Contract Outputs

Location: Battambang \ Thma Koul Budget Year: 2003

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Thma Koul, Ta Pung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020201/03/01 TSO Vay Sokunthea Project Type Irrigation 42,548,300
Kouk Kduoch 1 420 Canal 2.31 [ 2.31 ] Km 5,071,558 0.750 Depth (m) 9,091.000 Volume (m3) 11,715,300
Kaksekam 2 420 Canal 1.50 [ 1.50 ] Km 5,099,000 0.750 Depth (m) 0.000 Volume (m3) 7,648,500
Paoy Yong 3 420 Canal 1.50 [ 1.50 ] Km 5,099,055 0.750 Depth (m) 0.000 Volume (m3) 7,648,582
Paoy Samraong 4 420 Canal 1.26 [ 1.26 ] Km 5,110,883 0.750 Depth (m) 0.000 Volume (m3) 6,439,712
Tumpung Tboung 5 420 Canal 0.48 [ 0.48 ] Km 5,268,335 0.750 Depth (m) 0.000 Volume (m3) 2,502,459
Kouk Kduoch 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,792,564 0.800 Diameter (m) 5.000 Length (m) 1,792,564
Kaksekam 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,792,564 0.800 Diameter (m) 10.000 Length (m) 1,792,564
Thma Koul Tboung 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,008,492 0.800 Diameter (m) 10.000 Length (m) 3,008,492
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,548,173

Thma Koul, Ta Meun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020202/03/01 TSO Vay Sokunthea Project Type Rural Transport 47,906,400
Krasang 1 202 Laterite road 1.17 [ 1.17 ] Km 11,645,795 3.000 Width (m) 150.000 Earth fill m3 13,625,580
Chrouy Mtes 2 202 Laterite road 1.00 [ 1.00 ] Km 11,662,430 3.000 Width (m) 150.000 Earth fill m3 11,662,430
Ta Sei 3 202 Laterite road 0.60 [ 0.60 ] Km 11,741,315 3.000 Width (m) 150.000 Earth fill m3 7,044,789
Thmei 4 202 Laterite road 0.58 [ 0.58 ] Km 11,739,978 3.000 Width (m) 150.000 Earth fill m3 6,809,187
Samraong 5 202 Laterite road 0.54 [ 0.54 ] Km 11,785,822 3.000 Width (m) 150.000 Earth fill m3 6,364,344
Chrouy Mtes 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,400,100 1.000 Diameter (m) 5.000 Length (m) 2,400,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,906,430

Thma Koul, Ou Ta Ki

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020203/03/01 TSO Vay Sokunthea Project Type Irrigation 44,331,200
Popeal Khae 1 420 Canal 2.52 [ 2.52 ] Km 7,275,510 0.800 Depth (m) 11,223.000 Volume (m3) 18,327,009
Veal Trea 2 420 Canal 2.40 [ 2.40 ] Km 6,925,334 0.800 Depth (m) 0.000 Volume (m3) 16,620,802
Tras 3 420 Canal 1.50 [ 1.50 ] Km 6,255,600 0.800 Depth (m) 0.000 Volume (m3) 9,383,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,331,211

Thma Koul, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020204/03/01 TSO Vay Sokunthea Project Type Irrigation 38,589,000
Hai San 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 16,504,000 1.250 Total Span (m) 4.000 Width(m) 16,504,000
Hai San 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,940,000 1.000 Diameter (m) 5.000 Length (m) 3,880,000
Chrey 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,940,000 1.000 Diameter (m) 5.000 Length (m) 5,820,000
Prey Totueng 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,940,000 1.000 Diameter (m) 5.000 Length (m) 5,820,000
Popeal Khae 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,125,000 1.000 Diameter (m) 5.000 Length (m) 2,125,000
Prey Totueng 6 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,480,000 0.800 Diameter (m) 5.000 Length (m) 4,440,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,589,000

Thma Koul, Anlong Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020205/03/01 TSO Vay Sokunthea Project Type Rural Transport 21,056,300
Chab Kab 1 202 Laterite road 1.30 [ 1.30 ] Km 7,892,648 3.000 Width (m) 150.000 Earth fill m3 10,260,443
Sla Slak 2 202 Laterite road 0.80 [ 0.80 ] Km 7,948,429 3.000 Width (m) 150.000 Earth fill m3 6,358,743
Souphi 3 202 Laterite road 0.53 [ 0.53 ] Km 8,372,075 3.000 Width (m) 150.000 Earth fill m3 4,437,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,056,386

Thma Koul, Chrouy Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020206/03/01 TSO Vay Sokunthea Project Type Irrigation 31,620,000
Chrouy Sdau 1 420 Canal 2.50 [ 2.50 ] Km 5,416,000 1.000 Depth (m) 8,005.000 Volume (m3) 13,540,000
Nikom Krau 2 420 Canal 1.50 [ 1.50 ] Km 5,416,267 1.000 Depth (m) 0.000 Volume (m3) 8,124,400
Nikom Knong 3 420 Canal 1.86 [ 1.86 ] Km 5,349,597 1.000 Depth (m) 0.000 Volume (m3) 9,955,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,620,000

Thma Koul, Boeng Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020207/03/01 TSO Vay Sokunthea Project Type Rural Transport 34,812,000
Ou Nhor 1 202 Laterite road 1.00 [ 1.00 ] Km 12,300,000 4.000 Width (m) 150.000 Earth fill m3 12,300,000
Paoy Ta Sek 2 202 Laterite road 1.00 [ 1.00 ] Km 12,300,000 4.000 Width (m) 150.000 Earth fill m3 12,300,000
Boeng Pring 3 202 Laterite road 1.35 [ 1.35 ] Km 7,581,292 3.000 Width (m) 150.000 Earth fill m3 10,212,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,812,000

Thma Koul, Kouk Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020208/03/01 TSO Vay Sokunthea Project Type Rural Transport 35,997,500
Kandal Cheung 1 202 Laterite road 1.10 [ 1.10 ] Km 10,439,269 3.000 Width (m) 150.000 Earth fill m3 11,431,000
Kouk Khmum 2 202 Laterite road 1.10 [ 1.10 ] Km 10,439,269 3.000 Width (m) 150.000 Earth fill m3 11,431,000
Ta Meakh 3 202 Laterite road 1.16 [ 1.16 ] Km 8,183,190 3.000 Width (m) 150.000 Earth fill m3 9,492,500
Kouk Khmum 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,214,500 0.600 Diameter (m) 5.000 Length (m) 2,429,000
Kandal Cheung 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,214,000 0.600 Diameter (m) 5.000 Length (m) 1,214,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,997,500

Thma Koul, Bansay Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020209/03/01 TSO Vay Sokunthea Project Type Irrigation 32,572,700
Kaong Kang 1 420 Canal 3.00 [ 3.00 ] Km 10,059,167 0.800 Depth (m) 7,634.000 Volume (m3) 30,177,500
Thmei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,395,200 1.000 Diameter (m) 5.000 Length (m) 2,395,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,572,700

Thma Koul, Rung Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020210/03/01 TSO Vay Sokunthea Project Type Rural Transport 15,620,800
Rung Chrey 1 201 Earth road 1.60 [ 1.60 ] Km 7,386,250 4.000 Width (m) 0.600 Earth fill m3 11,818,000
Prakeab 2 201 Earth road 0.52 [ 0.52 ] Km 7,384,078 4.000 Width (m) 0.600 Earth fill m3 3,802,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,620,800
Contract ID 020210/03/02 TSO Vay Sokunthea Project Type Irrigation 20,698,000
Preah Ponlea 1 420 Canal 1.00 [ 1.00 ] Km 5,137,000 0.800 Depth (m) 1,271.842 Volume (m3) 5,137,000
Paoy Rumchek 2 420 Canal 1.00 [ 1.00 ] Km 5,137,000 0.800 Depth (m) 1,271.842 Volume (m3) 5,137,000
Kouk Khpos 3 420 Canal 1.00 [ 1.00 ] Km 5,137,000 0.800 Depth (m) 1,271.842 Volume (m3) 5,137,000
Ballang Kraom 4 420 Canal 1.00 [ 1.00 ] Km 5,287,000 0.800 Depth (m) 1,271.842 Volume (m3) 5,287,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,698,000