Contract Outputs

Location: Pursat Budget Year: 2004

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Bakan, Boeng Bat Kandaol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150101/04/01 TSO Chhoeung Sarim Project Type Rural Transport 26,350,000
Bat Kandaol 1 202 Laterite road 1.20 [ 1.20 ] Km 13,175,000 3.000 Width (m) 150.000 Earth fill m3 15,810,000
Tram Seh 2 202 Laterite road 0.80 [ 0.80 ] Km 13,175,000 3.000 Width (m) 150.000 Earth fill m3 10,540,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,350,000

Bakan, Boeng Khnar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150102/04/01 TSO Chhoeung Sarim Project Type Rural Transport 27,125,000
Prey Damrei 1 202 Laterite road 0.70 [ 0.70 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 7,595,000
Prey Phdau 2 202 Laterite road 1.70 [ 1.70 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 18,445,000
Rung 3 202 Laterite road 0.10 [ 0.10 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 1,085,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,125,000

Bakan, Khnar Totueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150103/04/01 TSO Chhoeung Sarim Project Type Rural Transport 22,727,000
Bak Meaek 1 202 Laterite road 1.20 [ 1.20 ] Km 13,740,000 3.000 Width (m) 150.000 Earth fill m3 16,488,000
Kaoh Svay 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,527,000 0.600 Diameter (m) 5.000 Length (m) 1,527,000
Kaoh Svay 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,356,000 0.600 Diameter (m) 5.000 Length (m) 4,712,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,727,000

Bakan, Me Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150104/04/01 TSO Chhoeung Sarim Project Type Irrigation 25,858,000
Ta Mom 1 451 Small water gate 1.00 [ 1.00 ] Place 7,000,000 5.500 Length (m) 1.500 Height (m) 7,000,000
Ta Mom 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 5.000 Width (m) 3,000,000
Ta Mom 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 6.000 Width (m) 4,000,000
Ta Mom 4 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,858,000 0.800 Diameter (m) 8.000 Width (m) 3,858,000
Cha Yov 5 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 8,000,000 2.000 Total span (m) 5.000 Width (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,858,000

Bakan, Ou Ta Paong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150105/04/01 TSO Chhoeung Sarim Project Type Rural Transport 33,420,000
Bat Kokir Chas 1 202 Laterite road 1.77 [ 1.77 ] Km 11,640,000 3.000 Width (m) 150.000 Earth fill m3 20,602,800
Ta Nai 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,100,000 1.000 Diameter (m) 5.000 Length (m) 3,100,000
Bat Kokir Chas 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Ou Ta Paong 4 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,317,200 2.000 Total Span (m) 4.500 Width(m) 7,317,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,420,000

Bakan, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150106/04/01 TSO Chhoeung Sarim Project Type Rural Transport 29,546,000
Kampong Kdei 1 202 Laterite road 1.37 [ 1.37 ] Km 15,800,000 3.000 Width (m) 150.000 Earth fill m3 21,646,000
Prasat 2 202 Laterite road 0.50 [ 0.50 ] Km 15,800,000 3.000 Width (m) 150.000 Earth fill m3 7,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,546,000

Bakan, Snam Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150107/04/01 TSO Chhoeung Sarim Project Type Rural Transport 36,778,900
Bak Pring 1 211 Single pipe culvert 7.00 [ 7.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 8,274,000
Pnov 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,381,000 0.800 Diameter (m) 5.000 Length (m) 2,381,000
Pnov 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,763,600 0.800 Diameter (m) 5.000 Length (m) 3,763,600
Kaoh Krasang 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 2,364,000
Andoung Sanbuor 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,763,600 0.800 Diameter (m) 5.000 Length (m) 3,763,600
Andoung Sanbuor 6 213 Triple pipe culvert 2.00 [ 2.00 ] Place 5,116,900 1.000 Diameter (m) 5.000 Length (m) 10,233,800
Dangkieb Kdam 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 2,364,000
Sdok Svay 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,381,000 0.800 Diameter (m) 5.000 Length (m) 2,381,000
Chambak Meas 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,253,900 0.600 Diameter (m) 7.000 Length (m) 1,253,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,778,900

Bakan, Svay Doun Kaev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150108/04/01 TSO Chhoeung Sarim Project Type Rural Transport 24,394,000
Chrab 1 202 Laterite road 0.82 [ 0.82 ] Km 17,200,000 3.000 Width (m) 150.000 Earth fill m3 14,104,000
Thmei 2 202 Laterite road 0.60 [ 0.60 ] Km 17,150,000 3.000 Width (m) 150.000 Earth fill m3 10,290,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,394,000

Bakan, Ta Lou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150109/04/01 TSO Chhoeung Sarim Project Type Rural Transport 29,950,000
Serei Kunthea 1 202 Laterite road 0.50 [ 0.50 ] Km 13,000,000 3.000 Width (m) 150.000 Earth fill m3 6,500,000
Thmei 2 202 Laterite road 1.50 [ 1.50 ] Km 4,500,000 3.000 Width (m) 150.000 Earth fill m3 6,750,000
Thmei 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,200,000 1.000 Diameter (m) 7.000 Length (m) 6,200,000
Thmei 4 211 Single pipe culvert 6.00 [ 6.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 9,000,000
Serei Kunthea 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,950,000

Bakan, Trapeang Chong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150110/04/01 TSO Chhoeung Sarim Project Type Rural Transport 20,895,000
Thmei 1 202 Laterite road 0.80 [ 0.80 ] Km 9,950,000 3.000 Width (m) 150.000 Earth fill m3 7,960,000
Pit Trang 2 202 Laterite road 1.30 [ 1.30 ] Km 9,950,000 3.000 Width (m) 150.000 Earth fill m3 12,935,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,895,000
Contract ID 150110/04/02 TSO Chhoeung Sarim Project Type Rural Transport 20,700,000
Ou Rumchek 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Poulyum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Bakan 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,400,000 3.000 Total Span (m) 4.500 Width(m) 9,400,000
Preah Chambak 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Kab Kralanh 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Poulyum 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,700,000

Kandieng, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150201/04/01 TSO Noun Vuthy Project Type Rural Domestic Water Supplies 18,627,000
Phteah Kor 1 141 Pond with no filter 1.00 [ 1.00 ] Place 4,127,000 3.000 Depth (m) 666.000 Volume (m3) 4,127,000
Tuol Char 2 141 Pond with no filter 1.00 [ 1.00 ] Place 5,860,000 2.500 Depth (m) 469.000 Volume (m3) 5,860,000
Phteah Kor 3 111 Ring well 4.00 [ 4.00 ] Place 2,160,000 6.000 Depth (m) 1.000 Diameter (m) 8,640,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,627,000

Kandieng, Banteay Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150202/04/01 TSO Noun Vuthy Project Type Rural Transport 12,700,000
Kaev Muni 1 202 Laterite road 0.77 [ 0.77 ] Km 7,307,690 3.000 Width (m) 150.000 Earth fill m3 5,626,921
Kaev Sovann Leu 2 202 Laterite road 0.27 [ 0.27 ] Km 7,307,690 3.000 Width (m) 150.000 Earth fill m3 1,973,076
Kaev Sovann Leu 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Ou Ba Krang Leu 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Ou Ba Krang Kraom 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 7.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,699,998
Contract ID 150202/04/02 TSO Noun Vuthy Project Type Domestic Sanitation 5,246,600
Kaev Muni 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 2,623,300 1.500 2.900 5,246,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,246,600

Kandieng, Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150203/04/01 TSO Noun Vuthy Project Type Rural Transport 21,830,000
Sya 1 202 Laterite road 1.09 [ 1.09 ] Km 12,972,477 3.000 Width (m) 150.000 Earth fill m3 14,140,000
Sthani 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,100,000 0.800 Diameter (m) 12.000 Length (m) 4,100,000
Kandieng 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,590,000 0.800 Diameter (m) 8.000 Length (m) 3,590,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,830,000

Kandieng, Kanhchor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150204/04/01 TSO Noun Vuthy Project Type Rural Transport 15,920,000
Preaek Trabaek 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,554,000 0.800 Diameter (m) 5.000 Length (m) 1,554,000
Preaek Trabaek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Dang Ou 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,554,000 0.800 Diameter (m) 5.000 Length (m) 1,554,000
Dang Ou 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Koun Kray 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,564,000 0.800 Diameter (m) 5.000 Length (m) 1,564,000
Kanhchor 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,574,000 0.800 Diameter (m) 5.000 Length (m) 1,574,000
Kanhchor 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Kandal 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,574,000 0.800 Diameter (m) 5.000 Length (m) 1,574,000
Kandal 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Koun Kray 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Tuol Totueng 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 5.000 Length (m) 1,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,920,000

Kandieng, Reang Til

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150205/04/01 TSO Noun Vuthy Project Type Rural Transport 20,055,700
Kaoh Ta Kaev 1 272 Inland waterway 1.10 [ 1.00 ] Km 20,055,700 5.000 Width (m) 1.000 20,055,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,055,700

Kandieng, Srae Sdok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150206/04/01 TSO Noun Vuthy Project Type Rural Transport 24,425,700
Chamreh 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Trang 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Veal 3 211 Single pipe culvert 3.00 [ 4.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 4,800,000
Pou Pir 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Entheakyea 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Thmei 6 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Phteah Kaoh 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Thlea Ampil 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Banteay Traok 9 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,625,700 2.000 Total Span (m) 5.000 Width(m) 7,625,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,425,700

Kandieng, Svay Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150207/04/01 TSO Noun Vuthy Project Type Rural Transport 15,450,000
Ka Kou 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 11,450,000 4.500 Total Span (m) 4.000 Width(m) 11,450,000
Ka Kou 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,450,000

Kandieng, Sya

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150208/04/01 TSO Noun Vuthy Project Type Rural Transport 23,100,000
Prey Srakum 1 202 Laterite road 2.18 [ 2.18 ] Km 10,596,330 3.000 Width (m) 150.000 Earth fill m3 23,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,100,000

Kandieng, Veal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150209/04/01 TSO Noun Vuthy Project Type Rural Drainage and Flood Protection 17,975,000
Pralay Thum 1 542 Foul water sewer 1.00 [ 1.00 ] Line 17,975,000 163.000 0.600 17,975,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,975,000

Krakor, Anlong Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150301/04/01 TSO Yun Sareth Project Type Rural Transport 23,358,900
Kandal 1 202 Laterite road 0.45 [ 0.45 ] Km 12,977,167 3.000 Width (m) 150.000 Earth fill m3 5,787,816
Phsar 2 202 Laterite road 0.67 [ 0.67 ] Km 12,977,167 3.000 Width (m) 150.000 Earth fill m3 8,694,702
Khleang Moeang 3 202 Laterite road 0.78 [ 0.68 ] Km 12,977,167 3.000 Width (m) 150.000 Earth fill m3 8,876,382
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,358,901

Krakor, Ansa Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150302/04/01 TSO Kim Sum Project Type Rural Transport 20,930,400
Khsach L'et 1 202 Laterite road 2.20 [ 2.20 ] Km 6,800,000 3.000 Width (m) 150.000 Earth fill m3 14,946,400
Thkoul Thum 2 202 Laterite road 0.88 [ 0.88 ] Km 6,800,000 3.000 Width (m) 150.000 Earth fill m3 5,984,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,930,400

Krakor, Boeng Kantuot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150303/04/01 TSO Yun Sareth Project Type Rural Transport 20,250,000
Chochok 1 202 Laterite road 1.94 [ 1.94 ] Km 9,516,000 3.000 Width (m) 150.000 Earth fill m3 18,413,460
Ta Kaev Kraom 2 202 Laterite road 0.19 [ 0.19 ] Km 9,516,000 3.000 Width (m) 150.000 Earth fill m3 1,836,588
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,250,048

Krakor, Chheu Tom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150304/04/01 TSO Yun Sareth Project Type Rural Transport 26,414,500
Phteah Chek 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,500,000 0.800 Diameter (m) 5.000 Length (m) 3,500,000
Phteah Chek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Phteah Chek 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,852,500 0.600 Diameter (m) 5.000 Length (m) 3,705,000
Chheu Tep 4 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 17,209,500 15.000 Total Span (m) 3.000 Width (m) 17,209,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,414,500

Krakor, Kampong Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150306/04/01 TSO Yun Sareth Project Type Rural Transport 19,720,000
Moat Prey 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 8,700,000 7.500 Total Span (m) 3.000 Width (m) 8,700,000
Moat Prey 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Moat Prey 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 4,000,000
Kampong La 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,020,000 1.000 Diameter (m) 5.000 Length (m) 3,020,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,720,000

Krakor, Kbal Trach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150307/04/01 TSO Yun Sareth Project Type Rural Transport 26,830,400
Samraong 1 202 Laterite road 0.70 [ 0.60 ] Km 13,415,200 3.000 Width (m) 150.000 Earth fill m3 8,049,120
Kandal 2 202 Laterite road 0.53 [ 0.53 ] Km 13,415,200 3.000 Width (m) 150.000 Earth fill m3 7,042,980
Trapeang Smach 3 202 Laterite road 0.28 [ 0.28 ] Km 13,415,200 3.000 Width (m) 150.000 Earth fill m3 3,756,256
Kampong Leu 4 202 Laterite road 0.60 [ 0.60 ] Km 13,415,200 3.000 Width (m) 150.000 Earth fill m3 7,982,044
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,830,400

Krakor, Ou Sandan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150308/04/01 TSO Yun Sareth Project Type Irrigation 28,900,000
Ou ach Kok 1 451 Small water gate 1.00 [ 1.00 ] Place 19,100,000 4.200 Length (m) 2.000 Height (m) 19,100,000
Ou ach Kok 2 452 Single pipe Culvert with gate 1.00 [ 2.00 ] Place 4,900,000 0.800 Diameter (m) 4.000 Width (m) 9,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,900,000

Krakor, Sna Ansa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150309/04/01 TSO Yun Sareth Project Type Rural Transport 19,274,900
Ansa Kdam 1 202 Laterite road 1.77 [ 1.77 ] Km 10,877,500 3.000 Width (m) 150.000 Earth fill m3 19,274,930
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,274,930

Krakor, Svay Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150310/04/01 TSO Yun Sareth Project Type Rural Transport 18,119,700
Boeng Smok 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 16,419,700 12.500 Total Span (m) 3.000 Width (m) 16,419,700
Kamraeng 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,119,700

Krakor, Tnaot Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150311/04/01 TSO Yun Sareth Project Type Rural Transport 25,800,000
Chheu Teal 1 202 Laterite road 2.13 [ 2.13 ] Km 12,129,800 4.000 Width (m) 150.000 Earth fill m3 25,800,085
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,800,085

Phnum Kravanh, Bak Chenhchien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150401/04/01 TSO Sek Chanrattha Project Type Rural Transport 21,674,400
Bak Chenhchien 1 202 Laterite road 0.61 [ 0.61 ] Km 10,400,000 3.000 Width (m) 150.000 Earth fill m3 6,354,400
Ouressey 2 202 Laterite road 0.60 [ 0.60 ] Km 10,400,000 3.000 Width (m) 150.000 Earth fill m3 6,240,000
Ou Rumchang 3 202 Laterite road 0.30 [ 0.30 ] Km 10,400,000 3.000 Width (m) 150.000 Earth fill m3 3,120,000
Ou Rumchang 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,480,000 0.600 Diameter (m) 5.000 Length (m) 2,960,000
Krabau Chrum 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,674,400

Phnum Kravanh, Leach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150402/04/01 TSO Sek Chanrattha Project Type Rural Transport 13,550,000
Paen 1 202 Laterite road 0.80 [ 0.80 ] Km 6,740,000 3.000 Width (m) 150.000 Earth fill m3 5,392,000
Sbov Rik 2 202 Laterite road 0.30 [ 0.30 ] Km 6,740,000 3.000 Width (m) 150.000 Earth fill m3 2,022,000
Paen 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,100,000 1.000 Diameter (m) 5.000 Length (m) 3,100,000
Sbov Rik 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,518,000 0.600 Diameter (m) 5.000 Length (m) 3,036,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,550,000
Contract ID 150402/04/02 TSO Sek Chanrattha Project Type Rural Transport 10,470,000
Baoh Puoy 1 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Baoh Puoy 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 6.000 Length (m) 1,250,000
Baoh Puoy 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,220,000 0.800 Diameter (m) 5.000 Length (m) 3,220,000
Paen 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Pech Ban 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,470,000

Phnum Kravanh, Phteah Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150403/04/01 TSO Sek Chanrattha Project Type Rural Transport 30,646,200
Kandal 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 10,226,200 2.000 Total Span (m) 4.500 Width(m) 10,226,200
Bat Rumduol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.800 Diameter (m) 6.000 Length (m) 1,200,000
Bat Rumduol 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 2,400,000
Kranham 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 3,600,000
Damnak Kansaeng 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 2,400,000
Damnak Kansaeng 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,220,000 0.800 Diameter (m) 6.000 Length (m) 3,220,000
Phteah Rung 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 1,200,000
Thlok Dangkao 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Prohoas Kbal 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Kandal 10 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,646,200

Phnum Kravanh, Prongil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150404/04/01 TSO Sek Chanrattha Project Type Rural Transport 23,150,100
Samraong Yea 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 14,214,500 10.000 Total Span (m) 3.000 Width (m) 14,214,500
Kampeaeng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Samraong Yea 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Ou Srav 4 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Svaypak 5 211 Single pipe culvert 1.00 [ 2.00 ] Place 967,800 0.600 Diameter (m) 5.000 Length (m) 1,935,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,150,100

Phnum Kravanh, Rokat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150405/04/01 TSO Sek Chanrattha Project Type Rural Transport 17,451,600
Veal Vong 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 9,451,900 2.000 Total Span (m) 6.000 Width(m) 9,451,900
Veal Vong 2 211 Single pipe culvert 2.00 [ 4.00 ] Place 2,000,000 0.800 Diameter (m) 6.000 Length (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,451,900

Phnum Kravanh, Santreae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150406/04/01 TSO Sek Chanrattha Project Type Rural Transport 14,373,950
Sraepopeay 1 202 Laterite road 0.78 [ 0.78 ] Km 6,794,000 3.000 Width (m) 150.000 Earth fill m3 5,265,350
Sraepopeay 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,518,100 0.600 Diameter (m) 5.000 Length (m) 4,554,300
Santreae 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,518,100 0.600 Diameter (m) 5.000 Length (m) 4,554,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,373,950

Phnum Kravanh, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150407/04/01 TSO Sek Chanrattha Project Type Rural Transport 27,400,000
Ou Heng 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 17,000,000 15.000 Total Span (m) 3.000 Width (m) 17,000,000
Veal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Ou Heng 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Veal 4 211 Single pipe culvert 2.00 [ 5.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,400,000

Sampov Meas, Chamraeun Phal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150501/04/01 TSO Dou Heng Project Type Rural Transport 20,850,000
Leav 1 202 Laterite road 1.54 [ 1.54 ] Km 8,370,132 3.000 Width (m) 150.000 Earth fill m3 12,848,153
Ou Tong 2 202 Laterite road 0.96 [ 0.96 ] Km 8,370,132 3.000 Width (m) 150.000 Earth fill m3 8,001,846
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,849,999

Sampov Meas, Kaoh Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150502/04/01 TSO Dou Heng Project Type Rural Transport 20,250,000
Phteah Pring 1 202 Laterite road 1.54 [ 1.54 ] Km 13,183,594 3.000 Width (m) 150.000 Earth fill m3 20,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,250,000

Sampov Meas, Lolok Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150503/04/01 TSO Dou Heng Project Type Rural Transport 28,100,000
Preaek Sdei 1 202 Laterite road 0.25 [ 0.25 ] Km 8,750,000 4.000 Width (m) 150.000 Earth fill m3 2,187,500
Lolok Sar 2 202 Laterite road 1.15 [ 1.15 ] Km 8,750,000 4.000 Width (m) 150.000 Earth fill m3 10,062,500
Kaoh 3 202 Laterite road 1.40 [ 1.40 ] Km 8,750,000 4.000 Width (m) 150.000 Earth fill m3 12,250,000
Damnak Ampil 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,600,000 0.800 Diameter (m) 5.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,100,000

Sampov Meas, Phteah Prey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150504/04/01 TSO Dou Heng Project Type Rural Transport 34,900,000
Ou Sdau 1 202 Laterite road 0.50 [ 0.50 ] Km 8,022,130 3.000 Width (m) 150.000 Earth fill m3 4,011,065
Chamkar Chek Cheung 2 202 Laterite road 0.40 [ 0.40 ] Km 8,022,130 3.000 Width (m) 150.000 Earth fill m3 3,200,830
Chamkar Chek Tboung 3 202 Laterite road 0.27 [ 0.27 ] Km 8,022,130 3.000 Width (m) 150.000 Earth fill m3 2,165,975
Chamkar Chek Cheung 4 202 Laterite road 1.00 [ 1.00 ] Km 8,022,130 3.000 Width (m) 150.000 Earth fill m3 8,022,130
Dangkear 5 223 Triple cell box culvert 1.00 [ 1.00 ] Place 13,000,000 4.500 Total Span (m) 5.000 Width(m) 13,000,000
Kok 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Ou Sdau 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Chamkar Chek Tboung 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,900,000

Sampov Meas, Prey Nhi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150505/04/01 TSO Dou Heng Project Type Rural Transport 10,050,000
Pralay Thum 1 202 Laterite road 0.20 [ 0.20 ] Km 9,136,363 3.500 Width (m) 150.000 Earth fill m3 1,827,273
Kbal Spean Thma 2 202 Laterite road 0.15 [ 0.15 ] Km 9,136,363 3.500 Width (m) 150.000 Earth fill m3 1,370,454
Doung Chrum 3 202 Laterite road 0.35 [ 0.35 ] Km 9,136,363 3.500 Width (m) 150.000 Earth fill m3 3,197,727
Bak Roteh 4 202 Laterite road 0.40 [ 0.40 ] Km 9,136,363 3.500 Width (m) 150.000 Earth fill m3 3,654,545
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,049,999
Contract ID 150505/04/02 TSO Dou Heng Project Type Education 11,208,600
Doung Chrum 1 310 Wooden school (general) 4.00 [ 4.00 ] School room 2,437,500 28.000 Length (m) 9.500 Width (m) 9,750,000
Doung Chrum 2 740 School furniture 1.00 [ 4.00 ] School room 364,650 200.000 Students 0.000 1,458,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,208,600

Sampov Meas, Roleab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150506/04/01 TSO Dou Heng Project Type Rural Transport 32,250,000
Roleab 1 202 Laterite road 3.00 [ 3.00 ] Km 3,973,333 3.000 Width (m) 150.000 Earth fill m3 11,919,999
Roleab 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 6,300,000
Roleab 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.600 Diameter (m) 8.000 Length (m) 1,600,000
Roleab 4 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,040,000 0.800 Diameter (m) 5.000 Length (m) 5,040,000
Stueng Touch 5 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,040,000 0.800 Diameter (m) 5.000 Length (m) 5,040,000
Pou Andaot 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,350,000 0.600 Diameter (m) 5.000 Length (m) 2,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,249,999

Sampov Meas, Svay at

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150507/04/01 TSO Dou Heng Project Type Rural Transport 18,572,000
Krang Pophleak 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 16,472,000 15.000 Total Span (m) 3.000 Width (m) 16,472,000
Svay at 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,572,000

Veal Veaeng, Ou Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150601/04/01 TSO Sam Sarom Project Type Education 14,480,000
Kien Chongruk 1 310 Wooden school (general) 2.00 [ 1.00 ] School room 14,480,000 16.000 Length (m) 9.000 Width (m) 14,480,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,480,000

Veal Veaeng, Krapeu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150602/04/01 TSO Sam Sarom Project Type Rural Transport 12,450,000
Krapeu Pir Kraom 1 230 Wood bridge (general) 1.00 [ 1.00 ] Place 12,450,000 6.000 Total Span (m) 4.000 Width(m) 12,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,450,000

Veal Veaeng, Anlong Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150603/04/01 TSO Sam Sarom Project Type Rural Domestic Water Supplies 14,478,700
Chamkar Chrey Khang Cheung 1 141 Pond with no filter 1.00 [ 1.00 ] Place 7,239,350 0.000 Depth (m) 540.000 Volume (m3) 7,239,350
Chamkar Chrey Khang Tboung 2 141 Pond with no filter 1.00 [ 1.00 ] Place 7,239,350 3.000 Depth (m) 540.000 Volume (m3) 7,239,350
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,478,700

Veal Veaeng, Pramaoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150604/04/01 TSO Sam Sarom Project Type Rural Domestic Water Supplies 15,779,000
Pramaoy 1 141 Pond with no filter 1.00 [ 1.00 ] Place 15,779,000 3.500 Depth (m) 1,177.000 Volume (m3) 15,779,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,779,000