Contract Outputs
Location: Kampong Thom Budget Year: 2008
Baray
Kampong Svay
Stueng Saen
Prasat Balangk
Prasat Sambour
Sandan
Santuk
Stoung
Baray, Bak Sna
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060101/08/01 |
TSO |
Chhear Nimol |
Project Type |
Rural Transport |
34,111,400 |
| Trapeang Tuk |
1 |
202 |
Laterite road |
0.88 [ 0.77 ] |
Km |
41,206,880 |
4.000 Width (m) |
3,339.000 Earth fill m3 |
31,877,642 |
| Trapeang Tuk |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,233,758 |
0.600 Diameter (m) |
5.000 Length (m) |
2,233,758 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,111,400 |
Baray, Ballangk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060102/08/01 |
TSO |
Chhear Nimol |
Project Type |
Rural Transport |
48,975,800 |
| Doung |
1 |
202 |
Laterite road |
0.81 [ 0.72 ] |
Km |
63,315,000 |
4.000 Width (m) |
4,430.000 Earth fill m3 |
45,840,060 |
| Doung |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,135,828 |
0.800 Diameter (m) |
5.000 Length (m) |
3,135,828 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,975,888 |
Baray, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060103/08/01 |
TSO |
Eung Socheat |
Project Type |
Irrigation |
43,614,700 |
| Svay |
1 |
420 |
Canal |
1.40 [ 1.40 ] |
Km |
19,087,429 |
0.600 Depth (m) |
3,920.000 Volume (m3) |
26,722,401 |
| Chakto Louk |
2 |
420 |
Canal |
1.15 [ 0.87 ] |
Km |
19,371,940 |
0.600 Depth (m) |
3,887.000 Volume (m3) |
16,892,332 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,614,732 |
Baray, Boeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060104/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
38,659,900 |
| Boeng Khang Cheung |
1 |
202 |
Laterite road |
1.28 [ 1.14 ] |
Km |
33,971,870 |
4.000 Width (m) |
1,940.000 Earth fill m3 |
38,659,988 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,659,988 |
Baray, Chaeung Daeung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060105/08/01 |
TSO |
Chhear Nimol |
Project Type |
Rural Transport |
41,379,300 |
| Prey Dom |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
41,379,398 |
4.000 Width (m) |
2,614.000 Earth fill m3 |
41,379,398 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,379,398 |
Baray, Chranieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060106/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Rural Transport |
44,542,600 |
| Chranieng |
1 |
202 |
Laterite road |
0.80 [ 0.91 ] |
Km |
46,764,753 |
4.000 Width (m) |
2,620.000 Earth fill m3 |
42,322,101 |
| Chranieng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,220,552 |
0.600 Diameter (m) |
5.000 Length (m) |
2,220,552 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,542,653 |
Baray, Chhuk Khsach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060107/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
46,872,400 |
| Phlov Totueng |
1 |
201 |
Earth road |
0.50 [ 0.37 ] |
Km |
57,108,910 |
4.000 Width (m) |
2,773.060 Earth fill m3 |
21,016,079 |
| Phlov Totueng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,849,220 |
0.600 Diameter (m) |
5.000 Length (m) |
1,849,220 |
| Phlov Totueng |
3 |
223 |
Triple cell box culvert |
1.00 [ 1.00 ] |
Place |
24,007,105 |
3.000 Total Span (m) |
5.500 Width(m) |
24,007,105 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,872,404 |
Baray, Chong Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060108/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
44,565,300 |
| Samraong |
1 |
202 |
Laterite road |
1.30 [ 1.34 ] |
Km |
33,282,520 |
4.000 Width (m) |
1,780.000 Earth fill m3 |
44,565,294 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,565,294 |
Baray, Chrolong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060109/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Rural Transport |
32,601,600 |
| Han Tvear |
1 |
202 |
Laterite road |
0.60 [ 0.55 ] |
Km |
46,441,750 |
4.000 Width (m) |
2,116.000 Earth fill m3 |
25,751,950 |
| Han Tvear |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,447,165 |
1.000 Diameter (m) |
5.000 Length (m) |
4,447,165 |
| Han Tvear |
3 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
2,402,545 |
0.600 Diameter (m) |
5.000 Length (m) |
2,402,545 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,601,660 |
Baray, Kokir Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060110/08/01 |
TSO |
Chhear Nimol |
Project Type |
Irrigation |
36,553,400 |
| Poun |
1 |
410 |
Earth dam |
0.13 [ 0.13 ] |
Km |
162,214,369 |
3.000 Max. height (m) |
2,646.000 Volume (m3) |
21,087,868 |
| Poun |
2 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
25,775,890 |
1.200 Depth (m) |
2,178.000 Volume (m3) |
15,465,534 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,553,402 |
Baray, Krava
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060111/08/01 |
TSO |
Chhear Nimol |
Project Type |
Irrigation |
38,639,700 |
| Roleab |
1 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
43,774,588 |
1.200 Depth (m) |
3,750.000 Volume (m3) |
21,887,294 |
| Pongro Ling |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
16,752,477 |
1.000 Total span (m) |
4.000 Width (m) |
16,752,477 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,639,771 |
Baray, Andoung Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060112/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Rural Transport |
33,334,600 |
| Chiveakpheap |
1 |
202 |
Laterite road |
0.71 [ 0.68 ] |
Km |
43,844,962 |
4.000 Width (m) |
2,260.000 Earth fill m3 |
29,595,349 |
| Chiveakpheap |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
3,739,300 |
1.000 Total Span (m) |
2.100 Width(m) |
3,739,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,334,649 |
Baray, Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060113/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Rural Transport |
36,142,700 |
| Pongro |
1 |
202 |
Laterite road |
0.91 [ 0.83 ] |
Km |
43,782,800 |
4.000 Width (m) |
2,302.000 Earth fill m3 |
36,142,701 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,142,701 |
Baray, Sou Young
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060114/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Irrigation |
35,446,800 |
| Khloy Khang Kaeut |
1 |
410 |
Earth dam |
0.17 [ 0.15 ] |
Km |
146,342,365 |
1.600 Max. height (m) |
1,951.900 Volume (m3) |
21,219,643 |
| Khloy Khang Kaeut |
2 |
420 |
Canal |
0.35 [ 0.21 ] |
Km |
14,913,260 |
0.900 Depth (m) |
1,021.000 Volume (m3) |
3,124,328 |
| Khloy Khang Kaeut |
3 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
11,102,869 |
1.000 Diameter (m) |
4.000 Width (m) |
11,102,869 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,446,840 |
Baray, Sralau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060115/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Rural Transport |
41,425,600 |
| Kokor |
1 |
202 |
Laterite road |
0.87 [ 0.70 ] |
Km |
49,869,540 |
4.000 Width (m) |
2,890.000 Earth fill m3 |
34,958,548 |
| Kokor |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,222,386 |
1.000 Diameter (m) |
5.000 Length (m) |
4,222,386 |
| Kokor |
3 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
2,244,698 |
0.600 Diameter (m) |
5.000 Length (m) |
2,244,698 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,425,632 |
Baray, Svay Phleung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060116/08/01 |
TSO |
Ay Seng Hay |
Project Type |
Irrigation |
32,487,100 |
| Svay Phleung |
1 |
410 |
Earth dam |
0.10 [ 0.09 ] |
Km |
67,048,100 |
1.300 Max. height (m) |
630.000 Volume (m3) |
6,268,997 |
| Svay Phleung |
2 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
8,952,966 |
0.600 Depth (m) |
432.000 Volume (m3) |
2,685,890 |
| Svay Phleung |
3 |
452 |
Single pipe Culvert with gate |
2.00 [ 1.00 ] |
Place |
7,420,402 |
1.000 Diameter (m) |
4.000 Width (m) |
7,420,402 |
| Svay Phleung |
4 |
452 |
Single pipe Culvert with gate |
3.00 [ 3.00 ] |
Place |
5,370,614 |
0.600 Diameter (m) |
4.000 Width (m) |
16,111,842 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,487,131 |
Baray, Tnaot Chum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060117/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
35,230,500 |
| Banteay Chas |
1 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
32,029,768 |
4.000 Width (m) |
560.000 Earth fill m3 |
25,623,814 |
| Pnov |
2 |
201 |
Earth road |
0.20 [ 0.14 ] |
Km |
66,945,880 |
4.000 Width (m) |
1,406.350 Earth fill m3 |
9,606,734 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,230,548 |
Baray, Treal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060118/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
52,945,950 |
| Prey Veaeng |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
34,990,340 |
4.000 Width (m) |
1,326.240 Earth fill m3 |
17,495,170 |
| Prakhnay |
2 |
202 |
Laterite road |
0.56 [ 0.53 ] |
Km |
67,409,740 |
4.000 Width (m) |
3,137.530 Earth fill m3 |
35,450,782 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,945,952 |
Kampong Svay, Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060201/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
27,377,900 |
| Lvea |
1 |
202 |
Laterite road |
0.65 [ 0.55 ] |
Km |
50,142,740 |
3.800 Width (m) |
1,917.000 Earth fill m3 |
27,377,936 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,377,936 |
Kampong Svay, Damrei Slab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060202/08/01 |
TSO |
Ly Sophal |
Project Type |
Rural Transport |
28,655,600 |
| Damrei Slab |
1 |
202 |
Laterite road |
0.30 [ 0.31 ] |
Km |
91,551,500 |
3.800 Width (m) |
1,719.000 Earth fill m3 |
28,655,620 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,655,620 |
Kampong Svay, Kampong Kou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060203/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
70,509,300 |
| Kampong Kou Leu |
1 |
201 |
Earth road |
1.18 [ 1.07 ] |
Km |
65,896,620 |
4.500 Width (m) |
7,872.000 Earth fill m3 |
70,509,383 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,509,383 |
Kampong Svay, Kampong Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060204/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Irrigation |
44,456,500 |
| Anlong Krasang |
1 |
410 |
Earth dam |
0.40 [ 0.36 ] |
Km |
123,148,300 |
2.900 Max. height (m) |
2,879.000 Volume (m3) |
44,456,536 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,456,536 |
Kampong Svay, Ni Pechr
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060205/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
55,417,800 |
| Nipech Kha |
1 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
47,841,000 |
3.500 Width (m) |
2,028.000 Earth fill m3 |
43,056,900 |
| Nipech Kha |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,114,916 |
0.800 Diameter (m) |
5.000 Length (m) |
3,114,916 |
| Nipech Kha |
3 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
4,623,025 |
0.800 Diameter (m) |
5.000 Length (m) |
9,246,050 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,417,866 |
Kampong Svay, Phat Sanday
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060206/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Education |
36,620,000 |
| Kampong Chamlang |
1 |
310 |
Wooden school (general) |
2.00 [ 2.00 ] |
School room |
18,310,000 |
10.000 Length (m) |
8.000 Width (m) |
36,620,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,620,000 |
Kampong Svay, San Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060207/08/01 |
TSO |
Ly Sophal |
Project Type |
Rural Transport |
50,349,100 |
| Prasat |
1 |
202 |
Laterite road |
0.80 [ 0.72 ] |
Km |
70,026,573 |
4.000 Width (m) |
3,392.000 Earth fill m3 |
50,349,106 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,349,106 |
Kampong Svay, Tbaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060208/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
45,113,200 |
| Tbaeng Kha |
1 |
202 |
Laterite road |
0.87 [ 0.77 ] |
Km |
53,753,026 |
4.000 Width (m) |
1,935.000 Earth fill m3 |
41,282,324 |
| Tbaeng Kha |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
3,830,885 |
1.000 Total Span (m) |
4.500 Width(m) |
3,830,885 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,113,209 |
Kampong Svay, Trapeang Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060209/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
52,169,600 |
| Serei Vongs |
1 |
202 |
Laterite road |
0.90 [ 0.86 ] |
Km |
60,381,560 |
4.000 Width (m) |
2,280.000 Earth fill m3 |
52,169,668 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,169,668 |
Stueng Saen, Damrei Choan Khla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060301/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
37,882,551 |
| Balang Khang Lech |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,017,513 |
0.600 Diameter (m) |
5.000 Length (m) |
2,017,513 |
| Balang Khang Lech |
2 |
202 |
Laterite road |
0.84 [ 0.81 ] |
Km |
44,060,242 |
4.000 Width (m) |
1,763.000 Earth fill m3 |
35,865,037 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,882,550 |
Stueng Saen, Kampong Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060302/08/01 |
TSO |
Kong Kear |
Project Type |
Urban Drainage and Flood Protection |
28,923,400 |
| Phum Prampir |
1 |
540 |
Drainage |
1.00 [ 1.00 ] |
Line |
28,923,400 |
190.000 Length (m) |
0.600 Diameter (m) |
28,923,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,923,400 |
Stueng Saen, Kampong Roteh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060303/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
30,307,697 |
| Kampong Thum |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
50,250,090 |
4.500 Width (m) |
1,856.000 Earth fill m3 |
27,637,550 |
| Kampong Thum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,670,145 |
0.800 Diameter (m) |
5.000 Length (m) |
2,670,145 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,307,695 |
Stueng Saen, Ou Kanthor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060304/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
29,216,400 |
| Boeng Lies |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,939,577 |
0.800 Diameter (m) |
5.000 Length (m) |
2,939,577 |
| Boeng Lies |
2 |
202 |
Laterite road |
0.50 [ 0.44 ] |
Km |
59,720,051 |
3.500 Width (m) |
2,375.000 Earth fill m3 |
26,276,822 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,216,399 |
Stueng Saen, Kdei Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060305/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
32,030,100 |
| Slaeng |
1 |
202 |
Laterite road |
0.40 [ 0.36 ] |
Km |
88,237,190 |
4.000 Width (m) |
2,862.000 Earth fill m3 |
32,030,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,030,100 |
Stueng Saen, Kampong Krabau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060306/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
31,252,499 |
| Kampong Krabau |
1 |
202 |
Laterite road |
0.91 [ 0.86 ] |
Km |
36,424,820 |
4.000 Width (m) |
1,676.000 Earth fill m3 |
31,252,496 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,252,496 |
Stueng Saen, Prey Kuy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060307/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
31,056,100 |
| Sambuor |
2 |
202 |
Laterite road |
0.75 [ 0.70 ] |
Km |
44,556,810 |
4.000 Width (m) |
1,720.000 Earth fill m3 |
31,056,097 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,056,097 |
Stueng Saen, Prey Ta Hu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060308/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
31,050,600 |
| Prey Ta Hu |
1 |
201 |
Earth road |
0.63 [ 0.59 ] |
Km |
33,766,527 |
4.000 Width (m) |
2,396.000 Earth fill m3 |
19,922,251 |
| Prey Ta Hu |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,331,916 |
1.000 Diameter (m) |
5.000 Length (m) |
4,331,916 |
| Prey Ta Hu |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,796,472 |
1.000 Diameter (m) |
5.000 Length (m) |
6,796,472 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,050,639 |
Stueng Saen, achar Leak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060309/08/01 |
TSO |
Kuch Pann Nha |
Project Type |
Rural Transport |
33,575,400 |
| Prey Banlich |
1 |
202 |
Laterite road |
0.76 [ 0.76 ] |
Km |
44,412,000 |
4.000 Width (m) |
1,443.000 Earth fill m3 |
33,575,472 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,575,472 |
Stueng Saen, Srayov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060310/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
55,760,150 |
| Puk Yuk |
1 |
202 |
Laterite road |
1.50 [ 1.39 ] |
Km |
40,260,040 |
4.000 Width (m) |
4,033.000 Earth fill m3 |
55,760,155 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,760,155 |
Stueng Saen, Tboung Krapeu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060311/08/01 |
TSO |
Kong Kear |
Project Type |
Rural Transport |
32,192,450 |
| Kal Mekh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,494,671 |
1.000 Diameter (m) |
5.000 Length (m) |
4,494,671 |
| Kal Mekh |
2 |
202 |
Laterite road |
1.05 [ 0.86 ] |
Km |
32,206,720 |
3.800 Width (m) |
1,897.000 Earth fill m3 |
27,697,779 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,192,450 |
Prasat Balangk, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060401/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
32,704,400 |
| Krabau |
1 |
202 |
Laterite road |
0.40 [ 0.34 ] |
Km |
95,348,240 |
3.700 Width (m) |
3,100.000 Earth fill m3 |
32,704,446 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,704,446 |
Prasat Balangk, Kraya
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060402/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
34,424,100 |
| Sangvat |
1 |
202 |
Laterite road |
0.60 [ 0.54 ] |
Km |
63,985,320 |
3.700 Width (m) |
2,796.000 Earth fill m3 |
34,424,102 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,424,102 |
Prasat Balangk, Phan Nheum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060403/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
29,760,000 |
| Trapeang Knong |
1 |
202 |
Laterite road |
0.80 [ 0.70 ] |
Km |
42,758,640 |
3.600 Width (m) |
1,555.000 Earth fill m3 |
29,760,013 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,760,013 |
Prasat Balangk, Sa Kream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060404/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
37,300,400 |
| Ou Khsang |
1 |
202 |
Laterite road |
1.00 [ 0.89 ] |
Km |
41,816,632 |
3.500 Width (m) |
2,569.000 Earth fill m3 |
37,300,436 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,300,436 |
Prasat Balangk, Sala Visai
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060405/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
40,481,400 |
| Chey |
1 |
202 |
Laterite road |
0.90 [ 0.79 ] |
Km |
51,048,499 |
3.500 Width (m) |
2,571.000 Earth fill m3 |
40,481,460 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,481,460 |
Prasat Balangk, Sameakki
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060406/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
29,871,400 |
| Samraong |
1 |
202 |
Laterite road |
0.84 [ 0.71 ] |
Km |
42,013,240 |
3.700 Width (m) |
1,430.000 Earth fill m3 |
29,871,414 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,871,414 |
Prasat Balangk, Tuol Kreul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060407/08/01 |
TSO |
Noun Silout |
Project Type |
Rural Transport |
27,997,000 |
| Thum |
1 |
202 |
Laterite road |
0.70 [ 0.62 ] |
Km |
44,867,045 |
3.500 Width (m) |
1,687.000 Earth fill m3 |
27,997,036 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,997,036 |
Prasat Sambour, Chhuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060501/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
41,983,300 |
| Boeng Khvaek |
1 |
202 |
Laterite road |
0.28 [ 0.25 ] |
Km |
169,972,874 |
4.500 Width (m) |
4,600.000 Earth fill m3 |
41,983,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,983,300 |
Prasat Sambour, Koul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060502/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
31,031,500 |
| Tuol Char |
1 |
202 |
Laterite road |
0.10 [ 0.10 ] |
Km |
82,577,590 |
4.000 Width (m) |
665.000 Earth fill m3 |
8,257,759 |
| Panhchak Lea |
2 |
202 |
Laterite road |
0.20 [ 0.17 ] |
Km |
135,558,339 |
4.000 Width (m) |
3,059.000 Earth fill m3 |
22,773,801 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,031,560 |
Prasat Sambour, Sambour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060503/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
50,485,400 |
| Chramas |
1 |
202 |
Laterite road |
1.00 [ 0.91 ] |
Km |
55,784,972 |
4.500 Width (m) |
3,825.000 Earth fill m3 |
50,485,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,485,400 |
Prasat Sambour, Sraeung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060504/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Irrigation |
33,087,500 |
| Sraeung |
1 |
410 |
Earth dam |
0.98 [ 0.69 ] |
Km |
24,134,102 |
0.600 Max. height (m) |
2,637.000 Volume (m3) |
16,652,530 |
| Svay |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
8,403,633 |
1.000 Total span (m) |
1.600 Width (m) |
8,403,633 |
| Svay |
3 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
8,031,392 |
2.000 Total span (m) |
1.600 Width (m) |
8,031,392 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,087,555 |
Prasat Sambour, Tang Krasau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060505/08/01 |
TSO |
Chhoun Sokny |
Project Type |
Rural Transport |
82,701,300 |
| Kampong Chheu Teal |
1 |
202 |
Laterite road |
1.30 [ 1.28 ] |
Km |
64,711,520 |
4.000 Width (m) |
5,307.000 Earth fill m3 |
82,701,323 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
82,701,323 |
Sandan, Chheu Teal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060601/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
33,933,900 |
| Boeng Pra |
1 |
202 |
Laterite road |
0.60 [ 0.54 ] |
Km |
62,840,580 |
4.000 Width (m) |
3,551.580 Earth fill m3 |
33,933,913 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,933,913 |
Sandan, Dang Kambet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060602/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
56,019,600 |
| Sampoar Touch |
1 |
202 |
Laterite road |
0.44 [ 0.36 ] |
Km |
58,207,725 |
4.000 Width (m) |
1,907.000 Earth fill m3 |
20,954,781 |
| Sampoar Touch |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,092,759 |
1.000 Diameter (m) |
5.000 Length (m) |
5,092,759 |
| Srae Veal Khang Lech |
3 |
202 |
Laterite road |
0.70 [ 0.60 ] |
Km |
49,870,380 |
3.500 Width (m) |
2,372.000 Earth fill m3 |
29,972,098 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,019,638 |
Sandan, Klaeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060603/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
29,763,650 |
| Prey Choar |
1 |
202 |
Laterite road |
0.82 [ 0.76 ] |
Km |
39,214,340 |
4.000 Width (m) |
2,037.000 Earth fill m3 |
29,763,684 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,763,684 |
Sandan, Mean Ritth
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060604/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
29,361,900 |
| Kanti |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,424,272 |
0.600 Diameter (m) |
5.000 Length (m) |
2,424,272 |
| Kanti |
2 |
202 |
Laterite road |
0.65 [ 0.55 ] |
Km |
48,800,053 |
4.000 Width (m) |
2,158.000 Earth fill m3 |
26,937,629 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,361,901 |
Sandan, Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060605/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
60,636,050 |
| Veal Snay |
1 |
202 |
Laterite road |
1.13 [ 0.98 ] |
Km |
62,127,150 |
4.000 Width (m) |
4,688.000 Earth fill m3 |
60,636,098 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
60,636,098 |
Sandan, Ngan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060606/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
33,918,850 |
| Ngon |
1 |
202 |
Laterite road |
0.65 [ 0.56 ] |
Km |
54,232,303 |
4.000 Width (m) |
2,072.000 Earth fill m3 |
30,370,090 |
| Ngon |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,548,803 |
0.800 Diameter (m) |
5.000 Length (m) |
3,548,803 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,918,893 |
Sandan, Sandan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060607/08/01 |
TSO |
Nguy Vong |
Project Type |
Rural Transport |
34,270,650 |
| Prasat Andaet |
1 |
202 |
Laterite road |
0.75 [ 0.65 ] |
Km |
45,897,769 |
4.000 Width (m) |
2,088.000 Earth fill m3 |
29,787,652 |
| Prasat Andaet |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,483,001 |
1.000 Diameter (m) |
5.000 Length (m) |
4,483,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,270,653 |
Sandan, Sochet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060608/08/01 |
TSO |
Chhear Nimol |
Project Type |
Rural Transport |
53,136,600 |
| Pren |
1 |
202 |
Laterite road |
1.25 [ 1.08 ] |
Km |
49,291,910 |
4.000 Width (m) |
4,677.000 Earth fill m3 |
53,136,679 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
53,136,679 |
Sandan, Tum Ring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060609/08/01 |
TSO |
Chhear Nimol |
Project Type |
Rural Domestic Water Supplies |
29,208,200 |
| Roneam |
1 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
2,632,548 |
| Khaos |
2 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
5,265,096 |
| Leaeng |
3 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
5,265,096 |
| Ronteah |
4 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
5,265,096 |
| Samraong |
5 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
2,632,548 |
| Kbal Damrei |
6 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
2,632,548 |
| Tum Ar |
7 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,632,548 |
9.000 Depth (m) |
1.000 Diameter (m) |
2,632,548 |
| Sralau Tong |
8 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,882,797 |
9.000 Depth (m) |
1.000 Diameter (m) |
2,882,797 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,208,277 |
Santuk, Boeng Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060701/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
31,128,700 |
| Boeng Lvea |
1 |
202 |
Laterite road |
0.55 [ 0.48 ] |
Km |
64,448,690 |
4.000 Width (m) |
2,315.000 Earth fill m3 |
31,128,717 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,128,717 |
Santuk, Chroab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060702/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
31,462,900 |
| Chey Mongkol |
1 |
202 |
Laterite road |
0.43 [ 0.41 ] |
Km |
77,494,860 |
4.000 Width (m) |
2,556.000 Earth fill m3 |
31,462,913 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,462,913 |
Santuk, Kampong Thma
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060703/08/01 |
TSO |
Eung Socheat |
Project Type |
Rural Transport |
37,153,550 |
| Chheu Teal |
1 |
202 |
Laterite road |
1.40 [ 1.30 ] |
Km |
28,623,700 |
4.000 Width (m) |
892.500 Earth fill m3 |
37,153,563 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,153,563 |
Santuk, Kakaoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060704/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
37,647,800 |
| Sala Santuk |
1 |
202 |
Laterite road |
0.59 [ 0.54 ] |
Km |
56,189,280 |
4.000 Width (m) |
2,406.000 Earth fill m3 |
30,566,968 |
| Sala Santuk |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,082 |
0.800 Diameter (m) |
6.000 Length (m) |
5,000,082 |
| Sala Santuk |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,080,769 |
0.600 Diameter (m) |
5.000 Length (m) |
2,080,769 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,647,819 |
Santuk, Kraya
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060705/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
40,765,000 |
| Dang Kdar |
1 |
202 |
Laterite road |
1.00 [ 1.08 ] |
Km |
37,606,180 |
4.000 Width (m) |
2,740.000 Earth fill m3 |
40,765,099 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,765,099 |
Santuk, Pnov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060706/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
26,398,500 |
| Pnov |
1 |
202 |
Laterite road |
0.30 [ 0.28 ] |
Km |
95,646,780 |
4.000 Width (m) |
2,345.000 Earth fill m3 |
26,398,511 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,398,511 |
Santuk, Prasat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060707/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
39,991,600 |
| Traeuy Myab |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
68,666,927 |
4.000 Width (m) |
2,421.000 Earth fill m3 |
37,766,810 |
| Traeuy Myab |
2 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
2,224,875 |
0.600 Diameter (m) |
5.000 Length (m) |
2,224,875 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,991,685 |
Santuk, Tang Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060708/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Transport |
50,188,000 |
| Veang Cheung |
1 |
202 |
Laterite road |
0.70 [ 0.65 ] |
Km |
74,397,840 |
4.000 Width (m) |
3,893.000 Earth fill m3 |
48,061,005 |
| Veang Cheung |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,127,043 |
0.600 Diameter (m) |
5.000 Length (m) |
2,127,043 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,188,048 |
Santuk, Ti Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060709/08/01 |
TSO |
Touch Doung |
Project Type |
Rural Domestic Water Supplies |
36,806,500 |
| Ta Preach |
1 |
111 |
Ring well |
1.00 [ 2.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
4,870,200 |
| Chhuk Rumduol |
2 |
111 |
Ring well |
1.00 [ 2.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
4,870,200 |
| Choam Thnanh |
3 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,715,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,715,100 |
| Samraong |
4 |
111 |
Ring well |
2.00 [ 1.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,435,100 |
| Thmei |
5 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
4,870,200 |
| Trapeang Trom |
6 |
111 |
Ring well |
2.00 [ 1.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,435,100 |
| Phlong |
7 |
111 |
Ring well |
1.00 [ 3.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
7,305,300 |
| Kbal Bei |
8 |
111 |
Ring well |
1.00 [ 1.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,435,100 |
| Srae Srama |
9 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
2,435,100 |
7.000 Depth (m) |
1.000 Diameter (m) |
4,870,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,806,500 |
Stoung, Banteay Stoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060801/08/01 |
TSO |
Ly Sophal |
Project Type |
Rural Transport |
35,965,500 |
| Ko Kruos |
1 |
202 |
Laterite road |
0.63 [ 0.57 ] |
Km |
63,655,917 |
4.000 Width (m) |
1,392.520 Earth fill m3 |
35,965,593 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,965,593 |
Stoung, Chamnar Kraom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060802/08/01 |
TSO |
Ly Sophal |
Project Type |
Rural Transport |
42,304,100 |
| Chamnak |
1 |
202 |
Laterite road |
0.66 [ 0.57 ] |
Km |
74,742,340 |
4.500 Width (m) |
2,369.000 Earth fill m3 |
42,304,164 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,304,164 |
Stoung, Chamnar Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060803/08/01 |
TSO |
Ly Sophal |
Project Type |
Rural Transport |
36,475,700 |
| Prasat |
1 |
202 |
Laterite road |
0.59 [ 0.51 ] |
Km |
71,521,030 |
4.000 Width (m) |
1,753.000 Earth fill m3 |
36,475,725 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,475,725 |
Stoung, Kampong Chen Cheung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060804/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
30,293,400 |
| Roka |
1 |
202 |
Laterite road |
0.39 [ 0.36 ] |
Km |
84,618,650 |
3.800 Width (m) |
1,578.000 Earth fill m3 |
30,293,477 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,293,477 |
Stoung, Kampong Chen Tboung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060805/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
36,300,950 |
| Kampong Chen |
1 |
202 |
Laterite road |
0.45 [ 0.41 ] |
Km |
89,191,550 |
3.800 Width (m) |
1,948.000 Earth fill m3 |
36,300,961 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,300,961 |
Stoung, Msar Krang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060806/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
38,376,300 |
| Chi Meas |
1 |
202 |
Laterite road |
0.50 [ 0.45 ] |
Km |
84,903,520 |
3.800 Width (m) |
2,143.000 Earth fill m3 |
38,376,391 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,376,391 |
Stoung, Peam Bang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060807/08/01 |
TSO |
Ly Sophal |
Project Type |
Education |
26,635,200 |
| Peam Bang |
1 |
310 |
Wooden school (general) |
1.00 [ 1.00 ] |
School room |
26,635,200 |
9.000 Length (m) |
8.000 Width (m) |
26,635,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,635,200 |
Stoung, Popok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060808/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
34,942,000 |
| Popok |
1 |
201 |
Earth road |
0.20 [ 0.18 ] |
Km |
193,049,800 |
5.000 Width (m) |
3,301.000 Earth fill m3 |
34,942,014 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,942,014 |
Stoung, Pralay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060809/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
44,446,600 |
| Ta Treal |
1 |
202 |
Laterite road |
0.87 [ 0.79 ] |
Km |
56,190,510 |
3.000 Width (m) |
1,858.000 Earth fill m3 |
44,446,693 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,446,693 |
Stoung, Preah Damrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060810/08/01 |
TSO |
Ly Sophal |
Project Type |
Irrigation |
29,438,700 |
| Prasat |
1 |
420 |
Canal |
0.90 [ 0.76 ] |
Km |
38,991,710 |
0.800 Depth (m) |
3,721.000 Volume (m3) |
29,438,741 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,438,741 |
Stoung, Rung Roeang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060811/08/01 |
TSO |
Ly Sophal |
Project Type |
Irrigation |
28,686,200 |
| Svay Rieng |
1 |
420 |
Canal |
0.98 [ 0.83 ] |
Km |
34,687,110 |
0.800 Depth (m) |
3,606.000 Volume (m3) |
28,686,240 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,686,240 |
Stoung, Samprouch
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060812/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
42,009,800 |
| Pophluk |
1 |
202 |
Laterite road |
0.45 [ 0.41 ] |
Km |
103,472,500 |
4.000 Width (m) |
2,476.000 Earth fill m3 |
42,009,835 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,009,835 |
Stoung, Trea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
060813/08/01 |
TSO |
Sok Houn |
Project Type |
Rural Transport |
43,143,300 |
| Leab Tong |
1 |
202 |
Laterite road |
0.63 [ 0.55 ] |
Km |
78,442,390 |
3.800 Width (m) |
2,035.000 Earth fill m3 |
43,143,315 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,143,315 |