Contract Outputs
Location: Stung Treng \ Thala Barivat Budget Year: 2008
Sesan
Siem Bouk
Siem Pang
Stueng Traeng
Thala Barivat
Thala Barivat, Ou Rai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
190506/08/01 |
TSO |
Hong Bunkheang |
Project Type |
Rural Transport |
28,115,078 |
| Anlong Svay |
1 |
202 |
Laterite road |
0.96 [ 0.96 ] |
Km |
29,286,539 |
5.000 Width (m) |
756.000 Earth fill m3 |
28,115,077 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,115,077 |
Thala Barivat, Ou Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
190507/08/01 |
TSO |
Tourn Tharith |
Project Type |
Rural Transport |
27,000,000 |
| Ou Svay |
1 |
211 |
Single pipe culvert |
14.00 [ 14.00 ] |
Place |
1,428,000 |
0.300 Diameter (m) |
7.000 Length (m) |
19,992,000 |
| Ou Svay |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,008,000 |
0.800 Diameter (m) |
7.000 Length (m) |
7,008,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,000,000 |
Thala Barivat, Thala
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
190511/08/01 |
TSO |
Hong Bunkheang |
Project Type |
Rural Transport |
29,300,000 |
| Ou Trael |
1 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
29,300,000 |
1.000 Diameter (m) |
10.000 Length (m) |
29,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,300,000 |