Contract Outputs
Location: Pursat \ Phnum Kravanh Budget Year: 2005
Bakan
Kandieng
Krakor
Phnum Kravanh
Sampov Meas
Veal Veaeng
Phnum Kravanh, Bak Chenhchien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150401/05/01 |
TSO |
Sek Chanrattha |
Project Type |
Irrigation |
12,237,100 |
| Chan Serei |
1 |
420 |
Canal |
1.55 [ 1.55 ] |
Km |
7,900,000 |
0.000 Depth (m) |
0.000 Volume (m3) |
12,237,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,237,100 |
| Contract ID |
150401/05/02 |
TSO |
Sek Chanrattha |
Project Type |
Irrigation |
12,050,000 |
| Chan Serei |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
7,950,000 |
1.000 Diameter (m) |
13.000 Width (m) |
7,950,000 |
| Bak Chenhchien |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,100,000 |
0.800 Diameter (m) |
6.000 Length (m) |
4,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,050,000 |
Phnum Kravanh, Phteah Rung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150403/05/01 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
13,968,000 |
| Kandal |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
8,900,000 |
2.500 Total Span (m) |
3.000 Width (m) |
8,900,000 |
| Prohoas Kbal |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,068,000 |
1.000 Diameter (m) |
6.000 Length (m) |
5,068,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,968,000 |
| Contract ID |
150403/05/02 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
12,999,200 |
| Bat Rumduol |
1 |
202 |
Laterite road |
2.78 [ 2.78 ] |
Km |
4,676,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
12,999,280 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,999,280 |
Phnum Kravanh, Prongil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150404/05/01 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
12,900,000 |
| Prongil |
1 |
231 |
Wood bridge, 5 tonne standard, concrete abutments |
1.00 [ 1.00 ] |
Place |
12,900,000 |
2.500 Total Span (m) |
3.000 Width (m) |
12,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,900,000 |
| Contract ID |
150404/05/02 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
13,680,000 |
| Svaypak |
1 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
10,000,000 |
2.000 Total Span (m) |
6.000 Width(m) |
10,000,000 |
| Svaypak |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,680,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,680,000 |
Phnum Kravanh, Rokat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150405/05/02 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
6,600,000 |
| Prey Khlong |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,000,000 |
| Prey Khlong |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,100,000 |
| Veal Vong |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,000,000 |
| Veal Vong |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,600,000 |
Phnum Kravanh, Santreae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150406/05/01 |
TSO |
Sek Chanrattha |
Project Type |
Irrigation |
26,950,000 |
| Santreae |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
5,390,000 |
1.000 Diameter (m) |
6.000 Width (m) |
5,390,000 |
| Sraepopeay |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
5,390,000 |
1.000 Diameter (m) |
6.000 Width (m) |
5,390,000 |
| Kol Totueng |
3 |
452 |
Single pipe Culvert with gate |
3.00 [ 3.00 ] |
Place |
5,390,000 |
1.000 Diameter (m) |
6.000 Width (m) |
16,170,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,950,000 |
Phnum Kravanh, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150407/05/01 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
15,124,900 |
| Samraong Pir |
1 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
7,378,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
5,902,400 |
| Ou Heng |
2 |
202 |
Laterite road |
1.25 [ 1.25 ] |
Km |
7,378,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
9,222,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,124,900 |
| Contract ID |
150407/05/02 |
TSO |
Sek Chanrattha |
Project Type |
Rural Transport |
7,500,000 |
| Ou Preal |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Ou Preal |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,300,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,300,000 |
| Samraong Pir |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Samraong Pir |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,500,000 |