Contract Outputs

Location: Siem Reap Budget Year: 2005

Angkor Chum    Angkor Thum    Banteay Srei    Chi Kraeng    Kralanh    Puok    Prasat Bakong    Siem Reab    Soutr Nikom    Srei Snam    Svay Leu    Varin   

Angkor Chum, Char Chhuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170101/05/01 TSO Born Sophal Project Type Rural Transport 12,800,000
Khlong 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,800,000 3.000 Total Span (m) 5.500 Width(m) 9,800,000
Kouk Kbat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Prasat 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,800,000
Contract ID 170101/05/02 TSO Born Sophal Project Type Irrigation 15,100,800
Khlong 1 451 Small water gate 1.00 [ 1.00 ] Place 5,033,600 5.500 Length (m) 1.200 Height (m) 5,033,600
Char Roka 2 451 Small water gate 1.00 [ 1.00 ] Place 5,033,600 5.500 Length (m) 1.200 Height (m) 5,033,600
Kouk Lvea 3 451 Small water gate 1.00 [ 1.00 ] Place 5,033,600 5.500 Length (m) 1.200 Height (m) 5,033,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,100,800

Angkor Chum, Doun Peaeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170102/05/01 TSO Born Sophal Project Type Rural Transport 24,488,000
Beng 1 202 Laterite road 1.50 [ 1,500.00 ] Km 16,325 3.000 Width (m) 1,540.000 Earth fill m3 24,488,007
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,488,007

Angkor Chum, Kouk Doung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170103/05/01 TSO Born Sophal Project Type Rural Transport 41,374,300
Kouk Doung Chas 1 202 Laterite road 2.70 [ 2,700.00 ] Km 15,324 4.000 Width (m) 2,016.000 Earth fill m3 41,374,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,374,300

Angkor Chum, Koul

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170104/05/01 TSO Born Sophal Project Type Rural Transport 28,112,000
Doun Miev 1 202 Laterite road 1.50 [ 1,500.00 ] Km 18,741 3.000 Width (m) 1,364.000 Earth fill m3 28,112,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,112,000

Angkor Chum, Nokor Pheas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170105/05/01 TSO Born Sophal Project Type Rural Transport 34,692,100
Tonle Sar 1 202 Laterite road 2.60 [ 2,600.00 ] Km 13,343 4.000 Width (m) 560.000 Earth fill m3 34,692,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,692,100

Angkor Chum, Srae Khvav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170106/05/01 TSO Born Sophal Project Type Rural Transport 27,872,000
Rundas 1 202 Laterite road 2.00 [ 2.00 ] Km 13,936,000 4.000 Width (m) 823.000 Earth fill m3 27,872,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,872,000

Angkor Chum, Ta Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170107/05/01 TSO Born Sophal Project Type Rural Transport 28,751,000
Pram Damloeng 1 202 Laterite road 2.00 [ 2.00 ] Km 14,375,500 4.000 Width (m) 1,050.000 Earth fill m3 28,751,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,751,000

Angkor Thum, Leang Dai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170202/05/01 TSO Moeun Makara Project Type Rural Transport 22,200,000
Leang Dai 1 201 Earth road 0.83 [ 0.83 ] Km 22,891,567 5.000 Width (m) 2,484.000 Earth fill m3 19,000,001
Leang Dai 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,600,000 0.600 Diameter (m) 6.000 Length (m) 3,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,200,001

Angkor Thum, Peak Snaeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170203/05/01 TSO Moeun Makara Project Type Rural Transport 19,800,000
Peak Snaeng Thmei 1 201 Earth road 0.82 [ 0.82 ] Km 21,707,317 5.000 Width (m) 3,566.000 Earth fill m3 17,800,000
Peak Snaeng Thmei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 6.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,800,000

Angkor Thum, Svay Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170204/05/01 TSO Moeun Makara Project Type Rural Transport 25,099,500
Svay Chek 1 201 Earth road 0.81 [ 0.81 ] Km 30,987,037 4.000 Width (m) 3,604.000 Earth fill m3 25,099,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,099,500

Banteay Srei, Khnar Sanday

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170301/05/01 TSO Proeun Tanravuth Project Type Irrigation 27,900,000
Banteay Srei 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 19,900,000 1.000 Diameter (m) 18.000 Length (m) 19,900,000
Khnar 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,000,000 2.000 Total Span (m) 4.500 Width(m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,900,000

Banteay Srei, Khun Ream

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170302/05/01 TSO Proeun Tanravuth Project Type Rural Domestic Water Supplies 20,400,000
Khnar Roveas 1 180 Piped water supplies 93.00 [ 93.00 ] Houses 219,355 2.085 km of pipe 1.000 20,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,400,000

Banteay Srei, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170304/05/01 TSO Proeun Tanravuth Project Type Rural Transport 22,154,500
Rumchek 1 202 Laterite road 0.90 [ 0.90 ] Km 24,616,110 4.000 Width (m) 560.000 Earth fill m3 22,154,499
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,154,499

Banteay Srei, Run Ta Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170305/05/01 TSO Proeun Tanravuth Project Type Rural Transport 28,110,000
Run 1 202 Laterite road 1.00 [ 1.00 ] Km 28,025,923 4.000 Width (m) 1,244.000 Earth fill m3 28,110,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,110,001

Banteay Srei, Tbaeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170306/05/01 TSO Proeun Tanravuth Project Type Rural Transport 22,625,000
Tbaeng Kaeut 1 202 Laterite road 0.91 [ 0.91 ] Km 24,862,638 4.000 Width (m) 800.000 Earth fill m3 22,625,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,625,001

Chi Kraeng, Anlong Samnar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170401/05/01 TSO Mon Chantha Project Type Rural Domestic Water Supplies 27,400,000
Chaek Khsach Kraom 1 141 Pond with no filter 1.00 [ 1.00 ] Place 11,000,000 5.000 Depth (m) 2,063.000 Volume (m3) 11,000,000
Preaek Angkor Thmei 2 141 Pond with no filter 1.00 [ 1.00 ] Place 11,000,000 5.000 Depth (m) 2,063.000 Volume (m3) 11,000,000
Trapeang Tras 3 141 Pond with no filter 1.00 [ 1.00 ] Place 5,400,000 3.000 Depth (m) 1,620.000 Volume (m3) 5,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,400,000
Contract ID 170401/05/02 TSO Mon Chantha Project Type Domestic Sanitation 3,460,000
Trapeang Tras 1 170 Latrines (general) 2.00 [ 2.00 ] Latrine room 1,730,000 0.000 0.000 3,460,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,460,000

Chi Kraeng, Chi Kraeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170402/05/01 TSO Mon Chantha Project Type Rural Transport 29,507,500
Phniet 1 202 Laterite road 1.85 [ 1.85 ] Km 15,950,000 3.500 Width (m) 1,036.000 Earth fill m3 29,507,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,507,500

Chi Kraeng, Kampong Kdei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170403/05/01 TSO Mon Chantha Project Type Domestic Sanitation 2,900,000
Kampong Kdei Pir 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 1,450,000 1.000 1.000 2,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,900,000
Contract ID 170403/05/02 TSO Mon Chantha Project Type Irrigation 12,900,000
Trapeang Chrey 1 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 2.000 Length (m) 1.500 Height (m) 4,300,000
Roka 2 451 Small water gate 2.00 [ 2.00 ] Place 4,300,000 2.000 Length (m) 1.500 Height (m) 8,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,900,000
Contract ID 170403/05/03 TSO Mon Chantha Project Type Rural Transport 11,837,000
Trach Thmei 1 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,275,000 0.600 Diameter (m) 5.000 Length (m) 2,550,000
Ta Peam 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,275,000 0.600 Diameter (m) 5.000 Length (m) 1,275,000
Ta Peam 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,830,000 0.800 Diameter (m) 5.000 Length (m) 1,830,000
Ansang Pong 4 251 Drift 1.00 [ 1.00 ] Place 6,182,000 20.000 Length (m) 4.000 Width (m) 6,182,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,837,000

Chi Kraeng, Khvav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170404/05/01 TSO Mon Chantha Project Type Rural Domestic Water Supplies 28,089,600
Krang 1 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Preah Theat 2 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Sraong 3 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Ou 4 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Khvav 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 5,107,200
Pou Ring 6 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Kambaar 7 131 Open mixed well 2.00 [ 2.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 5,107,200
Chong Spean 8 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Rovieng 9 131 Open mixed well 1.00 [ 1.00 ] Place 2,553,600 7.000 Depth (m) 1.000 Diameter (mm) 2,553,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,089,600

Chi Kraeng, Kouk Thlok Kraom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170405/05/01 TSO Mon Chantha Project Type Rural Transport 13,200,000
Toap Siem 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 10,200,000 1.500 Total Span (m) 5.500 Width(m) 10,200,000
Bak Angrut 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,200,000
Contract ID 170405/05/02 TSO Mon Chantha Project Type Irrigation 7,441,400
Doun Reach 1 451 Small water gate 1.00 [ 1.00 ] Place 7,441,400 4.000 Length (m) 2.000 Height (m) 7,441,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,441,400

Chi Kraeng, Kouk Thlok Leu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170406/05/01 TSO Mon Chantha Project Type Rural Transport 32,380,000
Ta Phnhea 1 202 Laterite road 2.30 [ 2.30 ] Km 14,078,261 3.500 Width (m) 2,576.000 Earth fill m3 32,380,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,380,000

Chi Kraeng, Lveaeng Ruessei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170407/05/01 TSO Mon Chantha Project Type Rural Transport 28,109,000
Rumchey Chroh 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,347,200 1.000 Diameter (m) 5.000 Length (m) 2,347,200
Ta Nguon 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,774,400 0.800 Diameter (m) 5.000 Length (m) 1,774,400
Chambak Khpos 3 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,022,280 2.000 Total Span (m) 5.000 Width(m) 7,022,280
Lveaeng Ruessei 4 223 Triple cell box culvert 1.00 [ 1.00 ] Place 14,617,901 4.500 Total Span (m) 5.500 Width(m) 14,617,901
Ta Nguon 5 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,347,200 1.000 Diameter (m) 5.000 Length (m) 2,347,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,108,981

Chi Kraeng, Pongro Kraom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170408/05/01 TSO Mon Chantha Project Type Rural Transport 24,861,600
Chey Bour 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,959,400 0.800 Diameter (m) 6.000 Length (m) 5,959,400
Ou Khlong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,387,400 0.600 Diameter (m) 5.000 Length (m) 1,387,400
Ta Poar Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,596,000 1.000 Diameter (m) 5.000 Length (m) 3,596,000
Pou 4 221 Single cell box culvert 2.00 [ 2.00 ] Place 5,959,400 5.000 Total Span (m) 2.000 Width(m) 11,918,800
Chey Bour 5 221 Single cell box culvert 1.00 [ 1.00 ] Place 2,000,000 2.000 Total Span (m) 5.000 Width(m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,861,600

Chi Kraeng, Pongro Leu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170409/05/01 TSO Mon Chantha Project Type Rural Domestic Water Supplies 21,960,000
Svay Chek 1 131 Open mixed well 2.00 [ 2.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 4,880,000
Kumru 2 131 Open mixed well 1.00 [ 1.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 2,440,000
Kbal Damrei 3 131 Open mixed well 1.00 [ 1.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 2,440,000
Kreang 4 131 Open mixed well 1.00 [ 1.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 2,440,000
Chek 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 4,880,000
Dob Tnaot 6 131 Open mixed well 1.00 [ 1.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 2,440,000
Sralau Sraong 7 131 Open mixed well 1.00 [ 1.00 ] Place 2,440,000 7.000 Depth (m) 1.000 Diameter (mm) 2,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,960,000
Contract ID 170409/05/02 TSO Mon Chantha Project Type Rural Transport 5,722,000
Kumru 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,680,000 0.600 Diameter (m) 5.000 Length (m) 1,680,000
Chek 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,042,000 0.800 Diameter (m) 5.000 Length (m) 4,042,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,722,000

Chi Kraeng, Ruessei Lok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170410/05/01 TSO Mon Chantha Project Type Irrigation 8,000,000
Ruessei Lok 1 451 Small water gate 1.00 [ 1.00 ] Place 8,000,000 4.000 Length (m) 2.000 Height (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,000,000
Contract ID 170410/05/02 TSO Mon Chantha Project Type Rural Domestic Water Supplies 20,250,000
Yeang 1 131 Open mixed well 1.00 [ 1.00 ] Place 2,250,000 7.000 Depth (m) 1.000 Diameter (mm) 2,250,000
Krouch 2 131 Open mixed well 2.00 [ 2.00 ] Place 2,250,000 7.000 Depth (m) 1.000 Diameter (mm) 4,500,000
Spean Touch 3 131 Open mixed well 2.00 [ 2.00 ] Place 2,250,000 7.000 Depth (m) 1.000 Diameter (mm) 4,500,000
Boeng 4 131 Open mixed well 2.00 [ 2.00 ] Place 2,250,000 7.000 Depth (m) 1.000 Diameter (mm) 4,500,000
Samraong Kanhchaoch 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,250,000 7.000 Depth (m) 1.000 Diameter (mm) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,250,000

Chi Kraeng, Sangvaeuy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170411/05/01 TSO Mon Chantha Project Type Rural Domestic Water Supplies 22,020,000
Kansaeng 1 111 Ring well 3.00 [ 3.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 4,404,000
Damrei Chhlang 2 111 Ring well 1.00 [ 1.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 1,468,000
Thnal Dach 3 111 Ring well 2.00 [ 2.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 2,936,000
Chak 4 111 Ring well 2.00 [ 2.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 2,936,000
Ta Prum 5 111 Ring well 2.00 [ 2.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 2,936,000
Ou 6 111 Ring well 2.00 [ 2.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 2,936,000
Peak Spea 7 111 Ring well 2.00 [ 2.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 2,936,000
Prey Pros 8 111 Ring well 1.00 [ 1.00 ] Place 1,468,000 7.000 Depth (m) 1.000 Diameter (m) 1,468,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,020,000
Contract ID 170411/05/02 TSO Mon Chantha Project Type Rural Transport 2,942,000
Thnal Dach 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,471,000 0.600 Diameter (m) 5.000 Length (m) 1,471,000
Ou 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,471,000 0.600 Diameter (m) 5.000 Length (m) 1,471,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,942,000

Chi Kraeng, Spean Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170412/05/01 TSO Mon Chantha Project Type Rural Domestic Water Supplies 26,438,400
Spean Tnaot Pir 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 2,203,200
Samraong 2 131 Open mixed well 2.00 [ 2.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 4,406,400
Totea 3 131 Open mixed well 2.00 [ 2.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 4,406,400
Lvea 4 131 Open mixed well 2.00 [ 2.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 4,406,400
Trapeang Veaeng 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 4,406,400
Ou Trach 6 131 Open mixed well 3.00 [ 3.00 ] Place 2,203,200 7.000 Depth (m) 1.000 Diameter (mm) 6,609,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,438,400

Kralanh, Chonloas Dai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170601/05/01 TSO Chhoun Monny Project Type Rural Transport 25,415,200
Chanlas Dai 1 201 Earth road 0.45 [ 0.45 ] Km 43,068,000 4.000 Width (m) 2,822.000 Earth fill m3 19,380,600
Chanlas Dai 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,017,300 0.800 Diameter (m) 5.000 Length (m) 3,017,300
Preah Lean 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,017,300 0.800 Diameter (m) 5.000 Length (m) 3,017,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,415,200
Contract ID 170601/05/02 TSO Chhoun Monny Project Type Education 4,638,000
Chanlas Dai 1 320 Brick school (general) 1.00 [ 1.00 ] School room 4,638,000 8.000 Length (m) 7.000 Width (m) 4,638,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,638,000

Kralanh, Kampong Thkov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170602/05/01 TSO Chhoun Monny Project Type Rural Transport 27,325,000
Kampong Thkov Pir 1 202 Laterite road 1.12 [ 1.12 ] Km 21,250,000 4.000 Width (m) 430.000 Earth fill m3 23,885,000
Kampong Thkov Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Kampong Thkov Muoy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,040,000 0.800 Diameter (m) 6.000 Length (m) 2,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,325,000

Kralanh, Kralanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170603/05/01 TSO Chhoun Monny Project Type Rural Transport 24,388,700
Pechchour 1 201 Earth road 0.58 [ 0.58 ] Km 29,037,758 4.000 Width (m) 2,534.000 Earth fill m3 16,841,900
Kralanh 2 201 Earth road 0.11 [ 0.11 ] Km 42,789,090 4.000 Width (m) 606.000 Earth fill m3 4,706,800
Pechchour 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,390,000 0.600 Diameter (m) 5.000 Length (m) 1,390,000
Pechchour 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 6.000 Length (m) 1,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,388,700

Kralanh, Krouch Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170604/05/01 TSO Chhoun Monny Project Type Rural Transport 27,500,000
Khnar Cheung 1 202 Laterite road 1.00 [ 1.00 ] Km 27,500,000 4.000 Width (m) 780.000 Earth fill m3 27,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,500,000

Kralanh, Roung Kou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170605/05/01 TSO Chhoun Monny Project Type Rural Transport 28,324,800
Ta Ni 1 202 Laterite road 1.68 [ 1.68 ] Km 16,860,000 3.500 Width (m) 1,144.000 Earth fill m3 28,324,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,324,800

Kralanh, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170606/05/01 TSO Chhoun Monny Project Type Rural Transport 26,500,000
Damnak Khchas 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 26,500,000 4.000 4.500 26,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,500,000

Kralanh, Saen Sokh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170607/05/01 TSO Chhoun Monny Project Type Rural Transport 35,200,000
Chranieng 1 202 Laterite road 1.50 [ 1.50 ] Km 23,466,700 4.000 Width (m) 840.000 Earth fill m3 35,200,050
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,200,050

Kralanh, Snuol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170608/05/01 TSO Chhoun Monny Project Type Rural Transport 31,122,000
Snuol 1 202 Laterite road 1.82 [ 1.82 ] Km 17,100,000 3.500 Width (m) 1,242.000 Earth fill m3 31,122,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,122,000

Kralanh, Sranal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170609/05/01 TSO Chhoun Monny Project Type Rural Transport 30,684,600
Kouk Trom 1 202 Laterite road 1.80 [ 1.80 ] Km 17,047,000 3.500 Width (m) 1,228.500 Earth fill m3 30,684,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,684,600

Kralanh, Ta an

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170610/05/01 TSO Chhoun Monny Project Type Irrigation 18,319,000
Kdol 1 410 Earth dam 0.05 [ 0.05 ] Km 352,288,461 4.000 Max. height (m) 2.800 Volume (m3) 18,319,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,319,000
Contract ID 170610/05/02 TSO Chhoun Monny Project Type Irrigation 10,334,000
Kdol 1 451 Small water gate 1.00 [ 1.00 ] Place 10,334,000 4.000 Length (m) 2.500 Height (m) 10,334,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,334,000

Puok, Sasar Sdam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170701/05/01 TSO Kim Bunnang Project Type Rural Transport 16,000,000
Damnak Slanh 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 13,000,000 4.500 Total Span (m) 5.000 Width(m) 13,000,000
Damnak Slanh 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,000,000
Contract ID 170701/05/02 TSO Kim Bunnang Project Type Rural Domestic Water Supplies 9,000,000
Sasar Sdam 1 131 Open mixed well 1.00 [ 1.00 ] Place 1,800,000 7.000 Depth (m) 1.000 Diameter (mm) 1,800,000
Kouk Run 2 131 Open mixed well 2.00 [ 2.00 ] Place 1,800,000 7.000 Depth (m) 1.000 Diameter (mm) 3,600,000
Pongro Chas 3 131 Open mixed well 1.00 [ 1.00 ] Place 1,800,000 7.000 Depth (m) 1.000 Diameter (mm) 1,800,000
Kouk Pnov 4 131 Open mixed well 1.00 [ 1.00 ] Place 1,800,000 7.000 Depth (m) 1.000 Diameter (mm) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,000,000

Puok, Doun Kaev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170702/05/01 TSO Kim Bunnang Project Type Rural Transport 28,500,000
Antangkon 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Antangkon 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Peam 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,750,000 1.000 Diameter (m) 5.000 Length (m) 3,750,000
Peam 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 7,500,000 3.000 Total Span (m) 5.000 Width(m) 7,500,000
Tnaot Chrum 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Tnaot Chrum 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,750,000 0.800 Diameter (m) 5.000 Length (m) 2,750,000
Prasat Char 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Rohal 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Rohal 9 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Kouk Pou 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Lbaeuk 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Ta Snae 12 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,500,000

Puok, Kdei Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170703/05/01 TSO Kim Bunnang Project Type Rural Domestic Water Supplies 20,000,000
Kdei Run 1 131 Open mixed well 2.00 [ 2.00 ] Place 1,900,000 7.000 Depth (m) 1.000 Diameter (mm) 3,800,000
Kouk Pou 2 131 Open mixed well 2.00 [ 2.00 ] Place 1,900,000 7.000 Depth (m) 1.000 Diameter (mm) 3,800,000
Lbaeuk 3 131 Open mixed well 2.00 [ 2.00 ] Place 1,900,000 7.000 Depth (m) 1.000 Diameter (mm) 3,800,000
Ta Pang 4 131 Open mixed well 2.00 [ 2.00 ] Place 1,900,000 7.000 Depth (m) 1.000 Diameter (mm) 3,800,000
Prey Yeang 5 131 Open mixed well 1.00 [ 1.00 ] Place 1,900,000 7.000 Depth (m) 1.000 Diameter (mm) 1,900,000
Bangkaong 6 111 Ring well 1.00 [ 1.00 ] Place 1,450,000 7.000 Depth (m) 1.000 Diameter (m) 1,450,000
Trapeang Veaeng 7 111 Ring well 1.00 [ 1.00 ] Place 1,450,000 7.000 Depth (m) 1.000 Diameter (m) 1,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,000,000

Puok, Kaev Poar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170704/05/01 TSO Kim Bunnang Project Type Rural Domestic Water Supplies 22,680,000
Kamphem 1 111 Ring well 2.00 [ 2.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 2,520,000
Thmei 2 111 Ring well 2.00 [ 2.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 2,520,000
Kouk Ruessei 3 111 Ring well 4.00 [ 4.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 5,040,000
Kouk Pou 4 111 Ring well 3.00 [ 3.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 3,780,000
Roka Yea 5 111 Ring well 2.00 [ 2.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 2,520,000
Prey Danghaeum 6 111 Ring well 3.00 [ 3.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 3,780,000
Svay Chek 7 111 Ring well 2.00 [ 2.00 ] Place 1,260,000 7.000 Depth (m) 1.000 Diameter (m) 2,520,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,680,000

Puok, Khnat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170705/05/01 TSO Kim Bunnang Project Type Rural Transport 19,747,200
Khnat 1 201 Earth road 0.75 [ 0.75 ] Km 26,329,600 5.000 Width (m) 2,873.000 Earth fill m3 19,747,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,747,200
Contract ID 170705/05/02 TSO Kim Bunnang Project Type Rural Transport 7,000,000
Kouk Snuol 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.600 Diameter (m) 7.000 Length (m) 1,800,000
Kouk Trach 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 6.000 Length (m) 1,000,000
Svay 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Trameng 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Ampil Peam 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 6.000 Length (m) 1,000,000
Tuek Thla 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Pralay 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,000,000

Puok, Krabei Riel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170706/05/01 TSO Kim Bunnang Project Type Rural Transport 28,141,200
Khnar 1 201 Earth road 0.80 [ 0.80 ] Km 23,451,000 4.000 Width (m) 2,581.600 Earth fill m3 18,760,800
Prey Pou 2 201 Earth road 0.40 [ 0.40 ] Km 23,451,000 4.000 Width (m) 1,153.600 Earth fill m3 9,380,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,141,200

Puok, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170707/05/01 TSO Kim Bunnang Project Type Rural Transport 19,000,000
Kouk Thmei 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,400,000 1.000 Diameter (m) 5.000 Length (m) 4,400,000
Kouk Thmei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Prohut 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Chreas 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,480,000 0.600 Diameter (m) 5.000 Length (m) 2,960,000
Stueng Preah Srok 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Lvea 6 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 4,040,000 4.000 5.000 4,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,000,000
Contract ID 170707/05/02 TSO Kim Bunnang Project Type Rural Domestic Water Supplies 5,920,000
Tuol Lvieng 1 131 Open mixed well 1.00 [ 1.00 ] Place 1,600,000 7.000 Depth (m) 1.000 Diameter (mm) 1,600,000
Stueng Preah Srok 2 111 Ring well 2.00 [ 2.00 ] Place 1,440,000 7.000 Depth (m) 1.000 Diameter (m) 2,880,000
Lvea 3 111 Ring well 1.00 [ 1.00 ] Place 1,440,000 7.000 Depth (m) 1.000 Diameter (m) 1,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,920,000

Puok, Mukh Paen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170708/05/01 TSO Kim Bunnang Project Type Rural Transport 21,804,800
Trakiet 1 201 Earth road 2.85 [ 2.85 ] Km 7,650,800 4.000 Width (m) 3,602.200 Earth fill m3 21,804,780
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,804,780

Puok, Pou Treay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170709/05/01 TSO Kim Bunnang Project Type Irrigation 19,239,800
Treay 1 420 Canal 0.90 [ 0.90 ] Km 21,377,555 0.700 Depth (m) 2.000 Volume (m3) 19,239,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,239,800

Puok, Puok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170710/05/01 TSO Kim Bunnang Project Type Rural Transport 26,000,000
Chambak He 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Puok Chas 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,200,000 1.000 Diameter (m) 5.000 Length (m) 3,200,000
Kouk Doung 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Kouk Thmei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Puok Chas 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,400,000 1.000 Diameter (m) 5.000 Length (m) 2,400,000
Kouk Chuon 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.800 Diameter (m) 13.000 Length (m) 2,200,000
Kampong Ta Yang 7 221 Single cell box culvert 1.00 [ 1.00 ] Place 11,000,000 2.000 Total Span (m) 5.000 Width(m) 11,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000

Puok, Prey Chruk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170711/05/01 TSO Kim Bunnang Project Type Rural Transport 20,000,000
Svay Chantor 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Prasat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Phlang 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,652,000 1.000 Diameter (m) 5.000 Length (m) 4,652,000
Chranieng 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Ta Mouk 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,148,000 1.000 Diameter (m) 5.000 Length (m) 2,148,000
Ta Mouk 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Ta Mouk 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Pongro 8 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,400,000 0.800 Diameter (m) 5.000 Length (m) 4,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,000,000
Contract ID 170711/05/02 TSO Kim Bunnang Project Type Rural Domestic Water Supplies 1,200,000
Prab Mai 1 111 Ring well 1.00 [ 1.00 ] Place 1,200,000 7.000 Depth (m) 1.000 Diameter (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,200,000

Puok, Reul

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170712/05/01 TSO Kim Bunnang Project Type Rural Transport 26,000,000
Tumrueng 1 222 Double cell box culvert 2.00 [ 2.00 ] Place 8,500,000 3.000 Total Span (m) 5.000 Width(m) 17,000,000
Trapeang Svay 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Srah 3 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Kouk Knang 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Reul 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 6.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000

Puok, Samraong Yea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170713/05/01 TSO Kim Bunnang Project Type Rural Transport 19,400,000
Prey Veaeng 1 201 Earth road 1.45 [ 1.45 ] Km 13,379,310 4.000 Width (m) 3,168.000 Earth fill m3 19,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,400,000

Puok, Tuek Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170714/05/01 TSO Kim Bunnang Project Type Rural Transport 18,470,000
Chey 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,220,000 1.000 Diameter (m) 6.000 Length (m) 2,220,000
Prei Thmei 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 9,200,000 2.000 Total Span (m) 6.000 Width(m) 9,200,000
Tuek Vil 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,550,000 0.800 Diameter (m) 5.000 Length (m) 1,550,000
Prayut 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 800,000
Prei Chas 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,550,000 0.800 Diameter (m) 5.000 Length (m) 1,550,000
Banteay Chheu 6 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,550,000 0.800 Diameter (m) 5.000 Length (m) 1,550,000
Kouk Doung 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 800,000 0.600 Diameter (m) 5.000 Length (m) 1,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,470,000

Puok, Trei Nhoar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170715/05/01 TSO Kim Bunnang Project Type Rural Transport 29,200,000
Thipakdei 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 10,800,000 4.500 3.000 10,800,000
Thipakdei 2 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 8,000,000 9.800 3.000 8,000,000
Chhuk 3 240 Concrete bridge (general) 2.00 [ 2.00 ] Place 5,200,000 6.800 3.000 10,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,200,000

Puok, Yeang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170716/05/01 TSO Kim Bunnang Project Type Rural Transport 23,211,000
Soun Sa 1 202 Laterite road 1.20 [ 1.20 ] Km 19,342,500 3.500 Width (m) 588.000 Earth fill m3 23,211,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,211,000

Prasat Bakong, Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170901/05/01 TSO Kung Sophat Project Type Rural Transport 22,000,000
Trach Chrum 1 201 Earth road 1.50 [ 1.50 ] Km 14,666,666 4.000 Width (m) 3,738.000 Earth fill m3 21,999,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,999,999

Prasat Bakong, Bakong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170902/05/01 TSO Kung Sophat Project Type Education 23,950,000
Stueng 1 320 Brick school (general) 1.00 [ 1.00 ] School room 23,950,000 8.000 Length (m) 7.000 Width (m) 23,950,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,950,000

Prasat Bakong, Ballangk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170903/05/01 TSO Kung Sophat Project Type Rural Transport 14,570,000
Thlok Kambot 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 1,050,000
Ta Koy 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,150,000 1.000 Diameter (m) 5.000 Length (m) 4,300,000
Trach 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,770,000 1.000 Diameter (m) 5.000 Length (m) 2,770,000
Trach 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,150,000 2.000 Diameter (m) 5.000 Length (m) 2,150,000
Prum Kod 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,150,000 1.000 Diameter (m) 5.000 Length (m) 4,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,570,000

Prasat Bakong, Kampong Phluk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170904/05/01 TSO Kung Sophat Project Type Education 21,500,000
Dei Kraham 1 320 Brick school (general) 2.00 [ 2.00 ] School room 10,750,000 8.000 Length (m) 7.000 Width (m) 21,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,500,000

Prasat Bakong, Kantreang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170905/05/01 TSO Kung Sophat Project Type Rural Transport 29,700,000
Sret Kaeut 1 202 Laterite road 1.90 [ 1.90 ] Km 15,631,578 3.500 Width (m) 1,297.000 Earth fill m3 29,699,998
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,699,998

Prasat Bakong, Kandaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170906/05/01 TSO Kung Sophat Project Type Education 35,500,000
Chrey 1 320 Brick school (general) 1.00 [ 1.00 ] School room 35,500,000 8.000 Length (m) 7.000 Width (m) 35,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,500,000

Prasat Bakong, Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170907/05/01 TSO Kung Sophat Project Type Rural Transport 17,200,000
Kampong Thkov 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 6,400,000 9.000 4.000 6,400,000
Trapeang Thum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,800,000 1.000 Diameter (m) 5.000 Length (m) 2,800,000
Banteay Ruessei 3 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,000,000 2.000 Total Span (m) 5.000 Width(m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,200,000
Contract ID 170907/05/02 TSO Kung Sophat Project Type Irrigation 5,600,000
Doun Num 1 430 Spillways (general) 1.00 [ 1.00 ] Place 5,600,000 18.000 Length (m) 3.000 5,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,600,000

Prasat Bakong, Roluos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170908/05/01 TSO Kung Sophat Project Type Rural Transport 29,302,200
Momeanh 1 202 Laterite road 1.50 [ 1.50 ] Km 19,534,800 4.000 Width (m) 1,170.000 Earth fill m3 29,302,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,302,200

Prasat Bakong, Trapeang Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 170909/05/01 TSO Kung Sophat Project Type Rural Transport 24,000,000
Svay Chey 1 201 Earth road 1.50 [ 1.50 ] Km 16,000,000 4.000 Width (m) 4,200.000 Earth fill m3 24,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,000,000

Siem Reab, Sla Kram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171001/05/01 TSO Kang Thy Project Type Rural Transport 51,387,200
Boeng Doun Pa 1 202 Laterite road 0.28 [ 0.28 ] Km 34,757,015 4.000 Width (m) 375.000 Earth fill m3 9,731,964
Chong Kausu 2 202 Laterite road 0.57 [ 0.57 ] Km 23,085,700 4.000 Width (m) 440.000 Earth fill m3 13,066,506
Treang 3 202 Laterite road 0.85 [ 0.85 ] Km 33,633,800 4.000 Width (m) 978.000 Earth fill m3 28,588,730
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,387,200

Siem Reab, Svay Dangkum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171002/05/01 TSO Kang Thy Project Type Rural Transport 49,415,100
Sala Kansaeng 1 202 Laterite road 0.74 [ 0.74 ] Km 48,270,857 5.000 Width (m) 1,676.000 Earth fill m3 35,479,080
Kouk Krasang 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 10,099,283 2.000 Total Span (m) 6.000 Width(m) 10,099,283
Pou Bos 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,836,746 1.000 Diameter (m) 6.000 Length (m) 3,836,746
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  49,415,109

Siem Reab, Kouk Chak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171003/05/01 TSO Kang Thy Project Type Rural Transport 32,000,000
Trapeang Seh 1 202 Laterite road 0.70 [ 0.70 ] Km 32,183,908 4.000 Width (m) 1,259.000 Earth fill m3 22,400,000
Trapeang Seh 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 2,400,000 0.800 Diameter (m) 6.000 Length (m) 9,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,000,000

Siem Reab, Sala Kamraeuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171004/05/01 TSO Kang Thy Project Type Rural Transport 33,000,000
Ta Vien 1 202 Laterite road 0.95 [ 0.95 ] Km 20,245,399 4.000 Width (m) 1,271.000 Earth fill m3 19,233,129
Chonlong 2 202 Laterite road 0.68 [ 0.68 ] Km 20,245,399 4.000 Width (m) 1,271.000 Earth fill m3 13,766,871
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,000,000

Siem Reab, Nokor Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171005/05/01 TSO Kang Thy Project Type Rural Transport 23,901,000
areaks Svay 1 201 Earth road 1.80 [ 1.80 ] Km 11,950,500 4.000 Width (m) 3,055.000 Earth fill m3 21,510,900
Kravan 2 201 Earth road 0.20 [ 0.20 ] Km 11,950,500 4.000 Width (m) 400.000 Earth fill m3 2,390,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,901,000

Siem Reab, Chreav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171006/05/01 TSO Kang Thy Project Type Rural Transport 26,400,000
Khnar 1 202 Laterite road 1.30 [ 1.30 ] Km 20,307,692 4.000 Width (m) 1,014.000 Earth fill m3 26,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,400,000

Siem Reab, Chong Khnies

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171007/05/01 TSO Kang Thy Project Type Education 16,373,000
Phum Prampir 1 310 Wooden school (general) 2.00 [ 2.00 ] School room 8,186,500 6.000 Length (m) 4.000 Width (m) 16,373,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,373,000

Siem Reab, Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171008/05/01 TSO Kang Thy Project Type Rural Transport 19,800,000
Sambuor 1 201 Earth road 0.76 [ 0.76 ] Km 26,225,166 4.000 Width (m) 3,871.000 Earth fill m3 19,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,800,000

Siem Reab, Siem Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171009/05/01 TSO Kang Thy Project Type Rural Transport 41,200,000
Pou 1 202 Laterite road 0.60 [ 0.60 ] Km 34,333,333 4.000 Width (m) 876.000 Earth fill m3 20,600,000
Pralay 2 202 Laterite road 0.60 [ 0.60 ] Km 34,333,333 4.000 Width (m) 877.000 Earth fill m3 20,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,200,000

Siem Reab, Srangae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171010/05/01 TSO Kang Thy Project Type Rural Transport 23,492,100
Prey Thum 1 202 Laterite road 0.85 [ 0.85 ] Km 27,637,765 4.000 Width (m) 848.000 Earth fill m3 23,492,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,492,100

Soutr Nikom, Chan Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171101/05/01 TSO Mao Luck Project Type Education 17,500,000
Chub 1 320 Brick school (general) 2.00 [ 2.00 ] School room 8,750,000 8.000 Length (m) 7.000 Width (m) 17,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,500,000
Contract ID 171101/05/02 TSO Mao Luck Project Type Rural Transport 4,000,000
Baek Kamphleung 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,000,000

Soutr Nikom, Dam Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171102/05/01 TSO Mao Luck Project Type Irrigation 34,282,800
Kouk Roluos 1 451 Small water gate 1.00 [ 1.00 ] Place 4,576,080 5.500 Length (m) 1.500 Height (m) 4,576,080
Kouk Mon 2 451 Small water gate 1.00 [ 1.00 ] Place 4,576,080 5.500 Length (m) 1.500 Height (m) 4,576,080
Krasar Tum 3 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 9,997,640 10.200 Total span (m) 1.300 Width (m) 9,997,640
Dam Daek Leu 4 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 15,133,000 13.500 Total span (m) 2.000 Width (m) 15,133,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,282,800

Soutr Nikom, Dan Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171103/05/01 TSO Mao Luck Project Type Education 14,475,700
Veal 1 320 Brick school (general) 2.00 [ 2.00 ] School room 7,237,850 8.000 Length (m) 7.000 Width (m) 14,475,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,475,700
Contract ID 171103/05/02 TSO Mao Luck Project Type Irrigation 10,686,000
Srama Thum 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,928,500 1.000 Diameter (m) 5.000 Width (m) 3,928,500
Thnong 2 451 Small water gate 1.00 [ 1.00 ] Place 6,757,500 4.000 Length (m) 2.000 Height (m) 6,757,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,686,000
Contract ID 171103/05/03 TSO Mao Luck Project Type Domestic Sanitation 2,900,000
Run Khang Tboung 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 1,450,000 1.500 1.450 2,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,900,000

Soutr Nikom, Kampong Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171104/05/01 TSO Mao Luck Project Type Rural Domestic Water Supplies 30,000,000
Mukh Voat 1 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 25.000 Volume (m3) 10,000,000
Cheay Chet 2 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 25.000 Volume (m3) 10,000,000
Ou Ta Puk 3 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 25.000 Volume (m3) 10,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,000,000

Soutr Nikom, Kien Sangkae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171105/05/01 TSO Mao Luck Project Type Education 13,980,000
Kouk Dei 1 320 Brick school (general) 2.00 [ 2.00 ] School room 6,990,000 8.000 Length (m) 7.000 Width (m) 13,980,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,980,000
Contract ID 171105/05/02 TSO Mao Luck Project Type Rural Transport 10,000,000
Trapeang Prey 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 10,000,000 8.000 Total Span (m) 4.500 Width(m) 10,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,000,000

Soutr Nikom, Khchas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171106/05/01 TSO Mao Luck Project Type Education 24,000,000
Yeang Tes 1 320 Brick school (general) 2.00 [ 2.00 ] School room 12,000,000 8.000 Length (m) 7.000 Width (m) 24,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,000,000

Soutr Nikom, Khnar Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171107/05/01 TSO Mao Luck Project Type Education 23,000,000
Chhuk 1 320 Brick school (general) 2.00 [ 2.00 ] School room 11,500,000 8.000 Length (m) 7.000 Width (m) 23,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,000,000

Soutr Nikom, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171108/05/01 TSO Mao Luck Project Type Irrigation 23,700,000
Prey Lean 1 451 Small water gate 1.00 [ 1.00 ] Place 4,000,000 5.500 Length (m) 2.000 Height (m) 4,000,000
Thnal Trang 2 451 Small water gate 1.00 [ 1.00 ] Place 4,000,000 5.500 Length (m) 2.000 Height (m) 4,000,000
Trapeang Trav 3 451 Small water gate 1.00 [ 1.00 ] Place 5,700,000 5.500 Length (m) 2.000 Height (m) 5,700,000
Popel Kandal 4 451 Small water gate 1.00 [ 1.00 ] Place 10,000,000 6.500 Length (m) 4.000 Height (m) 10,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,700,000

Soutr Nikom, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171109/05/01 TSO Mao Luck Project Type Irrigation 15,339,000
Samraong Khang Tboung 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,850,000 0.800 Diameter (m) 3.000 Width (m) 2,850,000
Krang Khcheay 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 8,583,000 9.000 Total span (m) 2.000 Width (m) 8,583,000
Angkonh 3 451 Small water gate 1.00 [ 1.00 ] Place 3,906,000 5.500 Length (m) 1.500 Height (m) 3,906,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,339,000
Contract ID 171109/05/02 TSO Mao Luck Project Type Rural Transport 4,600,000
Samraong Khang Tboung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 14.000 Length (m) 1,600,000
Samraong Khang Tboung 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,600,000

Soutr Nikom, Ta Yaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171110/05/01 TSO Mao Luck Project Type Irrigation 17,000,000
Ta Yaek 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 9,000,000 10.000 Total span (m) 2.000 Width (m) 9,000,000
Paoy Smach 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,000,000 0.800 Diameter (m) 8.000 Width (m) 4,000,000
Boeng Vien 3 451 Small water gate 1.00 [ 1.00 ] Place 4,000,000 5.500 Length (m) 2.000 Height (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,000,000
Contract ID 171110/05/02 TSO Mao Luck Project Type Rural Domestic Water Supplies 9,100,000
Boeng Ngat 1 141 Pond with no filter 1.00 [ 1.00 ] Place 9,100,000 4.000 Depth (m) 25.000 Volume (m3) 9,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,100,000

Srei Snam, Chrouy Neang Nguon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171201/05/01 TSO Som Sarith Project Type Rural Transport 23,656,500
Trom Tboung 1 202 Laterite road 1.75 [ 1.75 ] Km 13,518,000 4.000 Width (m) 1,190.000 Earth fill m3 23,656,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,656,500

Srei Snam, Klang Hay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171202/05/01 TSO Som Sarith Project Type Rural Transport 23,113,200
Slaeng Ta Vet 1 202 Laterite road 1.87 [ 1.87 ] Km 12,360,000 3.500 Width (m) 1,047.000 Earth fill m3 23,113,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,113,200

Srei Snam, Tram Sasar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171203/05/01 TSO Som Sarith Project Type Rural Transport 27,012,300
Pongro 1 202 Laterite road 2.10 [ 2.10 ] Km 12,863,000 3.500 Width (m) 1,291.500 Earth fill m3 27,012,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,012,300

Srei Snam, Moung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171204/05/01 TSO Som Sarith Project Type Rural Transport 27,508,000
Moung Tboung 1 202 Laterite road 2.00 [ 2.00 ] Km 13,754,000 3.500 Width (m) 1,128.000 Earth fill m3 27,508,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,508,000

Srei Snam, Prei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171205/05/01 TSO Som Sarith Project Type Rural Transport 25,623,000
Krabau 1 201 Earth road 0.96 [ 0.96 ] Km 26,579,800 4.000 Width (m) 3,968.000 Earth fill m3 25,622,927
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,622,927

Srei Snam, Slaeng Spean

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171206/05/01 TSO Som Sarith Project Type Rural Transport 35,234,000
Phnum Dei 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,725,000 0.600 Diameter (m) 5.000 Length (m) 1,725,000
Chranieng 2 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 28,334,000 20.000 Total Span (m) 3.000 Width (m) 28,334,000
Chranieng 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,725,000 0.600 Diameter (m) 5.000 Length (m) 5,175,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,234,000

Svay Leu, Kantuot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171302/05/01 TSO Chomm Nearg Project Type Irrigation 18,384,000
Khnar Krau 1 410 Earth dam 0.40 [ 0.40 ] Km 45,960,000 2.000 Max. height (m) 2,885.000 Volume (m3) 18,384,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,384,000

Svay Leu, Khnang Phnum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171303/05/01 TSO Chomm Nearg Project Type Rural Domestic Water Supplies 21,213,000
Khla Khmum 1 185 Pipe distribution system 46.00 [ 46.00 ] Houses 461,152 1.456 km of pipe 0.000 21,213,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,213,000

Svay Leu, Svay Leu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171304/05/01 TSO Chomm Nearg Project Type Irrigation 27,658,000
Bet Phka 1 410 Earth dam 0.15 [ 0.15 ] Km 131,302,632 1.500 Max. height (m) 3,106.000 Volume (m3) 19,958,000
Bet Phka 2 222 Double cell box culvert 1.00 [ 1.00 ] Place 7,700,000 1.000 Total Span (m) 5.000 Width(m) 7,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,658,000

Svay Leu, Ta Siem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171305/05/01 TSO Chomm Nearg Project Type Irrigation 24,154,000
Dambouk Khpos 1 410 Earth dam 0.51 [ 0.51 ] Km 34,098,814 1.000 Max. height (m) 2,881.000 Volume (m3) 17,254,000
Dambouk Khpos 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,450,000 0.600 Diameter (m) 4.000 Width (m) 6,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,154,000

Varin, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171401/05/01 TSO Dorn Sopheap Project Type Irrigation 16,560,000
Prasat 1 451 Small water gate 1.00 [ 1.00 ] Place 5,520,000 2.000 Length (m) 1.500 Height (m) 5,520,000
Kanhchan Run 2 451 Small water gate 2.00 [ 2.00 ] Place 5,520,000 2.000 Length (m) 1.500 Height (m) 11,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,560,000
Contract ID 171401/05/02 TSO Dorn Sopheap Project Type Rural Domestic Water Supplies 11,520,000
Vien 1 111 Ring well 1.00 [ 1.00 ] Place 1,920,000 6.000 Depth (m) 1.000 Diameter (m) 1,920,000
Prasat 2 111 Ring well 1.00 [ 1.00 ] Place 1,920,000 6.000 Depth (m) 1.000 Diameter (m) 1,920,000
Kab Dai 3 111 Ring well 3.00 [ 3.00 ] Place 1,920,000 6.000 Depth (m) 1.000 Diameter (m) 5,760,000
Tumneab Svay 4 111 Ring well 1.00 [ 1.00 ] Place 1,920,000 6.000 Depth (m) 1.000 Diameter (m) 1,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,520,000

Varin, Lvea Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171402/05/01 TSO Dorn Sopheap Project Type Rural Domestic Water Supplies 26,000,000
Ou Tey 1 121 Drilled well with VN no 6 pump 3.00 [ 3.00 ] Place 2,600,000 35.000 Depth (m) 100.000 Diameter (mm) 7,800,000
Kouk Kandal 2 121 Drilled well with VN no 6 pump 3.00 [ 3.00 ] Place 2,600,000 35.000 Depth (m) 100.000 Diameter (mm) 7,800,000
Kouk Chan 3 121 Drilled well with VN no 6 pump 4.00 [ 4.00 ] Place 2,600,000 35.000 Depth (m) 100.000 Diameter (mm) 10,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000

Varin, Srae Nouy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171403/05/01 TSO Dorn Sopheap Project Type Rural Domestic Water Supplies 23,100,000
Voat 1 141 Pond with no filter 1.00 [ 1.00 ] Place 7,714,000 5.000 Depth (m) 1,000.000 Volume (m3) 7,714,000
Kouk Voat 2 141 Pond with no filter 1.00 [ 1.00 ] Place 15,386,000 5.000 Depth (m) 1,000.000 Volume (m3) 15,386,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,100,000

Varin, Svay sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171404/05/01 TSO Dorn Sopheap Project Type Rural Transport 26,616,000
Svay Sa 1 202 Laterite road 1.80 [ 2.00 ] Km 13,308,000 3.500 Width (m) 600.000 Earth fill m3 26,616,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,616,000

Varin, Varin

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171405/05/01 TSO Dorn Sopheap Project Type Rural Transport 20,568,000
Toul Mead 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 20,568,000 12.000 Total Span (m) 3.000 Width (m) 20,568,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,568,000
Contract ID 171405/05/02 TSO Dorn Sopheap Project Type Irrigation 7,350,000
Varin 1 451 Small water gate 1.00 [ 1.00 ] Place 7,350,000 2.800 Length (m) 1.500 Height (m) 7,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,350,000