Contract Outputs
Location: Takeo \ Treang Budget Year: 2004
Angkor Borei
Bati
Bourei Cholsar
Kiri Vong
Kaoh Andaet
Prey Kabbas
Samraong
Doun Kaev
Tram Kak
Treang
Treang, Angkanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211001/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
21,767,500 |
| Ta Ren Chou |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
8,465,795 |
5.000 Width (m) |
2,738.000 Earth fill m3 |
14,391,852 |
| Krang Chheu Neang |
2 |
201 |
Earth road |
0.20 [ 0.50 ] |
Km |
8,465,795 |
5.000 Width (m) |
1,893.000 Earth fill m3 |
4,232,898 |
| Ta Ren Chou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,571,400 |
0.600 Diameter (m) |
6.000 Length (m) |
1,571,400 |
| Krang Chheu Neang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,571,400 |
0.600 Diameter (m) |
6.000 Length (m) |
1,571,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,767,549 |
Treang, Angk Khnaor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211002/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
19,848,500 |
| Spueu |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
14,923,684 |
4.000 Width (m) |
2,750.000 Earth fill m3 |
14,923,684 |
| Prey Meas |
2 |
201 |
Earth road |
0.18 [ 0.33 ] |
Km |
14,923,685 |
4.000 Width (m) |
2,080.000 Earth fill m3 |
4,924,816 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,848,500 |
Treang, Chi Khmar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211003/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
20,836,600 |
| Chuos |
1 |
201 |
Earth road |
0.70 [ 0.93 ] |
Km |
9,434,731 |
4.000 Width (m) |
2,878.000 Earth fill m3 |
8,774,300 |
| Chuos |
2 |
202 |
Laterite road |
0.70 [ 0.93 ] |
Km |
7,808,925 |
4.000 Width (m) |
618.000 Earth fill m3 |
7,262,300 |
| Chuos |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Chuos |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Chi Khmar |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,836,600 |
Treang, Khvav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211004/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
27,280,000 |
| Pongro |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
10,535,500 |
5.000 Total Span (m) |
3.000 Width(m) |
10,535,500 |
| Kakaoh |
2 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
7,550,500 |
4.000 Total Span (m) |
3.500 Width(m) |
7,550,500 |
| Ta Sraen |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,047,000 |
8.000 Diameter (m) |
1,000.000 Length (m) |
5,047,000 |
| Sama Leu |
4 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
4,147,000 |
5.000 Diameter (m) |
0.600 Length (m) |
4,147,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,280,000 |
Treang, Prambei Mom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211005/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
24,948,000 |
| Trapeang Veaeng |
1 |
203 |
Gravel road |
1.65 [ 1.65 ] |
Km |
9,456,788 |
3.500 Width (m) |
866.000 Earth fill m3 |
15,603,700 |
| Damnak Reachea |
3 |
203 |
Gravel road |
0.63 [ 0.85 ] |
Km |
9,456,800 |
3.500 Width (m) |
579.000 Earth fill m3 |
8,038,280 |
| Trapeang Veaeng |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,306,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,306,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,947,980 |
Treang, Angk Kaev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211006/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
19,451,000 |
| Trapeang Kak |
1 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
14,475,770 |
4.000 Width (m) |
160.000 Earth fill m3 |
2,895,154 |
| Serei Duoch |
2 |
202 |
Laterite road |
0.94 [ 0.94 ] |
Km |
14,475,829 |
4.000 Width (m) |
748.000 Earth fill m3 |
13,534,900 |
| Angk Kaev |
3 |
202 |
Laterite road |
0.00 [ 0.30 ] |
Km |
10,070,000 |
3.000 Width (m) |
90.000 Earth fill m3 |
3,021,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,451,054 |
Treang, Prey Sloek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211007/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
8,500,000 |
| Trapeang Veaeng |
1 |
131 |
Open mixed well |
1.00 [ 1.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
1,700,000 |
| Sangha |
2 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,400,000 |
| Kouk Nhoar |
3 |
131 |
Open mixed well |
2.00 [ 2.00 ] |
Place |
1,700,000 |
7.000 Depth (m) |
1,000.000 Diameter (mm) |
3,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,500,000 |
| Contract ID |
211007/04/02 |
TSO |
Ching Simon |
Project Type |
Rural Domestic Water Supplies |
22,219,000 |
| Sour Chant |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,380,770 |
2.000 Depth (m) |
522.000 Volume (m3) |
2,380,770 |
| Niel |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,731,285 |
2.000 Depth (m) |
749.000 Volume (m3) |
2,731,285 |
| Prey Sloek |
3 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
2,672,107 |
2.000 Depth (m) |
576.000 Volume (m3) |
2,672,107 |
| Daeum Phdiek |
4 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,825,408 |
1.500 Depth (m) |
399.000 Volume (m3) |
1,825,408 |
| Phnum Thnak |
5 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,415,716 |
1.500 Depth (m) |
310.000 Volume (m3) |
1,415,716 |
| Trapeang Ta Muong |
6 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
9,368,306 |
1.500 Depth (m) |
2,058.000 Volume (m3) |
9,368,306 |
| Srae Chrak |
7 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
1,825,400 |
1.000 Depth (m) |
401.000 Volume (m3) |
1,825,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,218,992 |
Treang, Roneam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211008/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
25,309,900 |
| Trapeang Ampeak |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
6.000 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Prey Ph'av |
2 |
202 |
Laterite road |
0.82 [ 1.06 ] |
Km |
11,284,313 |
4.000 Width (m) |
1,272.000 Earth fill m3 |
11,961,372 |
| Trapeang Chrey |
3 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
11,284,312 |
4.000 Width (m) |
2,100.000 Earth fill m3 |
11,848,528 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,309,900 |
Treang, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211009/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
29,664,000 |
| Pou |
1 |
201 |
Earth road |
1.05 [ 1.05 ] |
Km |
10,408,421 |
4.000 Width (m) |
630.000 Earth fill m3 |
10,928,842 |
| Tnaot Chum |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
10,408,421 |
4.000 Width (m) |
720.000 Earth fill m3 |
12,490,105 |
| Rovieng |
3 |
201 |
Earth road |
0.30 [ 0.60 ] |
Km |
10,408,588 |
4.000 Width (m) |
600.000 Earth fill m3 |
6,245,153 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,664,100 |
Treang, Sanlung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211010/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
21,566,000 |
| Louk |
1 |
203 |
Gravel road |
1.00 [ 1.12 ] |
Km |
19,341,704 |
4.000 Width (m) |
4.203 Earth fill m3 |
21,566,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,566,000 |
Treang, Smaong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211011/04/01 |
TSO |
Taing Touch |
Project Type |
Rural Transport |
19,657,800 |
| Smaong |
1 |
203 |
Gravel road |
1.50 [ 1.50 ] |
Km |
8,252,645 |
4.000 Width (m) |
150.000 Earth fill m3 |
12,378,967 |
| Trapeang Chrey |
2 |
203 |
Gravel road |
0.60 [ 0.88 ] |
Km |
8,252,645 |
4.000 Width (m) |
150.000 Earth fill m3 |
7,278,833 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,657,800 |
Treang, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211012/04/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
27,693,400 |
| Kantuot |
1 |
421 |
Concrete canal |
0.10 [ 0.12 ] |
Km |
230,778,333 |
1.500 Depth (m) |
58.000 |
27,693,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,693,400 |
Treang, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211013/04/01 |
TSO |
Ching Simon |
Project Type |
Irrigation |
29,849,000 |
| Prey Chheu Teal |
1 |
420 |
Canal |
0.95 [ 1.22 ] |
Km |
24,466,393 |
2.650 Depth (m) |
9,583.000 Volume (m3) |
29,849,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,849,000 |
Treang, Tralach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
211014/04/01 |
TSO |
Ching Simon |
Project Type |
Rural Transport |
21,003,600 |
| Tonle |
1 |
203 |
Gravel road |
0.73 [ 0.73 ] |
Km |
9,293,628 |
3.500 Width (m) |
497.000 Earth fill m3 |
6,765,761 |
| Tralach |
2 |
203 |
Gravel road |
0.55 [ 0.55 ] |
Km |
9,293,629 |
3.500 Width (m) |
375.000 Earth fill m3 |
5,111,496 |
| Choes |
3 |
203 |
Gravel road |
0.76 [ 0.98 ] |
Km |
9,293,628 |
3.500 Width (m) |
738.000 Earth fill m3 |
9,126,343 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,003,600 |