Contract Outputs

Location: Kampong Speu \ Thpong Budget Year: 2006

Basedth    Chbar Mon    Kong Pisei    Aoral    Odongk    Phnum Sruoch    Samraong Tong    Thpong   

Thpong, Monourom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 050802/06/01 TSO Tim Satha Project Type Rural Transport 25,300,000
Chambak Ph'aem 1 202 Laterite road 0.92 [ 0.92 ] Km 16,612,760 4.000 Width (m) 1,066.000 Earth fill m3 15,200,675
Veal Pon 2 202 Laterite road 1.32 [ 1.32 ] Km 7,651,007 4.000 Width (m) 792.000 Earth fill m3 10,099,329
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,300,005

Thpong, Prambei Mom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 050804/06/01 TSO Tim Satha Project Type Rural Domestic Water Supplies 39,812,500
La 1 141 Pond with no filter 1.00 [ 1.00 ] Place 17,508,800 3.500 Depth (m) 4.726 Volume (m3) 17,508,800
Thmei Doun Tip 2 141 Pond with no filter 1.00 [ 1.00 ] Place 22,303,700 3.500 Depth (m) 6,179.000 Volume (m3) 22,303,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,812,500

Thpong, Rung Roeang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 050805/06/01 TSO Tim Satha Project Type Rural Domestic Water Supplies 41,304,015
Tuek Long Muoy 1 141 Pond with no filter 1.00 [ 1.00 ] Place 26,194,210 3.000 Depth (m) 8,426.000 Volume (m3) 26,194,210
Keammoni 2 141 Pond with no filter 1.00 [ 1.00 ] Place 15,109,810 2.500 Depth (m) 4,833.000 Volume (m3) 15,109,810
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,304,020

Thpong, Veal Pon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 050807/06/01 TSO Tim Satha Project Type Rural Transport 39,980,100
Tang Banteay 1 202 Laterite road 0.27 [ 0.27 ] Km 20,375,640 4.000 Width (m) 744.000 Earth fill m3 5,521,798
Ream Kandal 2 202 Laterite road 1.81 [ 1.81 ] Km 19,058,810 4.000 Width (m) 3,298.000 Earth fill m3 34,458,328
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,980,127