/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
16,915,400 |
| Tras |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
16,915,400 |
10.000 Total Span (m) |
3.000 Width (m) |
16,915,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,915,400 |
Svay Chrum, Angk Ta Sou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200501/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
15,773,200 |
| Roka |
1 |
201 |
Earth road |
1.11 [ 1.11 ] |
Km |
14,210,090 |
4.000 Width (m) |
2,834.000 Earth fill m3 |
15,773,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,773,200 |
| Contract ID |
200501/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
7,054,900 |
| Roka |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,274,120 |
0.600 Diameter (m) |
5.000 Length (m) |
2,548,240 |
| Thma Pean |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,274,120 |
0.600 Diameter (m) |
5.000 Length (m) |
2,548,240 |
| Chaeng Maeng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,958,500 |
0.800 Diameter (m) |
5.000 Length (m) |
1,958,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,054,980 |
Svay Chrum, Basak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200502/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
10,850,000 |
| Basak |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
14,000,000 |
4.000 Width (m) |
1,990.000 Earth fill m3 |
10,850,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,850,000 |
| Contract ID |
200502/04/02 |
TSO |
Mey Sambatt |
Project Type |
Education |
36,291,700 |
| Sala Rien |
1 |
320 |
Brick school (general) |
2.00 [ 2.00 ] |
School room |
18,145,850 |
16.000 Length (m) |
9.000 Width (m) |
36,291,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,291,700 |
| Contract ID |
200502/04/03 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
11,500,000 |
| Basak |
1 |
211 |
Single pipe culvert |
2.00 [ 6.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,500,000 |
| Basak |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,500,000 |
Svay Chrum, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200503/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
29,040,000 |
| Thmei |
1 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
13,200,000 |
4.000 Width (m) |
6,094.000 Earth fill m3 |
29,040,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,040,000 |
| Contract ID |
200503/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
9,261,000 |
| Thmei |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,961,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,961,000 |
| Thmei |
2 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Thmei |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,261,000 |
Svay Chrum, Chamlang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200504/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
12,936,000 |
| Chambak Kuy |
1 |
201 |
Earth road |
1.16 [ 1.16 ] |
Km |
11,200,000 |
4.000 Width (m) |
2,362.000 Earth fill m3 |
12,936,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,936,000 |
| Contract ID |
200504/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
18,823,300 |
| Chie Ruessei |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
18,823,300 |
1.500 Total span (m) |
15.000 Width (m) |
18,823,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,823,300 |
Svay Chrum, Ta Suos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200505/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
32,173,600 |
| Ta Pa |
1 |
201 |
Earth road |
2.46 [ 2.46 ] |
Km |
13,100,000 |
4.000 Width (m) |
6,194.000 Earth fill m3 |
32,173,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,173,600 |
Svay Chrum, Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200506/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
20,444,400 |
| Meloung |
1 |
201 |
Earth road |
1.19 [ 1.19 ] |
Km |
17,136,966 |
4.000 Width (m) |
3,018.000 Earth fill m3 |
20,444,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,444,400 |
| Contract ID |
200506/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
5,603,900 |
| Chambak |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,865,170 |
0.800 Diameter (m) |
5.000 Length (m) |
1,865,170 |
| Chambak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,290 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,290 |
| Meloung |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,290 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,290 |
| Chek |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,330,100 |
0.600 Diameter (m) |
6.000 Length (m) |
1,330,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,603,850 |
Svay Chrum, Chheu Teal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200507/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
38,251,000 |
| Chek |
1 |
201 |
Earth road |
0.94 [ 0.94 ] |
Km |
14,500,000 |
4.000 Width (m) |
2,511.000 Earth fill m3 |
13,601,000 |
| Sangkae |
2 |
203 |
Gravel road |
1.70 [ 1.70 ] |
Km |
14,500,000 |
4.000 Width (m) |
1,020.000 Earth fill m3 |
24,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,251,000 |
| Contract ID |
200507/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
12,441,400 |
| Prey Chambak |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,355,175 |
0.600 Diameter (m) |
5.000 Length (m) |
4,065,525 |
| Prey Chambak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Sangkae |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,355,175 |
0.600 Diameter (m) |
5.000 Length (m) |
2,710,350 |
| Poun Kak |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,355,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,710,400 |
| Chek |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,355,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,355,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,441,475 |
Svay Chrum, Doun Sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200508/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
20,410,000 |
| Chensa |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
15,700,000 |
4.000 Width (m) |
3,788.000 Earth fill m3 |
20,410,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,410,000 |
| Contract ID |
200508/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
3,811,500 |
| Kuoy |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,270,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,270,500 |
| Sour |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,270,500 |
0.600 Diameter (m) |
5.000 Length (m) |
2,541,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,811,500 |
Svay Chrum, Kouk Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200509/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
39,249,700 |
| Svat Prahut |
1 |
201 |
Earth road |
2.81 [ 2.81 ] |
Km |
13,948,010 |
4.000 Width (m) |
7,696.000 Earth fill m3 |
39,249,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,249,700 |
| Contract ID |
200509/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
13,360,000 |
| Kdompi |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Chambak Thloeng |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,450,000 |
| Svat Prahut |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kantuot Praong |
4 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kandal |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Doun Leaeb |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kandal |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,560,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,560,000 |
| Leach Chhuk |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,150,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,360,000 |
Svay Chrum, Kraol Kou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200510/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
24,380,000 |
| Ruessei Chuor Tboung |
1 |
201 |
Earth road |
3.21 [ 3.21 ] |
Km |
7,597,382 |
4.000 Width (m) |
3,641.000 Earth fill m3 |
24,380,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,380,000 |
| Contract ID |
200510/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
6,323,200 |
| Ruessei Chuor Tboung |
1 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
3,161,600 |
0.800 Diameter (m) |
5.000 Length (m) |
6,323,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,323,200 |
Svay Chrum, Kruos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200511/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
30,914,700 |
| Thna |
1 |
201 |
Earth road |
2.41 [ 2.41 ] |
Km |
12,833,001 |
4.000 Width (m) |
5,999.000 Earth fill m3 |
30,914,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,914,700 |
Svay Chrum, Pouthi Reach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200512/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
21,600,000 |
| Prey Damloung |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
13,500,000 |
4.000 Width (m) |
4,688.000 Earth fill m3 |
21,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,600,000 |
| Contract ID |
200512/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
2,620,000 |
| Prey Damloung |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,620,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,620,000 |
Svay Chrum, Svay Angk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200513/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
22,527,900 |
| Svay Ph'aem |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
15,018,600 |
4.000 Width (m) |
4,081.000 Earth fill m3 |
22,527,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,527,900 |
Svay Chrum, Svay Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200514/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
11,936,420 |
| Trabaek |
1 |
201 |
Earth road |
1.22 [ 1.22 ] |
Km |
9,800,000 |
3.000 Width (m) |
2,115.000 Earth fill m3 |
11,936,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,936,400 |
| Contract ID |
200514/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
8,182,900 |
| Trabaek |
1 |
220 |
Box culvert (general) |
1.00 [ 1.00 ] |
Place |
7,000,000 |
2.000 Total Span (m) |
4.500 Width(m) |
7,000,000 |
| Thma Sa |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,182,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,182,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,182,900 |
Svay Chrum, Svay Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200515/04/01 |
TSO |
Mey Sambatt |
Project Type |
Irrigation |
47,081,000 |
| Traok Touch |
1 |
420 |
Canal |
4.45 [ 4.45 ] |
Km |
10,580,000 |
1.450 Depth (m) |
14,432.000 Volume (m3) |
47,081,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,081,000 |
| Contract ID |
200515/04/02 |
TSO |
Mey Sambatt |
Project Type |
Irrigation |
8,640,000 |
| Dak Po |
1 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,140,000 |
| Tuol Trea |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,560,000 |
0.600 Diameter (m) |
8.000 Length (m) |
3,120,000 |
| Chamreh |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,640,000 |
Svay Chrum, Svay Yea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200516/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
24,500,000 |
| Prey Ph'ong |
1 |
201 |
Earth road |
2.05 [ 2.05 ] |
Km |
11,962,891 |
4.000 Width (m) |
4,688.000 Earth fill m3 |
24,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,500,000 |
| Contract ID |
200516/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
4,050,000 |
| Sikar |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,667,640 |
0.600 Diameter (m) |
7.000 Length (m) |
1,667,640 |
| Prey Ph'ong |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,191,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,382,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,050,040 |
Svay Chrum, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200517/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
11,170,000 |
| Doun Tong |
1 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
12,564,679 |
4.000 Width (m) |
1,947.000 Earth fill m3 |
11,170,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,170,000 |
| Contract ID |
200517/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
9,485,400 |
| Ampov Prey |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,889,800 |
0.800 Diameter (m) |
11.000 Length (m) |
4,889,800 |
| Thum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,229,800 |
0.600 Diameter (m) |
5.000 Length (m) |
1,229,800 |
| Snay Kreang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,229,776 |
0.600 Diameter (m) |
5.000 Length (m) |
1,229,776 |
| Samdei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,112,990 |
0.600 Diameter (m) |
4.000 Length (m) |
1,112,990 |
| Samdei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,023,000 |
0.600 Diameter (m) |
3.000 Length (m) |
1,023,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,485,366 |
Svay Rieng, Svay Rieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200601/04/01 |
TSO |
Prum Chan |
Project Type |
Urban transport |
23,600,500 |
| Veal Yon |
1 |
203 |
Gravel road |
0.37 [ 0.37 ] |
Km |
16,214,477 |
5.000 Width (m) |
3,289.000 Earth fill m3 |
6,048,000 |
| Veal Yon |
2 |
201 |
Earth road |
0.37 [ 0.37 ] |
Km |
47,057,641 |
5.000 Width (m) |
3,289.000 Earth fill m3 |
17,552,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,600,500 |
| Contract ID |
200601/04/02 |
TSO |
Prum Chan |
Project Type |
Urban transport |
7,042,000 |
| Veal Yon |
1 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
1,173,673 |
0.600 Diameter (m) |
6.000 Length (m) |
7,042,038 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,042,038 |
Svay Rieng, Prey Chhlak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200602/04/01 |
TSO |
Prum Chan |
Project Type |
Urban transport |
8,569,600 |
| Suon Thmei |
1 |
203 |
Gravel road |
0.28 [ 0.28 ] |
Km |
12,975,265 |
4.000 Width (m) |
726.000 Earth fill m3 |
3,672,000 |
| Suon Thmei |
2 |
201 |
Earth road |
0.28 [ 0.28 ] |
Km |
17,306,007 |
4.000 Width (m) |
726.000 Earth fill m3 |
4,897,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,569,600 |
| Contract ID |
200602/04/02 |
TSO |
Prum Chan |
Project Type |
Urban transport |
6,630,900 |
| Prey Chhlak |
1 |
201 |
Earth road |
0.43 [ 0.43 ] |
Km |
15,384,919 |
4.000 Width (m) |
1,250.000 Earth fill m3 |
6,630,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,630,900 |
Svay Rieng, Koy Trabaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200603/04/01 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
7,000,000 |
| Koy Trabaek |
1 |
203 |
Gravel road |
0.49 [ 0.49 ] |
Km |
14,373,717 |
4.000 Width (m) |
292.000 Earth fill m3 |
7,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,000,000 |
| Contract ID |
200603/04/02 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
4,591,600 |
| Koy Trabaek |
1 |
203 |
Gravel road |
0.09 [ 0.09 ] |
Km |
16,483,871 |
4.000 Width (m) |
70.000 Earth fill m3 |
1,533,000 |
| Koy Trabaek |
2 |
201 |
Earth road |
0.09 [ 0.09 ] |
Km |
32,888,172 |
5.000 Width (m) |
493.000 Earth fill m3 |
3,058,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,591,600 |
| Contract ID |
200603/04/03 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
1,021,600 |
| Koy Trabaek |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,021,600 |
0.600 Diameter (m) |
4.000 Length (m) |
1,021,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,021,600 |
Svay Rieng, Pou Ta Hao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200604/04/01 |
TSO |
Prum Chan |
Project Type |
Rural Transport |
20,265,200 |
| Kbal Spean |
1 |
203 |
Gravel road |
0.48 [ 0.48 ] |
Km |
15,000,000 |
5.000 Width (m) |
363.000 Earth fill m3 |
7,260,000 |
| La |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,400,000 |
| Kbal Spean |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
6.000 Length (m) |
4,200,000 |
| Kbal Spean |
4 |
201 |
Earth road |
0.48 [ 0.48 ] |
Km |
15,300,000 |
5.000 Width (m) |
673.000 Earth fill m3 |
7,405,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,265,200 |
Svay Teab, Chrak Mtes
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200701/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
23,650,000 |
| Bat Sloek |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,800,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,800,000 |
| Thnal Totueng |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
5.000 Length (m) |
5,700,000 |
| Prey Phdau |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Thlok |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Kampout Pras |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
7.000 Length (m) |
2,000,000 |
| Chrak Mtes |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Chrak Mtes |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,450,000 |
| Prey Tob |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Dambouk Chuor |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Tuol Ampil |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Veal |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Kampout Skear |
12 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,650,000 |
Svay Teab, Kokir Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200702/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
18,336,500 |
| Bat Thang |
1 |
201 |
Earth road |
1.69 [ 1.69 ] |
Km |
10,850,000 |
4.000 Width (m) |
4,221.000 Earth fill m3 |
18,336,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,336,500 |
| Contract ID |
200702/04/02 |
TSO |
Prak Dara |
Project Type |
Education |
33,600,000 |
| Sangkom |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
16,800,000 |
16.000 Length (m) |
9.000 Width (m) |
33,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,600,000 |
| Contract ID |
200702/04/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
3,840,000 |
| Bat Thang |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,280,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,840,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,840,000 |
Svay Teab, Kandieng Reay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200703/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
20,600,000 |
| Chub |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
20,600,000 |
4.000 Total Span (m) |
4.000 Width (m) |
20,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,600,000 |
| Contract ID |
200703/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
2,360,000 |
| Prasoutr Ti Pir |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,100,000 |
| Prasoutr Ti Pir |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,260,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,260,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,360,000 |
Svay Teab, Monourom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200704/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
11,491,200 |
| Ou Ta Mou |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,183,400 |
0.600 Diameter (m) |
7.000 Length (m) |
2,183,400 |
| Monourom |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,354,200 |
1.000 Diameter (m) |
7.000 Length (m) |
4,354,200 |
| Monourom |
3 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
2,476,800 |
0.800 Diameter (m) |
7.000 Length (m) |
4,953,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,491,200 |
| Contract ID |
200704/04/02 |
TSO |
Prak Dara |
Project Type |
Irrigation |
2,699,600 |
| Ou Ta Mou |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,699,600 |
0.800 Diameter (m) |
5.000 Width (m) |
2,699,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,699,600 |
| Contract ID |
200704/04/03 |
TSO |
Prak Dara |
Project Type |
Irrigation |
12,499,200 |
| Monourom |
1 |
420 |
Canal |
1.55 [ 1.55 ] |
Km |
8,064,000 |
0.900 Depth (m) |
6,884.000 Volume (m3) |
12,499,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,499,200 |
Svay Teab, Popeaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200705/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
17,702,900 |
| Thlok Pring |
1 |
201 |
Earth road |
2.11 [ 2.11 ] |
Km |
8,390,000 |
4.000 Width (m) |
3,827.000 Earth fill m3 |
17,702,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,702,900 |
| Contract ID |
200705/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
23,900,000 |
| Thnal Kaeng |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
23,900,000 |
4.000 Total Span (m) |
4.000 Width (m) |
23,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,900,000 |
| Contract ID |
200705/04/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
11,748,000 |
| Thlok Pring |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,220,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,660,000 |
| Thlok Pring |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,022,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,066,000 |
| Kampong Roteh |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,022,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,022,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,748,000 |
Svay Teab, Prey Ta Ei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200706/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
15,000,000 |
| Trapeang Sbov |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
11,538,462 |
4.000 Width (m) |
2,652.000 Earth fill m3 |
15,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,000,000 |
| Contract ID |
200706/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
2,624,000 |
| Trapeang Sbov |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,312,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,624,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,624,000 |
Svay Teab, Prasout
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200707/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
24,745,200 |
| Angk Ta Mouk |
1 |
201 |
Earth road |
2.75 [ 2.75 ] |
Km |
8,998,255 |
4.000 Width (m) |
4,339.000 Earth fill m3 |
24,745,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,745,200 |
| Contract ID |
200707/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
11,950,000 |
| Pou Vong |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Prey Tuol |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Prey Ta Yueng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Prey Totueng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Prey Totueng |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Prey Rumduol |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Chheu Teal |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Angk Ta Mouk |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Angk Ta Mouk |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,950,000 |
Svay Teab, Romeang Thkaol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200708/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
16,598,000 |
| Kranhung |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
8,299,000 |
4.000 Width (m) |
3,606.000 Earth fill m3 |
16,598,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,598,000 |
| Contract ID |
200708/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
5,247,800 |
| Kranhung |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,148,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,148,200 |
| Kranhung |
2 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
2,049,800 |
0.800 Diameter (m) |
5.000 Length (m) |
4,099,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,247,800 |
Svay Teab, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200709/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
10,900,000 |
| Tuol Angkob |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
10,900,000 |
5.000 Total Span (m) |
3.000 Width (m) |
10,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,900,000 |
| Contract ID |
200709/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
12,047,700 |
| Sambuor |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,030,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,030,000 |
| Sangkruoh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,030,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,030,000 |
| Trapeang Ampil |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,030,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,030,000 |
| Prey Samphor |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,046,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,046,000 |
| Prey Samphor |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,085,100 |
0.600 Diameter (m) |
6.000 Length (m) |
1,085,100 |
| Prey Totueng |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,085,100 |
0.600 Diameter (m) |
6.000 Length (m) |
2,170,200 |
| Prey Samphor |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,328,200 |
0.800 Diameter (m) |
5.000 Length (m) |
2,328,200 |
| Ou K'am |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,328,200 |
0.800 Diameter (m) |
5.000 Length (m) |
2,328,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,047,700 |
Svay Teab, Sangkhoar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200710/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
16,920,000 |
| Chambak Peam |
1 |
201 |
Earth road |
2.35 [ 2.35 ] |
Km |
7,200,000 |
4.000 Width (m) |
3,099.000 Earth fill m3 |
16,920,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,920,000 |
| Contract ID |
200710/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
7,789,600 |
| Chambak Peam |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,049,600 |
0.800 Diameter (m) |
5.000 Length (m) |
2,049,600 |
| Chambak Peam |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,690,400 |
1.000 Diameter (m) |
4.000 Length (m) |
3,690,400 |
| Thlok |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,049,600 |
0.800 Diameter (m) |
5.000 Length (m) |
2,049,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,789,600 |
Svay Teab, Svay Rumpea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200711/04/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
19,090,200 |
| Angkrong |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
11,229,529 |
4.000 Width (m) |
3,990.000 Earth fill m3 |
19,090,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,090,200 |
| Contract ID |
200711/04/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
8,640,600 |
| Kak |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
5,760,400 |
4.000 Width (m) |
1,395.000 Earth fill m3 |
8,640,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,640,600 |
| Contract ID |
200711/04/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
5,800,000 |
| Angkrong |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,433,350 |
0.600 Diameter (m) |
5.000 Length (m) |
4,300,050 |
| Kak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,800,050 |