Contract Outputs

Location: Battambang \ Moung Ruessei Budget Year: 2003

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Moung Ruessei, Moung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020601/03/01 TSO Ma Sareun Project Type Rural Transport 45,410,700
Paen 1 201 Earth road 2.40 [ 2.40 ] Km 9,392,292 5.000 Width (m) 500.000 Earth fill m3 22,541,500
Roluos 2 201 Earth road 1.63 [ 1.63 ] Km 9,584,761 5.000 Width (m) 500.000 Earth fill m3 15,661,500
Paen 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,105,767 0.600 Diameter (m) 5.000 Length (m) 3,317,300
Roluos 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,105,800 0.600 Diameter (m) 5.000 Length (m) 2,211,600
Roluos 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,678,800 0.800 Diameter (m) 5.000 Length (m) 1,678,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,410,700

Moung Ruessei, Kear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020602/03/01 TSO Ma Sareun Project Type Irrigation 47,546,900
Ta Nak 1 420 Canal 2.84 [ 2.84 ] Km 13,008,020 0.700 Depth (m) 4,000.000 Volume (m3) 36,981,800
Roka Chhmoul 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,113,900 0.600 Diameter (m) 5.000 Length (m) 2,227,800
Roka Chhmoul 3 454 Triple pipe culvert with gate 1.00 [ 1.00 ] Place 8,337,300 2.500 Diameter (m) 4.000 Width (m) 8,337,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  47,546,900

Moung Ruessei, Prey Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020603/03/01 TSO Ma Sareun Project Type Rural Transport 30,774,000
Prey Svay 1 141 Pond with no filter 1.00 [ 1.00 ] Place 14,064,000 2.000 Depth (m) 0.000 Volume (m3) 14,064,000
Prey Svay 1 202 Laterite road 2.93 [ 2.93 ] Km 7,891,058 2.500 Width (m) 150.000 Earth fill m3 23,120,800
Tuol Thnong 2 202 Laterite road 0.96 [ 0.96 ] Km 7,972,083 2.500 Width (m) 150.000 Earth fill m3 7,653,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,838,000
Contract ID 020603/03/02 TSO Ma Sareun Project Type Rural Domestic Water Supplies 14,064,000
Prey Svay 1 141 Pond with no filter 1.00 [ 1.00 ] Place 14,064,000 2.000 Depth (m) 0.000 Volume (m3) 14,064,000
Prey Svay 1 202 Laterite road 2.93 [ 2.93 ] Km 7,891,058 2.500 Width (m) 150.000 Earth fill m3 23,120,800
Tuol Thnong 2 202 Laterite road 0.96 [ 0.96 ] Km 7,972,083 2.500 Width (m) 150.000 Earth fill m3 7,653,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,838,000

Moung Ruessei, Ruessei Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020604/03/01 TSO Ma Sareun Project Type Rural Transport 44,371,400
Ampil Chhung 1 202 Laterite road 2.39 [ 2.39 ] Km 10,655,425 3.000 Width (m) 150.000 Earth fill m3 25,434,500
Yeun Mean 2 202 Laterite road 1.03 [ 1.03 ] Km 14,275,799 3.000 Width (m) 150.000 Earth fill m3 14,746,900
Yeun Mean 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,790,000 0.800 Diameter (m) 5.000 Length (m) 1,790,000
Yeun Mean 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,400,000 1.000 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,371,400

Moung Ruessei, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020605/03/01 TSO Ma Sareun Project Type Rural Transport 38,626,100
Angkrong 1 201 Earth road 3.95 [ 3.95 ] Km 8,482,479 5.000 Width (m) 560.000 Earth fill m3 33,502,400
Doun Tri 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,534,450 0.800 Diameter (m) 5.000 Length (m) 3,068,900
Doun Tri 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,054,800 1.000 Diameter (m) 5.000 Length (m) 2,054,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,626,100

Moung Ruessei, Ta Loas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020606/03/01 TSO Ma Sareun Project Type Rural Transport 29,182,000
Stueng Thmei 1 201 Earth road 2.97 [ 2.97 ] Km 9,052,455 5.000 Width (m) 450.000 Earth fill m3 26,922,000
Sdei Stueng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,130,000 0.600 Diameter (m) 5.000 Length (m) 2,260,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,182,000

Moung Ruessei, Kakaoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020607/03/01 TSO Ly Oubol Project Type Irrigation 40,916,700
Kakaoh 1 420 Canal 3.90 [ 3.90 ] Km 7,304,282 0.500 Depth (m) 7,591.000 Volume (m3) 28,486,700
Kakaoh 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,637,670 0.800 Diameter (m) 5.000 Length (m) 1,637,670
Tuol Prum Pir 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 5,396,150 0.800 Diameter (m) 5.000 Length (m) 10,792,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,916,670

Moung Ruessei, Prey Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020608/03/01 TSO Ly Oubol Project Type Rural Transport 32,387,300
Stueng Chak 1 202 Laterite road 2.54 [ 2.54 ] Km 7,594,291 3.000 Width (m) 150.000 Earth fill m3 19,289,500
Prean Nil 2 202 Laterite road 1.85 [ 1.85 ] Km 7,064,617 3.000 Width (m) 150.000 Earth fill m3 13,097,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,387,300

Moung Ruessei, Robas Mongkol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020609/03/01 TSO Ma Sareun Project Type Rural Transport 7,032,000
Prey Prum Muoy 1 202 Laterite road 0.87 [ 0.87 ] Km 8,082,759 2.500 Width (m) 150.000 Earth fill m3 7,032,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,032,000
Contract ID 020609/03/02 TSO Ma Sareun Project Type Rural Transport 30,128,400
Preaek Am 1 201 Earth road 3.40 [ 3.40 ] Km 8,112,765 5.000 Width (m) 450.000 Earth fill m3 27,583,400
Prey Prum Pir 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,010,000 0.600 Diameter (m) 5.000 Length (m) 1,010,000
Prey Prum Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,535,000 0.800 Diameter (m) 5.000 Length (m) 1,535,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,128,400

Moung Ruessei, Prek Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020610/03/01 TSO Ma Sareun Project Type Rural Transport 36,806,100
Prek Ta Ven 1 201 Earth road 3.59 [ 3.59 ] Km 8,870,764 5.000 Width (m) 500.000 Earth fill m3 31,828,300
Prek Ta Ven 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 987,000 0.600 Diameter (m) 5.000 Length (m) 987,000
Prek Ta Ven 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,632,700 0.600 Diameter (m) 5.000 Length (m) 1,632,700
Prek Ta Ven 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,358,100 0.800 Diameter (m) 5.000 Length (m) 2,358,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,806,100

Moung Ruessei, Prey Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020611/03/01 TSO Ma Sareun Project Type Rural Transport 61,940,100
Sdok Pravoek 1 202 Laterite road 8.40 [ 8.40 ] Km 6,769,096 3.000 Width (m) 150.000 Earth fill m3 56,840,100
Srah Kuy 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,550,000 0.800 Diameter (m) 5.000 Length (m) 2,550,000
Srah Kuy 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,550,000 0.800 Diameter (m) 5.000 Length (m) 2,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  61,940,100