Contract Outputs

Location: Battambang Budget Year: 2007

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Banan, Kantueu Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020101/07/01 TSO Sem Vanno Project Type Rural Domestic Water Supplies 23,962,400
Thmei 1 141 Pond with no filter 1.00 [ 1.00 ] Place 11,981,200 3.000 Depth (m) 2,484.000 Volume (m3) 11,981,200
Kampong Ampil 2 141 Pond with no filter 1.00 [ 1.00 ] Place 11,981,200 3.000 Depth (m) 2,484.000 Volume (m3) 11,981,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,962,400

Banan, Kantueu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020102/07/01 TSO Sem Vanno Project Type Rural Transport 28,670,000
Phnom Kul 1 201 Earth road 1.85 [ 3.85 ] Km 7,226,541 4.000 Width (m) 10,461.000 Earth fill m3 27,833,023
Phnom Kul 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 836,967 0.600 Diameter (m) 5.000 Length (m) 836,967
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,669,990

Banan, Bay Damram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020103/07/01 TSO Sem Vanno Project Type Rural Transport 30,372,000
Tuol Chranieng 1 201 Earth road 1.96 [ 3.95 ] Km 7,690,087 4.000 Width (m) 8,373.000 Earth fill m3 30,371,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,371,999

Banan, Chheu Teal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020104/07/01 TSO Sem Vanno Project Type Rural Transport 40,954,700
Svay Prakeab 1 202 Laterite road 1.79 [ 2.87 ] Km 14,259,500 3.000 Width (m) 1,113.480 Earth fill m3 40,954,710
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,954,710

Banan, Chaeng Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020105/07/01 TSO Sem Vanno Project Type Rural Transport 25,997,200
Changhour Svay 1 201 Earth road 1.10 [ 1.77 ] Km 12,412,640 4.000 Width (m) 3,422.000 Earth fill m3 21,970,373
Changhour Svay 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,503,472 0.800 Diameter (m) 5.000 Length (m) 3,006,944
Changhour Svay 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,019,889 0.600 Diameter (m) 5.000 Length (m) 1,019,889
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,997,206

Banan, Phnum Sampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020106/07/01 TSO Sem Vanno Project Type Rural Transport 39,026,300
Sampov Kaeut 1 202 Laterite road 2.71 [ 2,870.40 ] Km 13,596 3.000 Width (m) 165.750 Earth fill m3 39,026,303
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,026,303

Banan, Snoeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020107/07/01 TSO Sem Vanno Project Type Rural Transport 42,470,500
Snoeng Lech 1 202 Laterite road 1.33 [ 1.33 ] Km 14,300,000 3.000 Width (m) 0.000 Earth fill m3 19,076,200
Boeng Prei 2 202 Laterite road 1.09 [ 1,199.60 ] Km 16,001 3.000 Width (m) 0.000 Earth fill m3 19,194,296
Boeng Prei 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,200,000 1.000 Diameter (m) 5.000 Length (m) 4,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,470,496

Banan, Ta Kream

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020108/07/01 TSO Sem Vanno Project Type Rural Transport 48,289,500
Thmei 1 201 Earth road 2.54 [ 5.45 ] Km 8,385,441 4.000 Width (m) 8,498.000 Earth fill m3 45,700,653
Thmei 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 862,950 0.600 Diameter (m) 5.000 Length (m) 2,588,850
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,289,503

Thma Koul, Ta Pung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020201/07/01 TSO Vay Sokunthea Project Type Irrigation 42,230,000
Paoy Samraong 1 420 Canal 0.91 [ 2.60 ] Km 16,223,590 1.500 Depth (m) 7,564.000 Volume (m3) 42,230,005
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,230,005

Thma Koul, Ta Meun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020202/07/01 TSO Vay Sokunthea Project Type Irrigation 18,474,500
Krasang 1 420 Canal 0.56 [ 1.10 ] Km 16,795,000 1.500 Depth (m) 4,770.000 Volume (m3) 18,474,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,474,500
Contract ID 020202/07/02 TSO Vay Sokunthea Project Type Rural Transport 23,655,800
Samraong 1 202 Laterite road 1.12 [ 1.13 ] Km 20,990,060 3.000 Width (m) 0.000 Earth fill m3 23,655,798
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,655,798

Thma Koul, Ou Ta Ki

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020203/07/01 TSO Vay Sokunthea Project Type Irrigation 44,035,300
Ou Ta Ki 1 420 Canal 0.29 [ 0.82 ] Km 13,360,270 1.500 Depth (m) 1,967.000 Volume (m3) 10,995,502
Popeal Khae 2 420 Canal 0.29 [ 0.82 ] Km 13,360,270 1.500 Depth (m) 1,967.000 Volume (m3) 10,995,502
Veal Trea 3 420 Canal 0.29 [ 0.82 ] Km 13,360,190 1.500 Depth (m) 1,967.000 Volume (m3) 11,008,797
Tras 4 420 Canal 0.29 [ 0.83 ] Km 13,360,170 1.500 Depth (m) 1,980.000 Volume (m3) 11,035,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,035,301

Thma Koul, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020204/07/01 TSO Vay Sokunthea Project Type Rural Transport 41,733,600
Ka Kou 1 201 Earth road 1.00 [ 2.03 ] Km 9,368,756 4.000 Width (m) 4,120.000 Earth fill m3 18,981,100
Popeal Khae 2 201 Earth road 0.82 [ 2.09 ] Km 10,881,010 4.000 Width (m) 2,805.000 Earth fill m3 22,752,192
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,733,292

Thma Koul, Anlong Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020205/07/01 TSO Vay Sokunthea Project Type Irrigation 27,582,300
Souphi 1 420 Canal 0.36 [ 0.90 ] Km 15,265,380 1.500 Depth (m) 2,470.000 Volume (m3) 13,799,904
Kruos 2 420 Canal 0.48 [ 1.19 ] Km 11,601,350 1.200 Depth (m) 2,453.000 Volume (m3) 13,782,404
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,582,307

Thma Koul, Chrouy Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020206/07/01 TSO Vay Sokunthea Project Type Irrigation 34,538,200
Chrouy Sdau 1 420 Canal 0.79 [ 2.25 ] Km 15,370,810 1.500 Depth (m) 6,183.000 Volume (m3) 34,538,210
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,538,210

Thma Koul, Boeng Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020207/07/01 TSO Vay Sokunthea Project Type Irrigation 17,550,000
Paoy Ta Sek 1 420 Canal 1.00 [ 1.30 ] Km 13,500,000 1.200 Depth (m) 5,750.000 Volume (m3) 17,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,550,000
Contract ID 020207/07/02 TSO Vay Sokunthea Project Type Rural Transport 18,138,600
Paoy Ta Sek 1 202 Laterite road 0.50 [ 0.93 ] Km 19,462,020 3.000 Width (m) 0.000 Earth fill m3 18,138,603
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,138,603

Thma Koul, Kouk Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020208/07/01 TSO Vay Sokunthea Project Type Rural Transport 39,200,700
Kouk Khmum 1 202 Laterite road 0.40 [ 0.40 ] Km 22,632,650 3.000 Width (m) 0.000 Earth fill m3 9,053,060
Chranieng 2 202 Laterite road 0.40 [ 0.40 ] Km 22,632,650 3.000 Width (m) 0.000 Earth fill m3 9,053,060
Kien Kaes Pir 3 202 Laterite road 1.31 [ 0.70 ] Km 22,632,650 3.000 Width (m) 0.000 Earth fill m3 15,888,120
Chranieng 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,734,214 0.600 Diameter (m) 5.000 Length (m) 3,468,428
Kouk Khmum 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,738,044 0.600 Diameter (m) 5.000 Length (m) 1,738,044
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,200,712

Thma Koul, Bansay Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020209/07/01 TSO Vay Sokunthea Project Type Rural Transport 33,619,200
Tuol Ta Sokh 1 202 Laterite road 1.72 [ 1.00 ] Km 33,788,140 3.500 Width (m) 0.000 Earth fill m3 33,619,199
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,619,199

Thma Koul, Rung Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020210/07/01 TSO Vay Sokunthea Project Type Irrigation 37,474,000
Ballang Kraom 1 420 Canal 0.34 [ 1.00 ] Km 11,541,500 1.500 Depth (m) 2,547.000 Volume (m3) 11,541,500
Kouk Khpos 2 420 Canal 0.35 [ 0.83 ] Km 15,994,190 1.500 Depth (m) 2,533.000 Volume (m3) 13,211,201
Prakeab 3 420 Canal 0.30 [ 0.78 ] Km 16,351,290 1.500 Depth (m) 1,567.000 Volume (m3) 12,721,304
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,474,005

Battambang, Tuol Ta Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020301/07/01 TSO Oum Naram Project Type Rural Transport 42,300,000
Dangkao Teab 1 202 Laterite road 0.23 [ 0.23 ] Km 22,560,000 3.000 Width (m) 39.000 Earth fill m3 5,233,920
Tuol Ta Aek 2 202 Laterite road 0.95 [ 0.95 ] Km 22,560,000 4.000 Width (m) 0.000 Earth fill m3 21,432,000
Ou Ta Kam Pir 3 202 Laterite road 0.41 [ 0.41 ] Km 22,560,000 4.000 Width (m) 139.000 Earth fill m3 9,136,800
Ou Ta Kam Pir 4 202 Laterite road 0.20 [ 0.20 ] Km 22,560,000 2.800 Width (m) 182.000 Earth fill m3 4,512,000
Ou Ta Kam Pir 5 202 Laterite road 0.09 [ 0.09 ] Km 22,560,000 4.000 Width (m) 0.000 Earth fill m3 1,985,280
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,300,000

Battambang, Preaek Preah Sdach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020302/07/01 TSO Oum Naram Project Type Rural Transport 38,941,400
Ou Khcheay 1 201 Earth road 0.37 [ 0.68 ] Km 10,810,810 4.000 Width (m) 1,365.000 Earth fill m3 7,308,108
Ou Khcheay 2 211 Single pipe culvert 1.00 [ 5.00 ] Place 1,000,000 0.800 Diameter (m) 6.000 Length (m) 5,000,000
Chamkar Ruessei 3 201 Earth road 0.67 [ 1.46 ] Km 14,880,950 4.000 Width (m) 3,238.000 Earth fill m3 21,666,663
Chamkar Ruessei 4 211 Single pipe culvert 3.00 [ 7.00 ] Place 566,667 0.800 Diameter (m) 6.000 Length (m) 3,966,667
Chamkar Ruessei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 7.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,941,438

Battambang, Rotanak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020303/07/01 TSO Oum Naram Project Type Rural Transport 26,000,000
Rumchek Pir 1 202 Laterite road 0.19 [ 0.19 ] Km 26,595,750 3.000 Width (m) 135.000 Earth fill m3 5,000,001
Rumchek Pram 2 202 Laterite road 0.53 [ 0.53 ] Km 18,147,450 3.000 Width (m) 47.000 Earth fill m3 9,600,001
Souphi Muoy 3 202 Laterite road 0.42 [ 0.42 ] Km 19,184,650 3.000 Width (m) 125.000 Earth fill m3 7,999,999
Rumchek Pir 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.800 Diameter (m) 4.000 Length (m) 1,300,000
Souphi Muoy 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 6.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,000,001
Contract ID 020303/07/02 TSO Oum Naram Project Type Rural Transport 11,106,800
Rumchek Pir 1 201 Earth road 0.14 [ 0.14 ] Km 25,889,970 3.000 Width (m) 533.000 Earth fill m3 3,572,816
Souphi Muoy 2 201 Earth road 0.17 [ 0.17 ] Km 25,889,970 3.000 Width (m) 412.000 Earth fill m3 4,427,185
Rumchek Buon 3 201 Earth road 0.12 [ 0.12 ] Km 25,889,970 3.000 Width (m) 0.000 Earth fill m3 3,106,796
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,106,797

Battambang, Chamkar Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020304/07/01 TSO Oum Naram Project Type Irrigation 40,925,100
Chamkar Samraong Muoy 1 420 Canal 1.48 [ 3.00 ] Km 10,150,000 1.200 Depth (m) 9,588.000 Volume (m3) 30,450,000
Chamkar Samraong Muoy 2 211 Single pipe culvert 2.00 [ 7.00 ] Place 1,496,448 1.000 Diameter (m) 6.000 Length (m) 10,475,136
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,925,136

Battambang, Sla Kaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020305/07/01 TSO Oum Naram Project Type Rural Transport 14,300,000
Chrey Kaong 2 201 Earth road 0.35 [ 0.35 ] Km 28,846,690 4.000 Width (m) 1,122.000 Earth fill m3 10,009,801
Chrey Kaong 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,385,200 0.800 Diameter (m) 6.000 Length (m) 2,385,200
Chrey Kaong 4 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 1,905,000 0.800 Length (m) 8.000 Diameter (m) 1,905,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,300,001
Contract ID 020305/07/02 TSO Oum Naram Project Type Rural Transport 15,598,300
Dam Spey 1 202 Laterite road 0.59 [ 0.66 ] Km 19,219,910 3.000 Width (m) 153.000 Earth fill m3 12,608,261
Dam Spey 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,495,000 0.600 Diameter (m) 5.000 Length (m) 2,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,598,261

Battambang, Kdol Doun Teav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020306/07/01 TSO Oum Naram Project Type Rural Transport 31,166,400
Ou Ta Nob 1 202 Laterite road 0.78 [ 0.83 ] Km 22,648,740 3.000 Width (m) 863.000 Earth fill m3 18,866,400
Ou Ta Nob 2 202 Laterite road 0.52 [ 0.52 ] Km 18,304,430 3.000 Width (m) 191.000 Earth fill m3 9,499,999
Ou Ta Nob 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,166,400

Battambang, Ou Mal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020307/07/01 TSO Oum Naram Project Type Rural Transport 35,500,000
Voat Roka 1 220 Box culvert (general) 1.00 [ 1.00 ] Place 35,500,000 1.500 Total Span (m) 4.400 Width(m) 35,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,500,000
Contract ID 020307/07/02 TSO Oum Naram Project Type Irrigation 18,376,300
Prey Dach 1 420 Canal 0.51 [ 1.63 ] Km 9,824,902 0.610 Depth (m) 1,888.000 Volume (m3) 15,975,291
Prey Dach 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,375,291

Battambang, Voat Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020308/07/01 TSO Oum Naram Project Type Rural Transport 47,772,000
Kampong Seima 1 202 Laterite road 2.60 [ 2.69 ] Km 16,966,120 3.000 Width (m) 753.000 Earth fill m3 45,570,998
Kampong Seima 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,770,998

Battambang, Ou Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020309/07/01 TSO Oum Naram Project Type Rural Transport 40,083,400
Ang 1 202 Laterite road 1.03 [ 1.03 ] Km 18,640,780 3.000 Width (m) 243.000 Earth fill m3 19,200,003
Andoung Chenh 2 202 Laterite road 0.37 [ 0.37 ] Km 14,209,120 3.000 Width (m) 0.000 Earth fill m3 5,300,002
Ou Char 3 202 Laterite road 0.13 [ 0.14 ] Km 13,846,150 3.000 Width (m) 0.000 Earth fill m3 1,913,538
Prey Koun Sek 4 202 Laterite road 0.63 [ 0.63 ] Km 14,338,120 3.000 Width (m) 0.000 Earth fill m3 8,990,001
Prey Koun Sek 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,340,200 0.800 Diameter (m) 6.000 Length (m) 4,680,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,083,944

Battambang, Svay Pao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020310/07/01 TSO Oum Naram Project Type Irrigation 20,049,600
Preaek Moha Tep 1 420 Canal 0.23 [ 0.23 ] Km 6,442,127 1.200 Depth (m) 272.000 Volume (m3) 1,488,131
Preaek Moha Tep 2 541 Drain pipe for flood water 2.00 [ 2.00 ] Line 2,633,300 0.800 Length (m) 2.000 Diameter (m) 5,266,600
Mphey Osakphea 3 420 Canal 0.34 [ 0.34 ] Km 6,442,127 1.200 Depth (m) 385.000 Volume (m3) 2,203,207
Mphey Osakphea 4 541 Drain pipe for flood water 2.00 [ 2.00 ] Line 2,633,300 0.800 Length (m) 20.000 Diameter (m) 5,266,600
Mphey Osakphea 5 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 2,096,600 0.800 Length (m) 10.000 Diameter (m) 2,096,600
Kampong Krabei 6 420 Canal 0.17 [ 0.17 ] Km 6,442,127 1.200 Depth (m) 185.000 Volume (m3) 1,095,162
Kampong Krabei 7 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 2,633,300 0.800 Length (m) 10.000 Diameter (m) 2,633,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,049,600
Contract ID 020310/07/02 TSO Oum Naram Project Type Rural Transport 21,114,100
Kammeakkar 1 202 Laterite road 0.15 [ 0.15 ] Km 24,213,080 5.000 Width (m) 0.000 Earth fill m3 3,728,814
Kammeakkar 2 202 Laterite road 0.35 [ 0.35 ] Km 24,213,070 4.000 Width (m) 64.000 Earth fill m3 8,401,935
Kammeakkar 3 202 Laterite road 0.20 [ 0.20 ] Km 24,213,080 3.000 Width (m) 64.000 Earth fill m3 4,745,764
Kammeakkar 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Preaek Moha Tep 5 202 Laterite road 0.12 [ 0.12 ] Km 24,213,070 5.000 Width (m) 0.000 Earth fill m3 2,953,995
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,130,508

Bavel, Bavel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020401/07/01 TSO Som Bunthong Project Type Rural Transport 26,290,700
Sangkae Vear 1 201 Earth road 0.94 [ 1.30 ] Km 7,336,693 4.000 Width (m) 2,329.000 Earth fill m3 9,537,701
Kampong Chhnang Muoy 2 201 Earth road 0.43 [ 1.53 ] Km 7,340,509 4.000 Width (m) 1,557.000 Earth fill m3 11,253,000
Sangkae Vear 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Sangkae Vear 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,290,701
Contract ID 020401/07/02 TSO Som Bunthong Project Type Rural Transport 69,132,760
Bavel Muoy 1 202 Laterite road 0.15 [ 0.15 ] Km 19,998,000 3.000 Width (m) 0.000 Earth fill m3 2,999,700
Prey Totueng Muoy 2 202 Laterite road 0.24 [ 0.24 ] Km 25,220,000 3.000 Width (m) 0.000 Earth fill m3 6,052,800
Tumnob Tuek 3 202 Laterite road 0.24 [ 0.24 ] Km 20,173,420 3.000 Width (m) 0.000 Earth fill m3 4,841,621
Kampong Chhnang Muoy 4 202 Laterite road 0.50 [ 0.50 ] Km 22,880,000 3.000 Width (m) 0.000 Earth fill m3 11,440,000
Spean Kandaol 5 202 Laterite road 0.10 [ 0.11 ] Km 19,998,000 3.000 Width (m) 0.000 Earth fill m3 2,139,786
Sang Reang 6 202 Laterite road 0.42 [ 0.42 ] Km 21,829,000 3.000 Width (m) 0.000 Earth fill m3 9,168,180
Svay Chrum 7 202 Laterite road 0.40 [ 0.40 ] Km 23,849,000 3.000 Width (m) 0.000 Earth fill m3 9,539,600
Doun Avav 8 202 Laterite road 0.26 [ 0.26 ] Km 21,829,000 3.000 Width (m) 0.000 Earth fill m3 5,675,540
Bavel Pir 9 202 Laterite road 0.60 [ 0.60 ] Km 21,480,000 3.000 Width (m) 0.000 Earth fill m3 12,888,000
Prey Totueng Pir 10 202 Laterite road 0.21 [ 0.21 ] Km 20,730,000 3.000 Width (m) 0.000 Earth fill m3 4,394,760
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  69,139,987

Bavel, Khnach Romeas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020402/07/01 TSO Som Bunthong Project Type Rural Transport 57,630,800
Khnach Romeas 1 202 Laterite road 2.00 [ 1.50 ] Km 23,700,000 3.000 Width (m) 0.000 Earth fill m3 35,550,000
Ballang Leu 2 202 Laterite road 0.54 [ 1.16 ] Km 19,065,420 3.000 Width (m) 0.000 Earth fill m3 22,077,756
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  57,627,756

Bavel, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020403/07/01 TSO Som Bunthong Project Type Rural Transport 40,867,500
Ta Ny 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 40,867,500 2.000 Total Span (m) 2.000 Width(m) 40,867,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,867,500
Contract ID 020403/07/02 TSO Som Bunthong Project Type Rural Transport 29,015,000
Boeng Samraong 2 202 Laterite road 1.24 [ 1.24 ] Km 23,441,290 3.000 Width (m) 0.000 Earth fill m3 29,020,317
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,020,317

Bavel, Prey Khpos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020404/07/01 TSO Som Bunthong Project Type Irrigation 31,000,000
Ta Mat 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 31,000,000 2.000 Total Span (m) 2.000 Width(m) 31,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,000,000
Contract ID 020404/07/02 TSO Som Bunthong Project Type Rural Transport 39,148,700
Meakkloea 1 202 Laterite road 1.67 [ 1.68 ] Km 23,371,190 3.000 Width (m) 0.000 Earth fill m3 39,146,743
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,146,743

Bavel, Ampil Pram Daeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020405/07/01 TSO Som Bunthong Project Type Irrigation 39,199,600
Buo Run 1 420 Canal 1.00 [ 2.38 ] Km 9,000,000 1.043 Depth (m) 2,674.000 Volume (m3) 21,420,000
Ampil 2 420 Canal 0.76 [ 3.38 ] Km 5,263,351 1.000 Depth (m) 1,900.000 Volume (m3) 17,779,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,199,600
Contract ID 020405/07/02 TSO Som Bunthong Project Type Rural Transport 10,162,900
Ta Khiev 1 201 Earth road 0.55 [ 0.62 ] Km 16,339,070 4.000 Width (m) 0.000 Earth fill m3 10,162,902
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,162,902

Bavel, Kdol Tahen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020406/07/01 TSO Som Bunthong Project Type Rural Transport 42,210,400
Kdol Kraom 1 211 Single pipe culvert 1.00 [ 3.00 ] Place 2,000,000 1.000 Diameter (m) 5.000 Length (m) 6,000,000
San 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
San 3 201 Earth road 2.03 [ 4.09 ] Km 8,123,875 4.000 Width (m) 6,227.500 Earth fill m3 33,210,401
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,210,401
Contract ID 020406/07/02 TSO Som Bunthong Project Type Rural Transport 15,826,500
Ou Doan Poa 1 202 Laterite road 0.98 [ 0.99 ] Km 16,020,408 3.000 Width (m) 0.000 Earth fill m3 15,828,163
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,828,163

Aek Phnum, Preaek Norint

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020501/07/01 TSO Mak Sucheth Project Type Rural Transport 41,346,200
Preaek Krouch 1 202 Laterite road 1.00 [ 1.00 ] Km 19,300,000 3.000 Width (m) 0.000 Earth fill m3 19,300,000
Sdei 2 202 Laterite road 1.00 [ 1.14 ] Km 19,288,010 3.000 Width (m) 0.000 Earth fill m3 22,046,195
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,346,195

Aek Phnum, Samraong Knong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020502/07/01 TSO Mak Sucheth Project Type Rural Transport 35,900,000
Samraong Snao 1 202 Laterite road 0.90 [ 0.90 ] Km 16,000,000 2.500 Width (m) 0.000 Earth fill m3 14,400,000
Samraong Knong 2 202 Laterite road 0.42 [ 0.42 ] Km 16,144,580 2.500 Width (m) 0.000 Earth fill m3 6,700,001
Samraong Ou Trea 3 202 Laterite road 0.94 [ 0.94 ] Km 15,744,680 2.500 Width (m) 0.000 Earth fill m3 14,799,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,900,000

Aek Phnum, Preaek Khpob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020503/07/01 TSO Mak Sucheth Project Type Rural Transport 32,179,900
Preaek Khpos 1 202 Laterite road 0.47 [ 0.47 ] Km 21,276,600 3.000 Width (m) 0.000 Earth fill m3 10,000,002
Preaek Snao 2 202 Laterite road 1.03 [ 1.04 ] Km 21,429,860 3.000 Width (m) 0.000 Earth fill m3 22,179,905
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,179,907

Aek Phnum, Preaek Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020504/07/01 TSO Mak Sucheth Project Type Rural Transport 32,365,500
Bak Amraek 1 202 Laterite road 1.56 [ 1.56 ] Km 20,694,050 3.000 Width (m) 0.000 Earth fill m3 32,365,494
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,365,494

Aek Phnum, Peam Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020505/07/01 TSO Mak Sucheth Project Type Irrigation 43,290,900
Ka Rohal 1 420 Canal 2.18 [ 3.52 ] Km 10,100,000 0.930 Depth (m) 10,960.000 Volume (m3) 35,572,200
Ka Rohal 2 211 Single pipe culvert 2.00 [ 3.00 ] Place 2,572,900 0.800 Diameter (m) 5.000 Length (m) 7,718,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,290,900

Aek Phnum, Prey Chas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020506/07/01 TSO Mak Sucheth Project Type Education 34,300,000
Peam Seima 1 310 Wooden school (general) 2.00 [ 2.00 ] School room 16,400,000 16.000 Length (m) 9.000 Width (m) 32,800,000
Peam Seima 2 740 School furniture 2.00 [ 10.00 ] School room 150,000 200.000 Students 0.000 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,300,000

Aek Phnum, Kaoh Chiveang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020507/07/01 TSO Mak Sucheth Project Type Social Interventions 34,990,000
Anlong Ta Uor 1 360 Community buildings 1.00 [ 1.00 ] Building 34,990,000 7.000 Length (m) 9.000 Width (m) 34,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,990,000

Moung Ruessei, Moung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020601/07/01 TSO Ma Sareun Project Type Rural Transport 40,874,500
Roluos 1 201 Earth road 1.34 [ 2.65 ] Km 11,782,820 5.000 Width (m) 5,667.000 Earth fill m3 31,271,604
Ou Krabau 2 211 Single pipe culvert 2.00 [ 3.00 ] Place 860,900 0.600 Diameter (m) 5.000 Length (m) 2,582,700
Ou Krabau 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,287,600 0.800 Diameter (m) 5.000 Length (m) 1,287,600
Ou Krabau 4 212 Double pipe culvert 1.00 [ 2.00 ] Place 2,866,300 100.000 Diameter (m) 5.000 Length (m) 5,732,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,874,504

Moung Ruessei, Kear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020602/07/01 TSO Ma Sareun Project Type Rural Transport 49,752,000
Kear Muoy 1 202 Laterite road 2.30 [ 2.30 ] Km 15,366,000 3.000 Width (m) 0.150 Earth fill m3 35,341,800
Kear Muoy 2 202 Laterite road 0.76 [ 0.83 ] Km 15,331,970 3.000 Width (m) 2.400 Earth fill m3 12,710,203
Kear Muoy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  49,752,003

Moung Ruessei, Prey Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020603/07/01 TSO Ma Sareun Project Type Rural Transport 38,331,200
Cham Ro'a 1 201 Earth road 0.99 [ 2.16 ] Km 13,490,870 5.000 Width (m) 11,690.000 Earth fill m3 29,099,807
Cham Ro'a 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,432,300 0.800 Diameter (m) 6.000 Length (m) 1,432,300
Cham Ro'a 3 212 Double pipe culvert 2.00 [ 3.00 ] Place 2,280,500 0.800 Diameter (m) 6.000 Length (m) 6,841,500
Cham Ro'a 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 957,600 0.600 Diameter (m) 6.000 Length (m) 957,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,331,207

Moung Ruessei, Ruessei Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020604/07/01 TSO Ma Sareun Project Type Rural Transport 40,018,200
Srah Chineang 1 202 Laterite road 1.79 [ 1.79 ] Km 22,100,000 3.000 Width (m) 705.000 Earth fill m3 39,559,000
Pech Changvar 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 459,200 0.800 Diameter (m) 3.000 Length (m) 459,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,018,200

Moung Ruessei, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020605/07/01 TSO Ma Sareun Project Type Rural Transport 35,587,000
Chrey Cheung 1 201 Earth road 1.99 [ 2.66 ] Km 13,398,720 5.000 Width (m) 7,410.000 Earth fill m3 35,587,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,587,000

Moung Ruessei, Ta Loas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020606/07/01 TSO Ma Sareun Project Type Rural Transport 32,452,000
Sdei Stueng 1 201 Earth road 0.97 [ 1.43 ] Km 19,009,070 4.500 Width (m) 5,512.000 Earth fill m3 27,239,997
Sdei Stueng 2 212 Double pipe culvert 1.00 [ 2.00 ] Place 2,606,000 0.800 Diameter (m) 6.000 Length (m) 5,212,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,451,997

Moung Ruessei, Kakaoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020607/07/01 TSO Ly Oubol Project Type Rural Transport 36,567,800
Chak Thum 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,022,533 0.800 Diameter (m) 5.000 Length (m) 2,022,533
Chak Thum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,583,004 0.600 Diameter (m) 5.000 Length (m) 1,583,004
Chak Thum 3 201 Earth road 1.56 [ 3.26 ] Km 10,111,120 4.000 Width (m) 5,293.000 Earth fill m3 32,962,251
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,567,788
Contract ID 020607/07/02 TSO Ly Oubol Project Type Rural Transport 33,736,500
Tuol Prum Muoy 1 202 Laterite road 1.76 [ 1.57 ] Km 21,474,540 3.000 Width (m) 150.000 Earth fill m3 33,736,502
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,736,502

Moung Ruessei, Prey Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020608/07/01 TSO Ly Oubol Project Type Rural Transport 32,887,000
Thmei 1 211 Single pipe culvert 2.00 [ 3.00 ] Place 909,639 0.600 Diameter (m) 5.000 Length (m) 2,728,917
Thmei 2 201 Earth road 1.30 [ 2.51 ] Km 12,015,170 4.000 Width (m) 6,216.000 Earth fill m3 30,158,077
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,886,994

Moung Ruessei, Robas Mongkol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020609/07/01 TSO Ma Sareun Project Type Rural Transport 37,196,400
Koun K'aek Muoy 1 202 Laterite road 0.53 [ 0.53 ] Km 22,346,980 3.000 Width (m) 0.150 Earth fill m3 11,843,899
Koun K'aek Muoy 2 202 Laterite road 0.64 [ 0.64 ] Km 22,346,880 3.000 Width (m) 1,140.000 Earth fill m3 14,302,003
Koun K'aek Muoy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.600 Diameter (m) 5.000 Length (m) 1,800,000
Anlong Koub 4 202 Laterite road 0.38 [ 0.41 ] Km 22,344,200 3.000 Width (m) 205.000 Earth fill m3 9,250,499
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,196,401

Moung Ruessei, Prek Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020610/07/01 TSO Ma Sareun Project Type Rural Transport 34,669,600
Prek Ta Ven 1 202 Laterite road 1.24 [ 1.24 ] Km 16,400,000 3.500 Width (m) 1,055.000 Earth fill m3 20,336,000
Prek Chik 2 202 Laterite road 0.81 [ 0.87 ] Km 16,400,000 3.000 Width (m) 730.000 Earth fill m3 14,333,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,669,600

Moung Ruessei, Prey Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020611/07/01 TSO Ma Sareun Project Type Rural Transport 59,721,800
Toul Svay 1 201 Earth road 3.27 [ 3.27 ] Km 7,885,522 4.500 Width (m) 9,048.000 Earth fill m3 25,762,000
Sdok Pravoek 2 201 Earth road 0.60 [ 0.60 ] Km 56,411,630 4.500 Width (m) 2,406.000 Earth fill m3 33,959,801
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,721,802
Contract ID 020611/07/02 TSO Ma Sareun Project Type Rural Transport 17,000,000
Prah Andong 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,750,000 0.600 Diameter (m) 5.000 Length (m) 3,500,000
Sdok Pravoek 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,750,000 0.600 Diameter (m) 5.000 Length (m) 3,500,000
Sdok Pravoek 4 251 Drift 1.00 [ 1.00 ] Place 7,500,000 4.000 Length (m) 15.000 Width (m) 7,500,000
Sdok Pravoek 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.600 Diameter (m) 5.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,000,000

Rotonak Mondol, Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020701/07/01 TSO Hin Dara Project Type Rural Transport 49,463,700
O Khmum 1 201 Earth road 1.71 [ 3.39 ] Km 14,608,300 4.000 Width (m) 6,433.520 Earth fill m3 49,463,704
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  49,463,704

Rotonak Mondol, Andaeuk Haeb

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020702/07/01 TSO Hin Dara Project Type Rural Transport 28,890,000
Andaeuk Haeb 1 202 Laterite road 2.17 [ 2.17 ] Km 13,331,800 5.000 Width (m) 975.150 Earth fill m3 28,890,011
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,890,011

Rotonak Mondol, Phlov Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020703/07/01 TSO Hin Dara Project Type Rural Transport 29,252,400
Ou Da 1 201 Earth road 1.41 [ 3.08 ] Km 9,512,975 4.000 Width (m) 3,939.750 Earth fill m3 29,252,398
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,252,398

Rotonak Mondol, Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020704/07/01 TSO Hin Dara Project Type Rural Domestic Water Supplies 31,050,000
Chi Sang 1 123 Drilled well with Afridev pump 5.00 [ 5.00 ] Place 6,210,000 35.000 Depth (m) 0.100 Diameter (mm) 31,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,050,000

Sangkae, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020801/07/01 TSO Dy Peou Project Type Rural Transport 42,844,660
Chrab Veal 1 202 Laterite road 0.82 [ 0.82 ] Km 23,239,950 3.500 Width (m) 473.000 Earth fill m3 19,079,999
Chrab Veal 2 202 Laterite road 0.15 [ 0.15 ] Km 16,733,330 3.000 Width (m) 0.000 Earth fill m3 2,510,000
Chrab Veal 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 10.000 Length (m) 2,400,000
Chrab Veal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.600 Diameter (m) 5.000 Length (m) 1,450,000
Chrab Veal 5 202 Laterite road 0.45 [ 0.58 ] Km 16,180,450 3.000 Width (m) 0.000 Earth fill m3 9,384,661
Chrab Veal 6 202 Laterite road 0.25 [ 0.25 ] Km 32,080,000 4.000 Width (m) 308.000 Earth fill m3 8,020,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,844,659

Sangkae, Norea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020802/07/01 TSO Dy Peou Project Type Rural Transport 11,733,260
Ta Kok 1 201 Earth road 0.55 [ 0.55 ] Km 21,333,200 4.000 Width (m) 2,527.000 Earth fill m3 11,733,260
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,733,260
Contract ID 020802/07/02 TSO Dy Peou Project Type Education 13,662,440
Norea Pir 1 303 School yard 1.00 [ 1.00 ] Place 13,662,440 0.500 748.000 13,662,440
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,662,440

Sangkae, Ta Pon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020803/07/01 TSO Dy Peou Project Type Rural Transport 35,140,500
Boeng Tuem 1 202 Laterite road 1.81 [ 1.83 ] Km 19,226,620 3.000 Width (m) 0.150 Earth fill m3 35,140,493
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,140,493

Sangkae, Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020804/07/01 TSO Dy Peou Project Type Rural Transport 29,146,500
Ambaeng Thngae 1 202 Laterite road 1.66 [ 1.73 ] Km 16,837,960 3.000 Width (m) 0.150 Earth fill m3 29,146,509
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,146,509

Sangkae, Kampong Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020805/07/01 TSO Dy Peou Project Type Rural Transport 30,597,200
Kampong Preah 1 202 Laterite road 0.52 [ 0.63 ] Km 17,571,890 3.000 Width (m) 551.000 Earth fill m3 11,000,003
Prey Chaek 3 202 Laterite road 0.63 [ 0.63 ] Km 24,904,330 3.000 Width (m) 70.000 Earth fill m3 15,697,199
Prey Chaek 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Prey Chaek 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 6.000 Length (m) 1,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,597,202

Sangkae, Kampong Preang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020806/07/01 TSO Dy Peou Project Type Rural Transport 34,849,000
Kach Roteh 1 201 Earth road 1.11 [ 2.78 ] Km 12,549,150 4.000 Width (m) 4,789.000 Earth fill m3 34,848,990
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,848,990

Sangkae, Reang Kesei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020807/07/01 TSO Dy Peou Project Type Rural Transport 29,581,600
Tuol Snuol 1 202 Laterite road 1.29 [ 1.35 ] Km 21,863,710 3.500 Width (m) 0.150 Earth fill m3 29,581,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,581,600

Sangkae, Ou Dambang Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020808/07/01 TSO Dy Peou Project Type Rural Transport 40,282,800
Ou Sralau 1 202 Laterite road 1.31 [ 1.02 ] Km 15,686,280 3.000 Width (m) 0.150 Earth fill m3 16,000,006
Ou Sralau 2 202 Laterite road 0.29 [ 0.39 ] Km 16,321,650 3.000 Width (m) 0.150 Earth fill m3 6,332,800
Ou Khcheay 3 202 Laterite road 0.30 [ 0.30 ] Km 15,833,330 3.000 Width (m) 0.150 Earth fill m3 4,749,999
Samraong Kaong 4 202 Laterite road 0.85 [ 0.85 ] Km 13,176,470 2.500 Width (m) 0.150 Earth fill m3 11,200,000
Voat Chaeng 5 202 Laterite road 0.15 [ 0.15 ] Km 13,333,330 2.500 Width (m) 0.150 Earth fill m3 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,282,804

Sangkae, Ou Dambang Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020809/07/01 TSO Dy Peou Project Type Rural Transport 34,929,400
Svay Chrum 1 201 Earth road 0.95 [ 0.95 ] Km 11,209,700 4.000 Width (m) 2,223.000 Earth fill m3 10,649,215
Svay Chrum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,732,700 0.600 Diameter (m) 10.000 Length (m) 1,732,700
Svay Chrum 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,365,600 0.800 Diameter (m) 5.000 Length (m) 2,731,200
Svay Chrum 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,034,700 0.600 Diameter (m) 5.000 Length (m) 2,069,400
Svay Chrum 5 201 Earth road 0.21 [ 1.08 ] Km 16,371,670 4.000 Width (m) 2,326.000 Earth fill m3 17,746,890
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,929,405

Sangkae, Voat Ta Muem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020810/07/01 TSO Dy Peou Project Type Rural Transport 40,381,470
Ou Sralau 1 202 Laterite road 2.16 [ 2.28 ] Km 17,732,170 3.000 Width (m) 0.150 Earth fill m3 40,381,471
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,381,471

Samlout, Ta Taok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020901/07/01 TSO Chea Tem Project Type Rural Transport 23,498,400
Peam Ta 1 203 Gravel road 0.99 [ 0.99 ] Km 18,650,540 3.500 Width (m) 0.000 Earth fill m3 18,426,734
Peam Ta 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,037,562 0.800 Diameter (m) 5.000 Length (m) 3,037,562
Peam Ta 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,034,106 0.600 Diameter (m) 5.000 Length (m) 2,034,106
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,498,402

Samlout, Ou Samrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020902/07/01 TSO Chea Tem Project Type Rural Transport 23,963,600
Ou Rumchek Leu 1 203 Gravel road 2.81 [ 3.03 ] Km 7,921,851 3.500 Width (m) 0.000 Earth fill m3 23,963,599
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,963,599

Samlout, Kampong Lpou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020903/07/01 TSO Chea Tem Project Type Rural Transport 24,567,600
Ou Daem Chek 1 201 Earth road 1.15 [ 1.21 ] Km 13,686,160 4.000 Width (m) 5,399.000 Earth fill m3 16,532,881
Ou Daem Chek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Ou Daem Chek 3 233 Wood bridge, 15 tonne standard 1.00 [ 1.00 ] Place 5,034,722 4.000 Total Span (m) 15.000 Width (m) 5,034,722
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,567,603

Samlout, Mean Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020904/07/01 TSO Chea Tem Project Type Rural Transport 26,148,600
Sre Sdao 1 201 Earth road 1.41 [ 1.54 ] Km 12,401,940 4.000 Width (m) 5,574.000 Earth fill m3 19,148,595
Sre Sdao 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Sre Sdao 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,148,595

Samlout, Samlout

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020905/07/01 TSO Chea Tem Project Type Rural Transport 26,825,600
Ou Chrab 1 203 Gravel road 1.17 [ 1.26 ] Km 17,253,320 3.500 Width (m) 0.000 Earth fill m3 21,721,930
Ou Chrab 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,037,562 0.800 Diameter (m) 5.000 Length (m) 3,037,562
Ou Chrab 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,066,114 0.600 Diameter (m) 5.000 Length (m) 2,066,114
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,825,606

Samlout, Sung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020906/07/01 TSO Chea Tem Project Type Rural Transport 24,436,500
Kandal 1 203 Gravel road 1.06 [ 1.14 ] Km 17,130,140 2.500 Width (m) 1,290.000 Earth fill m3 19,562,620
Kandal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,903,791 0.800 Diameter (m) 5.000 Length (m) 2,903,791
Kandal 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,970,092 0.600 Diameter (m) 5.000 Length (m) 1,970,092
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,436,503

Samlout, Ta Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020907/07/01 TSO Chea Tem Project Type Rural Transport 27,510,100
Doun Troek 1 201 Earth road 1.68 [ 1.80 ] Km 11,860,180 4.000 Width (m) 5,000.000 Earth fill m3 21,360,184
Doun Troek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,906,177 0.600 Diameter (m) 5.000 Length (m) 1,906,177
Doun Troek 3 233 Wood bridge, 15 tonne standard 1.00 [ 1.00 ] Place 4,243,739 4.000 Total Span (m) 10.000 Width (m) 4,243,739
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,510,100

Sampov Lun, Sampou Lun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021001/07/01 TSO Hor Hak Project Type Rural Transport 20,173,000
Tuol Chrey 1 203 Gravel road 0.62 [ 0.85 ] Km 12,983,000 4.000 Width (m) 1,286.000 Earth fill m3 10,996,601
Tuol Chrey 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 9,176,400 1.000 Diameter (m) 7.000 Length (m) 9,176,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,173,001

Sampov Lun, Angkor Ban

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021002/07/01 TSO Hor Hak Project Type Rural Transport 20,713,700
Andoung Pir 1 203 Gravel road 0.64 [ 0.87 ] Km 12,563,250 4.000 Width (m) 1,135.000 Earth fill m3 10,904,901
Andoung Pir 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 7,113,400 1.000 Diameter (m) 7.000 Length (m) 7,113,400
Andoung Pir 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,695,400 0.600 Diameter (m) 5.000 Length (m) 2,695,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,713,701

Sampov Lun, Ta Sda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021003/07/01 TSO Hor Hak Project Type Rural Transport 23,613,800
Veal Vong 1 203 Gravel road 1.07 [ 1.30 ] Km 11,214,953 4.000 Width (m) 2,269.000 Earth fill m3 14,613,084
Veal Vong 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 3,000,000 0.600 Diameter (m) 5.000 Length (m) 9,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,613,084

Sampov Lun, Santepheap

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021004/07/01 TSO Hor Hak Project Type Rural Transport 25,744,200
Trapeang Prolit 1 203 Gravel road 1.08 [ 1.30 ] Km 13,885,640 4.000 Width (m) 5.000 Earth fill m3 17,981,904
Trapeang Prolit 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,196,900 0.800 Diameter (m) 5.000 Length (m) 4,196,900
Trapeang Prolit 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,782,700 0.600 Diameter (m) 5.000 Length (m) 3,565,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,744,204

Sampov Lun, Serei Maen Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021005/07/01 TSO Hor Hak Project Type Rural Transport 26,879,600
Pou Chrey 1 203 Gravel road 1.26 [ 1.55 ] Km 9,624,580 4.000 Width (m) 2,117.000 Earth fill m3 14,879,601
Pou Chrey 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 4,000,000 0.600 Diameter (m) 5.000 Length (m) 12,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,879,601

Sampov Lun, Chrey Sema

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021006/07/01 TSO Hor Hak Project Type Rural Transport 27,920,300
Spean Youl 1 203 Gravel road 1.04 [ 1.21 ] Km 15,903,790 4.000 Width (m) 1,939.000 Earth fill m3 19,291,297
Spean Youl 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,426,000 0.600 Diameter (m) 5.000 Length (m) 4,852,000
Spean Youl 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,777,000 0.800 Diameter (m) 5.000 Length (m) 3,777,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,920,297

Phnum Proek, Phnum Proek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021101/07/01 TSO Hul Sina Project Type Rural Transport 23,418,900
Kokir 1 203 Gravel road 2.25 [ 1.08 ] Km 17,887,870 3.500 Width (m) 5,418.000 Earth fill m3 19,318,900
Kokir 2 211 Single pipe culvert 2.00 [ 1.00 ] Place 2,460,000 0.600 Diameter (m) 5.000 Length (m) 2,460,000
Kokir 3 212 Double pipe culvert 2.00 [ 1.00 ] Place 1,640,000 0.600 Diameter (m) 5.000 Length (m) 1,640,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,418,900

Phnum Proek, Pech Chenda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021102/07/01 TSO Hul Sina Project Type Rural Transport 34,705,900
Ou 1 203 Gravel road 0.80 [ 0.80 ] Km 19,181,250 3.500 Width (m) 3,850.000 Earth fill m3 15,345,000
Pech Chenda 2 203 Gravel road 0.80 [ 1.06 ] Km 18,230,600 3.500 Width (m) 3,850.000 Earth fill m3 19,360,897
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,705,897

Phnum Proek, Chakrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021103/07/01 TSO Hul Sina Project Type Rural Transport 42,435,200
Chakrei 1 203 Gravel road 0.75 [ 0.75 ] Km 17,765,730 3.500 Width (m) 4,687.000 Earth fill m3 13,324,298
Chamkar Trab 2 203 Gravel road 1.00 [ 1.18 ] Km 17,766,270 3.500 Width (m) 0.000 Earth fill m3 20,910,900
Chamkar Trab 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,460,000 0.600 Diameter (m) 5.000 Length (m) 2,460,000
Chakrei 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,460,000 0.600 Diameter (m) 5.000 Length (m) 2,460,000
Chakrei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,280,000 0.800 Diameter (m) 5.000 Length (m) 3,280,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,435,197

Phnum Proek, Barang Thleak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021104/07/01 TSO Hul Sina Project Type Rural Transport 26,286,500
Barang Thleak 1 203 Gravel road 2.40 [ 1.27 ] Km 16,140,220 3.500 Width (m) 4,687.000 Earth fill m3 20,546,500
Barang Thleak 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,640,000 0.600 Diameter (m) 5.000 Length (m) 3,280,000
Barang Thleak 3 212 Double pipe culvert 3.00 [ 1.00 ] Place 2,460,000 0.600 Diameter (m) 5.000 Length (m) 2,460,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,286,500

Phnum Proek, Ou Rumduol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021105/07/01 TSO Hul Sina Project Type Rural Transport 26,913,900
Ou Lhong 1 203 Gravel road 3.30 [ 3.20 ] Km 7,653,803 3.500 Width (m) 0.000 Earth fill m3 24,453,901
Ou Lhong 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,460,000 0.600 Diameter (m) 5.000 Length (m) 2,460,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,913,901

Kamrieng, Kamrieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021201/07/01 TSO Mout Roun Project Type Rural Transport 27,301,200
Bangorchang 1 201 Earth road 3.78 [ 4.13 ] Km 6,612,061 4.000 Width (m) 2,446.000 Earth fill m3 27,301,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,301,200

Kamrieng, Boeng Reang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021202/07/01 TSO Mout Roun Project Type Rural Transport 31,421,000
Boeng Reang 1 203 Gravel road 3.53 [ 3.71 ] Km 8,460,151 3.500 Width (m) 0.000 Earth fill m3 31,421,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,421,001

Kamrieng, Ou Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021203/07/01 TSO Mout Roun Project Type Rural Transport 14,137,000
Tangyou 1 201 Earth road 1.00 [ 1.11 ] Km 12,793,670 4.000 Width (m) 1,518.000 Earth fill m3 14,137,005
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,137,005
Contract ID 021203/07/02 TSO Mout Roun Project Type Rural Transport 13,460,800
Samroung 1 203 Gravel road 1.51 [ 1.58 ] Km 8,497,980 4.000 Width (m) 0.000 Earth fill m3 13,460,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,460,800

Kamrieng, Trang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021204/07/01 TSO Mout Roun Project Type Rural Transport 25,944,700
Lvea Te 1 201 Earth road 2.00 [ 2.24 ] Km 10,198,530 4.000 Width (m) 2,764.000 Earth fill m3 22,844,707
Lvea Te 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Lvea Te 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,944,707

Kamrieng, Ta Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021205/07/01 TSO Mout Roun Project Type Rural Transport 27,232,100
Ou Toek Thla 1 201 Earth road 1.91 [ 2.01 ] Km 13,551,597 4.000 Width (m) 3,007.000 Earth fill m3 27,238,710
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,238,710

Kamrieng, Ta Krai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021206/07/01 TSO Mout Roun Project Type Rural Transport 11,200,000
Sam Sip 1 201 Earth road 1.00 [ 1.00 ] Km 11,200,000 4.000 Width (m) 1,676.000 Earth fill m3 11,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,200,000
Contract ID 021206/07/02 TSO Mout Roun Project Type Rural Transport 21,760,000
Sras Kampot 1 203 Gravel road 1.72 [ 1.91 ] Km 11,368,860 3.500 Width (m) 0.000 Earth fill m3 21,759,998
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,759,998

Koas Krala, Thipakdei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021301/07/01 TSO Ly Oubol Project Type Rural Transport 31,615,200
Koun Prum 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,000,000 0.600 Diameter (m) 5.000 Length (m) 6,000,000
Koun Prum 2 202 Laterite road 1.82 [ 1.82 ] Km 14,074,290 3.000 Width (m) 1,508.000 Earth fill m3 25,615,208
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,615,208

Koas Krala, Koas Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021302/07/01 TSO Ly Oubol Project Type Rural Transport 25,084,600
Koas Krala 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,850,000 0.600 Diameter (m) 5.000 Length (m) 1,850,000
Tuol Balangk 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,850,000 0.600 Diameter (m) 5.000 Length (m) 7,400,000
Tuol Balangk 3 202 Laterite road 1.63 [ 1.13 ] Km 14,012,920 3.000 Width (m) 150.000 Earth fill m3 15,834,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,084,600

Koas Krala, Hab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021303/07/01 TSO Ly Oubol Project Type Rural Transport 25,163,700
Klaeng Chuor 1 201 Earth road 3.15 [ 2.14 ] Km 11,758,740 4.000 Width (m) 12,672.000 Earth fill m3 25,163,704
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,163,704

Koas Krala, Doun Ba

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021304/07/01 TSO Ly Oubol Project Type Rural Transport 24,705,700
Prey Phnheas 1 202 Laterite road 1.13 [ 0.96 ] Km 17,245,520 3.000 Width (m) 150.000 Earth fill m3 16,555,699
Prey Phnheas 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,850,000 0.600 Diameter (m) 5.000 Length (m) 5,550,000
Prey Phnheas 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,850,000 0.600 Diameter (m) 5.000 Length (m) 5,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,705,699

Koas Krala, Preah Phos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021305/07/01 TSO Ly Oubol Project Type Rural Transport 25,237,100
Koy Veaeng 1 202 Laterite road 1.93 [ 1.90 ] Km 11,914,260 3.000 Width (m) 150.000 Earth fill m3 22,637,094
Koy Veaeng 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 0.800 Diameter (m) 5.000 Length (m) 2,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,237,094

Koas Krala, Chhnal Moan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021306/07/01 TSO Ly Oubol Project Type Rural Transport 23,770,500
Krang Svat 1 202 Laterite road 1.68 [ 1.69 ] Km 14,065,380 3.000 Width (m) 150.000 Earth fill m3 23,770,492
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,770,492