Contract Outputs

Location: Siem Reap \ Soutr Nikom Budget Year: 2007

Angkor Chum    Angkor Thum    Banteay Srei    Chi Kraeng    Kralanh    Puok    Prasat Bakong    Siem Reab    Soutr Nikom    Srei Snam    Svay Leu    Varin   

Soutr Nikom, Chan Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171101/07/01 TSO Mao Luck Project Type Rural Transport 35,000,000
Kouk Chen 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 15,000,000 3.000 Total Span (m) 5.000 Width(m) 15,000,000
Baek Kamphleung 2 223 Triple cell box culvert 1.00 [ 1.00 ] Place 20,000,000 4.500 Total Span (m) 5.000 Width(m) 20,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Soutr Nikom, Dam Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171102/07/01 TSO Mao Luck Project Type Rural Transport 45,636,000
Dam Daek Phsar 1 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 2,040,000 0.600 Diameter (m) 9.000 Length (m) 4,080,000
Dam Daek Phsar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,040,000 0.600 Diameter (m) 7.000 Length (m) 2,040,000
Kouk Mon 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,376,000 0.600 Diameter (m) 9.000 Length (m) 2,376,000
Dam Daek Leu 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 1,700,000
Dam Daek Leu 5 222 Double cell box culvert 1.00 [ 1.00 ] Place 13,300,000 3.000 Total Span (m) 5.000 Width(m) 13,300,000
Bos 6 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,150,000 2.000 Total Span (m) 5.000 Width(m) 8,150,000
Krasar Tum 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,090,000 0.600 Diameter (m) 5.000 Length (m) 3,090,000
Krasar Tum 8 221 Single cell box culvert 1.00 [ 1.00 ] Place 10,900,000 2.000 Total Span (m) 5.000 Width(m) 10,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,636,000

Soutr Nikom, Dan Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171103/07/01 TSO Mao Luck Project Type Rural Transport 48,900,000
Veal 1 202 Laterite road 2.15 [ 2.15 ] Km 22,744,189 4.000 Width (m) 1,439.000 Earth fill m3 48,900,006
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,900,006

Soutr Nikom, Kampong Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171104/07/01 TSO Mao Luck Project Type Rural Domestic Water Supplies 40,000,000
Ou Ta Puk 1 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 2,137.000 Volume (m3) 10,000,000
Ta Uor Sa 2 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 2,137.000 Volume (m3) 10,000,000
Spean Veaeng 3 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 2,137.000 Volume (m3) 10,000,000
Preaek Sramaoch 4 141 Pond with no filter 1.00 [ 1.00 ] Place 10,000,000 4.000 Depth (m) 2,137.000 Volume (m3) 10,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,000,000

Soutr Nikom, Kien Sangkae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171105/07/01 TSO Mao Luck Project Type Rural Transport 36,764,000
Chrey Khang Tboung 1 202 Laterite road 1.00 [ 1.00 ] Km 28,764,230 4.000 Width (m) 1,368.000 Earth fill m3 28,764,230
Doun Lei 2 202 Laterite road 0.30 [ 0.28 ] Km 28,776,151 4.000 Width (m) 410.000 Earth fill m3 7,999,770
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,764,000

Soutr Nikom, Khchas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171106/07/01 TSO Mao Luck Project Type Rural Transport 45,987,800
Thlat 1 201 Earth road 0.50 [ 0.50 ] Km 25,752,000 4.000 Width (m) 1,561.000 Earth fill m3 12,876,000
Thmei 2 201 Earth road 1.00 [ 1.29 ] Km 25,747,900 4.000 Width (m) 3,122.000 Earth fill m3 33,111,799
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,987,799

Soutr Nikom, Khnar Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171107/07/01 TSO Mao Luck Project Type Rural Transport 44,341,800
Chhuk 1 202 Laterite road 1.50 [ 1.50 ] Km 14,780,600 3.500 Width (m) 915.000 Earth fill m3 22,170,900
Bos 2 202 Laterite road 1.00 [ 1.00 ] Km 14,780,600 3.500 Width (m) 610.000 Earth fill m3 14,780,600
Damrei Chhlang 3 202 Laterite road 0.50 [ 0.50 ] Km 14,780,600 3.500 Width (m) 305.000 Earth fill m3 7,390,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,341,800

Soutr Nikom, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171108/07/01 TSO Mao Luck Project Type Rural Transport 48,880,000
Kriel Pong 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 24,440,000 6.000 Total Span (m) 5.000 Width(m) 24,440,000
Prey Lean 2 223 Triple cell box culvert 1.00 [ 1.00 ] Place 24,440,000 6.000 Total Span (m) 5.000 Width(m) 24,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,880,000

Soutr Nikom, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171109/07/01 TSO Mao Luck Project Type Rural Transport 36,000,000
Stueng 1 202 Laterite road 0.99 [ 0.99 ] Km 18,117,766 4.000 Width (m) 676.000 Earth fill m3 17,882,235
Samraong Khang Cheung 2 202 Laterite road 1.00 [ 1.00 ] Km 18,117,766 4.000 Width (m) 480.000 Earth fill m3 18,117,766
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,000,001

Soutr Nikom, Ta Yaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171110/07/01 TSO Mao Luck Project Type Rural Transport 39,650,000
Boeng Vien 1 202 Laterite road 1.45 [ 1.45 ] Km 20,333,333 4.000 Width (m) 1,032.000 Earth fill m3 29,483,333
Dak Phka 2 202 Laterite road 0.50 [ 0.50 ] Km 20,333,330 4.000 Width (m) 356.000 Earth fill m3 10,166,665
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,649,998