Contract Outputs

Location: Takeo \ Doun Kaev Budget Year: 2006

Angkor Borei    Bati    Bourei Cholsar    Kiri Vong    Kaoh Andaet    Prey Kabbas    Samraong    Doun Kaev    Tram Kak    Treang   

Doun Kaev, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210801/06/01 TSO Youn Sothon Project Type Irrigation 27,154,000
Chrouy Samraong 1 460 Pumping station 1.00 [ 1.00 ] Place 27,154,000 5.500 4.500 27,154,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,154,000

Doun Kaev, Roka Knong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210802/06/01 TSO Youn Sothon Project Type Irrigation 27,290,000
Chres 1 460 Pumping station 1.00 [ 1.00 ] Place 27,290,000 5.500 4.500 27,290,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,290,000

Doun Kaev, Roka Krau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210803/06/01 TSO Youn Sothon Project Type Rural Transport 41,257,600
Trapeang Sala 1 203 Gravel road 1.52 [ 1.52 ] Km 9,779,696 3.500 Width (m) 1,214.000 Earth fill m3 14,835,799
Souchan 2 203 Gravel road 1.85 [ 1.85 ] Km 9,779,708 3.500 Width (m) 1,482.000 Earth fill m3 18,121,799
Trapeang Sala 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 6.000 Length (m) 1,300,000
Trapeang Sala 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,600,000 1.000 Diameter (m) 5.000 Length (m) 5,200,000
Souchan 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,257,598