Contract Outputs

Location: Svay Rieng \ Svay Rieng Budget Year: 2008

Chantrea    Kampong Rou    Rumduol    Romeas Haek    Svay Chrum    Svay Rieng    Svay Teab   

Svay Rieng, Svay Rieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200601/08/01 TSO On Kea Project Type Urban transport 34,988,700
Chong Preaek 1 203 Gravel road 0.32 [ 0.32 ] Km 66,900,000 3.500 Width (m) 177.000 Earth fill m3 21,073,500
Me Pheung 2 203 Gravel road 0.21 [ 0.21 ] Km 66,900,000 5.000 Width (m) 1,265.000 Earth fill m3 13,915,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,988,700

Svay Rieng, Prey Chhlak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200602/08/01 TSO On Kea Project Type Urban transport 24,999,700
Roub Ko 1 203 Gravel road 0.33 [ 0.33 ] Km 48,543,000 4.000 Width (m) 839.000 Earth fill m3 15,873,561
Sala Srok 2 203 Gravel road 0.19 [ 0.19 ] Km 48,543,620 4.000 Width (m) 505.000 Earth fill m3 9,126,201
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,999,762

Svay Rieng, Koy Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200603/08/01 TSO On Kea Project Type Irrigation 29,400,000
Koy Trabaek 1 420 Canal 1.25 [ 1.25 ] Km 16,800,000 1.900 Depth (m) 26,990.000 Volume (m3) 21,000,000
Tarang Bal 2 420 Canal 0.00 [ 0.50 ] Km 16,800,000 1.900 Depth (m) 20,241.000 Volume (m3) 8,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,400,000

Svay Rieng, Pou Ta Hao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200604/08/01 TSO On Kea Project Type Urban Drainage and Flood Protection 24,990,000
Thnal Kaeng 1 540 Drainage 1.00 [ 1.00 ] Line 24,990,000 224.000 Length (m) 0.600 Diameter (m) 24,990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,990,000