Contract Outputs
Location: Battambang Budget Year: 2007
Banan
Thma Koul
Battambang
Bavel
Aek Phnum
Moung Ruessei
Rotonak Mondol
Sangkae
Samlout
Sampov Lun
Phnum Proek
Kamrieng
Koas Krala
Banan, Kantueu Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020101/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Domestic Water Supplies |
23,962,400 |
| Thmei |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
11,981,200 |
3.000 Depth (m) |
2,484.000 Volume (m3) |
11,981,200 |
| Kampong Ampil |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
11,981,200 |
3.000 Depth (m) |
2,484.000 Volume (m3) |
11,981,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,962,400 |
Banan, Kantueu Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020102/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
28,670,000 |
| Phnom Kul |
1 |
201 |
Earth road |
1.85 [ 3.85 ] |
Km |
7,226,541 |
4.000 Width (m) |
10,461.000 Earth fill m3 |
27,833,023 |
| Phnom Kul |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
836,967 |
0.600 Diameter (m) |
5.000 Length (m) |
836,967 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,669,990 |
Banan, Bay Damram
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020103/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
30,372,000 |
| Tuol Chranieng |
1 |
201 |
Earth road |
1.96 [ 3.95 ] |
Km |
7,690,087 |
4.000 Width (m) |
8,373.000 Earth fill m3 |
30,371,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,371,999 |
Banan, Chheu Teal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020104/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
40,954,700 |
| Svay Prakeab |
1 |
202 |
Laterite road |
1.79 [ 2.87 ] |
Km |
14,259,500 |
3.000 Width (m) |
1,113.480 Earth fill m3 |
40,954,710 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,954,710 |
Banan, Chaeng Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020105/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
25,997,200 |
| Changhour Svay |
1 |
201 |
Earth road |
1.10 [ 1.77 ] |
Km |
12,412,640 |
4.000 Width (m) |
3,422.000 Earth fill m3 |
21,970,373 |
| Changhour Svay |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,503,472 |
0.800 Diameter (m) |
5.000 Length (m) |
3,006,944 |
| Changhour Svay |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,019,889 |
0.600 Diameter (m) |
5.000 Length (m) |
1,019,889 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,997,206 |
Banan, Phnum Sampov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020106/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
39,026,300 |
| Sampov Kaeut |
1 |
202 |
Laterite road |
2.71 [ 2,870.40 ] |
Km |
13,596 |
3.000 Width (m) |
165.750 Earth fill m3 |
39,026,303 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,026,303 |
Banan, Snoeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020107/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
42,470,500 |
| Snoeng Lech |
1 |
202 |
Laterite road |
1.33 [ 1.33 ] |
Km |
14,300,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
19,076,200 |
| Boeng Prei |
2 |
202 |
Laterite road |
1.09 [ 1,199.60 ] |
Km |
16,001 |
3.000 Width (m) |
0.000 Earth fill m3 |
19,194,296 |
| Boeng Prei |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,200,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,470,496 |
Banan, Ta Kream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020108/07/01 |
TSO |
Sem Vanno |
Project Type |
Rural Transport |
48,289,500 |
| Thmei |
1 |
201 |
Earth road |
2.54 [ 5.45 ] |
Km |
8,385,441 |
4.000 Width (m) |
8,498.000 Earth fill m3 |
45,700,653 |
| Thmei |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
862,950 |
0.600 Diameter (m) |
5.000 Length (m) |
2,588,850 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,289,503 |
Thma Koul, Ta Pung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020201/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
42,230,000 |
| Paoy Samraong |
1 |
420 |
Canal |
0.91 [ 2.60 ] |
Km |
16,223,590 |
1.500 Depth (m) |
7,564.000 Volume (m3) |
42,230,005 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,230,005 |
Thma Koul, Ta Meun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020202/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
18,474,500 |
| Krasang |
1 |
420 |
Canal |
0.56 [ 1.10 ] |
Km |
16,795,000 |
1.500 Depth (m) |
4,770.000 Volume (m3) |
18,474,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,474,500 |
| Contract ID |
020202/07/02 |
TSO |
Vay Sokunthea |
Project Type |
Rural Transport |
23,655,800 |
| Samraong |
1 |
202 |
Laterite road |
1.12 [ 1.13 ] |
Km |
20,990,060 |
3.000 Width (m) |
0.000 Earth fill m3 |
23,655,798 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,655,798 |
Thma Koul, Ou Ta Ki
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020203/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
44,035,300 |
| Ou Ta Ki |
1 |
420 |
Canal |
0.29 [ 0.82 ] |
Km |
13,360,270 |
1.500 Depth (m) |
1,967.000 Volume (m3) |
10,995,502 |
| Popeal Khae |
2 |
420 |
Canal |
0.29 [ 0.82 ] |
Km |
13,360,270 |
1.500 Depth (m) |
1,967.000 Volume (m3) |
10,995,502 |
| Veal Trea |
3 |
420 |
Canal |
0.29 [ 0.82 ] |
Km |
13,360,190 |
1.500 Depth (m) |
1,967.000 Volume (m3) |
11,008,797 |
| Tras |
4 |
420 |
Canal |
0.29 [ 0.83 ] |
Km |
13,360,170 |
1.500 Depth (m) |
1,980.000 Volume (m3) |
11,035,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,035,301 |
Thma Koul, Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020204/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Rural Transport |
41,733,600 |
| Ka Kou |
1 |
201 |
Earth road |
1.00 [ 2.03 ] |
Km |
9,368,756 |
4.000 Width (m) |
4,120.000 Earth fill m3 |
18,981,100 |
| Popeal Khae |
2 |
201 |
Earth road |
0.82 [ 2.09 ] |
Km |
10,881,010 |
4.000 Width (m) |
2,805.000 Earth fill m3 |
22,752,192 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,733,292 |
Thma Koul, Anlong Run
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020205/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
27,582,300 |
| Souphi |
1 |
420 |
Canal |
0.36 [ 0.90 ] |
Km |
15,265,380 |
1.500 Depth (m) |
2,470.000 Volume (m3) |
13,799,904 |
| Kruos |
2 |
420 |
Canal |
0.48 [ 1.19 ] |
Km |
11,601,350 |
1.200 Depth (m) |
2,453.000 Volume (m3) |
13,782,404 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,582,307 |
Thma Koul, Chrouy Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020206/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
34,538,200 |
| Chrouy Sdau |
1 |
420 |
Canal |
0.79 [ 2.25 ] |
Km |
15,370,810 |
1.500 Depth (m) |
6,183.000 Volume (m3) |
34,538,210 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,538,210 |
Thma Koul, Boeng Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020207/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
17,550,000 |
| Paoy Ta Sek |
1 |
420 |
Canal |
1.00 [ 1.30 ] |
Km |
13,500,000 |
1.200 Depth (m) |
5,750.000 Volume (m3) |
17,550,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,550,000 |
| Contract ID |
020207/07/02 |
TSO |
Vay Sokunthea |
Project Type |
Rural Transport |
18,138,600 |
| Paoy Ta Sek |
1 |
202 |
Laterite road |
0.50 [ 0.93 ] |
Km |
19,462,020 |
3.000 Width (m) |
0.000 Earth fill m3 |
18,138,603 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,138,603 |
Thma Koul, Kouk Khmum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020208/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Rural Transport |
39,200,700 |
| Kouk Khmum |
1 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
22,632,650 |
3.000 Width (m) |
0.000 Earth fill m3 |
9,053,060 |
| Chranieng |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
22,632,650 |
3.000 Width (m) |
0.000 Earth fill m3 |
9,053,060 |
| Kien Kaes Pir |
3 |
202 |
Laterite road |
1.31 [ 0.70 ] |
Km |
22,632,650 |
3.000 Width (m) |
0.000 Earth fill m3 |
15,888,120 |
| Chranieng |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,734,214 |
0.600 Diameter (m) |
5.000 Length (m) |
3,468,428 |
| Kouk Khmum |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,738,044 |
0.600 Diameter (m) |
5.000 Length (m) |
1,738,044 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,200,712 |
Thma Koul, Bansay Traeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020209/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Rural Transport |
33,619,200 |
| Tuol Ta Sokh |
1 |
202 |
Laterite road |
1.72 [ 1.00 ] |
Km |
33,788,140 |
3.500 Width (m) |
0.000 Earth fill m3 |
33,619,199 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,619,199 |
Thma Koul, Rung Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020210/07/01 |
TSO |
Vay Sokunthea |
Project Type |
Irrigation |
37,474,000 |
| Ballang Kraom |
1 |
420 |
Canal |
0.34 [ 1.00 ] |
Km |
11,541,500 |
1.500 Depth (m) |
2,547.000 Volume (m3) |
11,541,500 |
| Kouk Khpos |
2 |
420 |
Canal |
0.35 [ 0.83 ] |
Km |
15,994,190 |
1.500 Depth (m) |
2,533.000 Volume (m3) |
13,211,201 |
| Prakeab |
3 |
420 |
Canal |
0.30 [ 0.78 ] |
Km |
16,351,290 |
1.500 Depth (m) |
1,567.000 Volume (m3) |
12,721,304 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,474,005 |
Battambang, Tuol Ta Aek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020301/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
42,300,000 |
| Dangkao Teab |
1 |
202 |
Laterite road |
0.23 [ 0.23 ] |
Km |
22,560,000 |
3.000 Width (m) |
39.000 Earth fill m3 |
5,233,920 |
| Tuol Ta Aek |
2 |
202 |
Laterite road |
0.95 [ 0.95 ] |
Km |
22,560,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
21,432,000 |
| Ou Ta Kam Pir |
3 |
202 |
Laterite road |
0.41 [ 0.41 ] |
Km |
22,560,000 |
4.000 Width (m) |
139.000 Earth fill m3 |
9,136,800 |
| Ou Ta Kam Pir |
4 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
22,560,000 |
2.800 Width (m) |
182.000 Earth fill m3 |
4,512,000 |
| Ou Ta Kam Pir |
5 |
202 |
Laterite road |
0.09 [ 0.09 ] |
Km |
22,560,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
1,985,280 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,300,000 |
Battambang, Preaek Preah Sdach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020302/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
38,941,400 |
| Ou Khcheay |
1 |
201 |
Earth road |
0.37 [ 0.68 ] |
Km |
10,810,810 |
4.000 Width (m) |
1,365.000 Earth fill m3 |
7,308,108 |
| Ou Khcheay |
2 |
211 |
Single pipe culvert |
1.00 [ 5.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
5,000,000 |
| Chamkar Ruessei |
3 |
201 |
Earth road |
0.67 [ 1.46 ] |
Km |
14,880,950 |
4.000 Width (m) |
3,238.000 Earth fill m3 |
21,666,663 |
| Chamkar Ruessei |
4 |
211 |
Single pipe culvert |
3.00 [ 7.00 ] |
Place |
566,667 |
0.800 Diameter (m) |
6.000 Length (m) |
3,966,667 |
| Chamkar Ruessei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.800 Diameter (m) |
7.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,941,438 |
Battambang, Rotanak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020303/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
26,000,000 |
| Rumchek Pir |
1 |
202 |
Laterite road |
0.19 [ 0.19 ] |
Km |
26,595,750 |
3.000 Width (m) |
135.000 Earth fill m3 |
5,000,001 |
| Rumchek Pram |
2 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
18,147,450 |
3.000 Width (m) |
47.000 Earth fill m3 |
9,600,001 |
| Souphi Muoy |
3 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
19,184,650 |
3.000 Width (m) |
125.000 Earth fill m3 |
7,999,999 |
| Rumchek Pir |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.800 Diameter (m) |
4.000 Length (m) |
1,300,000 |
| Souphi Muoy |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,100,000 |
0.800 Diameter (m) |
6.000 Length (m) |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,000,001 |
| Contract ID |
020303/07/02 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
11,106,800 |
| Rumchek Pir |
1 |
201 |
Earth road |
0.14 [ 0.14 ] |
Km |
25,889,970 |
3.000 Width (m) |
533.000 Earth fill m3 |
3,572,816 |
| Souphi Muoy |
2 |
201 |
Earth road |
0.17 [ 0.17 ] |
Km |
25,889,970 |
3.000 Width (m) |
412.000 Earth fill m3 |
4,427,185 |
| Rumchek Buon |
3 |
201 |
Earth road |
0.12 [ 0.12 ] |
Km |
25,889,970 |
3.000 Width (m) |
0.000 Earth fill m3 |
3,106,796 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,106,797 |
Battambang, Chamkar Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020304/07/01 |
TSO |
Oum Naram |
Project Type |
Irrigation |
40,925,100 |
| Chamkar Samraong Muoy |
1 |
420 |
Canal |
1.48 [ 3.00 ] |
Km |
10,150,000 |
1.200 Depth (m) |
9,588.000 Volume (m3) |
30,450,000 |
| Chamkar Samraong Muoy |
2 |
211 |
Single pipe culvert |
2.00 [ 7.00 ] |
Place |
1,496,448 |
1.000 Diameter (m) |
6.000 Length (m) |
10,475,136 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,925,136 |
Battambang, Sla Kaet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020305/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
14,300,000 |
| Chrey Kaong |
2 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
28,846,690 |
4.000 Width (m) |
1,122.000 Earth fill m3 |
10,009,801 |
| Chrey Kaong |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,385,200 |
0.800 Diameter (m) |
6.000 Length (m) |
2,385,200 |
| Chrey Kaong |
4 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
1,905,000 |
0.800 Length (m) |
8.000 Diameter (m) |
1,905,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,300,001 |
| Contract ID |
020305/07/02 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
15,598,300 |
| Dam Spey |
1 |
202 |
Laterite road |
0.59 [ 0.66 ] |
Km |
19,219,910 |
3.000 Width (m) |
153.000 Earth fill m3 |
12,608,261 |
| Dam Spey |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,495,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,990,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,598,261 |
Battambang, Kdol Doun Teav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020306/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
31,166,400 |
| Ou Ta Nob |
1 |
202 |
Laterite road |
0.78 [ 0.83 ] |
Km |
22,648,740 |
3.000 Width (m) |
863.000 Earth fill m3 |
18,866,400 |
| Ou Ta Nob |
2 |
202 |
Laterite road |
0.52 [ 0.52 ] |
Km |
18,304,430 |
3.000 Width (m) |
191.000 Earth fill m3 |
9,499,999 |
| Ou Ta Nob |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,166,400 |
Battambang, Ou Mal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020307/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
35,500,000 |
| Voat Roka |
1 |
220 |
Box culvert (general) |
1.00 [ 1.00 ] |
Place |
35,500,000 |
1.500 Total Span (m) |
4.400 Width(m) |
35,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,500,000 |
| Contract ID |
020307/07/02 |
TSO |
Oum Naram |
Project Type |
Irrigation |
18,376,300 |
| Prey Dach |
1 |
420 |
Canal |
0.51 [ 1.63 ] |
Km |
9,824,902 |
0.610 Depth (m) |
1,888.000 Volume (m3) |
15,975,291 |
| Prey Dach |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,375,291 |
Battambang, Voat Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020308/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
47,772,000 |
| Kampong Seima |
1 |
202 |
Laterite road |
2.60 [ 2.69 ] |
Km |
16,966,120 |
3.000 Width (m) |
753.000 Earth fill m3 |
45,570,998 |
| Kampong Seima |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,770,998 |
Battambang, Ou Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020309/07/01 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
40,083,400 |
| Ang |
1 |
202 |
Laterite road |
1.03 [ 1.03 ] |
Km |
18,640,780 |
3.000 Width (m) |
243.000 Earth fill m3 |
19,200,003 |
| Andoung Chenh |
2 |
202 |
Laterite road |
0.37 [ 0.37 ] |
Km |
14,209,120 |
3.000 Width (m) |
0.000 Earth fill m3 |
5,300,002 |
| Ou Char |
3 |
202 |
Laterite road |
0.13 [ 0.14 ] |
Km |
13,846,150 |
3.000 Width (m) |
0.000 Earth fill m3 |
1,913,538 |
| Prey Koun Sek |
4 |
202 |
Laterite road |
0.63 [ 0.63 ] |
Km |
14,338,120 |
3.000 Width (m) |
0.000 Earth fill m3 |
8,990,001 |
| Prey Koun Sek |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,340,200 |
0.800 Diameter (m) |
6.000 Length (m) |
4,680,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,083,944 |
Battambang, Svay Pao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020310/07/01 |
TSO |
Oum Naram |
Project Type |
Irrigation |
20,049,600 |
| Preaek Moha Tep |
1 |
420 |
Canal |
0.23 [ 0.23 ] |
Km |
6,442,127 |
1.200 Depth (m) |
272.000 Volume (m3) |
1,488,131 |
| Preaek Moha Tep |
2 |
541 |
Drain pipe for flood water |
2.00 [ 2.00 ] |
Line |
2,633,300 |
0.800 Length (m) |
2.000 Diameter (m) |
5,266,600 |
| Mphey Osakphea |
3 |
420 |
Canal |
0.34 [ 0.34 ] |
Km |
6,442,127 |
1.200 Depth (m) |
385.000 Volume (m3) |
2,203,207 |
| Mphey Osakphea |
4 |
541 |
Drain pipe for flood water |
2.00 [ 2.00 ] |
Line |
2,633,300 |
0.800 Length (m) |
20.000 Diameter (m) |
5,266,600 |
| Mphey Osakphea |
5 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
2,096,600 |
0.800 Length (m) |
10.000 Diameter (m) |
2,096,600 |
| Kampong Krabei |
6 |
420 |
Canal |
0.17 [ 0.17 ] |
Km |
6,442,127 |
1.200 Depth (m) |
185.000 Volume (m3) |
1,095,162 |
| Kampong Krabei |
7 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
2,633,300 |
0.800 Length (m) |
10.000 Diameter (m) |
2,633,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,049,600 |
| Contract ID |
020310/07/02 |
TSO |
Oum Naram |
Project Type |
Rural Transport |
21,114,100 |
| Kammeakkar |
1 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
24,213,080 |
5.000 Width (m) |
0.000 Earth fill m3 |
3,728,814 |
| Kammeakkar |
2 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
24,213,070 |
4.000 Width (m) |
64.000 Earth fill m3 |
8,401,935 |
| Kammeakkar |
3 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
24,213,080 |
3.000 Width (m) |
64.000 Earth fill m3 |
4,745,764 |
| Kammeakkar |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,300,000 |
| Preaek Moha Tep |
5 |
202 |
Laterite road |
0.12 [ 0.12 ] |
Km |
24,213,070 |
5.000 Width (m) |
0.000 Earth fill m3 |
2,953,995 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,130,508 |
Bavel, Bavel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020401/07/01 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
26,290,700 |
| Sangkae Vear |
1 |
201 |
Earth road |
0.94 [ 1.30 ] |
Km |
7,336,693 |
4.000 Width (m) |
2,329.000 Earth fill m3 |
9,537,701 |
| Kampong Chhnang Muoy |
2 |
201 |
Earth road |
0.43 [ 1.53 ] |
Km |
7,340,509 |
4.000 Width (m) |
1,557.000 Earth fill m3 |
11,253,000 |
| Sangkae Vear |
3 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Sangkae Vear |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,290,701 |
| Contract ID |
020401/07/02 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
69,132,760 |
| Bavel Muoy |
1 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
19,998,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
2,999,700 |
| Prey Totueng Muoy |
2 |
202 |
Laterite road |
0.24 [ 0.24 ] |
Km |
25,220,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
6,052,800 |
| Tumnob Tuek |
3 |
202 |
Laterite road |
0.24 [ 0.24 ] |
Km |
20,173,420 |
3.000 Width (m) |
0.000 Earth fill m3 |
4,841,621 |
| Kampong Chhnang Muoy |
4 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
22,880,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
11,440,000 |
| Spean Kandaol |
5 |
202 |
Laterite road |
0.10 [ 0.11 ] |
Km |
19,998,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
2,139,786 |
| Sang Reang |
6 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
21,829,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
9,168,180 |
| Svay Chrum |
7 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
23,849,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
9,539,600 |
| Doun Avav |
8 |
202 |
Laterite road |
0.26 [ 0.26 ] |
Km |
21,829,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
5,675,540 |
| Bavel Pir |
9 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
21,480,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
12,888,000 |
| Prey Totueng Pir |
10 |
202 |
Laterite road |
0.21 [ 0.21 ] |
Km |
20,730,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
4,394,760 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
69,139,987 |
Bavel, Khnach Romeas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020402/07/01 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
57,630,800 |
| Khnach Romeas |
1 |
202 |
Laterite road |
2.00 [ 1.50 ] |
Km |
23,700,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
35,550,000 |
| Ballang Leu |
2 |
202 |
Laterite road |
0.54 [ 1.16 ] |
Km |
19,065,420 |
3.000 Width (m) |
0.000 Earth fill m3 |
22,077,756 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
57,627,756 |
Bavel, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020403/07/01 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
40,867,500 |
| Ta Ny |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
40,867,500 |
2.000 Total Span (m) |
2.000 Width(m) |
40,867,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,867,500 |
| Contract ID |
020403/07/02 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
29,015,000 |
| Boeng Samraong |
2 |
202 |
Laterite road |
1.24 [ 1.24 ] |
Km |
23,441,290 |
3.000 Width (m) |
0.000 Earth fill m3 |
29,020,317 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,020,317 |
Bavel, Prey Khpos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020404/07/01 |
TSO |
Som Bunthong |
Project Type |
Irrigation |
31,000,000 |
| Ta Mat |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
31,000,000 |
2.000 Total Span (m) |
2.000 Width(m) |
31,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,000,000 |
| Contract ID |
020404/07/02 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
39,148,700 |
| Meakkloea |
1 |
202 |
Laterite road |
1.67 [ 1.68 ] |
Km |
23,371,190 |
3.000 Width (m) |
0.000 Earth fill m3 |
39,146,743 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,146,743 |
Bavel, Ampil Pram Daeum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020405/07/01 |
TSO |
Som Bunthong |
Project Type |
Irrigation |
39,199,600 |
| Buo Run |
1 |
420 |
Canal |
1.00 [ 2.38 ] |
Km |
9,000,000 |
1.043 Depth (m) |
2,674.000 Volume (m3) |
21,420,000 |
| Ampil |
2 |
420 |
Canal |
0.76 [ 3.38 ] |
Km |
5,263,351 |
1.000 Depth (m) |
1,900.000 Volume (m3) |
17,779,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,199,600 |
| Contract ID |
020405/07/02 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
10,162,900 |
| Ta Khiev |
1 |
201 |
Earth road |
0.55 [ 0.62 ] |
Km |
16,339,070 |
4.000 Width (m) |
0.000 Earth fill m3 |
10,162,902 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,162,902 |
Bavel, Kdol Tahen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020406/07/01 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
42,210,400 |
| Kdol Kraom |
1 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| San |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| San |
3 |
201 |
Earth road |
2.03 [ 4.09 ] |
Km |
8,123,875 |
4.000 Width (m) |
6,227.500 Earth fill m3 |
33,210,401 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,210,401 |
| Contract ID |
020406/07/02 |
TSO |
Som Bunthong |
Project Type |
Rural Transport |
15,826,500 |
| Ou Doan Poa |
1 |
202 |
Laterite road |
0.98 [ 0.99 ] |
Km |
16,020,408 |
3.000 Width (m) |
0.000 Earth fill m3 |
15,828,163 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,828,163 |
Aek Phnum, Preaek Norint
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020501/07/01 |
TSO |
Mak Sucheth |
Project Type |
Rural Transport |
41,346,200 |
| Preaek Krouch |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
19,300,000 |
3.000 Width (m) |
0.000 Earth fill m3 |
19,300,000 |
| Sdei |
2 |
202 |
Laterite road |
1.00 [ 1.14 ] |
Km |
19,288,010 |
3.000 Width (m) |
0.000 Earth fill m3 |
22,046,195 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,346,195 |
Aek Phnum, Samraong Knong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020502/07/01 |
TSO |
Mak Sucheth |
Project Type |
Rural Transport |
35,900,000 |
| Samraong Snao |
1 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
16,000,000 |
2.500 Width (m) |
0.000 Earth fill m3 |
14,400,000 |
| Samraong Knong |
2 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
16,144,580 |
2.500 Width (m) |
0.000 Earth fill m3 |
6,700,001 |
| Samraong Ou Trea |
3 |
202 |
Laterite road |
0.94 [ 0.94 ] |
Km |
15,744,680 |
2.500 Width (m) |
0.000 Earth fill m3 |
14,799,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,900,000 |
Aek Phnum, Preaek Khpob
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020503/07/01 |
TSO |
Mak Sucheth |
Project Type |
Rural Transport |
32,179,900 |
| Preaek Khpos |
1 |
202 |
Laterite road |
0.47 [ 0.47 ] |
Km |
21,276,600 |
3.000 Width (m) |
0.000 Earth fill m3 |
10,000,002 |
| Preaek Snao |
2 |
202 |
Laterite road |
1.03 [ 1.04 ] |
Km |
21,429,860 |
3.000 Width (m) |
0.000 Earth fill m3 |
22,179,905 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,179,907 |
Aek Phnum, Preaek Luong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020504/07/01 |
TSO |
Mak Sucheth |
Project Type |
Rural Transport |
32,365,500 |
| Bak Amraek |
1 |
202 |
Laterite road |
1.56 [ 1.56 ] |
Km |
20,694,050 |
3.000 Width (m) |
0.000 Earth fill m3 |
32,365,494 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,365,494 |
Aek Phnum, Peam Aek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020505/07/01 |
TSO |
Mak Sucheth |
Project Type |
Irrigation |
43,290,900 |
| Ka Rohal |
1 |
420 |
Canal |
2.18 [ 3.52 ] |
Km |
10,100,000 |
0.930 Depth (m) |
10,960.000 Volume (m3) |
35,572,200 |
| Ka Rohal |
2 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
2,572,900 |
0.800 Diameter (m) |
5.000 Length (m) |
7,718,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,290,900 |
Aek Phnum, Prey Chas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020506/07/01 |
TSO |
Mak Sucheth |
Project Type |
Education |
34,300,000 |
| Peam Seima |
1 |
310 |
Wooden school (general) |
2.00 [ 2.00 ] |
School room |
16,400,000 |
16.000 Length (m) |
9.000 Width (m) |
32,800,000 |
| Peam Seima |
2 |
740 |
School furniture |
2.00 [ 10.00 ] |
School room |
150,000 |
200.000 Students |
0.000 |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,300,000 |
Aek Phnum, Kaoh Chiveang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020507/07/01 |
TSO |
Mak Sucheth |
Project Type |
Social Interventions |
34,990,000 |
| Anlong Ta Uor |
1 |
360 |
Community buildings |
1.00 [ 1.00 ] |
Building |
34,990,000 |
7.000 Length (m) |
9.000 Width (m) |
34,990,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,990,000 |
Moung Ruessei, Moung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020601/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
40,874,500 |
| Roluos |
1 |
201 |
Earth road |
1.34 [ 2.65 ] |
Km |
11,782,820 |
5.000 Width (m) |
5,667.000 Earth fill m3 |
31,271,604 |
| Ou Krabau |
2 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
860,900 |
0.600 Diameter (m) |
5.000 Length (m) |
2,582,700 |
| Ou Krabau |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,287,600 |
0.800 Diameter (m) |
5.000 Length (m) |
1,287,600 |
| Ou Krabau |
4 |
212 |
Double pipe culvert |
1.00 [ 2.00 ] |
Place |
2,866,300 |
100.000 Diameter (m) |
5.000 Length (m) |
5,732,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,874,504 |
Moung Ruessei, Kear
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020602/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
49,752,000 |
| Kear Muoy |
1 |
202 |
Laterite road |
2.30 [ 2.30 ] |
Km |
15,366,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
35,341,800 |
| Kear Muoy |
2 |
202 |
Laterite road |
0.76 [ 0.83 ] |
Km |
15,331,970 |
3.000 Width (m) |
2.400 Earth fill m3 |
12,710,203 |
| Kear Muoy |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,752,003 |
Moung Ruessei, Prey Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020603/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
38,331,200 |
| Cham Ro'a |
1 |
201 |
Earth road |
0.99 [ 2.16 ] |
Km |
13,490,870 |
5.000 Width (m) |
11,690.000 Earth fill m3 |
29,099,807 |
| Cham Ro'a |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,432,300 |
0.800 Diameter (m) |
6.000 Length (m) |
1,432,300 |
| Cham Ro'a |
3 |
212 |
Double pipe culvert |
2.00 [ 3.00 ] |
Place |
2,280,500 |
0.800 Diameter (m) |
6.000 Length (m) |
6,841,500 |
| Cham Ro'a |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
957,600 |
0.600 Diameter (m) |
6.000 Length (m) |
957,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,331,207 |
Moung Ruessei, Ruessei Krang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020604/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
40,018,200 |
| Srah Chineang |
1 |
202 |
Laterite road |
1.79 [ 1.79 ] |
Km |
22,100,000 |
3.000 Width (m) |
705.000 Earth fill m3 |
39,559,000 |
| Pech Changvar |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
459,200 |
0.800 Diameter (m) |
3.000 Length (m) |
459,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,018,200 |
Moung Ruessei, Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020605/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
35,587,000 |
| Chrey Cheung |
1 |
201 |
Earth road |
1.99 [ 2.66 ] |
Km |
13,398,720 |
5.000 Width (m) |
7,410.000 Earth fill m3 |
35,587,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,587,000 |
Moung Ruessei, Ta Loas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020606/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
32,452,000 |
| Sdei Stueng |
1 |
201 |
Earth road |
0.97 [ 1.43 ] |
Km |
19,009,070 |
4.500 Width (m) |
5,512.000 Earth fill m3 |
27,239,997 |
| Sdei Stueng |
2 |
212 |
Double pipe culvert |
1.00 [ 2.00 ] |
Place |
2,606,000 |
0.800 Diameter (m) |
6.000 Length (m) |
5,212,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,451,997 |
Moung Ruessei, Kakaoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020607/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
36,567,800 |
| Chak Thum |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,022,533 |
0.800 Diameter (m) |
5.000 Length (m) |
2,022,533 |
| Chak Thum |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,583,004 |
0.600 Diameter (m) |
5.000 Length (m) |
1,583,004 |
| Chak Thum |
3 |
201 |
Earth road |
1.56 [ 3.26 ] |
Km |
10,111,120 |
4.000 Width (m) |
5,293.000 Earth fill m3 |
32,962,251 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,567,788 |
| Contract ID |
020607/07/02 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
33,736,500 |
| Tuol Prum Muoy |
1 |
202 |
Laterite road |
1.76 [ 1.57 ] |
Km |
21,474,540 |
3.000 Width (m) |
150.000 Earth fill m3 |
33,736,502 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,736,502 |
Moung Ruessei, Prey Touch
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020608/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
32,887,000 |
| Thmei |
1 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
909,639 |
0.600 Diameter (m) |
5.000 Length (m) |
2,728,917 |
| Thmei |
2 |
201 |
Earth road |
1.30 [ 2.51 ] |
Km |
12,015,170 |
4.000 Width (m) |
6,216.000 Earth fill m3 |
30,158,077 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,886,994 |
Moung Ruessei, Robas Mongkol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020609/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
37,196,400 |
| Koun K'aek Muoy |
1 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
22,346,980 |
3.000 Width (m) |
0.150 Earth fill m3 |
11,843,899 |
| Koun K'aek Muoy |
2 |
202 |
Laterite road |
0.64 [ 0.64 ] |
Km |
22,346,880 |
3.000 Width (m) |
1,140.000 Earth fill m3 |
14,302,003 |
| Koun K'aek Muoy |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Anlong Koub |
4 |
202 |
Laterite road |
0.38 [ 0.41 ] |
Km |
22,344,200 |
3.000 Width (m) |
205.000 Earth fill m3 |
9,250,499 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,196,401 |
Moung Ruessei, Prek Chik
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020610/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
34,669,600 |
| Prek Ta Ven |
1 |
202 |
Laterite road |
1.24 [ 1.24 ] |
Km |
16,400,000 |
3.500 Width (m) |
1,055.000 Earth fill m3 |
20,336,000 |
| Prek Chik |
2 |
202 |
Laterite road |
0.81 [ 0.87 ] |
Km |
16,400,000 |
3.000 Width (m) |
730.000 Earth fill m3 |
14,333,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,669,600 |
Moung Ruessei, Prey Tralach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020611/07/01 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
59,721,800 |
| Toul Svay |
1 |
201 |
Earth road |
3.27 [ 3.27 ] |
Km |
7,885,522 |
4.500 Width (m) |
9,048.000 Earth fill m3 |
25,762,000 |
| Sdok Pravoek |
2 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
56,411,630 |
4.500 Width (m) |
2,406.000 Earth fill m3 |
33,959,801 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
59,721,802 |
| Contract ID |
020611/07/02 |
TSO |
Ma Sareun |
Project Type |
Rural Transport |
17,000,000 |
| Prah Andong |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,750,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Sdok Pravoek |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,750,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Sdok Pravoek |
4 |
251 |
Drift |
1.00 [ 1.00 ] |
Place |
7,500,000 |
4.000 Length (m) |
15.000 Width (m) |
7,500,000 |
| Sdok Pravoek |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,000,000 |
Rotonak Mondol, Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020701/07/01 |
TSO |
Hin Dara |
Project Type |
Rural Transport |
49,463,700 |
| O Khmum |
1 |
201 |
Earth road |
1.71 [ 3.39 ] |
Km |
14,608,300 |
4.000 Width (m) |
6,433.520 Earth fill m3 |
49,463,704 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,463,704 |
Rotonak Mondol, Andaeuk Haeb
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020702/07/01 |
TSO |
Hin Dara |
Project Type |
Rural Transport |
28,890,000 |
| Andaeuk Haeb |
1 |
202 |
Laterite road |
2.17 [ 2.17 ] |
Km |
13,331,800 |
5.000 Width (m) |
975.150 Earth fill m3 |
28,890,011 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,890,011 |
Rotonak Mondol, Phlov Meas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020703/07/01 |
TSO |
Hin Dara |
Project Type |
Rural Transport |
29,252,400 |
| Ou Da |
1 |
201 |
Earth road |
1.41 [ 3.08 ] |
Km |
9,512,975 |
4.000 Width (m) |
3,939.750 Earth fill m3 |
29,252,398 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,252,398 |
Rotonak Mondol, Traeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020704/07/01 |
TSO |
Hin Dara |
Project Type |
Rural Domestic Water Supplies |
31,050,000 |
| Chi Sang |
1 |
123 |
Drilled well with Afridev pump |
5.00 [ 5.00 ] |
Place |
6,210,000 |
35.000 Depth (m) |
0.100 Diameter (mm) |
31,050,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,050,000 |
Sangkae, Anlong Vil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020801/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
42,844,660 |
| Chrab Veal |
1 |
202 |
Laterite road |
0.82 [ 0.82 ] |
Km |
23,239,950 |
3.500 Width (m) |
473.000 Earth fill m3 |
19,079,999 |
| Chrab Veal |
2 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
16,733,330 |
3.000 Width (m) |
0.000 Earth fill m3 |
2,510,000 |
| Chrab Veal |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
0.600 Diameter (m) |
10.000 Length (m) |
2,400,000 |
| Chrab Veal |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,450,000 |
| Chrab Veal |
5 |
202 |
Laterite road |
0.45 [ 0.58 ] |
Km |
16,180,450 |
3.000 Width (m) |
0.000 Earth fill m3 |
9,384,661 |
| Chrab Veal |
6 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
32,080,000 |
4.000 Width (m) |
308.000 Earth fill m3 |
8,020,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,844,659 |
Sangkae, Norea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020802/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
11,733,260 |
| Ta Kok |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
21,333,200 |
4.000 Width (m) |
2,527.000 Earth fill m3 |
11,733,260 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,733,260 |
| Contract ID |
020802/07/02 |
TSO |
Dy Peou |
Project Type |
Education |
13,662,440 |
| Norea Pir |
1 |
303 |
School yard |
1.00 [ 1.00 ] |
Place |
13,662,440 |
0.500 |
748.000 |
13,662,440 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,662,440 |
Sangkae, Ta Pon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020803/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
35,140,500 |
| Boeng Tuem |
1 |
202 |
Laterite road |
1.81 [ 1.83 ] |
Km |
19,226,620 |
3.000 Width (m) |
0.150 Earth fill m3 |
35,140,493 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,140,493 |
Sangkae, Roka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020804/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
29,146,500 |
| Ambaeng Thngae |
1 |
202 |
Laterite road |
1.66 [ 1.73 ] |
Km |
16,837,960 |
3.000 Width (m) |
0.150 Earth fill m3 |
29,146,509 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,146,509 |
Sangkae, Kampong Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020805/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
30,597,200 |
| Kampong Preah |
1 |
202 |
Laterite road |
0.52 [ 0.63 ] |
Km |
17,571,890 |
3.000 Width (m) |
551.000 Earth fill m3 |
11,000,003 |
| Prey Chaek |
3 |
202 |
Laterite road |
0.63 [ 0.63 ] |
Km |
24,904,330 |
3.000 Width (m) |
70.000 Earth fill m3 |
15,697,199 |
| Prey Chaek |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Prey Chaek |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
6.000 Length (m) |
1,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,597,202 |
Sangkae, Kampong Preang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020806/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
34,849,000 |
| Kach Roteh |
1 |
201 |
Earth road |
1.11 [ 2.78 ] |
Km |
12,549,150 |
4.000 Width (m) |
4,789.000 Earth fill m3 |
34,848,990 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,848,990 |
Sangkae, Reang Kesei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020807/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
29,581,600 |
| Tuol Snuol |
1 |
202 |
Laterite road |
1.29 [ 1.35 ] |
Km |
21,863,710 |
3.500 Width (m) |
0.150 Earth fill m3 |
29,581,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,581,600 |
Sangkae, Ou Dambang Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020808/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
40,282,800 |
| Ou Sralau |
1 |
202 |
Laterite road |
1.31 [ 1.02 ] |
Km |
15,686,280 |
3.000 Width (m) |
0.150 Earth fill m3 |
16,000,006 |
| Ou Sralau |
2 |
202 |
Laterite road |
0.29 [ 0.39 ] |
Km |
16,321,650 |
3.000 Width (m) |
0.150 Earth fill m3 |
6,332,800 |
| Ou Khcheay |
3 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
15,833,330 |
3.000 Width (m) |
0.150 Earth fill m3 |
4,749,999 |
| Samraong Kaong |
4 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
13,176,470 |
2.500 Width (m) |
0.150 Earth fill m3 |
11,200,000 |
| Voat Chaeng |
5 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
13,333,330 |
2.500 Width (m) |
0.150 Earth fill m3 |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,282,804 |
Sangkae, Ou Dambang Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020809/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
34,929,400 |
| Svay Chrum |
1 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
11,209,700 |
4.000 Width (m) |
2,223.000 Earth fill m3 |
10,649,215 |
| Svay Chrum |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,732,700 |
0.600 Diameter (m) |
10.000 Length (m) |
1,732,700 |
| Svay Chrum |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,365,600 |
0.800 Diameter (m) |
5.000 Length (m) |
2,731,200 |
| Svay Chrum |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,034,700 |
0.600 Diameter (m) |
5.000 Length (m) |
2,069,400 |
| Svay Chrum |
5 |
201 |
Earth road |
0.21 [ 1.08 ] |
Km |
16,371,670 |
4.000 Width (m) |
2,326.000 Earth fill m3 |
17,746,890 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,929,405 |
Sangkae, Voat Ta Muem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020810/07/01 |
TSO |
Dy Peou |
Project Type |
Rural Transport |
40,381,470 |
| Ou Sralau |
1 |
202 |
Laterite road |
2.16 [ 2.28 ] |
Km |
17,732,170 |
3.000 Width (m) |
0.150 Earth fill m3 |
40,381,471 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,381,471 |
Samlout, Ta Taok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020901/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
23,498,400 |
| Peam Ta |
1 |
203 |
Gravel road |
0.99 [ 0.99 ] |
Km |
18,650,540 |
3.500 Width (m) |
0.000 Earth fill m3 |
18,426,734 |
| Peam Ta |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,037,562 |
0.800 Diameter (m) |
5.000 Length (m) |
3,037,562 |
| Peam Ta |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,034,106 |
0.600 Diameter (m) |
5.000 Length (m) |
2,034,106 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,498,402 |
Samlout, Ou Samrel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020902/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
23,963,600 |
| Ou Rumchek Leu |
1 |
203 |
Gravel road |
2.81 [ 3.03 ] |
Km |
7,921,851 |
3.500 Width (m) |
0.000 Earth fill m3 |
23,963,599 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,963,599 |
Samlout, Kampong Lpou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020903/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
24,567,600 |
| Ou Daem Chek |
1 |
201 |
Earth road |
1.15 [ 1.21 ] |
Km |
13,686,160 |
4.000 Width (m) |
5,399.000 Earth fill m3 |
16,532,881 |
| Ou Daem Chek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Ou Daem Chek |
3 |
233 |
Wood bridge, 15 tonne standard |
1.00 [ 1.00 ] |
Place |
5,034,722 |
4.000 Total Span (m) |
15.000 Width (m) |
5,034,722 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,567,603 |
Samlout, Mean Cheay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020904/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
26,148,600 |
| Sre Sdao |
1 |
201 |
Earth road |
1.41 [ 1.54 ] |
Km |
12,401,940 |
4.000 Width (m) |
5,574.000 Earth fill m3 |
19,148,595 |
| Sre Sdao |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Sre Sdao |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,148,595 |
Samlout, Samlout
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020905/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
26,825,600 |
| Ou Chrab |
1 |
203 |
Gravel road |
1.17 [ 1.26 ] |
Km |
17,253,320 |
3.500 Width (m) |
0.000 Earth fill m3 |
21,721,930 |
| Ou Chrab |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,037,562 |
0.800 Diameter (m) |
5.000 Length (m) |
3,037,562 |
| Ou Chrab |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,066,114 |
0.600 Diameter (m) |
5.000 Length (m) |
2,066,114 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,825,606 |
Samlout, Sung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020906/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
24,436,500 |
| Kandal |
1 |
203 |
Gravel road |
1.06 [ 1.14 ] |
Km |
17,130,140 |
2.500 Width (m) |
1,290.000 Earth fill m3 |
19,562,620 |
| Kandal |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,903,791 |
0.800 Diameter (m) |
5.000 Length (m) |
2,903,791 |
| Kandal |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,970,092 |
0.600 Diameter (m) |
5.000 Length (m) |
1,970,092 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,436,503 |
Samlout, Ta Sanh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020907/07/01 |
TSO |
Chea Tem |
Project Type |
Rural Transport |
27,510,100 |
| Doun Troek |
1 |
201 |
Earth road |
1.68 [ 1.80 ] |
Km |
11,860,180 |
4.000 Width (m) |
5,000.000 Earth fill m3 |
21,360,184 |
| Doun Troek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,906,177 |
0.600 Diameter (m) |
5.000 Length (m) |
1,906,177 |
| Doun Troek |
3 |
233 |
Wood bridge, 15 tonne standard |
1.00 [ 1.00 ] |
Place |
4,243,739 |
4.000 Total Span (m) |
10.000 Width (m) |
4,243,739 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,510,100 |
Sampov Lun, Sampou Lun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021001/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
20,173,000 |
| Tuol Chrey |
1 |
203 |
Gravel road |
0.62 [ 0.85 ] |
Km |
12,983,000 |
4.000 Width (m) |
1,286.000 Earth fill m3 |
10,996,601 |
| Tuol Chrey |
2 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
9,176,400 |
1.000 Diameter (m) |
7.000 Length (m) |
9,176,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,173,001 |
Sampov Lun, Angkor Ban
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021002/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
20,713,700 |
| Andoung Pir |
1 |
203 |
Gravel road |
0.64 [ 0.87 ] |
Km |
12,563,250 |
4.000 Width (m) |
1,135.000 Earth fill m3 |
10,904,901 |
| Andoung Pir |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,113,400 |
1.000 Diameter (m) |
7.000 Length (m) |
7,113,400 |
| Andoung Pir |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,695,400 |
0.600 Diameter (m) |
5.000 Length (m) |
2,695,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,713,701 |
Sampov Lun, Ta Sda
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021003/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
23,613,800 |
| Veal Vong |
1 |
203 |
Gravel road |
1.07 [ 1.30 ] |
Km |
11,214,953 |
4.000 Width (m) |
2,269.000 Earth fill m3 |
14,613,084 |
| Veal Vong |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
9,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,613,084 |
Sampov Lun, Santepheap
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021004/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
25,744,200 |
| Trapeang Prolit |
1 |
203 |
Gravel road |
1.08 [ 1.30 ] |
Km |
13,885,640 |
4.000 Width (m) |
5.000 Earth fill m3 |
17,981,904 |
| Trapeang Prolit |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,196,900 |
0.800 Diameter (m) |
5.000 Length (m) |
4,196,900 |
| Trapeang Prolit |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,782,700 |
0.600 Diameter (m) |
5.000 Length (m) |
3,565,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,744,204 |
Sampov Lun, Serei Maen Cheay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021005/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
26,879,600 |
| Pou Chrey |
1 |
203 |
Gravel road |
1.26 [ 1.55 ] |
Km |
9,624,580 |
4.000 Width (m) |
2,117.000 Earth fill m3 |
14,879,601 |
| Pou Chrey |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
4,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
12,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,879,601 |
Sampov Lun, Chrey Sema
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021006/07/01 |
TSO |
Hor Hak |
Project Type |
Rural Transport |
27,920,300 |
| Spean Youl |
1 |
203 |
Gravel road |
1.04 [ 1.21 ] |
Km |
15,903,790 |
4.000 Width (m) |
1,939.000 Earth fill m3 |
19,291,297 |
| Spean Youl |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
2,426,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,852,000 |
| Spean Youl |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,777,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,777,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,920,297 |
Phnum Proek, Phnum Proek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021101/07/01 |
TSO |
Hul Sina |
Project Type |
Rural Transport |
23,418,900 |
| Kokir |
1 |
203 |
Gravel road |
2.25 [ 1.08 ] |
Km |
17,887,870 |
3.500 Width (m) |
5,418.000 Earth fill m3 |
19,318,900 |
| Kokir |
2 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
2,460,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,460,000 |
| Kokir |
3 |
212 |
Double pipe culvert |
2.00 [ 1.00 ] |
Place |
1,640,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,640,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,418,900 |
Phnum Proek, Pech Chenda
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021102/07/01 |
TSO |
Hul Sina |
Project Type |
Rural Transport |
34,705,900 |
| Ou |
1 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
19,181,250 |
3.500 Width (m) |
3,850.000 Earth fill m3 |
15,345,000 |
| Pech Chenda |
2 |
203 |
Gravel road |
0.80 [ 1.06 ] |
Km |
18,230,600 |
3.500 Width (m) |
3,850.000 Earth fill m3 |
19,360,897 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,705,897 |
Phnum Proek, Chakrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021103/07/01 |
TSO |
Hul Sina |
Project Type |
Rural Transport |
42,435,200 |
| Chakrei |
1 |
203 |
Gravel road |
0.75 [ 0.75 ] |
Km |
17,765,730 |
3.500 Width (m) |
4,687.000 Earth fill m3 |
13,324,298 |
| Chamkar Trab |
2 |
203 |
Gravel road |
1.00 [ 1.18 ] |
Km |
17,766,270 |
3.500 Width (m) |
0.000 Earth fill m3 |
20,910,900 |
| Chamkar Trab |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,460,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,460,000 |
| Chakrei |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,460,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,460,000 |
| Chakrei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,280,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,280,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,435,197 |
Phnum Proek, Barang Thleak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021104/07/01 |
TSO |
Hul Sina |
Project Type |
Rural Transport |
26,286,500 |
| Barang Thleak |
1 |
203 |
Gravel road |
2.40 [ 1.27 ] |
Km |
16,140,220 |
3.500 Width (m) |
4,687.000 Earth fill m3 |
20,546,500 |
| Barang Thleak |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,640,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,280,000 |
| Barang Thleak |
3 |
212 |
Double pipe culvert |
3.00 [ 1.00 ] |
Place |
2,460,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,460,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,286,500 |
Phnum Proek, Ou Rumduol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021105/07/01 |
TSO |
Hul Sina |
Project Type |
Rural Transport |
26,913,900 |
| Ou Lhong |
1 |
203 |
Gravel road |
3.30 [ 3.20 ] |
Km |
7,653,803 |
3.500 Width (m) |
0.000 Earth fill m3 |
24,453,901 |
| Ou Lhong |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,460,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,460,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,913,901 |
Kamrieng, Kamrieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021201/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
27,301,200 |
| Bangorchang |
1 |
201 |
Earth road |
3.78 [ 4.13 ] |
Km |
6,612,061 |
4.000 Width (m) |
2,446.000 Earth fill m3 |
27,301,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,301,200 |
Kamrieng, Boeng Reang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021202/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
31,421,000 |
| Boeng Reang |
1 |
203 |
Gravel road |
3.53 [ 3.71 ] |
Km |
8,460,151 |
3.500 Width (m) |
0.000 Earth fill m3 |
31,421,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,421,001 |
Kamrieng, Ou Da
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021203/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
14,137,000 |
| Tangyou |
1 |
201 |
Earth road |
1.00 [ 1.11 ] |
Km |
12,793,670 |
4.000 Width (m) |
1,518.000 Earth fill m3 |
14,137,005 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,137,005 |
| Contract ID |
021203/07/02 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
13,460,800 |
| Samroung |
1 |
203 |
Gravel road |
1.51 [ 1.58 ] |
Km |
8,497,980 |
4.000 Width (m) |
0.000 Earth fill m3 |
13,460,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,460,800 |
Kamrieng, Trang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021204/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
25,944,700 |
| Lvea Te |
1 |
201 |
Earth road |
2.00 [ 2.24 ] |
Km |
10,198,530 |
4.000 Width (m) |
2,764.000 Earth fill m3 |
22,844,707 |
| Lvea Te |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Lvea Te |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,944,707 |
Kamrieng, Ta Saen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021205/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
27,232,100 |
| Ou Toek Thla |
1 |
201 |
Earth road |
1.91 [ 2.01 ] |
Km |
13,551,597 |
4.000 Width (m) |
3,007.000 Earth fill m3 |
27,238,710 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,238,710 |
Kamrieng, Ta Krai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021206/07/01 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
11,200,000 |
| Sam Sip |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
11,200,000 |
4.000 Width (m) |
1,676.000 Earth fill m3 |
11,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,200,000 |
| Contract ID |
021206/07/02 |
TSO |
Mout Roun |
Project Type |
Rural Transport |
21,760,000 |
| Sras Kampot |
1 |
203 |
Gravel road |
1.72 [ 1.91 ] |
Km |
11,368,860 |
3.500 Width (m) |
0.000 Earth fill m3 |
21,759,998 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,759,998 |
Koas Krala, Thipakdei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021301/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
31,615,200 |
| Koun Prum |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Koun Prum |
2 |
202 |
Laterite road |
1.82 [ 1.82 ] |
Km |
14,074,290 |
3.000 Width (m) |
1,508.000 Earth fill m3 |
25,615,208 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,615,208 |
Koas Krala, Koas Krala
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021302/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
25,084,600 |
| Koas Krala |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,850,000 |
| Tuol Balangk |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,400,000 |
| Tuol Balangk |
3 |
202 |
Laterite road |
1.63 [ 1.13 ] |
Km |
14,012,920 |
3.000 Width (m) |
150.000 Earth fill m3 |
15,834,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,084,600 |
Koas Krala, Hab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021303/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
25,163,700 |
| Klaeng Chuor |
1 |
201 |
Earth road |
3.15 [ 2.14 ] |
Km |
11,758,740 |
4.000 Width (m) |
12,672.000 Earth fill m3 |
25,163,704 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,163,704 |
Koas Krala, Doun Ba
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021304/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
24,705,700 |
| Prey Phnheas |
1 |
202 |
Laterite road |
1.13 [ 0.96 ] |
Km |
17,245,520 |
3.000 Width (m) |
150.000 Earth fill m3 |
16,555,699 |
| Prey Phnheas |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,550,000 |
| Prey Phnheas |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,550,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,705,699 |
Koas Krala, Preah Phos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021305/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
25,237,100 |
| Koy Veaeng |
1 |
202 |
Laterite road |
1.93 [ 1.90 ] |
Km |
11,914,260 |
3.000 Width (m) |
150.000 Earth fill m3 |
22,637,094 |
| Koy Veaeng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,600,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,237,094 |
Koas Krala, Chhnal Moan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
021306/07/01 |
TSO |
Ly Oubol |
Project Type |
Rural Transport |
23,770,500 |
| Krang Svat |
1 |
202 |
Laterite road |
1.68 [ 1.69 ] |
Km |
14,065,380 |
3.000 Width (m) |
150.000 Earth fill m3 |
23,770,492 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,770,492 |