Contract Outputs
Location: Svay Rieng \ Svay Chrum Budget Year: 2004
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Svay Chrum, Angk Ta Sou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200501/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
15,773,200 |
| Roka |
1 |
201 |
Earth road |
1.11 [ 1.11 ] |
Km |
14,210,090 |
4.000 Width (m) |
2,834.000 Earth fill m3 |
15,773,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,773,200 |
| Contract ID |
200501/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
7,054,900 |
| Roka |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,274,120 |
0.600 Diameter (m) |
5.000 Length (m) |
2,548,240 |
| Thma Pean |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,274,120 |
0.600 Diameter (m) |
5.000 Length (m) |
2,548,240 |
| Chaeng Maeng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,958,500 |
0.800 Diameter (m) |
5.000 Length (m) |
1,958,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,054,980 |
Svay Chrum, Basak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200502/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
10,850,000 |
| Basak |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
14,000,000 |
4.000 Width (m) |
1,990.000 Earth fill m3 |
10,850,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,850,000 |
| Contract ID |
200502/04/02 |
TSO |
Mey Sambatt |
Project Type |
Education |
36,291,700 |
| Sala Rien |
1 |
320 |
Brick school (general) |
2.00 [ 2.00 ] |
School room |
18,145,850 |
16.000 Length (m) |
9.000 Width (m) |
36,291,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,291,700 |
| Contract ID |
200502/04/03 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
11,500,000 |
| Basak |
1 |
211 |
Single pipe culvert |
2.00 [ 6.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,500,000 |
| Basak |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,500,000 |
Svay Chrum, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200503/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
29,040,000 |
| Thmei |
1 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
13,200,000 |
4.000 Width (m) |
6,094.000 Earth fill m3 |
29,040,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,040,000 |
| Contract ID |
200503/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
9,261,000 |
| Thmei |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,961,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,961,000 |
| Thmei |
2 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Thmei |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,261,000 |
Svay Chrum, Chamlang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200504/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
12,936,000 |
| Chambak Kuy |
1 |
201 |
Earth road |
1.16 [ 1.16 ] |
Km |
11,200,000 |
4.000 Width (m) |
2,362.000 Earth fill m3 |
12,936,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,936,000 |
| Contract ID |
200504/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
18,823,300 |
| Chie Ruessei |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
18,823,300 |
1.500 Total span (m) |
15.000 Width (m) |
18,823,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,823,300 |
Svay Chrum, Ta Suos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200505/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
32,173,600 |
| Ta Pa |
1 |
201 |
Earth road |
2.46 [ 2.46 ] |
Km |
13,100,000 |
4.000 Width (m) |
6,194.000 Earth fill m3 |
32,173,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,173,600 |
Svay Chrum, Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200506/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
20,444,400 |
| Meloung |
1 |
201 |
Earth road |
1.19 [ 1.19 ] |
Km |
17,136,966 |
4.000 Width (m) |
3,018.000 Earth fill m3 |
20,444,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,444,400 |
| Contract ID |
200506/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
5,603,900 |
| Chambak |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,865,170 |
0.800 Diameter (m) |
5.000 Length (m) |
1,865,170 |
| Chambak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,290 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,290 |
| Meloung |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,204,290 |
0.600 Diameter (m) |
5.000 Length (m) |
1,204,290 |
| Chek |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,330,100 |
0.600 Diameter (m) |
6.000 Length (m) |
1,330,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,603,850 |
Svay Chrum, Chheu Teal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200507/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
38,251,000 |
| Chek |
1 |
201 |
Earth road |
0.94 [ 0.94 ] |
Km |
14,500,000 |
4.000 Width (m) |
2,511.000 Earth fill m3 |
13,601,000 |
| Sangkae |
2 |
203 |
Gravel road |
1.70 [ 1.70 ] |
Km |
14,500,000 |
4.000 Width (m) |
1,020.000 Earth fill m3 |
24,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,251,000 |
| Contract ID |
200507/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
12,441,400 |
| Prey Chambak |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,355,175 |
0.600 Diameter (m) |
5.000 Length (m) |
4,065,525 |
| Prey Chambak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Sangkae |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,355,175 |
0.600 Diameter (m) |
5.000 Length (m) |
2,710,350 |
| Poun Kak |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,355,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,710,400 |
| Chek |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,355,200 |
0.600 Diameter (m) |
5.000 Length (m) |
1,355,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,441,475 |
Svay Chrum, Doun Sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200508/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
20,410,000 |
| Chensa |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
15,700,000 |
4.000 Width (m) |
3,788.000 Earth fill m3 |
20,410,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,410,000 |
| Contract ID |
200508/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
3,811,500 |
| Kuoy |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,270,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,270,500 |
| Sour |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,270,500 |
0.600 Diameter (m) |
5.000 Length (m) |
2,541,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,811,500 |
Svay Chrum, Kouk Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200509/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
39,249,700 |
| Svat Prahut |
1 |
201 |
Earth road |
2.81 [ 2.81 ] |
Km |
13,948,010 |
4.000 Width (m) |
7,696.000 Earth fill m3 |
39,249,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,249,700 |
| Contract ID |
200509/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
13,360,000 |
| Kdompi |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Chambak Thloeng |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,450,000 |
| Svat Prahut |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kantuot Praong |
4 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kandal |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Doun Leaeb |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,240,000 |
| Kandal |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,560,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,560,000 |
| Leach Chhuk |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,150,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,150,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,360,000 |
Svay Chrum, Kraol Kou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200510/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
24,380,000 |
| Ruessei Chuor Tboung |
1 |
201 |
Earth road |
3.21 [ 3.21 ] |
Km |
7,597,382 |
4.000 Width (m) |
3,641.000 Earth fill m3 |
24,380,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,380,000 |
| Contract ID |
200510/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
6,323,200 |
| Ruessei Chuor Tboung |
1 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
3,161,600 |
0.800 Diameter (m) |
5.000 Length (m) |
6,323,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,323,200 |
Svay Chrum, Kruos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200511/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
30,914,700 |
| Thna |
1 |
201 |
Earth road |
2.41 [ 2.41 ] |
Km |
12,833,001 |
4.000 Width (m) |
5,999.000 Earth fill m3 |
30,914,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,914,700 |
Svay Chrum, Pouthi Reach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200512/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
21,600,000 |
| Prey Damloung |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
13,500,000 |
4.000 Width (m) |
4,688.000 Earth fill m3 |
21,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,600,000 |
| Contract ID |
200512/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
2,620,000 |
| Prey Damloung |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,620,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,620,000 |
Svay Chrum, Svay Angk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200513/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
22,527,900 |
| Svay Ph'aem |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
15,018,600 |
4.000 Width (m) |
4,081.000 Earth fill m3 |
22,527,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,527,900 |
Svay Chrum, Svay Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200514/04/01 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
11,936,420 |
| Trabaek |
1 |
201 |
Earth road |
1.22 [ 1.22 ] |
Km |
9,800,000 |
3.000 Width (m) |
2,115.000 Earth fill m3 |
11,936,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,936,400 |
| Contract ID |
200514/04/02 |
TSO |
Mey Sambatt |
Project Type |
Rural Transport |
8,182,900 |
| Trabaek |
1 |
220 |
Box culvert (general) |
1.00 [ 1.00 ] |
Place |
7,000,000 |
2.000 Total Span (m) |
4.500 Width(m) |
7,000,000 |
| Thma Sa |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,182,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,182,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,182,900 |
Svay Chrum, Svay Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200515/04/01 |
TSO |
Mey Sambatt |
Project Type |
Irrigation |
47,081,000 |
| Traok Touch |
1 |
420 |
Canal |
4.45 [ 4.45 ] |
Km |
10,580,000 |
1.450 Depth (m) |
14,432.000 Volume (m3) |
47,081,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,081,000 |
| Contract ID |
200515/04/02 |
TSO |
Mey Sambatt |
Project Type |
Irrigation |
8,640,000 |
| Dak Po |
1 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,140,000 |
| Tuol Trea |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,560,000 |
0.600 Diameter (m) |
8.000 Length (m) |
3,120,000 |
| Chamreh |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,380,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,380,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,640,000 |
Svay Chrum, Svay Yea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200516/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
24,500,000 |
| Prey Ph'ong |
1 |
201 |
Earth road |
2.05 [ 2.05 ] |
Km |
11,962,891 |
4.000 Width (m) |
4,688.000 Earth fill m3 |
24,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,500,000 |
| Contract ID |
200516/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
4,050,000 |
| Sikar |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,667,640 |
0.600 Diameter (m) |
7.000 Length (m) |
1,667,640 |
| Prey Ph'ong |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,191,200 |
0.600 Diameter (m) |
5.000 Length (m) |
2,382,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,050,040 |
Svay Chrum, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200517/04/01 |
TSO |
On Kea |
Project Type |
Rural Transport |
11,170,000 |
| Doun Tong |
1 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
12,564,679 |
4.000 Width (m) |
1,947.000 Earth fill m3 |
11,170,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,170,000 |
| Contract ID |
200517/04/02 |
TSO |
On Kea |
Project Type |
Rural Transport |
9,485,400 |
| Ampov Prey |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,889,800 |
0.800 Diameter (m) |
11.000 Length (m) |
4,889,800 |
| Thum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,229,800 |
0.600 Diameter (m) |
5.000 Length (m) |
1,229,800 |
| Snay Kreang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,229,776 |
0.600 Diameter (m) |
5.000 Length (m) |
1,229,776 |
| Samdei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,112,990 |
0.600 Diameter (m) |
4.000 Length (m) |
1,112,990 |
| Samdei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,023,000 |
0.600 Diameter (m) |
3.000 Length (m) |
1,023,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,485,366 |