Contract Outputs

Location: Takeo \ Bourei Cholsar Budget Year: 2007

Angkor Borei    Bati    Bourei Cholsar    Kiri Vong    Kaoh Andaet    Prey Kabbas    Samraong    Doun Kaev    Tram Kak    Treang   

Bourei Cholsar, Bourei Cholsar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210301/07/01 TSO Taing Touch Project Type Education 52,882,000
Snay Duoch 1 321 Brick school with tile roof 1.00 [ 1.00 ] School room 52,882,000 9.000 Length (m) 8.000 Width (m) 52,882,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  52,882,000

Bourei Cholsar, Chey Chouk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210302/07/01 TSO Taing Touch Project Type Irrigation 26,541,000
Dei Leuk 1 420 Canal 0.60 [ 0.60 ] Km 25,490,170 1.400 Depth (m) 8,403.000 Volume (m3) 15,294,102
Banteay Sloek 2 420 Canal 0.42 [ 0.44 ] Km 25,491,610 2.290 Depth (m) 6,948.000 Volume (m3) 11,246,898
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,541,000

Bourei Cholsar, Doung Khpos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210303/07/01 TSO Taing Touch Project Type Rural Transport 37,000,000
Angkanh 1 203 Gravel road 0.67 [ 0.67 ] Km 29,522,090 4.500 Width (m) 352.000 Earth fill m3 19,779,800
Ta Sai 2 203 Gravel road 0.50 [ 0.50 ] Km 29,522,310 3.500 Width (m) 264.000 Earth fill m3 14,820,200
Angkanh 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Ta Sai 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,000,000

Bourei Cholsar, Kampong Krasang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210304/07/01 TSO Taing Touch Project Type Irrigation 29,600,000
Sangkom Mean Chey 1 420 Canal 0.81 [ 0.81 ] Km 36,453,200 1.500 Depth (m) 6,345.000 Volume (m3) 29,599,998
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,599,998

Bourei Cholsar, Kouk Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 210305/07/01 TSO Taing Touch Project Type Rural Transport 37,700,000
Pong Tuek 1 203 Gravel road 1.42 [ 1.42 ] Km 26,530,610 4.000 Width (m) 852.600 Earth fill m3 37,699,997
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,699,997