Contract ID 020301/06/01 TSO Keo Veasna Project Type Rural Transport 35,640,000
Ou Ta Kam Pir 1 202 Laterite road 0.75 [ 0.75 ] Km 25,306,670 4.000 Width (m) 463.000 Earth fill m3 18,980,003
Ou Ta Kam Pir 2 202 Laterite road 0.35 [ 0.35 ] Km 21,857,140 4.000 Width (m) 350.000 Earth fill m3 7,649,999
Dangkao Teab 3 202 Laterite road 0.26 [ 0.26 ] Km 13,576,920 3.000 Width (m) 0.000 Earth fill m3 3,529,999
Tuol Ta Aek 4 202 Laterite road 0.35 [ 0.35 ] Km 15,480,230 3.000 Width (m) 100.000 Earth fill m3 5,480,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,640,002
Contract ID 020301/06/02 TSO Keo Veasna Project Type Rural Transport 7,420,000
Ou Ta Kam Pir 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,239,604 0.600 Diameter (m) 7.000 Length (m) 2,479,208
Ou Ta Kam Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,046,112 1.000 Diameter (m) 0.800 Length (m) 2,046,112
Ou Ta Kam Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,894,680 1.000 Diameter (m) 8.000 Length (m) 2,894,680
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,420,000

Battambang, Preaek Preah Sdach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020302/06/01 TSO Keo Veasna Project Type Rural Transport 11,124,400
Ou Khcheay 1 201 Earth road 0.70 [ 0.70 ] Km 15,892,040 4.000 Width (m) 3,661.000 Earth fill m3 11,124,428
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,124,428
Contract ID 020302/06/02 TSO Keo Veasna Project Type Rural Transport 26,069,700
Baek Chan Thmei 1 202 Laterite road 0.25 [ 0.25 ] Km 18,932,220 4.000 Width (m) 0.000 Earth fill m3 4,638,394
Preaek Preah Sdach 2 202 Laterite road 0.37 [ 0.37 ] Km 18,932,220 4.000 Width (m) 0.000 Earth fill m3 7,004,921
Dabbei Meakkakra 3 202 Laterite road 0.76 [ 0.76 ] Km 18,932,230 4.000 Width (m) 0.000 Earth fill m3 14,426,359
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,069,675
Contract ID 020302/06/03 TSO Keo Veasna Project Type Rural Transport 3,990,000
Dabbei Meakkakra 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,702,984 0.800 Diameter (m) 7.000 Length (m) 1,702,984
Ou Khcheay 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,143,509 0.600 Diameter (m) 5.000 Length (m) 2,287,018
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,990,002

Battambang, Rotanak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020303/06/01 TSO Keo Veasna Project Type Rural Transport 27,000,000
Rumchek Pram 1 202 Laterite road 1.19 [ 1.19 ] Km 11,113,930 3.000 Width (m) 70.000 Earth fill m3 13,170,007
Rumchek Pir 2 202 Laterite road 0.28 [ 0.28 ] Km 18,642,860 3.000 Width (m) 189.000 Earth fill m3 5,220,001
Rumchek Muoy 3 202 Laterite road 0.09 [ 0.09 ] Km 16,666,670 3.000 Width (m) 42.000 Earth fill m3 1,500,000
Souphi Muoy 4 202 Laterite road 0.53 [ 0.53 ] Km 13,364,660 3.000 Width (m) 173.000 Earth fill m3 7,109,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,000,007
Contract ID 020303/06/02 TSO Keo Veasna Project Type Rural Transport 7,970,000
Rumchek Pir 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,140,000 0.600 Diameter (m) 5.000 Length (m) 1,140,000
Rumchek Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,140,000 0.800 Diameter (m) 6.000 Length (m) 1,140,000
Souphi Muoy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,896,667 0.800 Diameter (m) 5.000 Length (m) 1,896,667
Souphi Muoy 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,896,667 0.800 Diameter (m) 6.000 Length (m) 1,896,667
Souphi Muoy 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,896,667 0.600 Diameter (m) 5.000 Length (m) 1,896,667
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,970,001

Battambang, Chamkar Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020304/06/01 TSO Keo Veasna Project Type Urban Drainage and Flood Protection 16,897,600
Chamkar Samraong Muoy 1 420 Canal 1.03 [ 1.03 ] Km 4,825,133 1.000 Depth (m) 1,030.000 Volume (m3) 4,969,887
Chamkar Samraong Pir 2 420 Canal 1.39 [ 1.39 ] Km 4,825,133 1.000 Depth (m) 1,386.000 Volume (m3) 6,687,634
Voat Rumduol 3 420 Canal 1.09 [ 1.09 ] Km 4,825,132 1.000 Depth (m) 1,086.000 Volume (m3) 5,240,093
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,897,615
Contract ID 020304/06/02 TSO Keo Veasna Project Type Irrigation 16,149,820
Chamkar Samraong Pir 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,046,112 0.800 Diameter (m) 8.000 Length (m) 4,092,224
Chamkar Samraong Pir 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,362,874 1.000 Diameter (m) 10.000 Length (m) 6,725,748
Phka Sla 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,239,604 0.600 Diameter (m) 7.000 Length (m) 1,239,604
Voat Rumduol 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,046,112 0.800 Diameter (m) 88.000 Length (m) 4,092,224
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,149,800

Battambang, Sla Kaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020305/06/01 TSO Keo Veasna Project Type Rural Transport 7,290,900
Sla Kaet 1 201 Earth road 0.27 [ 0.40 ] Km 18,318,840 4.000 Width (m) 2,845.000 Earth fill m3 7,290,898
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,290,898
Contract ID 020305/06/02 TSO Keo Veasna Project Type Rural Transport 22,730,000
Chrey Kaong 1 202 Laterite road 0.28 [ 0.28 ] Km 28,273,380 3.000 Width (m) 700.000 Earth fill m3 7,860,000
Chrey Kaong 2 202 Laterite road 0.22 [ 0.22 ] Km 32,612,610 3.000 Width (m) 682.000 Earth fill m3 7,239,999
Dam Spey 3 202 Laterite road 0.47 [ 0.47 ] Km 13,425,530 3.000 Width (m) 0.000 Earth fill m3 6,309,999
Dam Spey 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,320,000 0.600 Diameter (m) 5.000 Length (m) 1,320,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,729,998

Battambang, Kdol Doun Teav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020306/06/01 TSO Keo Veasna Project Type Rural Transport 9,900,000
Ta Pruoch 1 201 Earth road 0.62 [ 0.62 ] Km 15,967,740 4.000 Width (m) 3,108.000 Earth fill m3 9,899,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,899,999
Contract ID 020306/06/02 TSO Keo Veasna Project Type Rural Transport 6,990,000
Ta Pruoch 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,239,604 0.600 Diameter (m) 7.000 Length (m) 3,718,812
Ta Pruoch 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,031,584 0.800 Diameter (m) 8.000 Length (m) 2,031,584
Ou Ta Nob 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,239,600 0.600 Diameter (m) 7.000 Length (m) 1,239,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,989,996

Battambang, Ou Mal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020307/06/01 TSO Keo Veasna Project Type Irrigation 7,633,800
Ou Mal 1 420 Canal 0.18 [ 0.61 ] Km 12,432,900 1.050 Depth (m) 6,783.000 Volume (m3) 7,633,801
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,633,801

Battambang, Voat Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020308/06/01 TSO Keo Veasna Project Type Irrigation 21,453,900
Chrab Krasang 1 420 Canal 1.70 [ 1.70 ] Km 3,762,594 1.000 Depth (m) 1,859.000 Volume (m3) 6,392,647
Chrab Krasang 2 420 Canal 2.42 [ 2.42 ] Km 6,215,959 2.000 Depth (m) 4,138.000 Volume (m3) 15,061,269
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,453,916
Contract ID 020308/06/02 TSO Keo Veasna Project Type Irrigation 4,040,000
Chrab Krasang 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,143,508 0.600 Diameter (m) 5.000 Length (m) 2,287,016
Chrab Krasang 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,752,984 0.800 Diameter (m) 5.000 Length (m) 1,752,984
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,040,000

Battambang, Ou Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020309/06/01 TSO Keo Veasna Project Type Rural Transport 4,178,000
Prey Koun Sek 1 201 Earth road 0.15 [ 0.15 ] Km 27,853,330 4.000 Width (m) 825.000 Earth fill m3 4,178,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,178,000
Contract ID 020309/06/02 TSO Keo Veasna Project Type Urban transport 32,024,500
Prey Koun Sek 1 202 Laterite road 0.79 [ 0.61 ] Km 15,219,380 3.000 Width (m) 0.000 Earth fill m3 9,344,699
Anhchanh 2 202 Laterite road 0.32 [ 0.32 ] Km 15,219,300 4.000 Width (m) 0.000 Earth fill m3 4,870,176
Anhchanh 3 202 Laterite road 0.67 [ 0.67 ] Km 15,223,880 3.000 Width (m) 150.000 Earth fill m3 10,200,000
Kab Kou Thmei 4 202 Laterite road 0.50 [ 0.50 ] Km 15,219,300 3.000 Width (m) 0.000 Earth fill m3 7,609,650
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,024,525

Battambang, Svay Pao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020310/06/01 TSO Keo Veasna Project Type Urban transport 15,552,200
Preaek Moha Tep 1 202 Laterite road 0.21 [ 0.21 ] Km 19,856,390 4.000 Width (m) 110.000 Earth fill m3 4,249,267
Kammeakkar 2 202 Laterite road 0.20 [ 0.20 ] Km 19,856,390 4.000 Width (m) 110.000 Earth fill m3 3,971,278
Preaek Moha Tep 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,665,400 0.800 Diameter (m) 10.000 Length (m) 2,665,400
Kampong Krabei 4 202 Laterite road 0.24 [ 0.24 ] Km 19,856,390 4.000 Width (m) 110.000 Earth fill m3 4,666,252
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,552,197
Contract ID 020310/06/02 TSO Keo Veasna Project Type Urban Drainage and Flood Protection 22,293,300
Preaek Moha Tep 1 420 Canal 0.90 [ 0.90 ] Km 6,268,948 1.000 Depth (m) 1.000 Volume (m3) 5,654,591
Kammeakkar 2 420 Canal 0.20 [ 0.20 ] Km 6,268,945 1.000 Depth (m) 1.000 Volume (m3) 1,253,789
Mphey Osakphea 3 420 Canal 0.29 [ 0.29 ] Km 6,268,948 1.000 Depth (m) 1.000 Volume (m3) 1,786,650
Mphey Osakphea 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,369,200 0.800 Diameter (m) 8.000 Length (m) 2,369,200
Preaek Moha Tep 5 542 Foul water sewer 1.00 [ 1.00 ] Line 2,489,000 0.800 6.000 2,489,000
Kampong Krabei 6 420 Canal 0.41 [ 0.41 ] Km 6,268,947 1.000 Depth (m) 1.000 Volume (m3) 2,570,268
Preaek Moha Tep 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,369,200 0.800 Diameter (m) 8.000 Length (m) 2,369,200
Kammeakkar 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,369,200 0.800 Diameter (m) 8.000 Length (m) 2,369,200
Mphey Osakphea 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,431,400 0.600 Diameter (m) 7.000 Length (m) 1,431,400