Contract Outputs
Location: Pursat \ Kandieng Budget Year: 2004
Bakan
Kandieng
Krakor
Phnum Kravanh
Sampov Meas
Veal Veaeng
Kandieng, Anlong Vil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150201/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Domestic Water Supplies |
18,627,000 |
| Phteah Kor |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
4,127,000 |
3.000 Depth (m) |
666.000 Volume (m3) |
4,127,000 |
| Tuol Char |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
5,860,000 |
2.500 Depth (m) |
469.000 Volume (m3) |
5,860,000 |
| Phteah Kor |
3 |
111 |
Ring well |
4.00 [ 4.00 ] |
Place |
2,160,000 |
6.000 Depth (m) |
1.000 Diameter (m) |
8,640,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,627,000 |
Kandieng, Banteay Dei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150202/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
12,700,000 |
| Kaev Muni |
1 |
202 |
Laterite road |
0.77 [ 0.77 ] |
Km |
7,307,690 |
3.000 Width (m) |
150.000 Earth fill m3 |
5,626,921 |
| Kaev Sovann Leu |
2 |
202 |
Laterite road |
0.27 [ 0.27 ] |
Km |
7,307,690 |
3.000 Width (m) |
150.000 Earth fill m3 |
1,973,076 |
| Kaev Sovann Leu |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Ou Ba Krang Leu |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Ou Ba Krang Kraom |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,100,000 |
0.800 Diameter (m) |
7.000 Length (m) |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
12,699,998 |
| Contract ID |
150202/04/02 |
TSO |
Noun Vuthy |
Project Type |
Domestic Sanitation |
5,246,600 |
| Kaev Muni |
1 |
171 |
Pour flush latrine with double waste tank system |
2.00 [ 2.00 ] |
Latrine room |
2,623,300 |
1.500 |
2.900 |
5,246,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,246,600 |
Kandieng, Kandieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150203/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
21,830,000 |
| Sya |
1 |
202 |
Laterite road |
1.09 [ 1.09 ] |
Km |
12,972,477 |
3.000 Width (m) |
150.000 Earth fill m3 |
14,140,000 |
| Sthani |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,100,000 |
0.800 Diameter (m) |
12.000 Length (m) |
4,100,000 |
| Kandieng |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,590,000 |
0.800 Diameter (m) |
8.000 Length (m) |
3,590,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,830,000 |
Kandieng, Kanhchor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150204/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
15,920,000 |
| Preaek Trabaek |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,554,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,554,000 |
| Preaek Trabaek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Dang Ou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,554,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,554,000 |
| Dang Ou |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Koun Kray |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,564,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,564,000 |
| Kanhchor |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,574,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,574,000 |
| Kanhchor |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Kandal |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,574,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,574,000 |
| Kandal |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Koun Kray |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Tuol Totueng |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,920,000 |
Kandieng, Reang Til
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150205/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
20,055,700 |
| Kaoh Ta Kaev |
1 |
272 |
Inland waterway |
1.10 [ 1.00 ] |
Km |
20,055,700 |
5.000 Width (m) |
1.000 |
20,055,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,055,700 |
Kandieng, Srae Sdok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150206/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
24,425,700 |
| Chamreh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Trang |
2 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Veal |
3 |
211 |
Single pipe culvert |
3.00 [ 4.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,800,000 |
| Pou Pir |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Entheakyea |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Thmei |
6 |
211 |
Single pipe culvert |
2.00 [ 3.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,600,000 |
| Phteah Kaoh |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Thlea Ampil |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Banteay Traok |
9 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
7,625,700 |
2.000 Total Span (m) |
5.000 Width(m) |
7,625,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,425,700 |
Kandieng, Svay Luong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150207/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
15,450,000 |
| Ka Kou |
1 |
223 |
Triple cell box culvert |
1.00 [ 1.00 ] |
Place |
11,450,000 |
4.500 Total Span (m) |
4.000 Width(m) |
11,450,000 |
| Ka Kou |
2 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,450,000 |
Kandieng, Sya
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150208/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Transport |
23,100,000 |
| Prey Srakum |
1 |
202 |
Laterite road |
2.18 [ 2.18 ] |
Km |
10,596,330 |
3.000 Width (m) |
150.000 Earth fill m3 |
23,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,100,000 |
Kandieng, Veal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
150209/04/01 |
TSO |
Noun Vuthy |
Project Type |
Rural Drainage and Flood Protection |
17,975,000 |
| Pralay Thum |
1 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
17,975,000 |
163.000 |
0.600 |
17,975,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,975,000 |