Contract Outputs

Location: Svay Rieng Budget Year: 2004

Chantrea    Kampong Rou    Rumduol    Romeas Haek    Svay Chrum    Svay Rieng    Svay Teab   

Chantrea, Bati

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200101/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 17,588,000
Thnal Kaeng 1 201 Earth road 1.51 [ 1.51 ] Km 11,655,401 5.000 Width (m) 3,923.000 Earth fill m3 17,588,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,588,000
Contract ID 200101/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 12,743,600
Trapeang Phlong 1 201 Earth road 0.95 [ 0.95 ] Km 13,485,291 4.000 Width (m) 2,228.000 Earth fill m3 12,743,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,743,600
Contract ID 200101/04/03 TSO Chou Sontravipheavy Project Type Rural Transport 4,890,000
Thnal Kaeng 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,240,000 0.800 Diameter (m) 6.000 Length (m) 2,240,000
Trapeang Phlong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,325,000 0.600 Diameter (m) 5.000 Length (m) 2,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,890,000

Chantrea, Bavet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200102/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 28,541,600
Chrak Leav 1 201 Earth road 2.05 [ 2.05 ] Km 13,922,732 5.000 Width (m) 5,743.000 Earth fill m3 28,541,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,541,600

Chantrea, Chantrea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200103/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 23,945,200
Saenta 1 201 Earth road 2.96 [ 2.96 ] Km 8,078,677 4.000 Width (m) 4,424.000 Earth fill m3 23,945,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,945,200
Contract ID 200103/04/02 TSO Chou Sontravipheavy Project Type Irrigation 16,384,000
Saenta 1 420 Canal 0.64 [ 0.64 ] Km 25,600,000 2.960 Depth (m) 9,093.000 Volume (m3) 16,384,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,384,000

Chantrea, Chres

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200104/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 14,094,000
Trapeang Thlok 1 201 Earth road 1.47 [ 1.47 ] Km 9,568,228 4.000 Width (m) 2,875.000 Earth fill m3 14,094,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,094,000
Contract ID 200104/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 2,670,000
Trapeang Thlok 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,335,000 0.600 Diameter (m) 5.000 Length (m) 2,670,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,670,000
Contract ID 200104/04/03 TSO Chou Sontravipheavy Project Type Rural Transport 20,061,400
Banla S'et 1 201 Earth road 1.32 [ 1.32 ] Km 15,152,115 4.000 Width (m) 3,611.000 Earth fill m3 20,061,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,061,400

Chantrea, Me Sa Thngak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200105/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 18,879,700
Baray 1 201 Earth road 1.29 [ 1.29 ] Km 14,635,426 4.000 Width (m) 3,373.000 Earth fill m3 18,879,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,879,700
Contract ID 200105/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 2,640,000
Baray 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,320,000 0.600 Diameter (m) 5.000 Length (m) 1,320,000
Svay Kuy 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,320,000 0.600 Diameter (m) 5.000 Length (m) 1,320,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,640,000

Chantrea, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200106/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 14,000,000
Kandal 1 201 Earth road 1.05 [ 1.05 ] Km 13,333,333 5.000 Width (m) 14,998.000 Earth fill m3 14,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,000,000
Contract ID 200106/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 2,224,100
Kandal 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,224,100 0.800 Diameter (m) 6.000 Length (m) 2,224,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,224,100

Chantrea, Prey Angkunh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200107/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 18,403,700
Kouk Lvieng 1 201 Earth road 1.51 [ 1.51 ] Km 12,204,045 4.000 Width (m) 3,602.000 Earth fill m3 18,403,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,403,700

Chantrea, Prey Kokir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200108/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 16,774,234
Trapeang Bon 1 201 Earth road 1.05 [ 1.05 ] Km 15,975,429 4.000 Width (m) 2,384.000 Earth fill m3 16,774,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,774,200
Contract ID 200108/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 1,310,000
Trapeang Bon 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,310,000 0.600 Diameter (m) 5.000 Length (m) 1,310,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,310,000

Chantrea, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200109/04/01 TSO Chou Sontravipheavy Project Type Rural Transport 16,106,000
Kaoh Kban Kandal 1 201 Earth road 1.00 [ 1.00 ] Km 16,106,000 4.000 Width (m) 3,171.000 Earth fill m3 16,106,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,106,000
Contract ID 200109/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 19,383,800
Kaoh Kban Kandal 1 201 Earth road 1.26 [ 1.26 ] Km 15,359,588 4.000 Width (m) 3,469.000 Earth fill m3 19,383,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,383,800
Contract ID 200109/04/03 TSO Chou Sontravipheavy Project Type Rural Transport 5,439,700
Kaoh Kban Kandal 1 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,359,920 0.600 Diameter (m) 5.000 Length (m) 5,439,680
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,439,680

Chantrea, Tuol Sdei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200110/04/01 TSO Chou Sontravipheavy Project Type Irrigation 16,955,800
Tuol Sdei 1 420 Canal 0.92 [ 1.15 ] Km 14,744,174 1.990 Depth (m) 8,771.000 Volume (m3) 16,955,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,955,800
Contract ID 200110/04/02 TSO Chou Sontravipheavy Project Type Rural Transport 3,900,000
Tuol Sdei 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,900,000 0.800 Diameter (m) 6.000 Length (m) 3,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,900,000

Kampong Rou, Banteay Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200201/04/01 TSO Sao Sam Oeun Project Type Rural Transport 19,840,000
Pou Krouch 1 201 Earth road 0.90 [ 1.24 ] Km 16,000,000 4.000 Width (m) 6,006.000 Earth fill m3 19,840,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,840,000

Kampong Rou, Nhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200202/04/01 TSO Sao Sam Oeun Project Type Rural Transport 16,625,000
Trapeang Trav 1 201 Earth road 1.75 [ 1.75 ] Km 9,500,000 4.000 Width (m) 4,639.000 Earth fill m3 16,625,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,625,000
Contract ID 200202/04/02 TSO Sao Sam Oeun Project Type Rural Transport 2,986,600
Svay anat 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,190,200 0.600 Diameter (m) 5.000 Length (m) 1,190,200
Trapeang Trav 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,796,400 0.800 Diameter (m) 5.000 Length (m) 1,796,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,986,600

Kampong Rou, Ksetr

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200203/04/01 TSO Sao Sam Oeun Project Type Rural Transport 25,500,000
Srama 1 201 Earth road 2.00 [ 2.00 ] Km 12,750,000 4.000 Width (m) 5,283.000 Earth fill m3 25,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Kampong Rou, Preah Ponlea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200204/04/01 TSO Sao Sam Oeun Project Type Rural Transport 17,216,000
Traok 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,395,000 0.600 Diameter (m) 7.000 Length (m) 2,790,000
Ou Doun am 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Angk Kduoch 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Tradaet 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Trapeang Leach 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,580,000 1.000 Diameter (m) 5.000 Length (m) 2,580,000
Pring Chrum 6 211 Single pipe culvert 2.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Preah Ponlea 7 211 Single pipe culvert 2.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Trapeang Run 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,580,000 1.000 Diameter (m) 5.000 Length (m) 2,580,000
Preah Ponlea 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,183,000 0.600 Diameter (m) 4.000 Length (m) 1,183,000
Pring Chrum 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,183,000 0.600 Diameter (m) 4.000 Length (m) 1,183,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,216,000

Kampong Rou, Prey Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200205/04/01 TSO Sao Sam Oeun Project Type Irrigation 14,000,000
Ta Koeng 1 420 Canal 1.60 [ 1.60 ] Km 8,750,000 1.700 Depth (m) 9,564.000 Volume (m3) 14,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,000,000

Kampong Rou, Reach Montir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200206/04/01 TSO Sao Sam Oeun Project Type Rural Transport 14,000,000
Phnum Srov 1 201 Earth road 1.75 [ 1.75 ] Km 8,000,000 4.000 Width (m) 4,066.000 Earth fill m3 14,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,000,000
Contract ID 200206/04/02 TSO Sao Sam Oeun Project Type Rural Transport 1,780,000
Daek Phleung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,780,000 0.800 Diameter (m) 5.000 Length (m) 1,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,780,000

Kampong Rou, Samlei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200207/04/01 TSO Prum Chan Project Type Rural Transport 10,366,500
Svay 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,334,500 0.600 Diameter (m) 5.000 Length (m) 1,334,500
Svay Chek 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,334,500 0.600 Diameter (m) 5.000 Length (m) 2,669,000
Ta Pao 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,334,500 0.600 Diameter (m) 5.000 Length (m) 1,334,500
Ta Pao 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,847,000 0.800 Diameter (m) 5.000 Length (m) 1,847,000
Samlei Khang Cheung 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,334,500 0.600 Diameter (m) 5.000 Length (m) 1,334,500
Prey Phniet 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,847,000 0.800 Diameter (m) 5.000 Length (m) 1,847,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,366,500
Contract ID 200207/04/02 TSO Prum Chan Project Type Rural Transport 12,887,000
Prey Mnoas 1 201 Earth road 1.32 [ 1.32 ] Km 9,800,000 4.000 Width (m) 2,580.000 Earth fill m3 12,887,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,887,000

Kampong Rou, Samyaong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200208/04/01 TSO Sao Sam Oeun Project Type Irrigation 13,000,000
Samyaong 1 420 Canal 1.10 [ 1.10 ] Km 11,818,182 2.300 Depth (m) 8,908.000 Volume (m3) 13,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,000,000

Kampong Rou, Svay Ta Yean

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200209/04/01 TSO Prum Chan Project Type Rural Transport 22,535,000
Ream Chou 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,360,000 0.600 Diameter (m) 6.000 Length (m) 2,720,000
Prey Praeus 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,360,000 0.600 Diameter (m) 6.000 Length (m) 2,720,000
Sek Chrum 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,360,000 0.600 Diameter (m) 6.000 Length (m) 4,080,000
Prey Thlok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,360,000 0.600 Diameter (m) 6.000 Length (m) 1,360,000
Trapeang Trach 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,460,000 0.600 Diameter (m) 7.000 Length (m) 1,460,000
Prey Stieng 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,460,000 0.600 Diameter (m) 7.000 Length (m) 1,460,000
Prey Thlok 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,460,000 0.600 Diameter (m) 7.000 Length (m) 1,460,000
Svay Ta Yean 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,360,000 0.600 Diameter (m) 6.000 Length (m) 1,360,000
Trapeang Trach 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,183,000 0.600 Diameter (m) 5.000 Length (m) 1,183,000
Bos 10 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,183,000 0.600 Diameter (m) 5.000 Length (m) 2,366,000
Pou Thmei 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,183,000 0.600 Diameter (m) 5.000 Length (m) 1,183,000
Daeum Pou 12 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,183,000 0.600 Diameter (m) 5.000 Length (m) 1,183,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,535,000

Kampong Rou, Svay Toea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200210/04/01 TSO Prum Chan Project Type Rural Transport 17,779,600
Svay Toea 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 17,779,600 4.000 4.000 17,779,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,779,600

Kampong Rou, Thmei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200211/04/01 TSO Sao Sam Oeun Project Type Rural Transport 11,680,000
Veal M'am 1 201 Earth road 0.80 [ 0.80 ] Km 14,600,000 4.000 Width (m) 2,391.000 Earth fill m3 11,680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,680,000
Contract ID 200211/04/02 TSO Sao Sam Oeun Project Type Rural Transport 6,854,000
Veal M'am 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,904,000 1.000 Diameter (m) 5.000 Length (m) 2,904,000
Veal M'am 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,950,000 1.000 Diameter (m) 5.000 Length (m) 3,950,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,854,000

Kampong Rou, Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200212/04/01 TSO Sao Sam Oeun Project Type Rural Transport 16,599,000
Bon 1 201 Earth road 1.30 [ 1.30 ] Km 12,768,462 4.000 Width (m) 3,321.000 Earth fill m3 16,599,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,599,000
Contract ID 200212/04/02 TSO Sao Sam Oeun Project Type Rural Transport 4,871,800
Bon 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,349,200 0.600 Diameter (m) 5.000 Length (m) 2,698,400
Pou M'am 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,173,400 0.800 Diameter (m) 6.000 Length (m) 2,173,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,871,800

Rumduol, Bos Mon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200301/04/01 TSO On Yanna Project Type Rural Transport 4,921,400
Bos Phlang 1 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,230,340 0.600 Diameter (m) 5.000 Length (m) 4,921,360
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,921,360
Contract ID 200301/04/02 TSO On Yanna Project Type Rural Transport 19,226,600
Bos Phlang 1 201 Earth road 1.70 [ 2.34 ] Km 8,220,009 4.000 Width (m) 4,875.000 Earth fill m3 19,226,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,226,600

Rumduol, Thmea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200302/04/01 TSO Sen Sovann Project Type Rural Transport 16,836,300
Thmea 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,263,200 0.600 Diameter (m) 5.000 Length (m) 2,526,400
Trapeang Poun 2 212 Double pipe culvert 2.00 [ 3.00 ] Place 3,085,700 0.800 Diameter (m) 5.000 Length (m) 9,257,100
Boeng Kaek 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,263,200 0.600 Diameter (m) 5.000 Length (m) 2,526,400
Preaek Tnaot 4 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,263,200 0.600 Diameter (m) 5.000 Length (m) 2,526,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,836,300
Contract ID 200302/04/02 TSO Sen Sovann Project Type Rural Transport 13,780,000
Trapeang Poun 1 201 Earth road 1.30 [ 1.30 ] Km 10,600,000 4.000 Width (m) 3,461.000 Earth fill m3 13,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,780,000

Rumduol, Chak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200303/04/01 TSO On Yanna Project Type Rural Transport 20,248,000
Chak 1 211 Single pipe culvert 4.00 [ 6.00 ] Place 1,124,900 0.600 Diameter (m) 5.000 Length (m) 6,749,400
Svay Rung 2 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,124,884 0.600 Diameter (m) 5.000 Length (m) 3,374,652
Chh'oeng Pos 3 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,124,884 0.600 Diameter (m) 5.000 Length (m) 3,374,652
Prey Keav 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,124,884 0.600 Diameter (m) 5.000 Length (m) 2,249,768
Leak Chea 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,124,884 0.600 Diameter (m) 5.000 Length (m) 2,249,768
Chambak Kaong 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,124,884 0.600 Diameter (m) 5.000 Length (m) 2,249,768
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,248,008

Rumduol, Chrung Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200304/04/01 TSO On Yanna Project Type Rural Transport 22,193,000
Trapeang Kruos 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 2,220,200
Trapeang Kraet 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,215,700 0.800 Diameter (m) 5.000 Length (m) 2,215,700
Preah Angk Kaev 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 2,220,200
Tuol Trea 4 211 Single pipe culvert 2.00 [ 4.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 4,440,400
Tuol Sala 5 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 3,330,300
Krouch 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 2,220,200
Neang Chan 7 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,110,100 0.600 Diameter (m) 5.000 Length (m) 3,330,300
Krouch 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,215,700 0.800 Diameter (m) 5.000 Length (m) 2,215,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,193,000

Rumduol, Kampong Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200305/04/01 TSO Sen Sovann Project Type Rural Transport 18,270,300
Tuol Chres 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,258,287 0.600 Diameter (m) 5.000 Length (m) 1,258,287
Svay Rolum 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,258,287 0.600 Diameter (m) 5.000 Length (m) 2,516,574
Kampong Ampil 3 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,258,287 0.600 Diameter (m) 5.000 Length (m) 3,774,861
Trapeang Damrei 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,258,287 0.600 Diameter (m) 5.000 Length (m) 2,516,574
Ta Sak 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,258,250 0.600 Diameter (m) 5.000 Length (m) 2,516,500
Ta Sak 6 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,895,800 0.800 Diameter (m) 5.000 Length (m) 5,687,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,270,196

Rumduol, Meun Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200306/04/01 TSO On Yanna Project Type Rural Transport 32,152,400
Haek Samnanh 1 201 Earth road 2.30 [ 3.50 ] Km 9,186,400 4.000 Width (m) 7,284.000 Earth fill m3 32,152,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,152,400
Contract ID 200306/04/02 TSO On Yanna Project Type Rural Transport 10,200,000
Haek Samnanh 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Prey Boeng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Trapeang Kandal 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Meun Chey 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Chong Preaek 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,200,000

Rumduol, Pong Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200307/04/01 TSO On Yanna Project Type Rural Transport 17,882,900
Tuol Ta Kaev 1 201 Earth road 2.18 [ 2.98 ] Km 6,000,973 4.000 Width (m) 3,980.000 Earth fill m3 17,882,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,882,900
Contract ID 200307/04/02 TSO On Yanna Project Type Rural Transport 7,273,600
Tuol Ta Kaev 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,818,400 0.800 Diameter (m) 5.000 Length (m) 1,818,400
Preysrakoum 2 211 Single pipe culvert 3.00 [ 1.00 ] Place 1,818,400 0.800 Diameter (m) 5.000 Length (m) 1,818,400
Andoung Krasang 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,818,400 0.800 Diameter (m) 5.000 Length (m) 3,636,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,273,600

Rumduol, Sangkae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200308/04/01 TSO On Yanna Project Type Rural Transport 18,144,400
Svay Rumpea 1 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 4,269,276
Poun 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 1,067,319
Ta Chou 3 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 3,201,957
Ta Naeng 4 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 4,269,276
Tuol Chambak 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 1,067,319
Trapeang Run 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 1,067,319
Ta Paong 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 1,067,319
Kouk Srama 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,067,319 0.600 Diameter (m) 4.000 Length (m) 2,134,638
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,144,423

Rumduol, Svay Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200309/04/01 TSO On Yanna Project Type Rural Transport 32,124,300
Svay Chek 1 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,125,100 0.600 Diameter (m) 4.000 Length (m) 4,500,400
Anlong Spean 2 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,125,100 0.600 Diameter (m) 4.000 Length (m) 4,500,400
Thmei 3 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,214,500 0.600 Diameter (m) 5.000 Length (m) 3,643,500
Roung Damrei 4 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,125,100 0.600 Diameter (m) 4.000 Length (m) 4,500,400
Ba Krong 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,125,100 0.600 Diameter (m) 4.000 Length (m) 3,375,300
Kandal 6 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,300,900 0.600 Diameter (m) 6.000 Length (m) 3,902,700
Thmei 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,688,100 0.800 Diameter (m) 5.000 Length (m) 2,688,100
Popul 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,899,500 0.800 Diameter (m) 5.000 Length (m) 3,799,000
Popul 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,214,500 0.600 Diameter (m) 5.000 Length (m) 1,214,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,124,300
Contract ID 200309/04/02 TSO On Yanna Project Type Rural Transport 20,990,000
Thmei 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 20,990,000 4.000 Total Span (m) 4.000 Width (m) 20,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,990,000

Rumduol, Thna Thnong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200310/04/01 TSO On Yanna Project Type Rural Transport 20,516,600
Trapeang Thma 1 201 Earth road 2.41 [ 3.41 ] Km 6,016,598 4.000 Width (m) 4,652.000 Earth fill m3 20,516,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,516,600
Contract ID 200310/04/02 TSO On Yanna Project Type Rural Transport 17,767,500
Chamnat Trach 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,184,500 0.600 Diameter (m) 5.000 Length (m) 3,553,500
Thmei 2 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,184,500 0.600 Diameter (m) 5.000 Length (m) 3,553,500
Thnong 3 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,184,500 0.600 Diameter (m) 5.000 Length (m) 3,553,500
Thna 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,184,500 0.600 Diameter (m) 5.000 Length (m) 3,553,500
Trapeang Thma 5 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,184,500 0.600 Diameter (m) 5.000 Length (m) 3,553,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,767,500

Romeas Haek, Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200401/04/01 TSO Soem Saravuth Project Type Rural Transport 9,250,000
Trapeang Bei 1 212 Double pipe culvert 2.00 [ 2.00 ] Place 4,625,000 1.000 Diameter (m) 5.000 Length (m) 9,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,250,000
Contract ID 200401/04/02 TSO Soem Saravuth Project Type Rural Transport 11,662,200
Traok 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 11,662,200 5.000 Total Span (m) 4.000 Width (m) 11,662,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,662,200

Romeas Haek, Andoung Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200402/04/01 TSO Sen Sovann Project Type Rural Transport 23,180,000
Trapeang Bos 1 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 2,440,000
Thmei 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 3,660,000
Trapeang Tbal 3 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 4,880,000
Roung Snao 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 3,660,000
Ream Sena 5 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 3,660,000
Trapeang Choar 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 2,440,000
Bos Kokir 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,220,000 0.600 Diameter (m) 4.000 Length (m) 2,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,180,000

Romeas Haek, Andoung Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200403/04/01 TSO Soem Saravuth Project Type Rural Transport 20,887,000
Tuol 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,520,000 0.600 Diameter (m) 5.000 Length (m) 1,520,000
Tuol 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 4,040,000 1.000 Diameter (m) 5.000 Length (m) 8,080,000
Chik Dei 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 11,287,000 2.000 Total Span (m) 5.000 Width(m) 11,287,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,887,000

Romeas Haek, Angk Prasrae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200404/04/01 TSO Sen Sovann Project Type Rural Transport 21,025,000
Trapeang Thum 1 201 Earth road 1.45 [ 1.45 ] Km 14,500,000 4.000 Width (m) 4,007.000 Earth fill m3 21,025,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,025,000
Contract ID 200404/04/02 TSO Sen Sovann Project Type Rural Transport 26,240,800
K'am 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 26,240,800 6.000 Total Span (m) 4.000 Width (m) 26,240,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,240,800

Romeas Haek, Chantrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200405/04/01 TSO Sen Sovann Project Type Rural Transport 23,250,000
Balangk Chea 1 201 Earth road 1.55 [ 1.55 ] Km 15,000,000 4.000 Width (m) 4,600.000 Earth fill m3 23,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,250,000
Contract ID 200405/04/02 TSO Sen Sovann Project Type Rural Transport 5,961,900
Prey Roluos 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,490,500 0.600 Diameter (m) 5.000 Length (m) 2,981,000
Prey Totueng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,490,450 0.600 Diameter (m) 5.000 Length (m) 2,980,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,961,900

Romeas Haek, Chrey Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200406/04/01 TSO Soem Saravuth Project Type Rural Transport 24,650,000
Sandao 1 201 Earth road 1.45 [ 1.45 ] Km 17,000,000 4.000 Width (m) 5,224.000 Earth fill m3 24,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,650,000

Romeas Haek, Doung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200407/04/01 TSO Sen Sovann Project Type Rural Transport 30,940,000
Poun 1 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Svay Pok 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Trapeang Thum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,194,000 0.800 Diameter (m) 5.000 Length (m) 2,194,000
Trapeang Phlong 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,194,000 0.800 Diameter (m) 5.000 Length (m) 2,194,000
Poun 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,194,000 0.800 Diameter (m) 5.000 Length (m) 6,582,000
Trapeang Kralanh 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,194,000 0.800 Diameter (m) 5.000 Length (m) 4,388,000
Svay Pok 7 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,194,000 0.800 Diameter (m) 5.000 Length (m) 6,582,000
Trapeang Svay 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Thmei 9 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,940,000

Romeas Haek, Kampong Trach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200408/04/01 TSO Sen Sovann Project Type Rural Transport 33,532,900
Kampong Trach 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 1,575,450
Ta Hang 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 4,726,350
Chong Ou 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 1,575,450
Prey Khcheay 4 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 6,301,800
Pramat Pram 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,575,500 0.600 Diameter (m) 5.000 Length (m) 1,575,500
Prey Kralanh 6 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 4,726,350
Khla Lout 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 3,150,900
Chheu Phleung 8 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,575,450 0.600 Diameter (m) 5.000 Length (m) 4,726,350
Ta Trav 9 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,725,000 0.800 Diameter (m) 5.000 Length (m) 1,725,000
Ta Khob 10 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,725,000 0.800 Diameter (m) 5.000 Length (m) 3,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,533,150

Romeas Haek, Kokir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200409/04/01 TSO Soem Saravuth Project Type Education 18,269,100
Kokir 1 320 Brick school (general) 3.00 [ 3.00 ] School room 6,089,700 24.000 Length (m) 9.000 Width (m) 18,269,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,269,100

Romeas Haek, Krasang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200410/04/01 TSO Soem Saravuth Project Type Rural Transport 23,900,000
Ta Menh 1 201 Earth road 2.00 [ 2.00 ] Km 11,950,000 4.000 Width (m) 4,320.000 Earth fill m3 23,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,900,000
Contract ID 200410/04/02 TSO Soem Saravuth Project Type Rural Transport 27,232,200
Prey Phtiek 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 3,025,800
Thmei 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 3,025,800
Smach 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 3,025,800
Thnong 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 1,512,900
Thlok Veay Ti Muoy 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 3,025,800
Thlok Veay Ti Pir 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 1,512,900
Trapeang Chrey 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 1,512,900
Ta Menh 8 211 Single pipe culvert 2.00 [ 4.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 6,051,600
Krasang 9 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,512,900 0.600 Diameter (m) 5.000 Length (m) 4,538,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,232,200

Romeas Haek, Mukh Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200411/04/01 TSO Soem Saravuth Project Type Rural Transport 22,540,000
Mukh Da 1 201 Earth road 1.25 [ 1.25 ] Km 12,702,152 4.000 Width (m) 3,010.000 Earth fill m3 15,877,690
Bos Kabbas 2 201 Earth road 1.22 [ 1.22 ] Km 5,460,902 4.000 Width (m) 1,263.000 Earth fill m3 6,662,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,539,990
Contract ID 200411/04/02 TSO Soem Saravuth Project Type Rural Transport 21,096,000
Mukh Da 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 21,096,000 1.000 Total Span (m) 4.000 Width (m) 21,096,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,096,000

Romeas Haek, Mream

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200412/04/01 TSO Soem Saravuth Project Type Rural Transport 26,700,000
Boeng Phe 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 2,600,000
Mream Khang Cheung 2 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 3,900,000
Trapeang Choar 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Chrung Popel 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Tralach 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 2,600,000
Ta Tru 6 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 3,900,000
Chrung Popel 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Chrung Popel 8 212 Double pipe culvert 1.00 [ 1.00 ] Place 9,000,000 0.800 Diameter (m) 5.000 Length (m) 9,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,700,000

Romeas Haek, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200413/04/01 TSO Soem Saravuth Project Type Rural Transport 18,607,700
Preaek Tnaot 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,364,350 0.600 Diameter (m) 5.000 Length (m) 4,093,050
Souphi 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,364,350 0.600 Diameter (m) 5.000 Length (m) 1,364,350
Traok 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,364,350 0.600 Diameter (m) 5.000 Length (m) 2,728,700
Prey Kur 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,364,350 0.600 Diameter (m) 5.000 Length (m) 4,093,050
Prich 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,364,350 0.600 Diameter (m) 5.000 Length (m) 2,728,700
Preaek Tnaot 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,600,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,607,850

Romeas Haek, Sambatt Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200414/04/01 TSO Soem Saravuth Project Type Rural Transport 18,975,000
Tuol Srama 1 201 Earth road 1.10 [ 1.10 ] Km 17,250,000 4.000 Width (m) 4,190.000 Earth fill m3 18,975,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,975,000
Contract ID 200414/04/02 TSO Soem Saravuth Project Type Rural Transport 24,450,000
Tuol Srama 1 211 Single pipe culvert 6.00 [ 6.00 ] Place 1,542,000 0.600 Diameter (m) 5.000 Length (m) 9,252,000
Bet Ting 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,542,000 0.600 Diameter (m) 5.000 Length (m) 3,084,000
Lbaeuk 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,542,000 0.600 Diameter (m) 5.000 Length (m) 3,084,000
Lbaeuk 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,030,000 3.000 Total Span (m) 5.000 Width(m) 9,030,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,450,000

Romeas Haek, Trapeang Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200415/04/01 TSO Sen Sovann Project Type Rural Transport 25,154,500
Svay Tontuem 1 201 Earth road 1.35 [ 1.35 ] Km 18,632,963 4.000 Width (m) 4,876.000 Earth fill m3 25,154,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,154,500

Romeas Haek, Tras

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200416/04/01 TSO Soem Saravuth Project Type Rural Transport 24,811,900
Tras 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Ta Suos 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Popel 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Veal Veaeng 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Veal Tmat 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Bos 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Serei Ao 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Mreaks Teab 8 222 Double cell box culvert 1.00 [ 1.00 ] Place 12,311,900 2.000 Total Span (m) 5.000 Width(m) 12,311,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,811,900
Contract ID 200416/04/02 TSO Soem Saravuth Project Type Rural Transport 16,915,400
Tras 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 16,915,400 10.000 Total Span (m) 3.000 Width (m) 16,915,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,915,400

Svay Chrum, Angk Ta Sou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200501/04/01 TSO On Kea Project Type Rural Transport 15,773,200
Roka 1 201 Earth road 1.11 [ 1.11 ] Km 14,210,090 4.000 Width (m) 2,834.000 Earth fill m3 15,773,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,773,200
Contract ID 200501/04/02 TSO On Kea Project Type Rural Transport 7,054,900
Roka 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,274,120 0.600 Diameter (m) 5.000 Length (m) 2,548,240
Thma Pean 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,274,120 0.600 Diameter (m) 5.000 Length (m) 2,548,240
Chaeng Maeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,958,500 0.800 Diameter (m) 5.000 Length (m) 1,958,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,054,980

Svay Chrum, Basak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200502/04/01 TSO Mey Sambatt Project Type Rural Transport 10,850,000
Basak 1 201 Earth road 0.78 [ 0.78 ] Km 14,000,000 4.000 Width (m) 1,990.000 Earth fill m3 10,850,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,850,000
Contract ID 200502/04/02 TSO Mey Sambatt Project Type Education 36,291,700
Sala Rien 1 320 Brick school (general) 2.00 [ 2.00 ] School room 18,145,850 16.000 Length (m) 9.000 Width (m) 36,291,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,291,700
Contract ID 200502/04/03 TSO Mey Sambatt Project Type Rural Transport 11,500,000
Basak 1 211 Single pipe culvert 2.00 [ 6.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 7,500,000
Basak 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,500,000

Svay Chrum, Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200503/04/01 TSO Mey Sambatt Project Type Rural Transport 29,040,000
Thmei 1 201 Earth road 2.20 [ 2.20 ] Km 13,200,000 4.000 Width (m) 6,094.000 Earth fill m3 29,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,040,000
Contract ID 200503/04/02 TSO Mey Sambatt Project Type Rural Transport 9,261,000
Thmei 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,961,000 0.800 Diameter (m) 5.000 Length (m) 1,961,000
Thmei 2 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 6,000,000
Thmei 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 6.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,261,000

Svay Chrum, Chamlang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200504/04/01 TSO Mey Sambatt Project Type Rural Transport 12,936,000
Chambak Kuy 1 201 Earth road 1.16 [ 1.16 ] Km 11,200,000 4.000 Width (m) 2,362.000 Earth fill m3 12,936,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,936,000
Contract ID 200504/04/02 TSO Mey Sambatt Project Type Rural Transport 18,823,300
Chie Ruessei 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 18,823,300 1.500 Total span (m) 15.000 Width (m) 18,823,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,823,300

Svay Chrum, Ta Suos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200505/04/01 TSO Mey Sambatt Project Type Rural Transport 32,173,600
Ta Pa 1 201 Earth road 2.46 [ 2.46 ] Km 13,100,000 4.000 Width (m) 6,194.000 Earth fill m3 32,173,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,173,600

Svay Chrum, Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200506/04/01 TSO On Kea Project Type Rural Transport 20,444,400
Meloung 1 201 Earth road 1.19 [ 1.19 ] Km 17,136,966 4.000 Width (m) 3,018.000 Earth fill m3 20,444,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,444,400
Contract ID 200506/04/02 TSO On Kea Project Type Rural Transport 5,603,900
Chambak 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,865,170 0.800 Diameter (m) 5.000 Length (m) 1,865,170
Chambak 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,204,290 0.600 Diameter (m) 5.000 Length (m) 1,204,290
Meloung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,204,290 0.600 Diameter (m) 5.000 Length (m) 1,204,290
Chek 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,330,100 0.600 Diameter (m) 6.000 Length (m) 1,330,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,603,850

Svay Chrum, Chheu Teal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200507/04/01 TSO Mey Sambatt Project Type Rural Transport 38,251,000
Chek 1 201 Earth road 0.94 [ 0.94 ] Km 14,500,000 4.000 Width (m) 2,511.000 Earth fill m3 13,601,000
Sangkae 2 203 Gravel road 1.70 [ 1.70 ] Km 14,500,000 4.000 Width (m) 1,020.000 Earth fill m3 24,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,251,000
Contract ID 200507/04/02 TSO Mey Sambatt Project Type Rural Transport 12,441,400
Prey Chambak 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,355,175 0.600 Diameter (m) 5.000 Length (m) 4,065,525
Prey Chambak 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Sangkae 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,355,175 0.600 Diameter (m) 5.000 Length (m) 2,710,350
Poun Kak 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,355,200 0.600 Diameter (m) 5.000 Length (m) 2,710,400
Chek 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,355,200 0.600 Diameter (m) 5.000 Length (m) 1,355,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,441,475

Svay Chrum, Doun Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200508/04/01 TSO On Kea Project Type Rural Transport 20,410,000
Chensa 1 201 Earth road 1.30 [ 1.30 ] Km 15,700,000 4.000 Width (m) 3,788.000 Earth fill m3 20,410,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,410,000
Contract ID 200508/04/02 TSO On Kea Project Type Rural Transport 3,811,500
Kuoy 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,270,500 0.600 Diameter (m) 5.000 Length (m) 1,270,500
Sour 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,270,500 0.600 Diameter (m) 5.000 Length (m) 2,541,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,811,500

Svay Chrum, Kouk Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200509/04/01 TSO On Kea Project Type Rural Transport 39,249,700
Svat Prahut 1 201 Earth road 2.81 [ 2.81 ] Km 13,948,010 4.000 Width (m) 7,696.000 Earth fill m3 39,249,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,249,700
Contract ID 200509/04/02 TSO On Kea Project Type Rural Transport 13,360,000
Kdompi 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,240,000 0.600 Diameter (m) 5.000 Length (m) 1,240,000
Chambak Thloeng 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,150,000 0.600 Diameter (m) 4.000 Length (m) 3,450,000
Svat Prahut 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,240,000 0.600 Diameter (m) 5.000 Length (m) 1,240,000
Kantuot Praong 4 211 Single pipe culvert 2.00 [ 1.00 ] Place 1,240,000 0.600 Diameter (m) 5.000 Length (m) 1,240,000
Kandal 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,240,000 0.600 Diameter (m) 5.000 Length (m) 1,240,000
Doun Leaeb 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,240,000 0.600 Diameter (m) 5.000 Length (m) 1,240,000
Kandal 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,560,000 1.000 Diameter (m) 5.000 Length (m) 2,560,000
Leach Chhuk 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,150,000 0.600 Diameter (m) 4.000 Length (m) 1,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,360,000

Svay Chrum, Kraol Kou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200510/04/01 TSO Mey Sambatt Project Type Rural Transport 24,380,000
Ruessei Chuor Tboung 1 201 Earth road 3.21 [ 3.21 ] Km 7,597,382 4.000 Width (m) 3,641.000 Earth fill m3 24,380,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,380,000
Contract ID 200510/04/02 TSO Mey Sambatt Project Type Rural Transport 6,323,200
Ruessei Chuor Tboung 1 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,161,600 0.800 Diameter (m) 5.000 Length (m) 6,323,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,323,200

Svay Chrum, Kruos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200511/04/01 TSO Mey Sambatt Project Type Rural Transport 30,914,700
Thna 1 201 Earth road 2.41 [ 2.41 ] Km 12,833,001 4.000 Width (m) 5,999.000 Earth fill m3 30,914,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,914,700

Svay Chrum, Pouthi Reach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200512/04/01 TSO On Kea Project Type Rural Transport 21,600,000
Prey Damloung 1 201 Earth road 1.60 [ 1.60 ] Km 13,500,000 4.000 Width (m) 4,688.000 Earth fill m3 21,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,600,000
Contract ID 200512/04/02 TSO On Kea Project Type Rural Transport 2,620,000
Prey Damloung 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,310,000 0.600 Diameter (m) 5.000 Length (m) 2,620,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,620,000

Svay Chrum, Svay Angk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200513/04/01 TSO On Kea Project Type Rural Transport 22,527,900
Svay Ph'aem 1 201 Earth road 1.50 [ 1.50 ] Km 15,018,600 4.000 Width (m) 4,081.000 Earth fill m3 22,527,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,527,900

Svay Chrum, Svay Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200514/04/01 TSO Mey Sambatt Project Type Rural Transport 11,936,420
Trabaek 1 201 Earth road 1.22 [ 1.22 ] Km 9,800,000 3.000 Width (m) 2,115.000 Earth fill m3 11,936,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,936,400
Contract ID 200514/04/02 TSO Mey Sambatt Project Type Rural Transport 8,182,900
Trabaek 1 220 Box culvert (general) 1.00 [ 1.00 ] Place 7,000,000 2.000 Total Span (m) 4.500 Width(m) 7,000,000
Thma Sa 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,182,900 0.600 Diameter (m) 5.000 Length (m) 1,182,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,182,900

Svay Chrum, Svay Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200515/04/01 TSO Mey Sambatt Project Type Irrigation 47,081,000
Traok Touch 1 420 Canal 4.45 [ 4.45 ] Km 10,580,000 1.450 Depth (m) 14,432.000 Volume (m3) 47,081,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,081,000
Contract ID 200515/04/02 TSO Mey Sambatt Project Type Irrigation 8,640,000
Dak Po 1 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 4,140,000
Tuol Trea 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,560,000 0.600 Diameter (m) 8.000 Length (m) 3,120,000
Chamreh 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,380,000 0.600 Diameter (m) 5.000 Length (m) 1,380,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,640,000

Svay Chrum, Svay Yea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200516/04/01 TSO On Kea Project Type Rural Transport 24,500,000
Prey Ph'ong 1 201 Earth road 2.05 [ 2.05 ] Km 11,962,891 4.000 Width (m) 4,688.000 Earth fill m3 24,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,500,000
Contract ID 200516/04/02 TSO On Kea Project Type Rural Transport 4,050,000
Sikar 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,667,640 0.600 Diameter (m) 7.000 Length (m) 1,667,640
Prey Ph'ong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,191,200 0.600 Diameter (m) 5.000 Length (m) 2,382,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,050,040

Svay Chrum, Thlok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200517/04/01 TSO On Kea Project Type Rural Transport 11,170,000
Doun Tong 1 201 Earth road 0.89 [ 0.89 ] Km 12,564,679 4.000 Width (m) 1,947.000 Earth fill m3 11,170,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,170,000
Contract ID 200517/04/02 TSO On Kea Project Type Rural Transport 9,485,400
Ampov Prey 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,889,800 0.800 Diameter (m) 11.000 Length (m) 4,889,800
Thum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,229,800 0.600 Diameter (m) 5.000 Length (m) 1,229,800
Snay Kreang 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,229,776 0.600 Diameter (m) 5.000 Length (m) 1,229,776
Samdei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,112,990 0.600 Diameter (m) 4.000 Length (m) 1,112,990
Samdei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,023,000 0.600 Diameter (m) 3.000 Length (m) 1,023,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,485,366

Svay Rieng, Svay Rieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200601/04/01 TSO Prum Chan Project Type Urban transport 23,600,500
Veal Yon 1 203 Gravel road 0.37 [ 0.37 ] Km 16,214,477 5.000 Width (m) 3,289.000 Earth fill m3 6,048,000
Veal Yon 2 201 Earth road 0.37 [ 0.37 ] Km 47,057,641 5.000 Width (m) 3,289.000 Earth fill m3 17,552,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,600,500
Contract ID 200601/04/02 TSO Prum Chan Project Type Urban transport 7,042,000
Veal Yon 1 211 Single pipe culvert 6.00 [ 6.00 ] Place 1,173,673 0.600 Diameter (m) 6.000 Length (m) 7,042,038
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,042,038

Svay Rieng, Prey Chhlak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200602/04/01 TSO Prum Chan Project Type Urban transport 8,569,600
Suon Thmei 1 203 Gravel road 0.28 [ 0.28 ] Km 12,975,265 4.000 Width (m) 726.000 Earth fill m3 3,672,000
Suon Thmei 2 201 Earth road 0.28 [ 0.28 ] Km 17,306,007 4.000 Width (m) 726.000 Earth fill m3 4,897,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,569,600
Contract ID 200602/04/02 TSO Prum Chan Project Type Urban transport 6,630,900
Prey Chhlak 1 201 Earth road 0.43 [ 0.43 ] Km 15,384,919 4.000 Width (m) 1,250.000 Earth fill m3 6,630,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,630,900

Svay Rieng, Koy Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200603/04/01 TSO Prum Chan Project Type Rural Transport 7,000,000
Koy Trabaek 1 203 Gravel road 0.49 [ 0.49 ] Km 14,373,717 4.000 Width (m) 292.000 Earth fill m3 7,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,000,000
Contract ID 200603/04/02 TSO Prum Chan Project Type Rural Transport 4,591,600
Koy Trabaek 1 203 Gravel road 0.09 [ 0.09 ] Km 16,483,871 4.000 Width (m) 70.000 Earth fill m3 1,533,000
Koy Trabaek 2 201 Earth road 0.09 [ 0.09 ] Km 32,888,172 5.000 Width (m) 493.000 Earth fill m3 3,058,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,591,600
Contract ID 200603/04/03 TSO Prum Chan Project Type Rural Transport 1,021,600
Koy Trabaek 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,021,600 0.600 Diameter (m) 4.000 Length (m) 1,021,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,021,600

Svay Rieng, Pou Ta Hao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200604/04/01 TSO Prum Chan Project Type Rural Transport 20,265,200
Kbal Spean 1 203 Gravel road 0.48 [ 0.48 ] Km 15,000,000 5.000 Width (m) 363.000 Earth fill m3 7,260,000
La 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 6.000 Length (m) 1,400,000
Kbal Spean 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,400,000 0.600 Diameter (m) 6.000 Length (m) 4,200,000
Kbal Spean 4 201 Earth road 0.48 [ 0.48 ] Km 15,300,000 5.000 Width (m) 673.000 Earth fill m3 7,405,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,265,200

Svay Teab, Chrak Mtes

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200701/04/01 TSO Prak Dara Project Type Rural Transport 23,650,000
Bat Sloek 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,800,000 0.800 Diameter (m) 4.000 Length (m) 2,800,000
Thnal Totueng 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 5,700,000
Prey Phdau 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Thlok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Kampout Pras 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 7.000 Length (m) 2,000,000
Chrak Mtes 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Chrak Mtes 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 6.000 Length (m) 1,450,000
Prey Tob 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Dambouk Chuor 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Tuol Ampil 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Veal 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Kampout Skear 12 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 4.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,650,000

Svay Teab, Kokir Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200702/04/01 TSO Prak Dara Project Type Rural Transport 18,336,500
Bat Thang 1 201 Earth road 1.69 [ 1.69 ] Km 10,850,000 4.000 Width (m) 4,221.000 Earth fill m3 18,336,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,336,500
Contract ID 200702/04/02 TSO Prak Dara Project Type Education 33,600,000
Sangkom 1 322 Brick school with fibro roof 2.00 [ 2.00 ] School room 16,800,000 16.000 Length (m) 9.000 Width (m) 33,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,600,000
Contract ID 200702/04/03 TSO Prak Dara Project Type Rural Transport 3,840,000
Bat Thang 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,280,000 0.600 Diameter (m) 5.000 Length (m) 3,840,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,840,000

Svay Teab, Kandieng Reay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200703/04/01 TSO Prak Dara Project Type Rural Transport 20,600,000
Chub 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 20,600,000 4.000 Total Span (m) 4.000 Width (m) 20,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,600,000
Contract ID 200703/04/02 TSO Prak Dara Project Type Rural Transport 2,360,000
Prasoutr Ti Pir 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 4.000 Length (m) 1,100,000
Prasoutr Ti Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,260,000 0.600 Diameter (m) 6.000 Length (m) 1,260,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,360,000

Svay Teab, Monourom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200704/04/01 TSO Prak Dara Project Type Rural Transport 11,491,200
Ou Ta Mou 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,183,400 0.600 Diameter (m) 7.000 Length (m) 2,183,400
Monourom 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,354,200 1.000 Diameter (m) 7.000 Length (m) 4,354,200
Monourom 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 2,476,800 0.800 Diameter (m) 7.000 Length (m) 4,953,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,491,200
Contract ID 200704/04/02 TSO Prak Dara Project Type Irrigation 2,699,600
Ou Ta Mou 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,699,600 0.800 Diameter (m) 5.000 Width (m) 2,699,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,699,600
Contract ID 200704/04/03 TSO Prak Dara Project Type Irrigation 12,499,200
Monourom 1 420 Canal 1.55 [ 1.55 ] Km 8,064,000 0.900 Depth (m) 6,884.000 Volume (m3) 12,499,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,499,200

Svay Teab, Popeaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200705/04/01 TSO Prak Dara Project Type Rural Transport 17,702,900
Thlok Pring 1 201 Earth road 2.11 [ 2.11 ] Km 8,390,000 4.000 Width (m) 3,827.000 Earth fill m3 17,702,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,702,900
Contract ID 200705/04/02 TSO Prak Dara Project Type Rural Transport 23,900,000
Thnal Kaeng 1 241 Concrete bridge, single span 1.00 [ 1.00 ] Place 23,900,000 4.000 Total Span (m) 4.000 Width (m) 23,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,900,000
Contract ID 200705/04/03 TSO Prak Dara Project Type Rural Transport 11,748,000
Thlok Pring 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,220,000 0.600 Diameter (m) 5.000 Length (m) 3,660,000
Thlok Pring 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,022,000 0.800 Diameter (m) 5.000 Length (m) 6,066,000
Kampong Roteh 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,022,000 0.800 Diameter (m) 5.000 Length (m) 2,022,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,748,000

Svay Teab, Prey Ta Ei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200706/04/01 TSO Prak Dara Project Type Rural Transport 15,000,000
Trapeang Sbov 1 201 Earth road 1.30 [ 1.30 ] Km 11,538,462 4.000 Width (m) 2,652.000 Earth fill m3 15,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,000,000
Contract ID 200706/04/02 TSO Prak Dara Project Type Rural Transport 2,624,000
Trapeang Sbov 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,312,000 0.600 Diameter (m) 5.000 Length (m) 2,624,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,624,000

Svay Teab, Prasout

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200707/04/01 TSO Prak Dara Project Type Rural Transport 24,745,200
Angk Ta Mouk 1 201 Earth road 2.75 [ 2.75 ] Km 8,998,255 4.000 Width (m) 4,339.000 Earth fill m3 24,745,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,745,200
Contract ID 200707/04/02 TSO Prak Dara Project Type Rural Transport 11,950,000
Pou Vong 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Prey Tuol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Prey Ta Yueng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Prey Totueng 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Prey Totueng 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Prey Rumduol 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Chheu Teal 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Angk Ta Mouk 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Angk Ta Mouk 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,950,000

Svay Teab, Romeang Thkaol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200708/04/01 TSO Prak Dara Project Type Rural Transport 16,598,000
Kranhung 1 201 Earth road 2.00 [ 2.00 ] Km 8,299,000 4.000 Width (m) 3,606.000 Earth fill m3 16,598,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,598,000
Contract ID 200708/04/02 TSO Prak Dara Project Type Rural Transport 5,247,800
Kranhung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,148,200 0.600 Diameter (m) 5.000 Length (m) 1,148,200
Kranhung 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 2,049,800 0.800 Diameter (m) 5.000 Length (m) 4,099,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,247,800

Svay Teab, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200709/04/01 TSO Prak Dara Project Type Rural Transport 10,900,000
Tuol Angkob 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 10,900,000 5.000 Total Span (m) 3.000 Width (m) 10,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,900,000
Contract ID 200709/04/02 TSO Prak Dara Project Type Rural Transport 12,047,700
Sambuor 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,030,000 0.600 Diameter (m) 4.000 Length (m) 1,030,000
Sangkruoh 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,030,000 0.600 Diameter (m) 4.000 Length (m) 1,030,000
Trapeang Ampil 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,030,000 0.600 Diameter (m) 4.000 Length (m) 1,030,000
Prey Samphor 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,046,000 0.600 Diameter (m) 5.000 Length (m) 1,046,000
Prey Samphor 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,085,100 0.600 Diameter (m) 6.000 Length (m) 1,085,100
Prey Totueng 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,085,100 0.600 Diameter (m) 6.000 Length (m) 2,170,200
Prey Samphor 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,328,200 0.800 Diameter (m) 5.000 Length (m) 2,328,200
Ou K'am 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,328,200 0.800 Diameter (m) 5.000 Length (m) 2,328,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,047,700

Svay Teab, Sangkhoar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200710/04/01 TSO Prak Dara Project Type Rural Transport 16,920,000
Chambak Peam 1 201 Earth road 2.35 [ 2.35 ] Km 7,200,000 4.000 Width (m) 3,099.000 Earth fill m3 16,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,920,000
Contract ID 200710/04/02 TSO Prak Dara Project Type Rural Transport 7,789,600
Chambak Peam 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,049,600 0.800 Diameter (m) 5.000 Length (m) 2,049,600
Chambak Peam 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,690,400 1.000 Diameter (m) 4.000 Length (m) 3,690,400
Thlok 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,049,600 0.800 Diameter (m) 5.000 Length (m) 2,049,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,789,600

Svay Teab, Svay Rumpea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200711/04/01 TSO Prak Dara Project Type Rural Transport 19,090,200
Angkrong 1 201 Earth road 1.70 [ 1.70 ] Km 11,229,529 4.000 Width (m) 3,990.000 Earth fill m3 19,090,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,090,200
Contract ID 200711/04/02 TSO Prak Dara Project Type Rural Transport 8,640,600
Kak 1 201 Earth road 1.50 [ 1.50 ] Km 5,760,400 4.000 Width (m) 1,395.000 Earth fill m3 8,640,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,640,600
Contract ID 200711/04/03 TSO Prak Dara Project Type Rural Transport 5,800,000
Angkrong 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,433,350 0.600 Diameter (m) 5.000 Length (m) 4,300,050
Kak 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,800,050