Contract Outputs

Location: Takeo \ Kaoh Andaet Budget Year: 2005

Angkor Borei    Bati    Bourei Cholsar    Kiri Vong    Kaoh Andaet    Prey Kabbas    Samraong    Doun Kaev    Tram Kak    Treang   

Kaoh Andaet, Krapum Chhuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210501/05/01 TSO Yim Sry Project Type Rural Transport 30,733,500
Ta Uy 1 202 Laterite road 0.13 [ 0.13 ] Km 21,236,800 3.500 Width (m) 198.000 Earth fill m3 2,654,600
Ta Por 2 202 Laterite road 0.65 [ 0.65 ] Km 21,237,846 3.500 Width (m) 1,686.000 Earth fill m3 13,804,600
Kaoh Moan 3 202 Laterite road 0.28 [ 0.56 ] Km 21,242,330 3.500 Width (m) 1,093.000 Earth fill m3 11,974,301
Kaoh Moan 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,300,000 0.600 Diameter (m) 4.000 Length (m) 2,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,733,501

Kaoh Andaet, Pech Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210502/05/01 TSO Yim Sry Project Type Rural Transport 29,543,400
Chong Angkar 1 202 Laterite road 1.00 [ 1.28 ] Km 22,174,386 3.500 Width (m) 3,593.000 Earth fill m3 28,343,300
Chong Angkar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 4.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,543,300

Kaoh Andaet, Prey Khla

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210503/05/01 TSO Yim Sry Project Type Rural Transport 24,670,800
Kaev Kamphleung 1 201 Earth road 1.20 [ 1.20 ] Km 15,052,667 4.000 Width (m) 2,605.000 Earth fill m3 18,063,200
Kaev Kamphleung 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,430,300 1.000 Diameter (m) 4.000 Length (m) 2,430,300
Kaev Kamphleung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,785,300 0.800 Diameter (m) 4.000 Length (m) 1,785,300
Kaev Kamphleung 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,196,000 0.600 Diameter (m) 4.000 Length (m) 2,392,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,670,800

Kaoh Andaet, Prey Yuthka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210504/05/01 TSO Yim Sry Project Type Rural Transport 23,698,000
Prey Bay 2 201 Earth road 0.20 [ 0.20 ] Km 35,276,500 4.000 Width (m) 1,369.000 Earth fill m3 7,055,300
Ta Phan 3 201 Earth road 0.30 [ 0.30 ] Km 35,276,660 4.000 Width (m) 2,039.000 Earth fill m3 10,582,998
Ta Nhuem 3 201 Earth road 0.00 [ 0.17 ] Km 35,230,810 4.000 Width (m) 1,204.000 Earth fill m3 6,059,699
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,697,997

Kaoh Andaet, Romenh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210505/05/01 TSO Yim Sry Project Type Irrigation 26,000,000
Romenh Khang Cheung 1 420 Canal 0.30 [ 0.30 ] Km 29,988,667 300.000 Depth (m) 1,689.640 Volume (m3) 8,996,600
Romenh Khang Tboung 2 420 Canal 0.30 [ 0.30 ] Km 29,988,667 300.000 Depth (m) 2,342.470 Volume (m3) 8,996,600
Pralay Meas 3 420 Canal 0.27 [ 0.27 ] Km 29,988,015 2.670 Depth (m) 3,652.620 Volume (m3) 8,006,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,000
Contract ID 210505/05/02 TSO Yim Sry Project Type Urban Drainage and Flood Protection 27,046,000
Romenh Khang Cheung 1 542 Foul water sewer 1.00 [ 1.00 ] Line 13,523,000 0.000 0.000 13,523,000
Romenh Khang Tboung 2 542 Foul water sewer 1.00 [ 1.00 ] Line 13,523,000 0.000 0.000 13,523,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,046,000
Contract ID 210505/05/03 TSO Yim Sry Project Type Rural Transport 11,708,000
Romenh Khang Cheung 1 203 Gravel road 0.20 [ 0.20 ] Km 26,384,615 5.500 Width (m) 234.000 Earth fill m3 5,276,923
Romenh Khang Tboung 2 203 Gravel road 0.06 [ 0.15 ] Km 26,383,067 5.500 Width (m) 174.000 Earth fill m3 3,931,077
Romenh Khang Cheung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 8.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,708,000

Kaoh Andaet, Thlea Prachum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210506/05/01 TSO Yim Sry Project Type Rural Transport 27,379,600
Trapeang Kak 1 203 Gravel road 0.90 [ 0.90 ] Km 21,215,222 3.500 Width (m) 2,207.000 Earth fill m3 19,093,700
Pnov 2 203 Gravel road 0.00 [ 0.39 ] Km 21,242,308 3.500 Width (m) 920.000 Earth fill m3 8,284,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,378,200