Contract Outputs
Location: Svay Rieng \ Romeas Haek Budget Year: 2007
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Romeas Haek, Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200401/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
65,126,500 |
| Traok |
1 |
201 |
Earth road |
0.38 [ 0.38 ] |
Km |
10,000,000 |
4.000 Width (m) |
1,188.000 Earth fill m3 |
3,820,000 |
| Trapeang Popel |
2 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
7,800,000 |
4.000 Width (m) |
5,071.000 Earth fill m3 |
10,530,000 |
| Traok |
3 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
7,285,000 |
3.000 Width (m) |
604.280 Earth fill m3 |
8,385,035 |
| Trapeang Popel |
4 |
202 |
Laterite road |
1.35 [ 1.35 ] |
Km |
7,285,037 |
3.000 Width (m) |
708.750 Earth fill m3 |
9,834,800 |
| Romeas Haek |
5 |
202 |
Laterite road |
4.47 [ 4.47 ] |
Km |
7,285,000 |
3.000 Width (m) |
2,346.230 Earth fill m3 |
32,556,665 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
65,126,500 |
| Contract ID |
200401/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,997,400 |
| Trapeang Popel |
1 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
907,909 |
4.000 Width (m) |
472.000 Earth fill m3 |
1,997,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,997,400 |
Romeas Haek, Andoung Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200402/07/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
16,445,100 |
| Roung Snao |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
6,150,000 |
4.000 Width (m) |
2,970.000 Earth fill m3 |
7,380,000 |
| Bos Kokir |
2 |
201 |
Earth road |
0.93 [ 1.47 ] |
Km |
6,150,000 |
4.000 Width (m) |
4,976.000 Earth fill m3 |
9,065,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,445,100 |
Romeas Haek, Andoung Trabaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200403/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
50,291,300 |
| Andoung Trabaek |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
7,174,223 |
4.000 Width (m) |
1,501.000 Earth fill m3 |
4,304,534 |
| Chik Dei |
2 |
201 |
Earth road |
3.90 [ 3.90 ] |
Km |
7,174,223 |
4.000 Width (m) |
13,166.000 Earth fill m3 |
27,979,470 |
| Tuol |
3 |
201 |
Earth road |
0.41 [ 2.51 ] |
Km |
7,174,223 |
4.000 Width (m) |
7,218.000 Earth fill m3 |
18,007,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,291,303 |
| Contract ID |
200403/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
10,800,000 |
| Chik Dei |
1 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
10,800,000 |
3.000 Total Span (m) |
5.000 Width(m) |
10,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,800,000 |
| Contract ID |
200403/07/03 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,961,700 |
| Kamraeng |
1 |
201 |
Earth road |
3.50 [ 3.50 ] |
Km |
560,486 |
4.000 Width (m) |
465.000 Earth fill m3 |
1,961,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,961,700 |
Romeas Haek, Angk Prasrae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200404/07/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
29,305,300 |
| Chrak Mreak |
1 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
6,350,000 |
4.000 Width (m) |
4,131.000 Earth fill m3 |
8,890,000 |
| Trapeang Pring |
2 |
201 |
Earth road |
0.92 [ 0.92 ] |
Km |
6,350,000 |
4.000 Width (m) |
2,951.000 Earth fill m3 |
5,842,000 |
| Kbal Krapeu |
3 |
201 |
Earth road |
2.30 [ 2.30 ] |
Km |
6,350,022 |
4.000 Width (m) |
7,716.000 Earth fill m3 |
14,573,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,305,300 |
| Contract ID |
200404/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
4,890,000 |
| Trapeang Pring |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
2,445,000 |
4.000 Width (m) |
496.000 Earth fill m3 |
4,890,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,890,000 |
Romeas Haek, Chantrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200405/07/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
21,080,000 |
| Trapeang Thlok Khang Tboung |
1 |
201 |
Earth road |
1.59 [ 1.59 ] |
Km |
6,800,000 |
4.000 Width (m) |
5,769.000 Earth fill m3 |
10,812,000 |
| Balangk Chea |
2 |
201 |
Earth road |
0.77 [ 1.51 ] |
Km |
6,800,000 |
4.000 Width (m) |
8,425.000 Earth fill m3 |
10,268,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,080,000 |
| Contract ID |
200405/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,997,400 |
| Trapeang Thlok Khang Tboung |
1 |
201 |
Earth road |
2.10 [ 2.10 ] |
Km |
951,143 |
4.000 Width (m) |
472.000 Earth fill m3 |
1,997,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,997,400 |
Romeas Haek, Chrey Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200406/07/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
90,290,000 |
| Chong Prey |
1 |
201 |
Earth road |
1.31 [ 1.31 ] |
Km |
10,437,000 |
4.000 Width (m) |
3,922.000 Earth fill m3 |
13,714,218 |
| Trapeang Smach |
2 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
10,335,126 |
3.000 Width (m) |
787.500 Earth fill m3 |
15,502,689 |
| Sandao |
3 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
10,335,126 |
3.000 Width (m) |
1,050.000 Earth fill m3 |
20,670,252 |
| Chong Prey |
4 |
202 |
Laterite road |
2.52 [ 2.52 ] |
Km |
10,335,126 |
3.000 Width (m) |
1,320.500 Earth fill m3 |
25,992,842 |
| Trapeang Smach |
5 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,620,000 |
| Chong Prey |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,310,000 |
| Ansaong |
7 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,310,000 |
| Dak Por |
8 |
211 |
Single pipe culvert |
0.00 [ 3.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,930,000 |
| Prey Chheu Teal |
9 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,310,000 |
| Dang Kdar |
10 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,310,000 |
| Trapeang Phluoh |
11 |
211 |
Single pipe culvert |
0.00 [ 2.00 ] |
Place |
1,310,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,620,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
90,290,001 |
| Contract ID |
200406/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
2,498,300 |
| Dang Kdar |
1 |
201 |
Earth road |
3.00 [ 3.00 ] |
Km |
832,767 |
4.000 Width (m) |
586.000 Earth fill m3 |
2,498,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,498,300 |
Romeas Haek, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200407/07/01 |
TSO |
Sen Sovann |
Project Type |
Irrigation |
31,500,000 |
| Poun |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
10,500,000 |
2.000 Depth (m) |
13,915.000 Volume (m3) |
10,500,000 |
| Ta Suos |
2 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
10,500,000 |
2.000 Depth (m) |
13,915.000 Volume (m3) |
10,500,000 |
| Svay Pok |
3 |
420 |
Canal |
0.80 [ 0.80 ] |
Km |
10,500,000 |
2.000 Depth (m) |
6,957.500 Volume (m3) |
8,400,000 |
| Trapeang Kralanh |
4 |
420 |
Canal |
0.00 [ 0.20 ] |
Km |
10,500,000 |
2.000 Depth (m) |
6,957.500 Volume (m3) |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,500,000 |
| Contract ID |
200407/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,891,000 |
| Kampong Thna |
1 |
201 |
Earth road |
0.65 [ 0.65 ] |
Km |
2,909,231 |
4.000 Width (m) |
449.000 Earth fill m3 |
1,891,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,891,000 |
Romeas Haek, Kampong Trach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200408/07/01 |
TSO |
Sen Sovann |
Project Type |
Education |
64,200,000 |
| Ta Khob |
1 |
322 |
Brick school with fibro roof |
3.00 [ 3.00 ] |
School room |
21,400,000 |
24.000 Length (m) |
9.000 Width (m) |
64,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,200,000 |
| Contract ID |
200408/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
29,997,500 |
| Ta Khob |
1 |
202 |
Laterite road |
2.00 [ 2.00 ] |
Km |
5,999,500 |
3.000 Width (m) |
1,050.000 Earth fill m3 |
11,999,000 |
| Chong Ou |
2 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
5,999,500 |
3.000 Width (m) |
787.500 Earth fill m3 |
8,999,250 |
| Khla Lout |
3 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
5,999,500 |
3.000 Width (m) |
787.500 Earth fill m3 |
8,999,250 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,997,500 |
| Contract ID |
200408/07/03 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,961,700 |
| Chheu Phleung |
1 |
201 |
Earth road |
3.45 [ 3.45 ] |
Km |
568,609 |
4.000 Width (m) |
465.000 Earth fill m3 |
1,961,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,961,700 |
Romeas Haek, Kokir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200409/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
25,289,200 |
| Ta Veang |
1 |
202 |
Laterite road |
2.84 [ 3.72 ] |
Km |
6,800,000 |
3.000 Width (m) |
2,403.600 Earth fill m3 |
25,289,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,289,200 |
Romeas Haek, Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200410/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
32,164,000 |
| Krasang |
1 |
201 |
Earth road |
1.72 [ 1.72 ] |
Km |
18,700,000 |
4.000 Width (m) |
3,426.000 Earth fill m3 |
32,164,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,164,000 |
| Contract ID |
200410/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,961,700 |
| Thlok Veay Ti Muoy |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
1,307,800 |
4.000 Width (m) |
465.000 Earth fill m3 |
1,961,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,961,700 |
Romeas Haek, Mukh Da
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200411/07/01 |
TSO |
Sen Sovann |
Project Type |
Education |
57,000,000 |
| Kranhung |
1 |
322 |
Brick school with fibro roof |
3.00 [ 3.00 ] |
School room |
19,000,000 |
24.000 Length (m) |
9.000 Width (m) |
57,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
57,000,000 |
| Contract ID |
200411/07/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,999,500 |
| Romiet |
1 |
201 |
Earth road |
2.05 [ 2.05 ] |
Km |
975,366 |
4.000 Width (m) |
474.000 Earth fill m3 |
1,999,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,500 |
Romeas Haek, Mream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200412/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
45,587,500 |
| Lbaeuk |
1 |
203 |
Gravel road |
0.17 [ 0.17 ] |
Km |
12,500,000 |
3.000 Width (m) |
89.250 Earth fill m3 |
2,125,000 |
| Ta Pang |
2 |
203 |
Gravel road |
1.15 [ 1.15 ] |
Km |
12,500,000 |
3.000 Width (m) |
603.750 Earth fill m3 |
14,375,000 |
| Boeng Mung |
3 |
203 |
Gravel road |
0.85 [ 0.85 ] |
Km |
12,500,000 |
3.000 Width (m) |
446.250 Earth fill m3 |
10,625,000 |
| Ampil |
4 |
203 |
Gravel road |
0.03 [ 1.48 ] |
Km |
12,500,000 |
3.000 Width (m) |
775.420 Earth fill m3 |
18,462,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,587,500 |
| Contract ID |
200412/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,999,500 |
| Lbaeuk |
1 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
908,864 |
4.000 Width (m) |
474.000 Earth fill m3 |
1,999,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,500 |
Romeas Haek, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200413/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
26,222,100 |
| Preaek Tnaot |
1 |
201 |
Earth road |
1.67 [ 1.67 ] |
Km |
7,145,000 |
4.000 Width (m) |
4,910.000 Earth fill m3 |
11,932,150 |
| Andoung Khmat |
2 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
7,145,000 |
4.000 Width (m) |
7,300.000 Earth fill m3 |
14,290,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,222,150 |
| Contract ID |
200413/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,999,500 |
| Souphi |
1 |
201 |
Earth road |
2.10 [ 2.10 ] |
Km |
952,143 |
4.000 Width (m) |
474.000 Earth fill m3 |
1,999,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,500 |
Romeas Haek, Sambatt Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200414/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
38,092,000 |
| Chamkar Kaoh |
1 |
201 |
Earth road |
2.14 [ 2.14 ] |
Km |
17,800,000 |
4.000 Width (m) |
8,102.000 Earth fill m3 |
38,092,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,092,000 |
| Contract ID |
200414/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,997,400 |
| Lbaeuk |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
1,664,500 |
4.000 Width (m) |
472.000 Earth fill m3 |
1,997,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,997,400 |
Romeas Haek, Trapeang Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200415/07/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
36,675,000 |
| Ta Kot |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
6,500,000 |
4.000 Width (m) |
1,847.000 Earth fill m3 |
3,900,000 |
| Khnang Chruk Khang Kaeut |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
6,500,000 |
4.000 Width (m) |
3,435.000 Earth fill m3 |
7,800,000 |
| Khnang Chruk Khang Lech |
3 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
6,500,000 |
4.000 Width (m) |
2,364.000 Earth fill m3 |
5,200,000 |
| Banla S'et |
4 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
6,500,000 |
4.000 Width (m) |
1,815.000 Earth fill m3 |
3,575,000 |
| Thmei |
5 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
6,500,000 |
4.000 Width (m) |
2,581.000 Earth fill m3 |
5,200,000 |
| Trapeang Sdau |
6 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
6,500,000 |
4.000 Width (m) |
2,599.000 Earth fill m3 |
5,200,000 |
| Voat Chas |
7 |
201 |
Earth road |
0.58 [ 0.58 ] |
Km |
10,000,000 |
4.000 Width (m) |
4,032.000 Earth fill m3 |
5,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,675,000 |
| Contract ID |
200415/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,999,500 |
| Voat Chas |
1 |
201 |
Earth road |
3.05 [ 3.05 ] |
Km |
655,574 |
4.000 Width (m) |
486.000 Earth fill m3 |
1,999,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,500 |
Romeas Haek, Tras
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200416/07/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
44,555,000 |
| Serei Ao |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
6,700,000 |
3.500 Width (m) |
600.000 Earth fill m3 |
6,700,000 |
| Boeng |
2 |
202 |
Laterite road |
2.50 [ 2.50 ] |
Km |
6,700,000 |
3.500 Width (m) |
1,500.000 Earth fill m3 |
16,750,000 |
| Ta Suos |
3 |
202 |
Laterite road |
0.90 [ 3.15 ] |
Km |
6,700,000 |
3.500 Width (m) |
2,070.000 Earth fill m3 |
21,105,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,555,000 |
| Contract ID |
200416/07/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,909,700 |
| Muni Proeksa |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
1,736,091 |
4.000 Width (m) |
444.000 Earth fill m3 |
1,909,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,909,700 |