Contract Outputs
Location: Takeo Budget Year: 2004
Angkor Borei
Bati
Bourei Cholsar
Kiri Vong
Kaoh Andaet
Prey Kabbas
Samraong
Doun Kaev
Tram Kak
Treang
Angkor Borei, Angkor Borei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210101/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
31,365,100 |
| Tuol Sang Kha |
1 |
420 |
Canal |
0.68 [ 0.68 ] |
Km |
14,130,325 |
1.060 Depth (m) |
4,231.000 Volume (m3) |
9,552,100 |
| Prey Sambuor |
2 |
420 |
Canal |
1.15 [ 1.53 ] |
Km |
14,256,863 |
0.920 Depth (m) |
5,010.000 Volume (m3) |
21,813,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,365,100 |
Angkor Borei, Ba Srae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210102/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
27,062,100 |
| Svay Tboung |
1 |
420 |
Canal |
0.96 [ 1.06 ] |
Km |
25,506,221 |
1.200 Depth (m) |
8,794.000 Volume (m3) |
27,062,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,062,100 |
Angkor Borei, Kouk Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210103/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
20,337,400 |
| Bak Dai |
1 |
420 |
Canal |
1.00 [ 1.50 ] |
Km |
13,558,267 |
0.900 Depth (m) |
6,319.100 Volume (m3) |
20,337,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,337,400 |
Angkor Borei, Ponley
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210104/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
24,799,700 |
| Ponley Cheung |
1 |
420 |
Canal |
0.81 [ 1.00 ] |
Km |
24,799,700 |
1.700 Depth (m) |
9,103.000 Volume (m3) |
24,799,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,799,700 |
Angkor Borei, Preaek Phtoul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210105/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
25,591,000 |
| Angkor |
1 |
420 |
Canal |
0.75 [ 0.84 ] |
Km |
30,611,244 |
2.660 Depth (m) |
7,712.440 Volume (m3) |
25,591,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,591,000 |
Angkor Borei, Prey Phkoam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210106/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
27,896,200 |
| Prey Phkoam Ka |
1 |
420 |
Canal |
1.03 [ 1.03 ] |
Km |
27,110,010 |
1.200 Depth (m) |
7,666.000 Volume (m3) |
27,896,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,896,200 |
Bati, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210201/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
25,846,000 |
| Seiha |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
15,881,750 |
5.000 Width (m) |
395.000 Earth fill m3 |
6,352,700 |
| Seiha |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Trapeang Trayueng |
3 |
201 |
Earth road |
1.07 [ 1.07 ] |
Km |
15,881,589 |
5.000 Width (m) |
15,881.630 Earth fill m3 |
16,993,300 |
| Trapeang Trayueng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,846,000 |
Bati, Champei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210202/04/01 |
TSO |
Pich Sovansou |
Project Type |
Irrigation |
19,068,000 |
| Trakiet |
1 |
420 |
Canal |
0.44 [ 0.44 ] |
Km |
20,177,011 |
1.500 Depth (m) |
1,884.950 Volume (m3) |
8,777,000 |
| Mkak |
2 |
420 |
Canal |
0.32 [ 0.32 ] |
Km |
20,178,125 |
1.500 Depth (m) |
2,396.000 Volume (m3) |
6,457,000 |
| Preaek |
3 |
420 |
Canal |
0.19 [ 0.19 ] |
Km |
20,178,947 |
1.500 Depth (m) |
2,567.920 Volume (m3) |
3,834,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,068,000 |
Bati, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210203/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
21,913,000 |
| Yuthka |
1 |
201 |
Earth road |
0.84 [ 0.90 ] |
Km |
11,200,000 |
5.000 Width (m) |
1,711.000 Earth fill m3 |
10,080,000 |
| Yuthka |
2 |
202 |
Laterite road |
0.84 [ 0.90 ] |
Km |
11,814,444 |
5.000 Width (m) |
819.000 Earth fill m3 |
10,633,000 |
| Yuthka |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
5.000 Diameter (m) |
600.000 Length (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,913,000 |
Bati, Kandoeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210204/04/01 |
TSO |
Vong Lo |
Project Type |
Irrigation |
24,686,300 |
| Haknuman |
1 |
420 |
Canal |
0.70 [ 0.70 ] |
Km |
22,442,143 |
1.300 Depth (m) |
5,056.860 Volume (m3) |
15,709,500 |
| Trapeang Leuk |
2 |
420 |
Canal |
0.15 [ 0.40 ] |
Km |
22,442,000 |
1.550 Depth (m) |
3,600.870 Volume (m3) |
8,976,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,686,300 |
Bati, Komar Reachea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210205/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
27,445,200 |
| Khnar Tong |
1 |
201 |
Earth road |
0.51 [ 0.51 ] |
Km |
10,866,082 |
4.000 Width (m) |
1,698.000 Earth fill m3 |
5,574,300 |
| Khnar Tong |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,620,700 |
0.600 Diameter (m) |
5.000 Length (m) |
1,620,700 |
| Thmei |
3 |
201 |
Earth road |
1.27 [ 1.27 ] |
Km |
10,865,983 |
4.000 Width (m) |
2,526.000 Earth fill m3 |
13,767,200 |
| Thmei |
4 |
211 |
Single pipe culvert |
2.00 [ 4.00 ] |
Place |
1,620,750 |
0.600 Diameter (m) |
5.000 Length (m) |
6,483,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,445,200 |
Bati, Krang Leav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210206/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Domestic Water Supplies |
32,324,000 |
| Maen Chey |
1 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,402,526 |
| Mean Chouk |
2 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Prasat |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Tram Tbal |
4 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Rung |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Trapeang Angk |
6 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Trapeang Chhuk |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Thnal Dach |
8 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Banh Khla |
9 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Prohut |
10 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Trapeang Pou |
11 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,402,526 |
| Krang Leav |
12 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Sameakki |
13 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Chheu Teal Chrum |
14 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Srei Krong Reach |
15 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Prey Chonluonh |
16 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,701,263 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,701,263 |
| Prey Trach |
17 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,700,800 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,700,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,323,534 |
Bati, Krang thnong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210207/04/01 |
TSO |
Pich Sovansou |
Project Type |
Irrigation |
26,522,000 |
| Haknuman |
1 |
420 |
Canal |
0.35 [ 0.35 ] |
Km |
21,217,143 |
1.500 Depth (m) |
3,548.140 Volume (m3) |
7,426,000 |
| Tboung Damrei |
2 |
420 |
Canal |
0.90 [ 0.90 ] |
Km |
21,217,778 |
1.500 Depth (m) |
6,711.380 Volume (m3) |
19,096,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,522,000 |
Bati, Lumpong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210208/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
25,559,600 |
| Pean Meas Kaeut |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
7,131,600 |
4.000 Width (m) |
300.000 Earth fill m3 |
3,565,800 |
| Pean Meas Lech |
2 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
7,131,600 |
4.000 Width (m) |
300.000 Earth fill m3 |
3,565,800 |
| Trapeang Kralaong |
3 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
7,131,600 |
4.000 Width (m) |
300.000 Earth fill m3 |
3,565,800 |
| Bak Ronoas |
4 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
7,131,600 |
4.000 Width (m) |
450.000 Earth fill m3 |
5,348,700 |
| Kandal |
5 |
202 |
Laterite road |
0.75 [ 1.33 ] |
Km |
7,131,559 |
4.000 Width (m) |
800.400 Earth fill m3 |
9,513,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,559,600 |
Bati, Pea Ream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210209/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
24,881,500 |
| Krang Krachang |
1 |
202 |
Laterite road |
0.95 [ 0.95 ] |
Km |
11,157,579 |
5.000 Width (m) |
926.250 Earth fill m3 |
10,599,700 |
| Chumrov |
2 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
11,157,647 |
5.000 Width (m) |
828.750 Earth fill m3 |
9,484,000 |
| Khnar Thum |
3 |
202 |
Laterite road |
0.20 [ 0.43 ] |
Km |
11,157,674 |
5.000 Width (m) |
195.000 Earth fill m3 |
4,797,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,881,500 |
Bati, Pot Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210210/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
26,465,500 |
| Kleang Sambatt |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
8,890,000 |
5.000 Width (m) |
750.000 Earth fill m3 |
8,890,000 |
| Khvan Meas |
2 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
8,890,000 |
5.000 Width (m) |
750.000 Earth fill m3 |
8,890,000 |
| Chambak |
3 |
202 |
Laterite road |
0.70 [ 0.98 ] |
Km |
8,890,000 |
5.000 Width (m) |
733.000 Earth fill m3 |
8,685,530 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,465,530 |
Bati, Souphi
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210211/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
22,975,000 |
| Phnum Touch |
1 |
202 |
Laterite road |
2.48 [ 2.80 ] |
Km |
7,669,643 |
4.000 Width (m) |
150.000 Earth fill m3 |
21,475,000 |
| Phnum Touch |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
5.000 Diameter (m) |
600.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,975,000 |
Bati, Tang Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210212/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
21,204,000 |
| Tuol Lhong |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Tuol Lhong |
2 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,550,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,550,000 |
| Neal |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,026,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,026,000 |
| Rovieng |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,026,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,026,000 |
| Ampeae Tum |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,026,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,026,000 |
| Angk Kralanh |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,700,000 |
| Angk Kralanh |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,950,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,950,000 |
| Prey Kdei |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,026,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,026,000 |
| Prey Kdei |
9 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,550,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,550,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,204,000 |
Bati, Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210213/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
19,288,000 |
| Ta Nob |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
8,802,000 |
5.000 Width (m) |
2,804.000 Earth fill m3 |
8,802,000 |
| Tnaot |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
8,802,222 |
5.000 Width (m) |
1,125.000 Earth fill m3 |
3,961,000 |
| Ta Nob |
3 |
203 |
Gravel road |
1.00 [ 1.00 ] |
Km |
4,500,000 |
5.000 Width (m) |
195.000 Earth fill m3 |
4,500,000 |
| Tnaot |
4 |
203 |
Gravel road |
0.45 [ 0.45 ] |
Km |
4,500,000 |
5.000 Width (m) |
87.750 Earth fill m3 |
2,025,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,288,000 |
Bati, Trapeang Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210214/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
18,549,000 |
| Roleang |
1 |
202 |
Laterite road |
0.26 [ 0.26 ] |
Km |
8,900,769 |
4.000 Width (m) |
156.000 Earth fill m3 |
2,314,200 |
| Thlok |
2 |
202 |
Laterite road |
0.78 [ 0.78 ] |
Km |
8,900,638 |
4.000 Width (m) |
470.000 Earth fill m3 |
6,978,100 |
| Tram Sasar |
3 |
202 |
Laterite road |
1.04 [ 1.04 ] |
Km |
8,900,673 |
4.000 Width (m) |
624.000 Earth fill m3 |
9,256,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,549,000 |
Bati, Trapeang Sab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210215/04/01 |
TSO |
Pich Sovansou |
Project Type |
Rural Transport |
31,857,000 |
| A Cheang |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.800 Diameter (m) |
10.000 Length (m) |
2,500,000 |
| A Cheang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| A Cheang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,300,000 |
| A Cheang |
5 |
201 |
Earth road |
2.11 [ 2.13 ] |
Km |
12,403,657 |
4.000 Width (m) |
8,051.000 Earth fill m3 |
26,457,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,857,000 |
Bourei Cholsar, Bourei Cholsar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210301/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
20,211,100 |
| Angk Krouch |
1 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
4,399,917 |
5.000 Width (m) |
685.000 Earth fill m3 |
2,859,946 |
| Snay Duoch |
2 |
201 |
Earth road |
1.70 [ 3.00 ] |
Km |
4,399,918 |
5.000 Width (m) |
1,417.000 Earth fill m3 |
13,199,754 |
| Snay Duoch |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,075,750 |
0.600 Diameter (m) |
6.000 Length (m) |
4,151,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,211,200 |
Bourei Cholsar, Chey Chouk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210302/04/01 |
TSO |
Taing Touch |
Project Type |
Irrigation |
19,688,000 |
| Kouk Panhcha |
1 |
420 |
Canal |
1.60 [ 1.60 ] |
Km |
11,932,121 |
1.000 Depth (m) |
4,796.980 Volume (m3) |
19,091,394 |
| Banteay Sloek |
2 |
420 |
Canal |
0.00 [ 0.05 ] |
Km |
11,932,320 |
1.000 Depth (m) |
4,533.070 Volume (m3) |
596,616 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,688,010 |
Bourei Cholsar, Doung Khpos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210303/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
22,459,700 |
| Ta Yueng |
1 |
203 |
Gravel road |
0.50 [ 0.50 ] |
Km |
10,634,328 |
5.000 Width (m) |
100.000 Earth fill m3 |
5,317,164 |
| Traeuy Khlouk |
2 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
10,634,328 |
5.000 Width (m) |
1,575.000 Earth fill m3 |
8,507,462 |
| Angkanh |
3 |
203 |
Gravel road |
0.71 [ 0.71 ] |
Km |
10,634,327 |
5.000 Width (m) |
2,725.000 Earth fill m3 |
7,571,641 |
| Doung Khpos |
4 |
203 |
Gravel road |
0.00 [ 0.10 ] |
Km |
10,634,000 |
5.000 Width (m) |
100.000 Earth fill m3 |
1,063,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,459,667 |
Bourei Cholsar, Kampong Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210304/04/01 |
TSO |
Taing Touch |
Project Type |
Education |
9,664,000 |
| Kdol Chrum |
1 |
321 |
Brick school with tile roof |
1.00 [ 1.00 ] |
School room |
6,856,000 |
8.000 Length (m) |
9.000 Width (m) |
6,856,000 |
| Kdol Chrum |
2 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
1,404,000 |
60.000 Students |
2.000 |
2,808,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,664,000 |
Bourei Cholsar, Kouk Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210305/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
26,946,200 |
| Chrey Kouk Pou |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
27,923,523 |
5.000 Width (m) |
2,278.000 Earth fill m3 |
11,169,409 |
| Neak Ta Tbal |
2 |
201 |
Earth road |
0.48 [ 0.57 ] |
Km |
27,923,524 |
5.000 Width (m) |
3,292.500 Earth fill m3 |
15,776,791 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,946,200 |
Kiri Vong, Angk Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210401/04/01 |
TSO |
Yim Sry |
Project Type |
Rural Transport |
24,005,000 |
| Pou Ta Mok |
2 |
201 |
Earth road |
0.85 [ 0.95 ] |
Km |
17,268,211 |
4.000 Width (m) |
3,249.000 Earth fill m3 |
16,404,800 |
| Pou Ta Mok |
2 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
3,192,723 |
4.000 Width (m) |
510.000 Earth fill m3 |
2,720,200 |
| Pou Ta Mok |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,340,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,680,000 |
| Pou Ta Mok |
4 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
2,200,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,005,000 |
Kiri Vong, Preah Bat Choan Chum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210402/04/01 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
38,484,300 |
| Chrouy |
1 |
420 |
Canal |
1.10 [ 1.22 ] |
Km |
15,137,131 |
1.570 Depth (m) |
5,631.000 Volume (m3) |
18,467,300 |
| Pou Roung |
2 |
420 |
Canal |
0.95 [ 1.23 ] |
Km |
16,273,984 |
1.800 Depth (m) |
6,104.000 Volume (m3) |
20,017,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,484,300 |
Kiri Vong, Kamnab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210403/04/01 |
TSO |
Yim Sry |
Project Type |
Rural Transport |
18,701,000 |
| Khmal |
1 |
201 |
Earth road |
1.45 [ 1.71 ] |
Km |
10,936,257 |
4.000 Width (m) |
5,278.000 Earth fill m3 |
18,701,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,701,000 |
Kiri Vong, Kampeaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210404/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
23,205,800 |
| Prasat |
1 |
201 |
Earth road |
0.55 [ 0.75 ] |
Km |
14,960,000 |
4.000 Width (m) |
3,300.000 Earth fill m3 |
11,220,000 |
| Prasat |
2 |
202 |
Laterite road |
0.55 [ 0.75 ] |
Km |
6,450,000 |
4.000 Width (m) |
150.000 Earth fill m3 |
4,837,500 |
| Prasat |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,130,150 |
6.000 Diameter (m) |
5.000 Length (m) |
2,260,300 |
| Andoung Chrung |
4 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,222,000 |
6.000 Diameter (m) |
6.000 Length (m) |
4,888,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,205,800 |
Kiri Vong, Kiri Chong Kaoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210405/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
21,058,000 |
| Daeum Beng |
1 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
14,150,000 |
5.000 Width (m) |
2,393.000 Earth fill m3 |
10,329,500 |
| Chambak Tuem |
2 |
201 |
Earth road |
0.47 [ 0.67 ] |
Km |
14,150,000 |
5.000 Width (m) |
2,158.000 Earth fill m3 |
9,452,200 |
| Chambak Tuem |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,276,300 |
0.600 Diameter (m) |
5.000 Length (m) |
1,276,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,058,000 |
Kiri Vong, Kouk Prech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210406/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
29,750,000 |
| Chi Khmol |
1 |
201 |
Earth road |
0.67 [ 0.67 ] |
Km |
11,000,000 |
4.000 Width (m) |
1,973.000 Earth fill m3 |
7,370,000 |
| Chi Khmol |
2 |
202 |
Laterite road |
0.67 [ 0.67 ] |
Km |
8,700,000 |
4.000 Width (m) |
402.000 Earth fill m3 |
5,829,000 |
| Chi Khmol |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,341,100 |
0.600 Diameter (m) |
5.000 Length (m) |
1,341,100 |
| Chheu Neang Khpos |
4 |
201 |
Earth road |
0.53 [ 0.70 ] |
Km |
11,000,000 |
4.000 Width (m) |
2,504.000 Earth fill m3 |
7,744,000 |
| Chheu Neang Khpos |
5 |
202 |
Laterite road |
0.53 [ 0.70 ] |
Km |
8,700,000 |
4.000 Width (m) |
423.000 Earth fill m3 |
6,124,800 |
| Chheu Neang Khpos |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,341,100 |
0.600 Diameter (m) |
5.000 Length (m) |
1,341,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,750,000 |
Kiri Vong, Phnum Den
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210407/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
36,053,000 |
| Totueng |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
48,334,000 |
5.000 Width (m) |
7,147.000 Earth fill m3 |
26,583,700 |
| Totueng |
2 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
9,500,000 |
5.000 Width (m) |
412.000 Earth fill m3 |
5,225,000 |
| Totueng |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,244,300 |
1.000 Diameter (m) |
7.000 Length (m) |
4,244,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,053,000 |
| Contract ID |
210407/04/02 |
TSO |
Chheng Chantha |
Project Type |
Rural Domestic Water Supplies |
6,304,000 |
| Phsar |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
6,304,000 |
0.000 Depth (m) |
0.000 Volume (m3) |
6,304,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,304,000 |
Kiri Vong, Prey Ampok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210408/04/01 |
TSO |
Chheng Chantha |
Project Type |
Irrigation |
25,615,000 |
| Chheu Teal Phluoh |
1 |
410 |
Earth dam |
0.35 [ 0.55 ] |
Km |
36,000,000 |
4.000 Max. height (m) |
5,519.000 Volume (m3) |
19,800,000 |
| Khvav |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
5,815,000 |
600.000 Diameter (m) |
10.000 Width (m) |
5,815,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,615,000 |
Kiri Vong, Prey Rumdeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210409/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Domestic Water Supplies |
27,272,000 |
| Buor |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 2.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
7,792,000 |
| Boeng Tumnob |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
3,896,000 |
| Phnum Krapeu |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
3,896,000 |
| Chamreh |
4 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
3,896,000 |
| Prey Rumdeng |
5 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
3,896,000 |
| Trapeang Chey |
6 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,896,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
3,896,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,272,000 |
Kiri Vong, Ream Andaeuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210410/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
20,933,600 |
| Pongro |
1 |
201 |
Earth road |
0.60 [ 0.75 ] |
Km |
23,450,000 |
4.000 Width (m) |
6,750.000 Earth fill m3 |
17,587,500 |
| Pongro |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,625,000 |
800.000 Diameter (m) |
6.000 Length (m) |
1,625,000 |
| Svay Sar |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,721,100 |
0.600 Diameter (m) |
5.000 Length (m) |
1,721,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,933,600 |
Kiri Vong, Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210411/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
25,054,000 |
| Pong Tuek |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
12,528,000 |
5.000 Width (m) |
3,617.000 Earth fill m3 |
16,286,400 |
| Tuol Pongro |
2 |
201 |
Earth road |
0.30 [ 0.60 ] |
Km |
12,528,000 |
5.000 Width (m) |
3,177.000 Earth fill m3 |
7,516,800 |
| Tuol Pongro |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,250,800 |
0.600 Diameter (m) |
5.000 Length (m) |
1,250,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,054,000 |
Kiri Vong, Ta Ou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210412/04/01 |
TSO |
Chheng Chantha |
Project Type |
Rural Transport |
26,427,000 |
| Ta Ou Khang Tboung |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
10,500,000 |
4.000 Width (m) |
2,822.000 Earth fill m3 |
12,075,000 |
| Ta Ou Khang Tboung |
2 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
7,000,000 |
4.000 Width (m) |
690.000 Earth fill m3 |
8,050,000 |
| Ta Ou Khang Tboung |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,504,500 |
0.600 Diameter (m) |
5.000 Length (m) |
2,504,500 |
| Roliek |
4 |
201 |
Earth road |
0.05 [ 0.22 ] |
Km |
10,500,000 |
4.000 Width (m) |
553.000 Earth fill m3 |
2,278,500 |
| Roliek |
5 |
202 |
Laterite road |
0.05 [ 0.22 ] |
Km |
7,000,000 |
4.000 Width (m) |
130.000 Earth fill m3 |
1,519,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,427,000 |
Kaoh Andaet, Krapum Chhuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210501/04/01 |
TSO |
Yim Sry |
Project Type |
Rural Transport |
26,383,200 |
| Ta Uy |
3 |
201 |
Earth road |
0.95 [ 1.11 ] |
Km |
16,175,719 |
4.000 Width (m) |
3,311.000 Earth fill m3 |
17,987,400 |
| Ta Uy |
4 |
202 |
Laterite road |
0.95 [ 1.11 ] |
Km |
5,391,906 |
4.000 Width (m) |
867.000 Earth fill m3 |
5,995,800 |
| Ta Uy |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,383,200 |
Kaoh Andaet, Pech Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210502/04/01 |
TSO |
Yim Sry |
Project Type |
Rural Transport |
38,573,400 |
| Trapeang Krasang |
1 |
201 |
Earth road |
1.20 [ 1.75 ] |
Km |
18,297,943 |
4.000 Width (m) |
8,733.000 Earth fill m3 |
32,021,400 |
| Trapeang Krasang |
2 |
202 |
Laterite road |
1.20 [ 1.75 ] |
Km |
3,744,000 |
4.000 Width (m) |
2,615.000 Earth fill m3 |
6,552,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,573,400 |
| Contract ID |
210502/04/02 |
TSO |
Yim Sry |
Project Type |
Irrigation |
18,850,000 |
| Kouk Khpos |
1 |
420 |
Canal |
1.20 [ 1.20 ] |
Km |
14,375,000 |
1.670 Depth (m) |
7,419.340 Volume (m3) |
17,250,000 |
| Kouk Khpos |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
4.000 Width (m) |
1,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,850,000 |
Kaoh Andaet, Prey Khla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210503/04/01 |
TSO |
Yim Sry |
Project Type |
Rural Transport |
31,919,200 |
| Prey Khla Khang Cheung |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Prey Khla Khang Cheung |
3 |
201 |
Earth road |
1.00 [ 1.14 ] |
Km |
26,244,912 |
4.000 Width (m) |
6,354.000 Earth fill m3 |
29,919,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,919,200 |
Kaoh Andaet, Prey Yuthka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210504/04/01 |
TSO |
Yim Sry |
Project Type |
Irrigation |
22,228,900 |
| Ta Phan |
1 |
420 |
Canal |
0.34 [ 0.42 ] |
Km |
53,563,614 |
415.000 Depth (m) |
1.500 Volume (m3) |
22,228,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,228,900 |
Kaoh Andaet, Thlea Prachum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210506/04/01 |
TSO |
Yim Sry |
Project Type |
Education |
21,430,000 |
| Roluos |
1 |
320 |
Brick school (general) |
1.00 [ 1.00 ] |
School room |
21,430,000 |
16.000 Length (m) |
9.000 Width (m) |
21,430,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,430,000 |
Prey Kabbas, Angkanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210601/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
17,002,000 |
| Angkanh |
1 |
420 |
Canal |
0.75 [ 0.75 ] |
Km |
13,179,900 |
0.900 Depth (m) |
2,546.690 Volume (m3) |
9,884,925 |
| Svay Pear |
2 |
420 |
Canal |
0.54 [ 0.54 ] |
Km |
13,179,900 |
0.900 Depth (m) |
2,483.680 Volume (m3) |
7,117,146 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,002,071 |
Prey Kabbas, Ban Kam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210602/04/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
23,410,000 |
| Thnal Bat |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
12,392,500 |
4.000 Width (m) |
5,424.630 Earth fill m3 |
19,828,000 |
| Thlok Doung Tum |
2 |
201 |
Earth road |
0.00 [ 0.15 ] |
Km |
23,880,000 |
4.000 Width (m) |
1,000.000 Earth fill m3 |
3,582,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,410,000 |
Prey Kabbas, Champa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210603/04/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
23,120,300 |
| Chroy |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
9,848,627 |
4.000 Width (m) |
2,478.000 Earth fill m3 |
9,848,627 |
| Chroy |
2 |
203 |
Gravel road |
1.00 [ 1.00 ] |
Km |
5,637,173 |
4.000 Width (m) |
210.000 Earth fill m3 |
5,637,173 |
| Chumpu Proek |
3 |
201 |
Earth road |
0.23 [ 0.23 ] |
Km |
9,848,627 |
4.000 Width (m) |
557.000 Earth fill m3 |
2,215,941 |
| Chumpu Proek |
4 |
203 |
Gravel road |
0.23 [ 0.23 ] |
Km |
5,637,169 |
4.000 Width (m) |
45.000 Earth fill m3 |
1,268,363 |
| Samraong |
5 |
201 |
Earth road |
0.08 [ 0.27 ] |
Km |
9,848,627 |
4.000 Width (m) |
506.000 Earth fill m3 |
2,639,432 |
| Samraong |
6 |
203 |
Gravel road |
0.08 [ 0.27 ] |
Km |
5,637,179 |
4.000 Width (m) |
536.000 Earth fill m3 |
1,510,764 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,120,300 |
Prey Kabbas, Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210604/04/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
25,249,700 |
| Angk Svay Chek |
1 |
201 |
Earth road |
0.50 [ 0.60 ] |
Km |
42,365,268 |
4.000 Width (m) |
4,945.000 Earth fill m3 |
25,249,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,249,700 |
Prey Kabbas, Kampeaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210605/04/01 |
TSO |
Suon San |
Project Type |
Irrigation |
26,494,000 |
| Chamnaom |
1 |
420 |
Canal |
1.55 [ 1.80 ] |
Km |
14,718,889 |
1.700 Depth (m) |
71.300 Volume (m3) |
26,494,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,494,000 |
Prey Kabbas, Kampong Reab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210606/04/01 |
TSO |
Suon San |
Project Type |
Irrigation |
22,175,000 |
| Kampong Srama |
1 |
420 |
Canal |
1.10 [ 1.22 ] |
Km |
18,206,076 |
2.500 Depth (m) |
7,455.000 Volume (m3) |
22,175,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,175,000 |
Prey Kabbas, Kdanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210607/04/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
22,843,100 |
| Samdach Poan |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
5,573,333 |
4.000 Width (m) |
390.000 Earth fill m3 |
1,672,000 |
| Samdach Poan |
2 |
203 |
Gravel road |
0.30 [ 0.30 ] |
Km |
6,887,667 |
4.000 Width (m) |
78.000 Earth fill m3 |
2,066,300 |
| Kdanh |
3 |
201 |
Earth road |
0.72 [ 0.72 ] |
Km |
10,563,536 |
4.000 Width (m) |
1,194.900 Earth fill m3 |
7,648,000 |
| Kdanh |
4 |
203 |
Gravel road |
0.72 [ 0.72 ] |
Km |
6,887,845 |
4.000 Width (m) |
188.000 Earth fill m3 |
4,986,800 |
| Kbab |
5 |
201 |
Earth road |
0.88 [ 0.63 ] |
Km |
3,333,333 |
4.000 Width (m) |
1,611.000 Earth fill m3 |
2,110,000 |
| Kbab |
6 |
203 |
Gravel road |
0.38 [ 0.63 ] |
Km |
6,887,836 |
4.000 Width (m) |
2,537.730 Earth fill m3 |
4,360,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,843,100 |
Prey Kabbas, Pou Rumchak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210608/04/01 |
TSO |
Phan Phanna |
Project Type |
Rural Transport |
39,641,000 |
| Samar Khmaer |
1 |
201 |
Earth road |
1.73 [ 1.73 ] |
Km |
10,005,300 |
4.000 Width (m) |
0.400 Earth fill m3 |
17,339,185 |
| Kouk Kanhchab |
2 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
10,005,300 |
4.000 Width (m) |
0.400 Earth fill m3 |
14,507,686 |
| Kor |
3 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
10,005,300 |
4.000 Width (m) |
0.400 Earth fill m3 |
7,794,129 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,641,000 |
Prey Kabbas, Prey Kabbas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210609/04/01 |
TSO |
Phan Phanna |
Project Type |
Irrigation |
23,406,800 |
| Prey Kabbas Ka |
1 |
420 |
Canal |
0.50 [ 0.61 ] |
Km |
38,371,803 |
0.600 Depth (m) |
3,798.000 Volume (m3) |
23,406,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,406,800 |
Prey Kabbas, Prey Phdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210611/04/01 |
TSO |
Suon San |
Project Type |
Irrigation |
21,827,000 |
| Prey Phdau Tboung |
1 |
420 |
Canal |
0.95 [ 1.00 ] |
Km |
21,827,000 |
3.000 Depth (m) |
7,350.000 Volume (m3) |
21,827,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,827,000 |
| Contract ID |
210611/04/02 |
TSO |
Suon San |
Project Type |
Rural Transport |
4,642,000 |
| Prey Phdau Tboung |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,570,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,570,000 |
| Prey Phdau Tboung |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,355,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,355,000 |
| Prey Phdau Tboung |
3 |
201 |
Earth road |
0.00 [ 0.01 ] |
Km |
71,700,000 |
4.000 Width (m) |
180.000 Earth fill m3 |
717,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,642,000 |
Prey Kabbas, Snao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210612/04/01 |
TSO |
Suon San |
Project Type |
Irrigation |
23,598,000 |
| Thomm Viney |
1 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
10,512,333 |
1.500 Depth (m) |
2,123.000 Volume (m3) |
6,307,400 |
| Trapeang Reang |
2 |
420 |
Canal |
0.70 [ 0.70 ] |
Km |
9,320,429 |
1.700 Depth (m) |
2,196.000 Volume (m3) |
6,524,300 |
| Roka |
3 |
420 |
Canal |
0.20 [ 0.40 ] |
Km |
26,915,750 |
2.180 Depth (m) |
3,626.000 Volume (m3) |
10,766,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,598,000 |
Prey Kabbas, Tang Yab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210613/04/01 |
TSO |
Suon San |
Project Type |
Rural Transport |
24,533,300 |
| Chranieng Khpos |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
8,666,250 |
4.000 Width (m) |
1.688 Earth fill m3 |
6,933,000 |
| Chranieng Khpos |
2 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
5,272,875 |
4.000 Width (m) |
208.000 Earth fill m3 |
4,218,300 |
| Roluos |
3 |
201 |
Earth road |
1.70 [ 0.96 ] |
Km |
8,666,667 |
4.000 Width (m) |
2,981.000 Earth fill m3 |
8,320,000 |
| Roluos |
4 |
203 |
Gravel road |
0.70 [ 0.96 ] |
Km |
5,272,917 |
4.000 Width (m) |
249.000 Earth fill m3 |
5,062,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,533,300 |
Samraong, Boeng Tranh Khang Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210701/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
28,144,900 |
| Angk Reang |
1 |
201 |
Earth road |
1.30 [ 1.49 ] |
Km |
17,129,966 |
4.000 Width (m) |
5,192.000 Earth fill m3 |
25,438,000 |
| Koun Romeas |
2 |
201 |
Earth road |
0.00 [ 0.19 ] |
Km |
14,631,892 |
4.000 Width (m) |
2,623.000 Earth fill m3 |
2,706,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,144,900 |
Samraong, Boeng Tranh Khang Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210702/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
30,358,300 |
| Tradak Pong |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
17,347,600 |
4.000 Width (m) |
540.000 Earth fill m3 |
19,949,740 |
| Hang Heng |
2 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
17,347,700 |
7.000 Width (m) |
4,767.000 Earth fill m3 |
10,408,620 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,358,360 |
Samraong, Cheung Kuon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210703/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
26,439,700 |
| Ta Mau |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
12,059,714 |
4.000 Width (m) |
1,903.000 Earth fill m3 |
8,441,800 |
| Cheung Kuon |
2 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
12,059,700 |
4.000 Width (m) |
2,773.000 Earth fill m3 |
12,059,700 |
| Ta Khouy |
3 |
201 |
Earth road |
0.10 [ 0.30 ] |
Km |
12,060,000 |
4.000 Width (m) |
684.000 Earth fill m3 |
3,618,000 |
| Ta Mau |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,160,100 |
5.000 Diameter (m) |
600.000 Length (m) |
1,160,100 |
| Ta Khouy |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,160,100 |
5.000 Diameter (m) |
0.600 Length (m) |
1,160,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,439,700 |
Samraong, Chumreah Pen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210704/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
30,089,000 |
| Srae Ta Sok |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.600 Length (m) |
2,000,000 |
| Thlok Damnak Luong |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,563,000 |
4.000 Diameter (m) |
0.800 Length (m) |
2,563,000 |
| Damnak Trayueng |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.600 Length (m) |
2,000,000 |
| Damnak Trayueng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Ponlueu |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Boeng |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Trapeang Khnar |
7 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,563,000 |
4.000 Diameter (m) |
0.800 Length (m) |
2,563,000 |
| Prey Khla |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,563,000 |
4.000 Diameter (m) |
0.800 Length (m) |
2,563,000 |
| Slaeng |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Trapeang Rumduol |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.800 Length (m) |
2,000,000 |
| Trapeang Rumduol |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Kansaom Khlaeng |
12 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.600 Length (m) |
2,000,000 |
| Chumreah Pen |
13 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.600 Length (m) |
2,000,000 |
| Angkor Phdiek |
14 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
4.000 Diameter (m) |
0.800 Length (m) |
2,000,000 |
| Prey Snuol |
15 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,485,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,485,000 |
| Trapeang Chambak |
16 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,490,000 |
4.000 Diameter (m) |
0.600 Length (m) |
1,490,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,089,000 |
Samraong, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210705/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
35,099,500 |
| Pou |
1 |
201 |
Earth road |
0.42 [ 0.42 ] |
Km |
18,000,000 |
4.000 Width (m) |
3,048.000 Earth fill m3 |
7,560,000 |
| Kab Nuem |
2 |
201 |
Earth road |
0.38 [ 0.38 ] |
Km |
18,000,000 |
4.000 Width (m) |
1,899.000 Earth fill m3 |
6,840,000 |
| Kab Nuem |
3 |
201 |
Earth road |
0.00 [ 0.12 ] |
Km |
28,576,613 |
4.000 Width (m) |
697.000 Earth fill m3 |
3,543,500 |
| Pou |
4 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
16,500,000 |
4.000 Width (m) |
327.600 Earth fill m3 |
6,930,000 |
| Kab Nuem |
5 |
202 |
Laterite road |
0.38 [ 0.38 ] |
Km |
16,500,000 |
4.000 Width (m) |
296.400 Earth fill m3 |
6,270,000 |
| Pou |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,006,000 |
5.000 Diameter (m) |
0.800 Length (m) |
2,006,000 |
| Leak Roteh |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,950,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,950,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,099,500 |
Samraong, Lumchang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210706/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
24,021,200 |
| Prasiek |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
15,992,809 |
4.000 Width (m) |
2,360.000 Earth fill m3 |
11,194,966 |
| Pong Tuek |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
15,992,809 |
4.000 Width (m) |
1,686.000 Earth fill m3 |
7,996,405 |
| Khvav |
3 |
201 |
Earth road |
0.00 [ 0.30 ] |
Km |
15,992,809 |
4.000 Width (m) |
1,468.000 Earth fill m3 |
4,829,828 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,021,199 |
Samraong, Rovieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210707/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Domestic Water Supplies |
29,943,000 |
| Krang Leav |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
10,081,000 |
3.000 Depth (m) |
1,404.000 Volume (m3) |
10,081,000 |
| Dak Por |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
9,981,000 |
3.000 Depth (m) |
1,869.000 Volume (m3) |
9,981,000 |
| Prey Snuol |
3 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
9,881,000 |
3.000 Depth (m) |
1,329.000 Volume (m3) |
9,881,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,943,000 |
Samraong, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210708/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Domestic Water Supplies |
25,707,400 |
| Kansaom Ak |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,848,700 |
| Prey Totueng |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,697,400 |
| Samraong |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,848,700 |
| Tuol Char |
4 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,697,400 |
| Krang Roout |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,848,700 |
| Ta Poun Lech |
6 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,848,700 |
| Ta Poun Kaeut |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,848,700 |
| Svay |
8 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,848,700 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,697,400 |
| Samraong |
9 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,790,500 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,790,500 |
| Kansaom Ak |
10 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,790,600 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,790,600 |
| Ta Poun Kaeut |
11 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,790,600 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,790,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,707,400 |
Samraong, Soeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210709/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
29,606,300 |
| Chhuk Sa Tboung |
1 |
201 |
Earth road |
1.05 [ 1.39 ] |
Km |
21,268,894 |
5.000 Width (m) |
7,047.000 Earth fill m3 |
29,606,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,606,300 |
Samraong, Sla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210710/04/01 |
TSO |
Vong Lo |
Project Type |
Rural Transport |
24,901,500 |
| Angk Chang'er |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
19,921,200 |
4.000 Width (m) |
1,362.000 Earth fill m3 |
9,960,600 |
| A Roung |
2 |
201 |
Earth road |
0.55 [ 0.75 ] |
Km |
19,921,200 |
4.000 Width (m) |
3,011.000 Earth fill m3 |
14,940,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,901,500 |
Doun Kaev, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210801/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
29,634,600 |
| Chong Thnal |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
13,462,286 |
4.000 Width (m) |
1,014.000 Earth fill m3 |
9,423,600 |
| Trapeang Ruessei |
2 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
13,462,286 |
4.000 Width (m) |
2,098.000 Earth fill m3 |
9,423,600 |
| Ruessei |
3 |
201 |
Earth road |
0.12 [ 0.12 ] |
Km |
13,461,789 |
4.000 Width (m) |
448.000 Earth fill m3 |
1,655,800 |
| Chong Thnal |
4 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
9,950,249 |
4.000 Width (m) |
241.000 Earth fill m3 |
4,000,000 |
| Trapeang Ruessei |
5 |
202 |
Laterite road |
0.00 [ 0.70 ] |
Km |
4,241,000 |
4.000 Width (m) |
298.000 Earth fill m3 |
2,968,700 |
| Chong Thnal |
6 |
202 |
Laterite road |
0.00 [ 0.30 ] |
Km |
4,240,940 |
4.000 Width (m) |
127.000 Earth fill m3 |
1,263,800 |
| Ruessei |
7 |
202 |
Laterite road |
0.00 [ 0.12 ] |
Km |
7,309,756 |
4.000 Width (m) |
53.000 Earth fill m3 |
899,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,634,600 |
Doun Kaev, Roka Knong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210802/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Domestic Water Supplies |
13,542,000 |
| Prey Prum |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
3,085,500 |
7.000 Depth (m) |
100.000 Diameter (mm) |
3,085,500 |
| Chres |
2 |
131 |
Open mixed well |
3.00 [ 3.00 ] |
Place |
1,542,750 |
7.000 Depth (m) |
100.000 Diameter (mm) |
4,628,250 |
| Ou Svay Chek |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,542,750 |
7.000 Depth (m) |
100.000 Diameter (mm) |
1,542,750 |
| Khsoeng |
4 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,200,000 |
40.000 Depth (m) |
100.000 Diameter (mm) |
1,200,000 |
| Chak |
5 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,542,800 |
7.000 Depth (m) |
100.000 Diameter (mm) |
3,085,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,542,100 |
| Contract ID |
210802/04/02 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
16,865,100 |
| Phsar Ta Kao |
1 |
201 |
Earth road |
0.32 [ 0.37 ] |
Km |
45,953,951 |
5.000 Width (m) |
3,009.000 Earth fill m3 |
16,865,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,865,100 |
Doun Kaev, Roka Krau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210803/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
27,687,000 |
| Thmei |
1 |
201 |
Earth road |
1.29 [ 1.29 ] |
Km |
8,871,206 |
4.000 Width (m) |
1,774.000 Earth fill m3 |
11,399,500 |
| Tumnob |
2 |
201 |
Earth road |
1.03 [ 1.03 ] |
Km |
8,871,165 |
4.000 Width (m) |
1,382.000 Earth fill m3 |
9,137,300 |
| Ta Du |
3 |
201 |
Earth road |
0.61 [ 0.81 ] |
Km |
8,871,216 |
4.000 Width (m) |
2,300.000 Earth fill m3 |
7,150,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,687,000 |
Tram Kak, Angk Ta Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210901/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
36,020,000 |
| Prey Rumdeng |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
4,000,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
4,000,000 |
| Prey Chheu Teal Kraom |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
4,000,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
4,000,000 |
| Prey Chheu Teal Leu |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Prey Sraong |
4 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Prey Preay |
5 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
3,113,333 |
| Prey Damrei |
6 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Angk Tnaot Kaeut |
7 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Angk Tnaot Lech |
8 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Chamkar Dieb |
9 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Trapeang Srangae |
10 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
3,113,333 |
| Angkor Moeang |
11 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
3,113,333 |
| Srok Chek |
12 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Trapeang Trabaek |
13 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Trapeang Khnar |
14 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Sman Pream |
15 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Khnar Tey |
16 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,667 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,667 |
| Trapeang Khlout |
17 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,556,400 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,556,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,019,733 |
Tram Kak, Cheang Tong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210902/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
27,743,000 |
| Moeang Char |
1 |
201 |
Earth road |
0.36 [ 0.36 ] |
Km |
10,769,444 |
4.000 Width (m) |
1,316.000 Earth fill m3 |
3,877,000 |
| Moeang Char |
2 |
202 |
Laterite road |
0.36 [ 0.36 ] |
Km |
6,572,500 |
4.000 Width (m) |
215.000 Earth fill m3 |
2,366,100 |
| Nomou |
4 |
202 |
Laterite road |
1.31 [ 1.24 ] |
Km |
6,568,548 |
4.000 Width (m) |
786.000 Earth fill m3 |
8,145,000 |
| Nomou |
5 |
201 |
Earth road |
1.31 [ 1.24 ] |
Km |
10,770,081 |
4.000 Width (m) |
2,769.000 Earth fill m3 |
13,354,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,743,000 |
Tram Kak, Kus
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210903/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
32,683,000 |
| Tumnob Chrey |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
8,535,250 |
4.000 Width (m) |
1,139.000 Earth fill m3 |
6,828,200 |
| Tumnob Chrey |
2 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
14,759,250 |
4.000 Width (m) |
192.000 Earth fill m3 |
11,807,400 |
| Chamkar Angk Tboung |
3 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
8,535,143 |
4.000 Width (m) |
1,550.000 Earth fill m3 |
5,974,600 |
| Chamkar Angk Tboung |
4 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
14,759,000 |
4.000 Width (m) |
0.150 Earth fill m3 |
2,951,800 |
| Tuek Thla |
5 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
8,535,000 |
4.000 Width (m) |
1,797.000 Earth fill m3 |
5,121,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,683,000 |
Tram Kak, Leay Bour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210904/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
8,891,000 |
| Seima |
1 |
201 |
Earth road |
0.47 [ 0.47 ] |
Km |
14,537,975 |
4.000 Width (m) |
683.000 Earth fill m3 |
6,891,000 |
| Seima |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,891,000 |
| Contract ID |
210904/04/02 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
28,399,000 |
| Angk Ta Kob |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Saen Ban |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Kach Trak |
4 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Bak Kout |
5 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
3,155,400 |
| Trapeang Chhuk |
6 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Tuol Tbaeng |
7 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Prasat |
8 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Prey Kuy |
9 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Sla |
10 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Prey Theat |
11 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Angk Ta Nu |
12 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Chreae |
13 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Thnong Roleung |
14 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Trapeang Pring |
15 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Trapeang Kur |
16 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Boeng |
17 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,578,100 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,578,100 |
| Angk Neareay |
18 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,577,700 |
40.000 Depth (m) |
75.000 Diameter (mm) |
1,577,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,399,000 |
Tram Kak, Nhaeng Nhang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210905/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
22,199,000 |
| Ou Sngaeun |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
9,897,600 |
4.000 Width (m) |
0.150 Earth fill m3 |
9,897,600 |
| Kamsei |
2 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
9,897,500 |
4.000 Width (m) |
0.150 Earth fill m3 |
5,938,500 |
| Ta Tai |
3 |
202 |
Laterite road |
0.48 [ 0.48 ] |
Km |
9,897,708 |
4.000 Width (m) |
0.150 Earth fill m3 |
4,750,900 |
| Ta Tai |
4 |
201 |
Earth road |
0.16 [ 0.16 ] |
Km |
10,075,000 |
4.000 Width (m) |
310.000 Earth fill m3 |
1,612,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,199,000 |
Tram Kak, Ou Saray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210906/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
26,563,800 |
| Tnaot Chum |
1 |
242 |
Concrete bridge with piers |
1.00 [ 1.01 ] |
Place |
26,248,814 |
10.600 Total Span (m) |
291.000 Width (m) |
26,563,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,563,800 |
Tram Kak, Trapeang Kranhung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210907/04/01 |
TSO |
Pes Phat |
Project Type |
Education |
41,091,000 |
| Prey Kduoch |
1 |
320 |
Brick school (general) |
2.00 [ 2.00 ] |
School room |
20,545,500 |
16.000 Length (m) |
9.000 Width (m) |
41,091,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,091,000 |
Tram Kak, Otdam Souriya
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210908/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Domestic Water Supplies |
27,800,000 |
| Rumpeak Pen |
1 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
2,138,450 |
7.000 Depth (m) |
49.000 Diameter (mm) |
4,276,900 |
| Prab Siem |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
2,138,450 |
7.000 Depth (m) |
49.000 Diameter (mm) |
4,276,900 |
| Ta Loea |
3 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
2,139,000 |
7.000 Depth (m) |
49.000 Diameter (mm) |
2,139,000 |
| Rumlich Svay |
4 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
2,138,450 |
7.000 Depth (m) |
49.000 Diameter (mm) |
4,276,900 |
| Dang Van |
5 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
2,138,461 |
7.000 Depth (m) |
49.000 Diameter (mm) |
2,138,461 |
| Trapeang Run |
6 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
2,138,450 |
7.000 Depth (m) |
49.000 Diameter (mm) |
4,276,900 |
| Angk Rumpeak |
7 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
2,138,450 |
7.000 Depth (m) |
49.000 Diameter (mm) |
4,276,900 |
| Chong ang |
8 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
2,138,000 |
7.000 Depth (m) |
49.000 Diameter (mm) |
2,138,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,799,961 |
Tram Kak, Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210909/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
24,587,800 |
| Trav Aem |
1 |
201 |
Earth road |
0.89 [ 0.89 ] |
Km |
24,234,802 |
4.000 Width (m) |
4,495.000 Earth fill m3 |
21,447,800 |
| Trav Aem |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,140,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,140,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,587,800 |
Tram Kak, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210910/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
22,150,800 |
| Paen Meas |
1 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
7,670,750 |
4.000 Width (m) |
480.000 Earth fill m3 |
6,136,600 |
| Prasout Thmei |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
7,670,750 |
4.000 Width (m) |
240.000 Earth fill m3 |
3,068,300 |
| Pong Tuek |
3 |
202 |
Laterite road |
0.68 [ 0.68 ] |
Km |
7,670,864 |
4.000 Width (m) |
409.800 Earth fill m3 |
5,239,200 |
| Krang Banteay |
4 |
202 |
Laterite road |
0.52 [ 0.52 ] |
Km |
7,670,793 |
4.000 Width (m) |
370.200 Earth fill m3 |
3,965,800 |
| Ta Sman |
5 |
202 |
Laterite road |
0.00 [ 0.76 ] |
Km |
4,922,237 |
4.000 Width (m) |
1.500 Earth fill m3 |
3,740,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,150,800 |
Tram Kak, Srae Ronoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210911/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
25,014,000 |
| Thum |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
7,766,200 |
4.000 Width (m) |
0.150 Earth fill m3 |
3,883,100 |
| Kouk Rovieng |
2 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
7,766,200 |
4.000 Width (m) |
0.150 Earth fill m3 |
4,659,720 |
| Praviney |
3 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
29,822,000 |
4.000 Width (m) |
5,619.000 Earth fill m3 |
11,928,800 |
| Praviney |
4 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
7,766,000 |
4.000 Width (m) |
0.150 Earth fill m3 |
3,106,400 |
| Praviney |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,436,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,436,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,014,020 |
Tram Kak, Ta Phem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210912/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Domestic Water Supplies |
35,124,000 |
| Khla Krohuem |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Angk Kokir |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Prasung |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Pou Preah Sang |
4 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
82.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Ta Toem |
5 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Trapeang Svay |
6 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,600,000 |
42.000 Depth (m) |
100.000 Diameter (mm) |
3,600,000 |
| Trapeang Ampil |
7 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Ta Much |
8 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Ta Phem |
9 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Li Nha |
10 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Ta Mom |
11 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Tbaeng Totueng |
12 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Prey Chheu Teal |
13 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,932,000 |
7.000 Depth (m) |
45.000 Diameter (mm) |
1,932,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,124,000 |
| Contract ID |
210912/04/02 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
4,577,000 |
| Mrum |
1 |
212 |
Double pipe culvert |
3.00 [ 3.00 ] |
Place |
1,525,667 |
0.600 Diameter (m) |
4.000 Length (m) |
4,577,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,577,000 |
Tram Kak, Tram Kak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210913/04/01 |
TSO |
Pes Phat |
Project Type |
Rural Transport |
24,184,000 |
| Angk Roneab |
1 |
242 |
Concrete bridge with piers |
1.00 [ 1.00 ] |
Place |
24,184,000 |
6.600 Total Span (m) |
4.000 Width (m) |
24,184,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,184,000 |
Tram Kak, Trapeang Thum Khang Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210914/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Domestic Water Supplies |
23,760,000 |
| Trapeang Svay |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,960,000 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,960,000 |
| Ta Suon |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,960,000 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,960,000 |
| Prey Ta Lei |
3 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,960,000 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,960,000 |
| Angk Trav |
4 |
123 |
Drilled well with Afridev pump |
2.00 [ 2.00 ] |
Place |
3,960,000 |
35.000 Depth (m) |
100.000 Diameter (mm) |
7,920,000 |
| Peak Bang'aong |
5 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
3,960,000 |
35.000 Depth (m) |
100.000 Diameter (mm) |
3,960,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,760,000 |
Tram Kak, Trapeang Thum Khang Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
210915/04/01 |
TSO |
Ouk Kevmonint |
Project Type |
Rural Transport |
24,181,000 |
| Trapeang Prei |
1 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
7,441,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,441,000 |
| Prey Preal |
2 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
16,740,000 |
1.000 Diameter (m) |
8.000 Length (m) |
16,740,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,181,000 |
Treang, Angkanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211001/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
21,767,500 |
| Ta Ren Chou |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
8,465,795 |
5.000 Width (m) |
2,738.000 Earth fill m3 |
14,391,852 |
| Krang Chheu Neang |
2 |
201 |
Earth road |
0.20 [ 0.50 ] |
Km |
8,465,795 |
5.000 Width (m) |
1,893.000 Earth fill m3 |
4,232,898 |
| Ta Ren Chou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,571,400 |
0.600 Diameter (m) |
6.000 Length (m) |
1,571,400 |
| Krang Chheu Neang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,571,400 |
0.600 Diameter (m) |
6.000 Length (m) |
1,571,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,767,549 |
Treang, Angk Khnaor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211002/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
19,848,500 |
| Spueu |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
14,923,684 |
4.000 Width (m) |
2,750.000 Earth fill m3 |
14,923,684 |
| Prey Meas |
2 |
201 |
Earth road |
0.18 [ 0.33 ] |
Km |
14,923,685 |
4.000 Width (m) |
2,080.000 Earth fill m3 |
4,924,816 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,848,500 |
Treang, Chi Khmar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211003/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
20,836,600 |
| Chuos |
1 |
201 |
Earth road |
0.70 [ 0.93 ] |
Km |
9,434,731 |
4.000 Width (m) |
2,878.000 Earth fill m3 |
8,774,300 |
| Chuos |
2 |
202 |
Laterite road |
0.70 [ 0.93 ] |
Km |
7,808,925 |
4.000 Width (m) |
618.000 Earth fill m3 |
7,262,300 |
| Chuos |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Chuos |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Chi Khmar |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,836,600 |
Treang, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211004/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
27,280,000 |
| Pongro |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
10,535,500 |
5.000 Total Span (m) |
3.000 Width(m) |
10,535,500 |
| Kakaoh |
2 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
7,550,500 |
4.000 Total Span (m) |
3.500 Width(m) |
7,550,500 |
| Ta Sraen |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,047,000 |
8.000 Diameter (m) |
1,000.000 Length (m) |
5,047,000 |
| Sama Leu |
4 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
4,147,000 |
5.000 Diameter (m) |
0.600 Length (m) |
4,147,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,280,000 |
Treang, Prambei Mom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211005/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
24,948,000 |
| Trapeang Veaeng |
1 |
203 |
Gravel road |
1.65 [ 1.65 ] |
Km |
9,456,788 |
3.500 Width (m) |
866.000 Earth fill m3 |
15,603,700 |
| Damnak Reachea |
3 |
203 |
Gravel road |
0.63 [ 0.85 ] |
Km |
9,456,800 |
3.500 Width (m) |
579.000 Earth fill m3 |
8,038,280 |
| Trapeang Veaeng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,306,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,306,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,947,980 |
Treang, Angk Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211006/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
19,451,000 |
| Trapeang Kak |
1 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
14,475,770 |
4.000 Width (m) |
160.000 Earth fill m3 |
2,895,154 |
| Serei Duoch |
2 |
202 |
Laterite road |
0.94 [ 0.94 ] |
Km |
14,475,829 |
4.000 Width (m) |
748.000 Earth fill m3 |
13,534,900 |
| Angk Kaev |
3 |
202 |
Laterite road |
0.00 [ 0.30 ] |
Km |
10,070,000 |
3.000 Width (m) |
90.000 Earth fill m3 |
3,021,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,451,054 |
Treang, Prey Sloek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211007/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
8,500,000 |
| Trapeang Veaeng |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,700,000 |
| Sangha |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,400,000 |
| Kouk Nhoar |
3 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,500,000 |
| Contract ID |
211007/04/02 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
22,219,000 |
| Sour Chant |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,380,770 |
2.000 Depth (m) |
522.000 Volume (m3) |
2,380,770 |
| Niel |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,731,285 |
2.000 Depth (m) |
749.000 Volume (m3) |
2,731,285 |
| Prey Sloek |
3 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,672,107 |
2.000 Depth (m) |
576.000 Volume (m3) |
2,672,107 |
| Daeum Phdiek |
4 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,825,408 |
1.500 Depth (m) |
399.000 Volume (m3) |
1,825,408 |
| Phnum Thnak |
5 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,415,716 |
1.500 Depth (m) |
310.000 Volume (m3) |
1,415,716 |
| Trapeang Ta Muong |
6 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
9,368,306 |
1.500 Depth (m) |
2,058.000 Volume (m3) |
9,368,306 |
| Srae Chrak |
7 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,825,400 |
1.000 Depth (m) |
401.000 Volume (m3) |
1,825,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,218,992 |
Treang, Roneam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211008/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
25,309,900 |
| Trapeang Ampeak |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
6.000 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Prey Ph'av |
2 |
202 |
Laterite road |
0.82 [ 1.06 ] |
Km |
11,284,313 |
4.000 Width (m) |
1,272.000 Earth fill m3 |
11,961,372 |
| Trapeang Chrey |
3 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
11,284,312 |
4.000 Width (m) |
2,100.000 Earth fill m3 |
11,848,528 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,309,900 |
Treang, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211009/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
29,664,000 |
| Pou |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
10,408,421 |
4.000 Width (m) |
630.000 Earth fill m3 |
10,928,842 |
| Tnaot Chum |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
10,408,421 |
4.000 Width (m) |
720.000 Earth fill m3 |
12,490,105 |
| Rovieng |
3 |
201 |
Earth road |
0.30 [ 0.60 ] |
Km |
10,408,588 |
4.000 Width (m) |
600.000 Earth fill m3 |
6,245,153 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,664,100 |
Treang, Sanlung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211010/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
21,566,000 |
| Louk |
1 |
203 |
Gravel road |
1.00 [ 1.12 ] |
Km |
19,341,704 |
4.000 Width (m) |
4.203 Earth fill m3 |
21,566,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,566,000 |
Treang, Smaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211011/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
19,657,800 |
| Smaong |
1 |
203 |
Gravel road |
1.50 [ 1.50 ] |
Km |
8,252,645 |
4.000 Width (m) |
150.000 Earth fill m3 |
12,378,967 |
| Trapeang Chrey |
2 |
203 |
Gravel road |
0.60 [ 0.88 ] |
Km |
8,252,645 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,278,833 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,657,800 |
Treang, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211012/04/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
27,693,400 |
| Kantuot |
1 |
421 |
Concrete canal |
0.10 [ 0.12 ] |
Km |
230,778,333 |
1.500 Depth (m) |
58.000 |
27,693,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,693,400 |
Treang, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211013/04/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
29,849,000 |
| Prey Chheu Teal |
1 |
420 |
Canal |
0.95 [ 1.22 ] |
Km |
24,466,393 |
2.650 Depth (m) |
9,583.000 Volume (m3) |
29,849,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,849,000 |
Treang, Tralach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211014/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
21,003,600 |
| Tonle |
1 |
203 |
Gravel road |
0.73 [ 0.73 ] |
Km |
9,293,628 |
3.500 Width (m) |
497.000 Earth fill m3 |
6,765,761 |
| Tralach |
2 |
203 |
Gravel road |
0.55 [ 0.55 ] |
Km |
9,293,629 |
3.500 Width (m) |
375.000 Earth fill m3 |
5,111,496 |
| Choes |
3 |
203 |
Gravel road |
0.76 [ 0.98 ] |
Km |
9,293,628 |
3.500 Width (m) |
738.000 Earth fill m3 |
9,126,343 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,003,600 |