Contract Outputs
Location: Svay Rieng \ Svay Chrum Budget Year: 2008
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Svay Chrum, Angk Ta Sou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200501/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
31,635,000 |
| Svay Ming |
1 |
203 |
Gravel road |
1.11 [ 1.11 ] |
Km |
28,500,000 |
4.500 Width (m) |
855.000 Earth fill m3 |
31,635,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,635,000 |
| Contract ID |
200501/08/02 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
1,991,600 |
| Roka |
1 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
905,273 |
4.000 Width (m) |
260.000 Earth fill m3 |
1,991,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,991,600 |
Svay Chrum, Basak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200502/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
32,868,000 |
| Svay Ta Phlo |
1 |
203 |
Gravel road |
0.66 [ 0.75 ] |
Km |
44,000,000 |
3.500 Width (m) |
1,907.000 Earth fill m3 |
32,868,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,868,000 |
| Contract ID |
200502/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
996,700 |
| Basak |
1 |
201 |
Earth road |
1.83 [ 1.83 ] |
Km |
544,645 |
4.000 Width (m) |
109.000 Earth fill m3 |
996,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
996,700 |
Svay Chrum, Chambak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200503/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Irrigation |
31,350,000 |
| Tuol Khpos |
1 |
420 |
Canal |
1.40 [ 1.50 ] |
Km |
20,900,000 |
1.700 Depth (m) |
19,497.000 Volume (m3) |
31,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,350,000 |
| Contract ID |
200503/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,982,300 |
| Thmei |
1 |
201 |
Earth road |
2.10 [ 2.10 ] |
Km |
943,952 |
4.000 Width (m) |
266.000 Earth fill m3 |
1,982,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,982,300 |
Svay Chrum, Chamlang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200504/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
62,748,800 |
| Chambak Kuy |
1 |
203 |
Gravel road |
1.70 [ 1.70 ] |
Km |
25,750,000 |
3.500 Width (m) |
956.250 Earth fill m3 |
43,775,000 |
| Chambak Kuy |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Ta S'ang |
3 |
203 |
Gravel road |
0.47 [ 0.47 ] |
Km |
25,750,000 |
3.500 Width (m) |
9,620.460 Earth fill m3 |
11,973,750 |
| Ta S'ang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
62,748,750 |
| Contract ID |
200504/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
2,977,400 |
| Chie Ruessei |
1 |
201 |
Earth road |
3.00 [ 3.00 ] |
Km |
992,467 |
4.000 Width (m) |
403.000 Earth fill m3 |
2,977,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,977,400 |
Svay Chrum, Ta Suos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200505/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
41,893,300 |
| Boeng Andaeng |
1 |
203 |
Gravel road |
0.30 [ 0.30 ] |
Km |
18,744,330 |
3.500 Width (m) |
168.750 Earth fill m3 |
5,623,299 |
| Traok |
2 |
203 |
Gravel road |
1.50 [ 1.50 ] |
Km |
18,744,200 |
3.500 Width (m) |
843.750 Earth fill m3 |
28,116,300 |
| Trabaek Prahaong |
3 |
203 |
Gravel road |
0.35 [ 0.44 ] |
Km |
18,744,140 |
3.500 Width (m) |
1,328.630 Earth fill m3 |
8,153,701 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,893,300 |
| Contract ID |
200505/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,994,500 |
| Boeng Andaeng |
1 |
201 |
Earth road |
2.70 [ 2.70 ] |
Km |
738,704 |
4.000 Width (m) |
248.000 Earth fill m3 |
1,994,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,994,500 |
Svay Chrum, Chek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200506/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
60,568,000 |
| Svay |
1 |
203 |
Gravel road |
1.14 [ 1.24 ] |
Km |
48,000,000 |
3.500 Width (m) |
4,834.500 Earth fill m3 |
59,568,000 |
| Svay |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
60,568,000 |
| Contract ID |
200506/08/02 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
1,993,600 |
| Chek |
1 |
201 |
Earth road |
1.75 [ 1.75 ] |
Km |
1,139,200 |
4.000 Width (m) |
275.000 Earth fill m3 |
1,993,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,993,600 |
Svay Chrum, Chheu Teal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200507/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
34,600,000 |
| Ta Reak |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
14,000,000 |
4.000 Width (m) |
1,188.000 Earth fill m3 |
5,600,000 |
| Poun Kak |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
14,000,000 |
4.000 Width (m) |
1,474.000 Earth fill m3 |
16,800,000 |
| Samraong |
3 |
201 |
Earth road |
0.40 [ 0.55 ] |
Km |
14,000,000 |
4.000 Width (m) |
2,717.380 Earth fill m3 |
7,700,000 |
| Poun Kak |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Samraong |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,600,000 |
| Contract ID |
200507/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,964,800 |
| Traok |
1 |
201 |
Earth road |
2.25 [ 2.25 ] |
Km |
873,244 |
4.000 Width (m) |
189.000 Earth fill m3 |
1,964,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,964,800 |
Svay Chrum, Doun Sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200508/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
32,879,000 |
| Doun Sar |
1 |
203 |
Gravel road |
0.20 [ 0.20 ] |
Km |
42,700,000 |
3.500 Width (m) |
583.500 Earth fill m3 |
8,540,000 |
| Kuoy |
2 |
203 |
Gravel road |
0.57 [ 0.57 ] |
Km |
42,700,000 |
3.500 Width (m) |
2,144.250 Earth fill m3 |
24,339,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,879,000 |
| Contract ID |
200508/08/02 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
1,099,000 |
| Rumpoat Chruk |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,099,000 |
4.000 Width (m) |
148.000 Earth fill m3 |
1,099,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,099,000 |
Svay Chrum, Kouk Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200509/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
34,150,000 |
| Kandal |
1 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
25,000,000 |
4.500 Width (m) |
450.000 Earth fill m3 |
20,000,000 |
| Angk Kabbas |
2 |
203 |
Gravel road |
0.35 [ 0.35 ] |
Km |
25,000,000 |
4.500 Width (m) |
196.880 Earth fill m3 |
8,750,000 |
| Svat Prahut |
3 |
203 |
Gravel road |
0.27 [ 0.27 ] |
Km |
20,000,000 |
3.500 Width (m) |
770.630 Earth fill m3 |
5,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,150,000 |
| Contract ID |
200509/08/02 |
TSO |
Phouk Plaly |
Project Type |
Rural Transport |
1,996,000 |
| Svat Prahut |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
998,000 |
4.000 Width (m) |
275.000 Earth fill m3 |
1,996,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,996,000 |
Svay Chrum, Kraol Kou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200510/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
20,010,000 |
| Ruessei Chuor Cheung |
1 |
203 |
Gravel road |
0.67 [ 0.87 ] |
Km |
23,000,000 |
3.500 Width (m) |
489.000 Earth fill m3 |
20,010,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,010,000 |
| Contract ID |
200510/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
18,980,000 |
| Kraol Kou |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Kraol Kou |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Prey Thnong |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,980,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,980,000 |
| Boeng Rae Khang Cheung |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Boeng Rae Khang Cheung |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
6,000,000 |
1.000 Diameter (m) |
7.000 Length (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,980,000 |
| Contract ID |
200510/08/03 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,997,000 |
| Ruessei Chuor Cheung |
1 |
201 |
Earth road |
2.60 [ 2.60 ] |
Km |
768,077 |
4.000 Width (m) |
249.000 Earth fill m3 |
1,997,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,997,000 |
Svay Chrum, Kruos
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200511/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
34,847,500 |
| Kandal |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
17,170,000 |
4.000 Width (m) |
383,488.000 Earth fill m3 |
25,755,000 |
| Traok |
2 |
201 |
Earth road |
0.20 [ 0.25 ] |
Km |
17,170,000 |
4.000 Width (m) |
1,074.000 Earth fill m3 |
4,292,500 |
| Kandal |
3 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,847,500 |
Svay Chrum, Pouthi Reach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200512/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
31,496,700 |
| Prasat |
1 |
203 |
Gravel road |
0.78 [ 0.78 ] |
Km |
36,770,000 |
3.500 Width (m) |
1,172.000 Earth fill m3 |
28,496,750 |
| Prasat |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,496,750 |
| Contract ID |
200512/08/02 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
17,875,000 |
| Anhchanh |
1 |
203 |
Gravel road |
0.35 [ 0.35 ] |
Km |
25,000,000 |
3.500 Width (m) |
210.000 Earth fill m3 |
8,750,000 |
| Ou Samdei |
2 |
203 |
Gravel road |
0.20 [ 0.20 ] |
Km |
25,000,000 |
3.500 Width (m) |
120.000 Earth fill m3 |
5,000,000 |
| Ta Mom |
3 |
203 |
Gravel road |
0.07 [ 0.17 ] |
Km |
25,000,000 |
3.500 Width (m) |
99.000 Earth fill m3 |
4,125,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,875,000 |
| Contract ID |
200512/08/03 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
1,999,600 |
| Prey Damloung |
1 |
201 |
Earth road |
2.46 [ 2.46 ] |
Km |
814,501 |
4.000 Width (m) |
221.750 Earth fill m3 |
1,999,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,600 |
Svay Chrum, Svay Angk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200513/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
29,463,000 |
| Thnong |
1 |
203 |
Gravel road |
1.11 [ 1.13 ] |
Km |
23,000,000 |
3.500 Width (m) |
633.380 Earth fill m3 |
25,898,000 |
| Khnor Khang Cheung |
2 |
203 |
Gravel road |
0.00 [ 0.16 ] |
Km |
23,000,000 |
3.500 Width (m) |
815.630 Earth fill m3 |
3,565,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,463,000 |
| Contract ID |
200513/08/02 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
1,991,600 |
| Khnor Khang Cheung |
1 |
201 |
Earth road |
1.85 [ 1.85 ] |
Km |
1,076,541 |
4.000 Width (m) |
266.000 Earth fill m3 |
1,991,601 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,991,601 |
Svay Chrum, Svay Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200514/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
36,815,300 |
| Thma Sa |
1 |
201 |
Earth road |
1.63 [ 1.63 ] |
Km |
13,980,000 |
4.000 Width (m) |
3,903.600 Earth fill m3 |
22,815,360 |
| Khmot |
2 |
203 |
Gravel road |
0.50 [ 0.50 ] |
Km |
20,000,000 |
3.500 Width (m) |
551.250 Earth fill m3 |
10,000,000 |
| Thma Sa |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,815,360 |
Svay Chrum, Svay Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200515/08/01 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
38,073,000 |
| Popear |
1 |
203 |
Gravel road |
0.65 [ 0.65 ] |
Km |
29,400,000 |
3.500 Width (m) |
896.140 Earth fill m3 |
19,110,000 |
| Krang Leav |
2 |
203 |
Gravel road |
0.65 [ 0.65 ] |
Km |
29,400,000 |
3.500 Width (m) |
1,696.860 Earth fill m3 |
18,963,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,073,000 |
| Contract ID |
200515/08/02 |
TSO |
Chou Sontravipheavy |
Project Type |
Rural Transport |
1,927,100 |
| Popear |
1 |
201 |
Earth road |
2.90 [ 2.90 ] |
Km |
664,517 |
4.000 Width (m) |
232.000 Earth fill m3 |
1,927,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,927,100 |
Svay Chrum, Svay Yea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200516/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
78,050,000 |
| Kbal Damrei |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
18,000,000 |
5.000 Width (m) |
4,118.300 Earth fill m3 |
23,400,000 |
| Kien Ta Siv |
2 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
18,000,000 |
5.000 Width (m) |
772.200 Earth fill m3 |
10,800,000 |
| Kien Ta Siv |
3 |
203 |
Gravel road |
0.70 [ 0.70 ] |
Km |
19,000,000 |
3.500 Width (m) |
393.750 Earth fill m3 |
13,300,000 |
| Svay Yea |
4 |
203 |
Gravel road |
1.45 [ 1.45 ] |
Km |
19,000,000 |
3.500 Width (m) |
1,012.500 Earth fill m3 |
27,550,000 |
| Kbal Damrei |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Kien Ta Siv |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
78,050,000 |
| Contract ID |
200516/08/02 |
TSO |
Phouk Plaly |
Project Type |
Rural Transport |
1,995,400 |
| Prey Ph'ong |
1 |
201 |
Earth road |
1.80 [ 1.80 ] |
Km |
1,108,556 |
4.000 Width (m) |
275.000 Earth fill m3 |
1,995,401 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,995,401 |
Svay Chrum, Thlok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200517/08/01 |
TSO |
Chu Lany |
Project Type |
Rural Transport |
56,241,900 |
| Doun Tong |
1 |
203 |
Gravel road |
1.02 [ 1.02 ] |
Km |
22,770,000 |
3.500 Width (m) |
915.190 Earth fill m3 |
23,225,400 |
| Samdei |
2 |
203 |
Gravel road |
1.45 [ 1.45 ] |
Km |
22,770,000 |
3.500 Width (m) |
815.630 Earth fill m3 |
33,016,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,241,900 |
| Contract ID |
200517/08/02 |
TSO |
Phouk Plaly |
Project Type |
Rural Transport |
1,999,600 |
| Doun Tong |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,999,600 |
4.000 Width (m) |
212.000 Earth fill m3 |
1,999,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,999,600 |