Contract Outputs

Location: Kampong Cham \ Ou Reang Ov Budget Year: 2007

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Ou Reang Ov, Ampil Ta Pok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031101/07/01 TSO Chea Theng Project Type Rural Transport 30,240,000
Meas Snae 2 201 Earth road 1.05 [ 1.05 ] Km 10,000,000 4.000 Width (m) 2,709.000 Earth fill m3 10,500,000
Meas Snae 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,870,000 0.800 Diameter (m) 5.000 Length (m) 2,870,000
Meas Snae 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Meas Snae 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Svay Roluos 6 201 Earth road 0.52 [ 0.52 ] Km 10,000,000 4.000 Width (m) 890.000 Earth fill m3 5,230,000
Svay Roluos 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Lekh Bei 8 201 Earth road 0.42 [ 0.42 ] Km 12,000,000 4.000 Width (m) 1,110.000 Earth fill m3 5,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,240,000
Contract ID 031101/07/02 TSO Chea Theng Project Type Rural Transport 9,918,300
Svay Roluos 1 202 Laterite road 1.60 [ 1.60 ] Km 5,417,688 3.500 Width (m) 427.000 Earth fill m3 8,668,301
Lekh Bei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,918,301

Ou Reang Ov, Chak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031102/07/01 TSO Chea Theng Project Type Rural Transport 41,886,000
Chumpu 1 202 Laterite road 1.00 [ 1.35 ] Km 13,000,000 3.500 Width (m) 867.000 Earth fill m3 17,550,000
Chrouy Ph'ong 2 202 Laterite road 0.97 [ 1.87 ] Km 13,000,000 3.500 Width (m) 1,975.000 Earth fill m3 24,336,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,886,000

Ou Reang Ov, Damrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031103/07/01 TSO Chea Theng Project Type Rural Transport 36,047,700
Khnab Damrei Cheung 1 202 Laterite road 0.10 [ 0.20 ] Km 9,365,500 3.500 Width (m) 86.000 Earth fill m3 1,873,100
Krapeu 2 202 Laterite road 0.69 [ 0.69 ] Km 9,365,562 3.500 Width (m) 596.000 Earth fill m3 6,499,700
Kbal Ou 3 202 Laterite road 0.15 [ 0.15 ] Km 9,365,333 3.500 Width (m) 210.000 Earth fill m3 1,404,800
Srae Sruoch 4 202 Laterite road 0.44 [ 0.44 ] Km 9,365,611 3.500 Width (m) 437.000 Earth fill m3 4,139,600
Sam Snae 5 202 Laterite road 0.60 [ 2.06 ] Km 9,365,563 3.500 Width (m) 1,187.000 Earth fill m3 19,330,522
Sam Snae 6 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,047,722

Ou Reang Ov, Kong Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031104/07/01 TSO Chea Theng Project Type Irrigation 28,956,500
Changva 2 420 Canal 0.30 [ 1.70 ] Km 7,826,059 1.000 Depth (m) 1,500.000 Volume (m3) 13,304,300
Tuol Trach 3 420 Canal 0.20 [ 0.20 ] Km 7,826,000 1.000 Depth (m) 500.000 Volume (m3) 1,565,200
Ou Popul 4 420 Canal 0.80 [ 0.80 ] Km 7,826,125 1.000 Depth (m) 1,000.000 Volume (m3) 6,260,900
Tuol Ta Hao 5 420 Canal 0.80 [ 0.80 ] Km 7,826,125 1.000 Depth (m) 1,000.000 Volume (m3) 6,260,900
Tuol Sama 6 420 Canal 0.20 [ 0.20 ] Km 7,826,000 1.000 Depth (m) 500.000 Volume (m3) 1,565,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,956,500

Ou Reang Ov, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031105/07/01 TSO Chea Theng Project Type Rural Transport 19,062,000
Banteay Mien 1 202 Laterite road 1.25 [ 1.25 ] Km 9,000,000 3.500 Width (m) 334.000 Earth fill m3 11,250,000
Prey Sambuor Kaeut 2 202 Laterite road 0.87 [ 0.87 ] Km 9,000,000 3.500 Width (m) 231.000 Earth fill m3 7,812,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,062,000
Contract ID 031105/07/02 TSO Chea Theng Project Type Rural Transport 16,796,600
Thma Samlieng 1 201 Earth road 0.31 [ 0.31 ] Km 8,300,540 4.000 Width (m) 630.000 Earth fill m3 2,556,566
Banteay Mien 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,430,000 0.600 Diameter (m) 5.000 Length (m) 1,430,000
Banteay Mien 3 201 Earth road 0.64 [ 0.64 ] Km 8,300,540 4.000 Width (m) 1,165.000 Earth fill m3 5,270,843
Kampul Serei 4 201 Earth road 0.74 [ 0.74 ] Km 8,300,540 4.000 Width (m) 1,189.000 Earth fill m3 6,109,197
Kampul Serei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,430,000 0.600 Diameter (m) 5.000 Length (m) 1,430,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,796,607

Ou Reang Ov, Preah Theat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031107/07/01 TSO Chea Theng Project Type Irrigation 15,496,800
Thnal Kaeng 1 410 Earth dam 0.12 [ 0.12 ] Km 114,379,700 2.000 Max. height (m) 1,295.000 Volume (m3) 13,496,805
Thnal Kaeng 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 8.000 Width (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,496,805
Contract ID 031107/07/02 TSO Chea Theng Project Type Irrigation 8,000,000
Thnal Kaeng 1 420 Canal 1.02 [ 1.02 ] Km 7,858,546 0.710 Depth (m) 3,395.000 Volume (m3) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,000,000

Ou Reang Ov, Tuol Sophi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031108/07/01 TSO Chea Theng Project Type Irrigation 29,000,000
Boeng Phtil 1 410 Earth dam 0.17 [ 0.17 ] Km 74,853,800 3.650 Max. height (m) 3,201.000 Volume (m3) 12,800,000
Boeng Phtil 2 452 Single pipe Culvert with gate 3.00 [ 3.00 ] Place 5,400,000 0.800 Diameter (m) 7.000 Width (m) 16,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,000,000