Contract Outputs

Location: Kampong Chhnang \ Kampong Leaeng Budget Year: 2007

Baribour    Chol Kiri    Kampong Chhnang    Kampong Leaeng    Kampong Tralach    Rolea B'ier    Sameakki Mean Chey    Tuek Phos   

Kampong Leaeng, Chranouk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040401/07/01 TSO Bith Sary Project Type Rural Transport 59,282,100
Kangkaeb 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,675,000 0.600 Diameter (m) 5.000 Length (m) 3,350,000
Kangkaeb 3 202 Laterite road 2.45 [ 3.26 ] Km 13,166,700 4.000 Width (m) 5,468.810 Earth fill m3 42,923,442
Kandal 3 202 Laterite road 0.99 [ 0.99 ] Km 13,166,700 4.000 Width (m) 1,658.000 Earth fill m3 13,008,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,282,142

Kampong Leaeng, Dar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040402/07/01 TSO Bith Sary Project Type Rural Transport 25,601,900
Dar 1 202 Laterite road 2.10 [ 2.72 ] Km 8,309,523 4.000 Width (m) 3,584.000 Earth fill m3 22,601,903
Dar 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 6.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,601,903

Kampong Leaeng, Kampong hau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040403/07/01 TSO Bith Sary Project Type Irrigation 24,000,000
Kaeng Ta Sok 1 420 Canal 0.80 [ 0.80 ] Km 30,000,000 2.300 Depth (m) 6,261.000 Volume (m3) 24,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,000,000

Kampong Leaeng, Phlov Tuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040404/07/01 TSO Bith Sary Project Type Irrigation 23,733,300
Thnal Chheu Teal 1 420 Canal 0.28 [ 0.24 ] Km 100,564,900 2.000 Depth (m) 3,662.000 Volume (m3) 23,733,316
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,733,316

Kampong Leaeng, Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040405/07/01 TSO Bith Sary Project Type Rural Transport 22,222,400
Kampong Ba Chen 1 201 Earth road 0.72 [ 0.72 ] Km 18,912,448 4.000 Width (m) 4,081.000 Earth fill m3 13,522,400
Kampong Ba Chen 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,150,000 1.000 Diameter (m) 6.000 Length (m) 6,300,000
Kampong Ba Chen 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,222,400
Contract ID 040405/07/02 TSO Bith Sary Project Type Irrigation 24,603,100
Pou 1 410 Earth dam 0.56 [ 0.56 ] Km 28,398,393 2.360 Max. height (m) 4,143.000 Volume (m3) 15,903,100
Pou 2 452 Single pipe Culvert with gate 2.00 [ 3.00 ] Place 2,900,000 0.600 Diameter (m) 8.000 Width (m) 8,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,603,100

Kampong Leaeng, Pralay Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040406/07/01 TSO Bith Sary Project Type Rural Transport 51,134,100
Pralay Meas 1 201 Earth road 2.50 [ 2.88 ] Km 17,785,771 4.000 Width (m) 9,707.000 Earth fill m3 51,134,092
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,134,092

Kampong Leaeng, Samraong Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040407/07/01 TSO Bith Sary Project Type Irrigation 26,500,000
Samraong Saen 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,731,500 0.600 Diameter (m) 5.000 Width (m) 3,731,500
Samraong Saen 3 410 Earth dam 1.40 [ 1.40 ] Km 10,811,435 1.800 Max. height (m) 6,581.000 Volume (m3) 15,136,009
Samraong Saen 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 7,632,500 1.000 Diameter (m) 6.000 Width (m) 7,632,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,500,009

Kampong Leaeng, Svay Rumpear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040408/07/01 TSO Bith Sary Project Type Irrigation 19,550,000
Knong 1 410 Earth dam 1.70 [ 1.70 ] Km 11,500,000 1.000 Max. height (m) 5,484.000 Volume (m3) 19,550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,550,000

Kampong Leaeng, Trangel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 040409/07/01 TSO Bith Sary Project Type Irrigation 24,198,000
Trapeang Meas 1 410 Earth dam 1.77 [ 1.77 ] Km 5,346,000 1.800 Max. height (m) 5,479.000 Volume (m3) 9,462,420
Trapeang Meas 2 452 Single pipe Culvert with gate 3.00 [ 4.00 ] Place 3,683,900 0.600 Diameter (m) 6.000 Width (m) 14,735,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,198,020