Contract Outputs

Location: Pursat Budget Year: 2006

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Bakan, Boeng Bat Kandaol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150101/06/01 TSO Chhoeung Sarim Project Type Rural Transport 35,071,000
Boeng Chhuk 1 202 Laterite road 2.30 [ 2.06 ] Km 17,000,000 3.000 Width (m) 500.000 Earth fill m3 35,071,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,071,000

Bakan, Boeng Khnar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150102/06/01 TSO Chhoeung Sarim Project Type Rural Transport 48,622,000
Rung 1 202 Laterite road 1.00 [ 1.00 ] Km 18,500,000 3.000 Width (m) 0.000 Earth fill m3 18,500,000
Daeum Chres 2 202 Laterite road 1.40 [ 1.41 ] Km 18,500,000 3.000 Width (m) 200.000 Earth fill m3 26,122,000
Rung 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Daeum Chres 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,622,000

Bakan, Khnar Totueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150103/06/01 TSO Chhoeung Sarim Project Type Irrigation 29,099,020
Bak Meaek 1 420 Canal 1.70 [ 1.70 ] Km 4,460,000 1.250 Depth (m) 2,686.000 Volume (m3) 7,582,000
Boeng Chhuk 2 420 Canal 1.11 [ 1.11 ] Km 4,460,000 1.250 Depth (m) 1,738.000 Volume (m3) 4,950,600
Khnar Totueng 3 420 Canal 0.13 [ 0.13 ] Km 4,460,000 1.250 Depth (m) 237.910 Volume (m3) 566,420
Bak Meaek 4 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 8,000,000 0.800 Diameter (m) 3.000 Width (m) 16,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,099,020

Bakan, Me Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150104/06/01 TSO Chhoeung Sarim Project Type Irrigation 12,900,000
Chen Tay 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 12,900,000 2.000 Total span (m) 1.700 Width (m) 12,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,900,000
Contract ID 150104/06/02 TSO Chhoeung Sarim Project Type Rural Transport 14,580,000
Chen Tay 1 221 Single cell box culvert 2.00 [ 2.00 ] Place 7,290,000 2.000 Total Span (m) 5.000 Width(m) 14,580,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,580,000
Contract ID 150104/06/03 TSO Chhoeung Sarim Project Type Rural Transport 37,536,730
Cha Yov 1 201 Earth road 1.60 [ 1.60 ] Km 22,330,000 4.000 Width (m) 4,967.000 Earth fill m3 35,728,000
Kdat 2 201 Earth road 0.08 [ 0.08 ] Km 22,330,000 4.000 Width (m) 516.000 Earth fill m3 1,808,730
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,536,730

Bakan, Ou Ta Paong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150105/06/01 TSO Chhoeung Sarim Project Type Rural Transport 43,475,500
Bat Kokir Chas 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 1.000 Diameter (m) 6.000 Length (m) 1,300,000
Sdok Khlouk 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 1.000 Diameter (m) 6.000 Length (m) 2,600,000
Srah Mkak 3 202 Laterite road 0.90 [ 0.60 ] Km 16,900,000 3.000 Width (m) 0.000 Earth fill m3 10,140,000
Oknha Moan 4 202 Laterite road 1.70 [ 1.74 ] Km 16,900,000 3.000 Width (m) 0.000 Earth fill m3 29,439,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,479,800

Bakan, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150106/06/01 TSO Chhoeung Sarim Project Type Rural Transport 40,882,000
Rumlech 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 7.000 Length (m) 3,000,000
Kaoh Khcheay 2 202 Laterite road 2.77 [ 2.44 ] Km 15,500,000 3.000 Width (m) 0.000 Earth fill m3 37,882,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,882,000

Bakan, Snam Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150107/06/01 TSO Chhoeung Sarim Project Type Rural Transport 56,631,200
Sdok Svay 1 202 Laterite road 3.50 [ 3.50 ] Km 11,600,000 3.000 Width (m) 100.000 Earth fill m3 40,600,000
Sameakki 2 202 Laterite road 1.70 [ 1.38 ] Km 11,600,000 3.000 Width (m) 100.000 Earth fill m3 16,031,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  56,631,200

Bakan, Svay Doun Kaev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150108/06/01 TSO Chhoeung Sarim Project Type Rural Transport 27,459,360
Svay Doun Kaev Muoy 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Svay Doun Kaev Muoy 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 6.000 Length (m) 2,500,000
Svay Doun Kaev Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 6.000 Length (m) 2,500,000
Svay Doun Kaev Muoy 4 201 Earth road 0.68 [ 0.68 ] Km 25,280,000 4.000 Width (m) 2,232.000 Earth fill m3 17,165,120
Svay Doun Kaev Pir 5 201 Earth road 0.16 [ 0.16 ] Km 25,280,000 4.000 Width (m) 778.000 Earth fill m3 3,994,240
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,459,360

Bakan, Ta Lou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150109/06/01 TSO Sek Chanrattha Project Type Rural Transport 18,010,000
Prey Roung 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,110,000 0.600 Diameter (m) 5.000 Length (m) 3,330,000
Thmei 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,110,000 0.600 Diameter (m) 5.000 Length (m) 2,220,000
Prey Roung 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Tuol Thma 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,110,000 0.600 Diameter (m) 5.000 Length (m) 4,440,000
Tuol Thma 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Boaskor 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Boaskor 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,110,000 0.600 Diameter (m) 5.000 Length (m) 1,110,000
Serei Kunthea 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,110,000 0.600 Diameter (m) 5.000 Length (m) 1,110,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,010,000
Contract ID 150109/06/03 TSO Sek Chanrattha Project Type Rural Transport 32,898,500
Prey Roung 1 202 Laterite road 1.70 [ 1.70 ] Km 9,500,000 3.000 Width (m) 0.000 Earth fill m3 16,150,000
Tuol Thma 2 202 Laterite road 2.14 [ 1.76 ] Km 9,500,000 3.000 Width (m) 0.000 Earth fill m3 16,748,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,898,500

Bakan, Trapeang Chong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150110/06/01 TSO Chhoeung Sarim Project Type Rural Transport 46,160,350
Kab Kralanh 1 202 Laterite road 0.90 [ 0.90 ] Km 14,160,000 3.000 Width (m) 0.000 Earth fill m3 12,744,000
Bakan 2 202 Laterite road 0.80 [ 0.80 ] Km 14,160,000 3.000 Width (m) 0.000 Earth fill m3 11,328,000
Poulyum 3 202 Laterite road 1.80 [ 1.48 ] Km 14,160,000 3.000 Width (m) 100.000 Earth fill m3 20,887,416
Poulyum 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,159,416

Kandieng, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150201/06/01 TSO Noun Vuthy Project Type Rural Transport 33,154,000
Kbal Romeas 1 201 Earth road 0.61 [ 0.61 ] Km 54,800,000 3.000 Width (m) 4,852.000 Earth fill m3 33,154,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,154,000

Kandieng, Banteay Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150202/06/01 TSO Noun Vuthy Project Type Irrigation 55,000,000
Kaev Muni 1 430 Spillways (general) 1.00 [ 1.00 ] Place 55,000,000 12.000 Length (m) 3.500 55,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  55,000,000

Kandieng, Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150203/06/01 TSO Noun Vuthy Project Type Irrigation 25,850,000
Sthani 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,900,000 1.000 Diameter (m) 2.000 Width (m) 3,900,000
Sthani 2 451 Small water gate 1.00 [ 1.00 ] Place 9,650,000 2.000 Length (m) 3.450 Height (m) 9,650,000
Stueng Kraom 4 451 Small water gate 3.00 [ 3.00 ] Place 4,100,000 2.000 Length (m) 3.450 Height (m) 12,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,850,000
Contract ID 150203/06/02 TSO Noun Vuthy Project Type Rural Transport 11,660,000
Bangkoul 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,110,000 1.000 Diameter (m) 7.000 Length (m) 5,110,000
Bangkoul 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 6,550,000 1.000 Diameter (m) 6.000 Length (m) 6,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,660,000

Kandieng, Kanhchor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150204/06/01 TSO Noun Vuthy Project Type Rural Transport 31,703,800
Tbaeng Prakieb 1 202 Laterite road 0.65 [ 0.39 ] Km 12,500,000 3.000 Width (m) 0.000 Earth fill m3 4,827,500
Kandal 2 202 Laterite road 1.05 [ 1.05 ] Km 12,500,000 3.000 Width (m) 0.000 Earth fill m3 13,125,000
Roleang 3 202 Laterite road 1.10 [ 1.10 ] Km 12,500,000 3.000 Width (m) 0.000 Earth fill m3 13,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,702,500

Kandieng, Reang Til

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150205/06/01 TSO Noun Vuthy Project Type Rural Transport 45,030,000
Reang Til 1 272 Inland waterway 0.95 [ 0.95 ] Km 47,400,000 10.390 Width (m) 0.000 45,030,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,030,000

Kandieng, Srae Sdok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150206/06/01 TSO Noun Vuthy Project Type Rural Transport 31,023,400
Trang 1 202 Laterite road 1.50 [ 1.48 ] Km 12,500,000 3.000 Width (m) 0.000 Earth fill m3 18,525,000
Trang 2 202 Laterite road 0.02 [ 1.00 ] Km 12,500,000 3.000 Width (m) 0.000 Earth fill m3 12,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,025,000

Kandieng, Svay Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150207/06/01 TSO Noun Vuthy Project Type Rural Transport 35,500,000
Svay Luong 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 35,500,000 2.000 Total Span (m) 3.500 Width (m) 35,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,500,000

Kandieng, Sya

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150208/06/01 TSO Noun Vuthy Project Type Irrigation 33,710,000
Anlong Vil 1 565 River bank protection Groyne (Wood) 2.00 [ 2.00 ] Place 16,855,000 7.500 Height (m) 10.000 Length (m) 33,710,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,710,000

Kandieng, Veal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150209/06/01 TSO Noun Vuthy Project Type Rural Transport 29,765,600
Kbal Hong 1 202 Laterite road 0.18 [ 0.22 ] Km 9,400,000 3.000 Width (m) 0.000 Earth fill m3 2,049,200
Pralay Thum 2 202 Laterite road 0.23 [ 0.23 ] Km 9,400,000 3.000 Width (m) 0.000 Earth fill m3 2,180,800
Veal 3 202 Laterite road 0.76 [ 0.76 ] Km 9,400,000 3.000 Width (m) 0.000 Earth fill m3 7,144,000
Pou Kambaor 4 202 Laterite road 0.33 [ 0.33 ] Km 9,400,000 3.000 Width (m) 0.000 Earth fill m3 3,083,200
Tuol Pongro 5 202 Laterite road 2.00 [ 1.63 ] Km 9,400,000 3.000 Width (m) 0.000 Earth fill m3 15,312,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,769,800

Krakor, Anlong Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150301/06/01 TSO Kim Sum Project Type Rural Transport 37,774,000
Banteay Krang 1 201 Earth road 1.20 [ 1.20 ] Km 22,220,000 4.000 Width (m) 4,080.000 Earth fill m3 26,664,000
Papet 2 201 Earth road 0.50 [ 0.50 ] Km 22,220,000 4.000 Width (m) 1,700.000 Earth fill m3 11,110,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,774,000

Krakor, Ansa Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150302/06/01 TSO Kim Sum Project Type Rural Transport 33,590,500
Thkoul Touch 1 202 Laterite road 0.41 [ 0.41 ] Km 17,150,000 3.000 Width (m) 0.000 Earth fill m3 6,945,750
Khsach L'et 2 202 Laterite road 1.75 [ 1.47 ] Km 17,150,000 3.000 Width (m) 0.000 Earth fill m3 25,244,800
Khsach L'et 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,590,550

Krakor, Boeng Kantuot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150303/06/01 TSO Kim Sum Project Type Irrigation 18,380,000
Boeng 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 9,190,000 0.800 Diameter (m) 3.000 Width (m) 9,190,000
Chochok 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 9,190,000 0.800 Diameter (m) 3.000 Width (m) 9,190,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,380,000

Krakor, Chheu Tom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150304/06/01 TSO Kim Sum Project Type Rural Transport 59,330,668
Kapas 1 201 Earth road 0.99 [ 0.99 ] Km 24,196,847 4.000 Width (m) 3,845.100 Earth fill m3 24,003,272
Bamnak 2 201 Earth road 1.46 [ 1.46 ] Km 24,196,847 4.000 Width (m) 5,659.130 Earth fill m3 35,327,397
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,330,669

Krakor, Kampong Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150306/06/01 TSO Kim Sum Project Type Rural Transport 28,163,500
Moat Prey 1 202 Laterite road 1.05 [ 1.05 ] Km 15,500,000 3.000 Width (m) 294.000 Earth fill m3 16,275,000
Chek Chau 2 202 Laterite road 0.90 [ 0.77 ] Km 15,500,000 3.000 Width (m) 0.000 Earth fill m3 11,888,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,163,500

Krakor, Kbal Trach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150307/06/01 TSO Kim Sum Project Type Education 38,410,000
Trapeang Smach 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 19,205,000 16.000 Length (m) 9.000 Width (m) 38,410,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,410,000

Krakor, Ou Sandan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150308/06/01 TSO Kim Sum Project Type Rural Transport 14,920,000
Doung Chuor 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 13,020,000 2.500 Total Span (m) 3.000 Width (m) 13,020,000
Doung Chuor 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 4.000 Length (m) 1,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,920,000
Contract ID 150308/06/02 TSO Kim Sum Project Type Rural Transport 5,000,000
Doung Chuor 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Puttream 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 6.000 Length (m) 1,100,000
Puttream 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,000,000

Krakor, Sna Ansa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150309/06/01 TSO Kim Sum Project Type Rural Transport 14,746,750
Ansa Kdam 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Ansa Kdam 2 202 Laterite road 0.99 [ 0.99 ] Km 13,550,000 3.000 Width (m) 480.190 Earth fill m3 13,346,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,746,750

Krakor, Svay Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150310/06/01 TSO Kim Sum Project Type Rural Transport 27,600,000
Kamraeng 1 230 Wood bridge (general) 1.00 [ 1.00 ] Place 27,600,000 6.000 Total Span (m) 4.500 Width(m) 27,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,600,000

Krakor, Tnaot Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150311/06/01 TSO KHUT TOUCH Project Type Rural Transport 31,590,000
Boeng Veal 1 202 Laterite road 1.00 [ 1.00 ] Km 8,100,000 3.000 Width (m) 0.000 Earth fill m3 8,100,000
Thmei 2 202 Laterite road 1.00 [ 1.00 ] Km 8,100,000 3.000 Width (m) 0.000 Earth fill m3 8,100,000
Chheu Teal 3 202 Laterite road 0.70 [ 0.70 ] Km 8,100,000 3.000 Width (m) 0.000 Earth fill m3 5,670,000
Kandal 4 202 Laterite road 1.00 [ 1.00 ] Km 8,100,000 3.000 Width (m) 0.000 Earth fill m3 8,100,000
Dang Tuek Leach 5 202 Laterite road 0.20 [ 0.20 ] Km 8,100,000 3.000 Width (m) 0.000 Earth fill m3 1,620,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,590,000

Phnum Kravanh, Bak Chenhchien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150401/06/01 TSO Sek Chanrattha Project Type Rural Transport 29,356,500
Krabau Chrum 1 201 Earth road 0.95 [ 0.95 ] Km 26,270,000 4.000 Width (m) 0.000 Earth fill m3 24,956,500
Krabau Chrum 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Krabau Chrum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,356,500

Phnum Kravanh, Leach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150402/06/01 TSO Sek Chanrattha Project Type Irrigation 40,119,900
Paen 1 420 Canal 0.78 [ 0.78 ] Km 8,816,200 1.279 Depth (m) 1.000 Volume (m3) 6,894,268
Sbov Rik 2 420 Canal 0.65 [ 0.65 ] Km 8,816,200 1.104 Depth (m) 1,386.220 Volume (m3) 5,739,346
Krouch Chhmar 3 420 Canal 1.81 [ 1.81 ] Km 8,816,200 0.809 Depth (m) 5.000 Volume (m3) 15,966,138
Ta Nuk 4 420 Canal 0.85 [ 0.85 ] Km 8,816,200 0.397 Depth (m) 912.650 Volume (m3) 7,520,219
Krouch Chhmar 5 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,000,000 0.600 Diameter (m) 5.000 Width (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,119,971
Contract ID 150402/06/02 TSO Sek Chanrattha Project Type Rural Transport 14,400,000
Sbov Rik 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 2,400,000
Sbov Rik 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,900,000 0.800 Diameter (m) 5.000 Length (m) 3,900,000
Sbov Rik 4 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Sbov Rik 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,500,000 1.000 Diameter (m) 5.000 Length (m) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,400,000

Phnum Kravanh, Phteah Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150403/06/01 TSO Sek Chanrattha Project Type Rural Transport 41,907,900
Bat Rumduol 1 202 Laterite road 1.50 [ 1.50 ] Km 8,700,000 3.000 Width (m) 0.000 Earth fill m3 13,050,000
Chongruk 2 202 Laterite road 3.20 [ 3.32 ] Km 8,700,000 3.000 Width (m) 0.000 Earth fill m3 28,857,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,907,900
Contract ID 150403/06/02 TSO Sek Chanrattha Project Type Rural Transport 5,100,000
Damnak Kansaeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,280,000 0.800 Diameter (m) 7.000 Length (m) 2,280,000
Damnak Kansaeng 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,410,000 0.600 Diameter (m) 6.000 Length (m) 1,410,000
Chongruk 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,410,000 0.600 Diameter (m) 6.000 Length (m) 1,410,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,100,000

Phnum Kravanh, Prongil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150404/06/01 TSO Sek Chanrattha Project Type Rural Transport 31,779,000
Prongil 1 201 Earth road 1.10 [ 1.10 ] Km 28,890,000 4.000 Width (m) 4,889.000 Earth fill m3 31,779,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,779,000

Phnum Kravanh, Rokat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150405/06/01 TSO Sek Chanrattha Project Type Education 41,260,000
Prey Khlong 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 19,400,000 16.000 Length (m) 9.000 Width (m) 38,800,000
Prey Khlong 2 740 School furniture 2.00 [ 2.00 ] School room 1,230,000 20.000 Students 0.000 2,460,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,260,000

Phnum Kravanh, Santreae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150406/06/01 TSO Sek Chanrattha Project Type Irrigation 7,484,650
Sraepopeay 1 420 Canal 1.40 [ 1.40 ] Km 5,350,000 0.800 Depth (m) 1,647.000 Volume (m3) 7,484,650
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,484,650
Contract ID 150406/06/04 TSO Sek Chanrattha Project Type Irrigation 16,160,000
Santreae 1 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 8,080,000 1.400 Diameter (m) 3.000 Width (m) 16,160,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,160,000

Phnum Kravanh, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150407/06/01 TSO Sek Chanrattha Project Type Rural Transport 37,210,000
Ou Preal 1 201 Earth road 1.22 [ 1.22 ] Km 30,500,000 4.000 Width (m) 0.000 Earth fill m3 37,210,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,210,000

Sampov Meas, Chamraeun Phal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150501/06/01 TSO KHUT TOUCH Project Type Rural Transport 29,964,400
Ou Roka 1 202 Laterite road 1.50 [ 1.06 ] Km 9,200,000 3.000 Width (m) 0.000 Earth fill m3 9,724,400
Doun Ei 2 202 Laterite road 2.20 [ 2.20 ] Km 9,200,000 3.000 Width (m) 0.000 Earth fill m3 20,240,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,964,400

Sampov Meas, Kaoh Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150502/06/01 TSO KHUT TOUCH Project Type Rural Transport 24,650,000
Phteah Pring 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 9,050,000 2.000 Total Span (m) 4.500 Width(m) 9,050,000
Phteah Pring 2 223 Triple cell box culvert 1.00 [ 1.00 ] Place 15,600,000 4.500 Total Span (m) 4.500 Width(m) 15,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,650,000

Sampov Meas, Lolok Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150503/06/01 TSO KHUT TOUCH Project Type Irrigation 46,657,800
Kaoh 1 420 Canal 1.13 [ 1.13 ] Km 41,400,000 0.535 Depth (m) 6,236.750 Volume (m3) 46,657,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,657,800
Contract ID 150503/06/02 TSO KHUT TOUCH Project Type Rural Transport 13,800,000
Kaoh 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,000,000 2.000 Total Span (m) 4.000 Width(m) 8,000,000
Lolok Sar 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,900,000 1.000 Diameter (m) 8.000 Length (m) 5,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,800,000

Sampov Meas, Phteah Prey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150504/06/01 TSO KHUT TOUCH Project Type Rural Transport 52,263,600
Chamkar Chek Cheung 1 202 Laterite road 1.90 [ 1.54 ] Km 15,200,000 3.000 Width (m) 1,085.000 Earth fill m3 23,338,080
Chamkar Chek Tboung 2 202 Laterite road 0.50 [ 0.50 ] Km 15,200,000 3.000 Width (m) 0.000 Earth fill m3 7,600,000
Tnaot Tret 3 202 Laterite road 1.11 [ 1.11 ] Km 15,200,000 3.000 Width (m) 30.000 Earth fill m3 16,872,000
Kbal Hong 4 202 Laterite road 0.29 [ 0.29 ] Km 15,200,000 3.000 Width (m) 50.000 Earth fill m3 4,453,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,263,680
Contract ID 150504/06/02 TSO KHUT TOUCH Project Type Rural Transport 8,750,000
Chamkar Chek Cheung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 1,200,000
Chamkar Chek Cheung 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,550,000 2.000 Total Span (m) 5.000 Width(m) 7,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,750,000

Sampov Meas, Prey Nhi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150505/06/01 TSO KHUT TOUCH Project Type Rural Transport 33,348,400
Moan Chae 1 202 Laterite road 0.30 [ 0.30 ] Km 12,815,900 3.000 Width (m) 93.000 Earth fill m3 3,844,770
Doung Chrum 2 202 Laterite road 1.99 [ 1.99 ] Km 12,815,900 3.000 Width (m) 400.000 Earth fill m3 25,503,641
Doung Chrum 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 6.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,348,411

Sampov Meas, Roleab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150506/06/01 TSO KHUT TOUCH Project Type Rural Transport 30,375,000
Souriya Leu 1 202 Laterite road 0.74 [ 0.74 ] Km 17,650,000 3.000 Width (m) 0.000 Earth fill m3 12,972,750
Preaek Tnaot 2 202 Laterite road 0.77 [ 0.77 ] Km 17,650,000 3.000 Width (m) 1,755.000 Earth fill m3 13,502,250
Preaek Tnaot 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,375,000

Sampov Meas, Svay at

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150507/06/01 TSO KHUT TOUCH Project Type Rural Transport 8,268,900
Svay at 1 202 Laterite road 0.79 [ 0.79 ] Km 10,467,000 3.000 Width (m) 0.000 Earth fill m3 8,268,930
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,268,930
Contract ID 150507/06/02 TSO KHUT TOUCH Project Type Rural Transport 13,900,000
Svay at 1 201 Earth road 0.50 [ 0.50 ] Km 24,800,000 4.000 Width (m) 2,128.000 Earth fill m3 12,400,000
Svay at 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,900,000

Veal Veaeng, Ou Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150601/06/01 TSO Sam Sarom Project Type Education 26,562,300
Ou Saom 1 311 Wooden school with tile roof, earth floor 3.00 [ 3.00 ] School room 7,411,100 24.000 Length (m) 9.000 Width (m) 22,233,300
Ou Saom 2 740 School furniture 3.00 [ 3.00 ] School room 1,443,000 40.000 Students 0.000 4,329,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,562,300

Veal Veaeng, Krapeu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150602/06/01 TSO Sam Sarom Project Type Rural Transport 20,794,200
Krapeu Pir Kraom 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 20,794,200 3.000 Total Span (m) 4.000 Width (m) 20,794,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,794,200

Veal Veaeng, Pramaoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150604/06/01 TSO Sam Sarom Project Type Rural Transport 29,880,000
Pramaoy 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 13,000,000 2.000 Total Span (m) 6.000 Width(m) 13,000,000
Pramaoy 2 211 Single pipe culvert 2.00 [ 1.00 ] Place 9,380,000 0.800 Diameter (m) 7.000 Length (m) 9,380,000
Pramaoy 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 7,500,000 1.000 Diameter (m) 6.000 Length (m) 7,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,880,000

Veal Veaeng, Thma Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150605/06/01 TSO Sam Sarom Project Type Rural Transport 28,550,000
Aekakpheap 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 20,000,000 2.000 Total Span (m) 6.000 Width(m) 20,000,000
Aekakpheap 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 8,550,000 1.000 Diameter (m) 7.000 Length (m) 8,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,550,000