Contract Outputs

Location: Pursat \ Bakan Budget Year: 2004

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Bakan, Boeng Bat Kandaol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150101/04/01 TSO Chhoeung Sarim Project Type Rural Transport 26,350,000
Bat Kandaol 1 202 Laterite road 1.20 [ 1.20 ] Km 13,175,000 3.000 Width (m) 150.000 Earth fill m3 15,810,000
Tram Seh 2 202 Laterite road 0.80 [ 0.80 ] Km 13,175,000 3.000 Width (m) 150.000 Earth fill m3 10,540,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,350,000

Bakan, Boeng Khnar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150102/04/01 TSO Chhoeung Sarim Project Type Rural Transport 27,125,000
Prey Damrei 1 202 Laterite road 0.70 [ 0.70 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 7,595,000
Prey Phdau 2 202 Laterite road 1.70 [ 1.70 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 18,445,000
Rung 3 202 Laterite road 0.10 [ 0.10 ] Km 10,850,000 3.000 Width (m) 150.000 Earth fill m3 1,085,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,125,000

Bakan, Khnar Totueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150103/04/01 TSO Chhoeung Sarim Project Type Rural Transport 22,727,000
Bak Meaek 1 202 Laterite road 1.20 [ 1.20 ] Km 13,740,000 3.000 Width (m) 150.000 Earth fill m3 16,488,000
Kaoh Svay 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,527,000 0.600 Diameter (m) 5.000 Length (m) 1,527,000
Kaoh Svay 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,356,000 0.600 Diameter (m) 5.000 Length (m) 4,712,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,727,000

Bakan, Me Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150104/04/01 TSO Chhoeung Sarim Project Type Irrigation 25,858,000
Ta Mom 1 451 Small water gate 1.00 [ 1.00 ] Place 7,000,000 5.500 Length (m) 1.500 Height (m) 7,000,000
Ta Mom 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 5.000 Width (m) 3,000,000
Ta Mom 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 6.000 Width (m) 4,000,000
Ta Mom 4 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,858,000 0.800 Diameter (m) 8.000 Width (m) 3,858,000
Cha Yov 5 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 8,000,000 2.000 Total span (m) 5.000 Width (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,858,000

Bakan, Ou Ta Paong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150105/04/01 TSO Chhoeung Sarim Project Type Rural Transport 33,420,000
Bat Kokir Chas 1 202 Laterite road 1.77 [ 1.77 ] Km 11,640,000 3.000 Width (m) 150.000 Earth fill m3 20,602,800
Ta Nai 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,100,000 1.000 Diameter (m) 5.000 Length (m) 3,100,000
Bat Kokir Chas 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Ou Ta Paong 4 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,317,200 2.000 Total Span (m) 4.500 Width(m) 7,317,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,420,000

Bakan, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150106/04/01 TSO Chhoeung Sarim Project Type Rural Transport 29,546,000
Kampong Kdei 1 202 Laterite road 1.37 [ 1.37 ] Km 15,800,000 3.000 Width (m) 150.000 Earth fill m3 21,646,000
Prasat 2 202 Laterite road 0.50 [ 0.50 ] Km 15,800,000 3.000 Width (m) 150.000 Earth fill m3 7,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,546,000

Bakan, Snam Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150107/04/01 TSO Chhoeung Sarim Project Type Rural Transport 36,778,900
Bak Pring 1 211 Single pipe culvert 7.00 [ 7.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 8,274,000
Pnov 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,381,000 0.800 Diameter (m) 5.000 Length (m) 2,381,000
Pnov 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,763,600 0.800 Diameter (m) 5.000 Length (m) 3,763,600
Kaoh Krasang 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 2,364,000
Andoung Sanbuor 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,763,600 0.800 Diameter (m) 5.000 Length (m) 3,763,600
Andoung Sanbuor 6 213 Triple pipe culvert 2.00 [ 2.00 ] Place 5,116,900 1.000 Diameter (m) 5.000 Length (m) 10,233,800
Dangkieb Kdam 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,182,000 0.600 Diameter (m) 5.000 Length (m) 2,364,000
Sdok Svay 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,381,000 0.800 Diameter (m) 5.000 Length (m) 2,381,000
Chambak Meas 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,253,900 0.600 Diameter (m) 7.000 Length (m) 1,253,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,778,900

Bakan, Svay Doun Kaev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150108/04/01 TSO Chhoeung Sarim Project Type Rural Transport 24,394,000
Chrab 1 202 Laterite road 0.82 [ 0.82 ] Km 17,200,000 3.000 Width (m) 150.000 Earth fill m3 14,104,000
Thmei 2 202 Laterite road 0.60 [ 0.60 ] Km 17,150,000 3.000 Width (m) 150.000 Earth fill m3 10,290,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,394,000

Bakan, Ta Lou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150109/04/01 TSO Chhoeung Sarim Project Type Rural Transport 29,950,000
Serei Kunthea 1 202 Laterite road 0.50 [ 0.50 ] Km 13,000,000 3.000 Width (m) 150.000 Earth fill m3 6,500,000
Thmei 2 202 Laterite road 1.50 [ 1.50 ] Km 4,500,000 3.000 Width (m) 150.000 Earth fill m3 6,750,000
Thmei 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,200,000 1.000 Diameter (m) 7.000 Length (m) 6,200,000
Thmei 4 211 Single pipe culvert 6.00 [ 6.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 9,000,000
Serei Kunthea 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,950,000

Bakan, Trapeang Chong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150110/04/01 TSO Chhoeung Sarim Project Type Rural Transport 20,895,000
Thmei 1 202 Laterite road 0.80 [ 0.80 ] Km 9,950,000 3.000 Width (m) 150.000 Earth fill m3 7,960,000
Pit Trang 2 202 Laterite road 1.30 [ 1.30 ] Km 9,950,000 3.000 Width (m) 150.000 Earth fill m3 12,935,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,895,000
Contract ID 150110/04/02 TSO Chhoeung Sarim Project Type Rural Transport 20,700,000
Ou Rumchek 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 1.000 Diameter (m) 5.000 Length (m) 4,000,000
Poulyum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Bakan 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,400,000 3.000 Total Span (m) 4.500 Width(m) 9,400,000
Preah Chambak 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Kab Kralanh 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Poulyum 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,700,000