Contract Outputs

Location: Takeo \ Angkor Borei Budget Year: 2007

Angkor Borei    Bati    Bourei Cholsar    Kiri Vong    Kaoh Andaet    Prey Kabbas    Samraong    Doun Kaev    Tram Kak    Treang   

Angkor Borei, Angkor Borei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210101/07/01 TSO Youn Sothon Project Type Rural Transport 42,985,000
Kampong Luong 1 203 Gravel road 0.98 [ 0.98 ] Km 38,479,150 3.500 Width (m) 3,419.000 Earth fill m3 37,825,004
Kampong Luong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,510,000 0.600 Diameter (m) 5.000 Length (m) 1,510,000
Kampong Luong 3 251 Drift 1.00 [ 1.00 ] Place 3,650,000 15.000 Length (m) 4.000 Width (m) 3,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,985,004

Angkor Borei, Ba Srae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210102/07/01 TSO Youn Sothon Project Type Rural Transport 38,182,700
Prey Ba Soeng 1 201 Earth road 1.39 [ 1.39 ] Km 23,362,450 4.000 Width (m) 3,916.000 Earth fill m3 32,473,806
Ba Srae 2 201 Earth road 0.14 [ 0.19 ] Km 23,362,180 4.000 Width (m) 1,135.000 Earth fill m3 4,508,901
Ba Srae 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,182,706

Angkor Borei, Kouk Thlok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210103/07/01 TSO Youn Sothon Project Type Irrigation 27,527,800
Preaek Da 1 420 Canal 0.97 [ 0.99 ] Km 27,777,800 2.790 Depth (m) 10,958.000 Volume (m3) 27,527,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,527,800

Angkor Borei, Ponley

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210104/07/01 TSO Youn Sothon Project Type Irrigation 33,091,200
Thlok Yol 1 420 Canal 1.08 [ 1.15 ] Km 28,800,000 2.970 Depth (m) 12,190.000 Volume (m3) 33,091,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,091,200

Angkor Borei, Preaek Phtoul

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210105/07/01 TSO Youn Sothon Project Type Rural Transport 35,598,500
Phnum Borei 1 201 Earth road 0.51 [ 0.53 ] Km 53,521,480 4.000 Width (m) 3,399.000 Earth fill m3 28,398,497
Phnum Borei 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,800,000 0.600 Diameter (m) 5.000 Length (m) 7,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,598,497

Angkor Borei, Prey Phkoam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210106/07/01 TSO Youn Sothon Project Type Irrigation 37,608,800
Prey Phkoam Kha 1 420 Canal 0.82 [ 0.82 ] Km 21,200,000 2.410 Depth (m) 5,313.000 Volume (m3) 17,468,800
Prey Phkoam Ko 2 420 Canal 0.90 [ 0.95 ] Km 21,200,000 2.280 Depth (m) 5,325.000 Volume (m3) 20,140,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,608,800