Contract Outputs

Location: Pursat \ Veal Veaeng Budget Year: 2006

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Veal Veaeng, Ou Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150601/06/01 TSO Sam Sarom Project Type Education 26,562,300
Ou Saom 1 311 Wooden school with tile roof, earth floor 3.00 [ 3.00 ] School room 7,411,100 24.000 Length (m) 9.000 Width (m) 22,233,300
Ou Saom 2 740 School furniture 3.00 [ 3.00 ] School room 1,443,000 40.000 Students 0.000 4,329,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,562,300

Veal Veaeng, Krapeu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150602/06/01 TSO Sam Sarom Project Type Rural Transport 20,794,200
Krapeu Pir Kraom 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 20,794,200 3.000 Total Span (m) 4.000 Width (m) 20,794,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,794,200

Veal Veaeng, Pramaoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150604/06/01 TSO Sam Sarom Project Type Rural Transport 29,880,000
Pramaoy 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 13,000,000 2.000 Total Span (m) 6.000 Width(m) 13,000,000
Pramaoy 2 211 Single pipe culvert 2.00 [ 1.00 ] Place 9,380,000 0.800 Diameter (m) 7.000 Length (m) 9,380,000
Pramaoy 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 7,500,000 1.000 Diameter (m) 6.000 Length (m) 7,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,880,000

Veal Veaeng, Thma Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150605/06/01 TSO Sam Sarom Project Type Rural Transport 28,550,000
Aekakpheap 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 20,000,000 2.000 Total Span (m) 6.000 Width(m) 20,000,000
Aekakpheap 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 8,550,000 1.000 Diameter (m) 7.000 Length (m) 8,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,550,000