Contract Outputs

Location: Pursat Budget Year: 2003

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Bakan, Boeng Bat Kandaol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150101/03/01 TSO Chhoeung Sarim Project Type Rural Transport 28,890,000
Bat Kandaol 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 15,990,000 7.000 Total Span (m) 3.000 Width (m) 15,990,000
Svay 2 213 Triple pipe culvert 2.00 [ 2.00 ] Place 3,450,000 800.000 Diameter (m) 5.000 Length (m) 6,900,000
Svay 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 600.000 Diameter (m) 8.000 Length (m) 1,700,000
Doung Chrum 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 600.000 Diameter (m) 8.000 Length (m) 1,700,000
Robang Romeas 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 600.000 Diameter (m) 5.000 Length (m) 1,300,000
Samraong 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 600.000 Diameter (m) 5.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,890,000
Contract ID 150101/03/02 TSO Chhoeung Sarim Project Type Rural Domestic Water Supplies 4,100,000
Tram Seh 1 112 Ring well with pump 1.00 [ 1.00 ] Place 2,050,000 7.000 Depth (m) 1.000 Diameter (m) 2,050,000
Bat Trach 2 112 Ring well with pump 1.00 [ 1.00 ] Place 2,050,000 7.000 Depth (m) 1.000 Diameter (m) 2,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,100,000

Bakan, Boeng Khnar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150102/03/01 TSO Chhoeung Sarim Project Type Rural Transport 33,460,000
Rung 1 202 Laterite road 0.50 [ 0.50 ] Km 11,950,000 3.000 Width (m) 150.000 Earth fill m3 5,975,000
Preah mlu 2 202 Laterite road 1.20 [ 1.20 ] Km 11,950,000 3.000 Width (m) 150.000 Earth fill m3 14,340,000
Sakar 3 202 Laterite road 1.10 [ 1.10 ] Km 11,950,000 3.000 Width (m) 150.000 Earth fill m3 13,145,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,460,000

Bakan, Khnar Totueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150103/03/01 TSO Chhoeung Sarim Project Type Rural Transport 27,731,250
Daeum Roka 1 202 Laterite road 1.06 [ 1.06 ] Km 13,050,000 3.000 Width (m) 593.438 Earth fill m3 13,767,750
Khnar Totueng 2 202 Laterite road 0.47 [ 0.47 ] Km 13,050,000 3.000 Width (m) 264.375 Earth fill m3 6,133,500
Boeng Chhuk 3 202 Laterite road 0.60 [ 0.60 ] Km 13,050,000 3.000 Width (m) 337.500 Earth fill m3 7,830,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,731,250

Bakan, Me Tuek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150104/03/01 TSO Chhoeung Sarim Project Type Rural Transport 41,377,250
Ta Mom 1 202 Laterite road 1.50 [ 1.50 ] Km 14,050,000 3.000 Width (m) 150.000 Earth fill m3 21,075,000
Me Tuek 2 202 Laterite road 0.45 [ 0.45 ] Km 14,050,000 3.000 Width (m) 150.000 Earth fill m3 6,252,250
Kaoh khsach 3 202 Laterite road 1.00 [ 1.00 ] Km 14,050,000 3.000 Width (m) 150.000 Earth fill m3 14,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,377,250

Bakan, Ou Ta Paong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150105/03/01 TSO Chhoeung Sarim Project Type Education 41,435,902
Srah Mkak 1 320 Brick school (general) 2.00 [ 2.00 ] School room 20,717,951 8.000 Length (m) 9.000 Width (m) 41,435,902
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,435,902
Contract ID 150105/03/02 TSO Chhoeung Sarim Project Type Education 6,800,000
Srah Mkak 1 740 School furniture 48.00 [ 48.00 ] School room 50,000 2.000 Students 0.000 2,400,000
Srah Mkak 2 302 School gate 1.00 [ 1.00 ] Place 4,400,000 4.900 4.500 4,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,800,000

Bakan, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150106/03/01 TSO Chhoeung Sarim Project Type Rural Transport 24,738,000
Pnov 1 202 Laterite road 1.56 [ 1.56 ] Km 9,300,000 3.000 Width (m) 150.000 Earth fill m3 14,508,000
Pralay Rumdeng 2 202 Laterite road 1.10 [ 1.10 ] Km 9,300,000 3.000 Width (m) 150.000 Earth fill m3 10,230,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,738,000

Bakan, Snam Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150107/03/01 TSO Chhoeung Sarim Project Type Rural Transport 37,680,000
Khmar 1 202 Laterite road 3.00 [ 3.00 ] Km 9,420,000 3.000 Width (m) 150.000 Earth fill m3 28,260,000
Svay at 2 202 Laterite road 1.00 [ 1.00 ] Km 9,420,000 3.000 Width (m) 150.000 Earth fill m3 9,420,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,680,000
Contract ID 150107/03/02 TSO Chhoeung Sarim Project Type Rural Transport 11,448,000
Pnov 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 6,948,000 2.000 Total Span (m) 5.000 Width(m) 6,948,000
Andoung Sanbuor 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,500,000 1.000 Diameter (m) 5.000 Length (m) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,448,000

Bakan, Svay Doun Kaev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150108/03/01 TSO Chhoeung Sarim Project Type Rural Transport 23,400,000
Svay Sa 1 202 Laterite road 0.98 [ 0.98 ] Km 14,020,000 3.000 Width (m) 150.000 Earth fill m3 13,739,600
Svay Sa 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 6,510,400 2.000 Total Span (m) 5.000 Width(m) 6,510,400
Thmei 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 2,100,000
Nikom Leu 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 1,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,400,000

Bakan, Ta Lou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150109/03/01 TSO Chhoeung Sarim Project Type Rural Transport 50,190,300
Prey Veang 1 202 Laterite road 1.90 [ 1.90 ] Km 7,833,480 3.000 Width (m) 150.000 Earth fill m3 14,883,612
Prey Veang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Serei Kunthea 3 202 Laterite road 1.20 [ 1.20 ] Km 7,833,480 3.000 Width (m) 150.000 Earth fill m3 9,361,009
Serei Kunthea 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Serei Kunthea 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,322,900 0.800 Diameter (m) 5.000 Length (m) 3,322,900
Tayang Sa 6 202 Laterite road 1.06 [ 1.06 ] Km 7,833,480 3.000 Width (m) 150.000 Earth fill m3 8,264,321
Tayang Sa 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Chhnal Moan 8 202 Laterite road 0.85 [ 0.85 ] Km 7,833,480 3.000 Width (m) 150.000 Earth fill m3 6,658,458
Chhnal Moan 9 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,190,300

Bakan, Trapeang Chong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150110/03/01 TSO Chhoeung Sarim Project Type Rural Transport 39,321,600
Srae Lvea 1 202 Laterite road 0.50 [ 0.50 ] Km 10,240,000 3.000 Width (m) 150.000 Earth fill m3 5,120,000
Chamkar Ou 2 202 Laterite road 1.00 [ 1.00 ] Km 10,240,000 3.000 Width (m) 150.000 Earth fill m3 10,240,000
Kandoeng Meas 3 202 Laterite road 2.34 [ 2.34 ] Km 10,240,000 3.000 Width (m) 150.000 Earth fill m3 23,961,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,321,600
Contract ID 150110/03/02 TSO Chhoeung Sarim Project Type Rural Transport 10,290,000
Poulyum 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 10,290,000 3.000 Total Span (m) 10.000 Width (m) 10,290,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,290,000

Kandieng, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150201/03/01 TSO Noun Vuthy Project Type Rural Transport 23,450,000
Chey Chumneah 1 202 Laterite road 2.32 [ 2.32 ] Km 9,145,866 3.000 Width (m) 150.000 Earth fill m3 21,254,993
Ou Ba Krang 2 202 Laterite road 0.24 [ 0.24 ] Km 9,145,866 3.000 Width (m) 150.000 Earth fill m3 2,195,008
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,450,000

Kandieng, Banteay Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150202/03/01 TSO Noun Vuthy Project Type Rural Transport 19,460,000
Bandoh Sandaek 1 202 Laterite road 0.29 [ 0.29 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 2,397,034
Bandoh Sandaek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Bandoh Sandaek 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Eslam 4 202 Laterite road 0.68 [ 0.68 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 5,719,239
Eslam 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Banteay Dei Leu 6 202 Laterite road 0.35 [ 0.35 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 2,943,726
Kaev Muni 7 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,459,999

Kandieng, Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150203/03/01 TSO Noun Vuthy Project Type Rural Transport 24,190,000
Stueng Leu 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 17,140,000 3.000 Total Span (m) 17.500 Width (m) 17,140,000
Stueng Leu 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,050,000 2.000 Total Span (m) 5.000 Width(m) 7,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,190,000

Kandieng, Kanhchor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150204/03/01 TSO Noun Vuthy Project Type Rural Transport 32,550,000
Preaek Trabaek 1 202 Laterite road 1.19 [ 1.19 ] Km 13,040,000 3.000 Width (m) 150.000 Earth fill m3 15,504,560
Pou Andaet 2 202 Laterite road 1.20 [ 1.20 ] Km 13,040,000 3.000 Width (m) 150.000 Earth fill m3 15,648,000
Phlov Luong 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,397,450 0.600 Diameter (m) 5.000 Length (m) 1,397,450
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,550,010

Kandieng, Reang Til

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150205/03/01 TSO Noun Vuthy Project Type Rural Transport 19,490,000
Phum Preaek 1 272 Inland waterway 0.33 [ 0.33 ] Km 24,987,179 5.000 Width (m) 1.000 8,245,769
Kaoh Ta Kaev 2 272 Inland waterway 0.45 [ 0.45 ] Km 24,987,179 5.000 Width (m) 1.000 11,244,231
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,490,000

Kandieng, Srae Sdok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150206/03/01 TSO Noun Vuthy Project Type Domestic Sanitation 7,046,000
Pou 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,523,000 1.500 2.900 7,046,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,046,000
Contract ID 150206/03/02 TSO Noun Vuthy Project Type Rural Transport 27,975,000
Banteay Traok 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,735,000 2.000 Total Span (m) 5.000 Width(m) 8,735,000
Ta Mao Leu 2 211 Single pipe culvert 8.00 [ 8.00 ] Place 1,344,000 0.600 Diameter (m) 5.000 Length (m) 10,752,000
Trang 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,068,000 0.800 Diameter (m) 5.000 Length (m) 4,136,000
Chamreh 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,176,000 0.600 Diameter (m) 5.000 Length (m) 4,352,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,975,000

Kandieng, Svay Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150207/03/01 TSO Noun Vuthy Project Type Rural Transport 23,090,000
Pou Laeung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Ka Kou 2 202 Laterite road 1.10 [ 1.10 ] Km 9,541,000 3.000 Width (m) 150.000 Earth fill m3 10,456,936
Chreaeng 3 202 Laterite road 1.00 [ 1.00 ] Km 9,541,000 3.000 Width (m) 150.000 Earth fill m3 9,541,000
Phteah Srae 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,097,936

Kandieng, Sya

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150208/03/01 TSO Noun Vuthy Project Type Domestic Sanitation 7,100,000
Anlong Vil 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,550,000 1.500 2.900 7,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,100,000
Contract ID 150208/03/02 TSO Noun Vuthy Project Type Rural Transport 17,100,000
Anlong Vil 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 0.800 Diameter (m) 12.000 Length (m) 2,600,000
Sya 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Kbal Chheu Puk 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Kbal Chheu Puk 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Trapeang Thma 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Sya 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Thlok 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Prey Srakum 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,100,000

Kandieng, Veal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150209/03/01 TSO Noun Vuthy Project Type Rural Drainage and Flood Protection 21,359,800
Veal 1 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 21,359,800 186.000 Length (m) 0.600 Diameter (m) 21,359,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,359,800

Krakor, Anlong Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150301/03/01 TSO Yun Sareth Project Type Rural Transport 27,603,750
Chrolong 1 202 Laterite road 1.50 [ 1.50 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 9,742,500
Thkoul Thum 2 202 Laterite road 2.30 [ 2.30 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 14,938,500
Kandal 3 202 Laterite road 0.45 [ 0.45 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 2,922,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,603,750

Krakor, Ansa Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150302/03/01 TSO Yun Sareth Project Type Rural Transport 15,444,000
San Sar 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 12,600,000 10.000 Total Span (m) 3.000 Width (m) 12,600,000
Khsach L'et 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,422,000 0.600 Diameter (m) 5.000 Length (m) 2,844,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,444,000
Contract ID 150302/03/02 TSO Yun Sareth Project Type Rural Transport 9,050,000
arang Pruoch 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.600 Diameter (m) 5.000 Length (m) 2,100,000
Thkoul Touch 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,450,000 0.600 Diameter (m) 6.000 Length (m) 2,450,000
arang Pruoch 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,050,000

Krakor, Boeng Kantuot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150303/03/01 TSO Yun Sareth Project Type Rural Transport 23,200,000
Trapeang Khley 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 11,200,000 7.500 Total Span (m) 3.000 Width (m) 11,200,000
Chochok 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 6,300,000 2.000 Total Span (m) 5.000 Width(m) 6,300,000
Boeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Chochok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Thmei 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,300,000 0.600 Diameter (m) 5.000 Length (m) 2,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,200,000

Krakor, Chheu Tom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150304/03/01 TSO Yun Sareth Project Type Rural Transport 40,958,125
Phteah Chek 1 202 Laterite road 7.38 [ 7.38 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 34,035,625
Chheu Tep 2 202 Laterite road 0.25 [ 0.25 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 1,153,750
Kandal 3 202 Laterite road 1.25 [ 1.25 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 5,768,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,958,125

Krakor, Kampong Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150305/03/01 TSO Yun Sareth Project Type Environmental Management 35,200,000
Phum Muoy 1 365 NREM Extension Building 1.00 [ 1.00 ] Building 35,200,000 12.000 Length (m) 6.500 Width (m) 35,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,200,000

Krakor, Kampong Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150306/03/01 TSO Yun Sareth Project Type Rural Transport 25,048,800
Chek Chau 1 202 Laterite road 2.49 [ 2.49 ] Km 10,080,000 3.000 Width (m) 150.000 Earth fill m3 25,048,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,048,800

Krakor, Kbal Trach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150307/03/01 TSO Yun Sareth Project Type Rural Transport 22,100,000
Trapeang Smach 1 202 Laterite road 1.30 [ 1.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 9,620,000
Totueng 2 202 Laterite road 0.30 [ 0.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 2,220,000
Trapeang Rumdenh 3 202 Laterite road 0.60 [ 0.60 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 4,440,000
Kampong Leu 4 202 Laterite road 0.30 [ 0.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 2,220,000
Trapeang Rumdenh 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Trapeang Rumdenh 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,100,000

Krakor, Ou Sandan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150308/03/01 TSO Yun Sareth Project Type Rural Transport 13,510,040
Krang Thum 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Krang Thum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Krang Thum 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 5.000 Length (m) 2,500,000
Ou Ta Prok 4 202 Laterite road 0.70 [ 0.70 ] Km 11,157,200 3.000 Width (m) 150.000 Earth fill m3 7,810,040
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,510,040
Contract ID 150308/03/02 TSO Yun Sareth Project Type Domestic Sanitation 7,150,000
Ou Ta Prok 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,575,000 1.500 2.900 7,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,150,000

Krakor, Sna Ansa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150309/03/01 TSO Yun Sareth Project Type Rural Transport 22,202,620
Krang Veaeng 1 202 Laterite road 0.73 [ 0.73 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 5,519,063
Veal Vong 2 202 Laterite road 0.95 [ 0.95 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 7,231,875
Sarovoan 3 202 Laterite road 0.45 [ 0.45 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 3,425,625
Beng 4 202 Laterite road 0.50 [ 0.50 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 3,806,250
Krang Veaeng 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,219,808 0.600 Diameter (m) 5.000 Length (m) 2,219,808
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,202,621

Krakor, Svay Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150310/03/01 TSO Yun Sareth Project Type Rural Transport 22,300,000
Tuol andaet 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,347,500 0.600 Diameter (m) 5.000 Length (m) 4,042,500
Boeng Smok 2 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 14,460,000 3.000 Total Span (m) 7.500 Width (m) 14,460,000
Boeng Smok 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,450,000 1.000 Diameter (m) 5.000 Length (m) 2,450,000
Boeng Smok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,347,500 0.600 Diameter (m) 5.000 Length (m) 1,347,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,300,000

Krakor, Tnaot Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150311/03/01 TSO Yun Sareth Project Type Rural Transport 31,629,600
Tbaeng Chrum 1 221 Single cell box culvert 2.00 [ 2.00 ] Place 9,664,800 2.000 Total Span (m) 5.000 Width(m) 19,329,600
Tbaeng Chrum 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 4,200,000
Chambak Thum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Chambak Thum 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Chambak Thum 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,100,000 0.800 Diameter (m) 5.000 Length (m) 3,100,000
Choar Mean 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,629,600

Phnum Kravanh, Bak Chenhchien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150401/03/01 TSO Sek Chanrattha Project Type Rural Transport 23,050,150
Bak Chenhchien 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,330,000 0.600 Diameter (m) 6.000 Length (m) 1,330,000
Ou Rumchang 3 202 Laterite road 0.75 [ 0.75 ] Km 8,650,000 3.000 Width (m) 150.000 Earth fill m3 6,487,500
Bak Chenhchien 4 202 Laterite road 1.76 [ 1.76 ] Km 8,650,000 3.000 Width (m) 150.000 Earth fill m3 15,232,650
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,050,150

Phnum Kravanh, Leach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150402/03/01 TSO Sek Chanrattha Project Type Rural Transport 28,882,000
Baoh Puoy 1 202 Laterite road 1.10 [ 1.10 ] Km 7,350,000 3.000 Width (m) 150.000 Earth fill m3 8,085,000
Sbov Rik 2 202 Laterite road 2.58 [ 2.58 ] Km 7,350,000 3.000 Width (m) 150.000 Earth fill m3 18,963,000
Ta Nuk 3 202 Laterite road 0.25 [ 0.25 ] Km 7,350,000 3.000 Width (m) 150.000 Earth fill m3 1,837,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,885,500

Phnum Kravanh, Phteah Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150403/03/01 TSO Sek Chanrattha Project Type Rural Transport 41,990,000
Thlok Dangkao 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,500,000 1.000 Diameter (m) 5.000 Length (m) 7,500,000
Bat Rumduol 2 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 11,700,000 3.000 Total Span (m) 3.000 Width (m) 11,700,000
Bat Rumduol 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Bat Rumduol 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,790,000 1.000 Diameter (m) 5.000 Length (m) 4,790,000
Kandal 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 5,600,000
Phteah Rung 6 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 4,200,000
Chongruk 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Chongruk 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Kandal 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,990,000

Phnum Kravanh, Prongil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150404/03/01 TSO Sek Chanrattha Project Type Education 31,998,000
Kampeaeng 1 313 Wooden school with tile roof, concrete floor 1.00 [ 1.00 ] School room 31,998,000 16.000 Length (m) 9.000 Width (m) 31,998,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,998,000

Phnum Kravanh, Rokat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150405/03/01 TSO Sek Chanrattha Project Type Rural Transport 20,576,000
Mol 1 202 Laterite road 1.40 [ 1.40 ] Km 8,573,330 3.000 Width (m) 150.000 Earth fill m3 12,002,662
Prey Khlong 2 202 Laterite road 1.00 [ 1.00 ] Km 8,573,330 3.000 Width (m) 150.000 Earth fill m3 8,573,330
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,575,992

Phnum Kravanh, Santreae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150406/03/01 TSO Sek Chanrattha Project Type Rural Transport 18,150,000
Ksetr Bourei 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 18,150,000 5.000 Total Span (m) 3.000 Width (m) 18,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,150,000

Phnum Kravanh, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150407/03/01 TSO Sek Chanrattha Project Type Rural Transport 33,040,000
Samraong Muoy 1 202 Laterite road 0.50 [ 0.50 ] Km 6,207,515 3.000 Width (m) 150.000 Earth fill m3 3,103,758
Samraong Pir 2 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 12,555,200 3.000 Total Span (m) 7.500 Width (m) 12,555,200
Samraong Pir 3 202 Laterite road 2.80 [ 2.80 ] Km 6,207,515 3.000 Width (m) 150.000 Earth fill m3 17,381,042
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,040,000

Sampov Meas, Chamraeun Phal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150501/03/01 TSO Dou Heng Project Type Rural Transport 25,500,000
Ou Roka 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 16,800,000 4.000 Total Span (m) 3.000 Width (m) 16,800,000
Ou Roka 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.800 Diameter (m) 5.000 Length (m) 1,450,000
Svay Meas 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,450,000 0.800 Diameter (m) 5.000 Length (m) 1,450,000
Svay Meas 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 6.000 Diameter (m) 5.000 Length (m) 2,200,000
Kampong Stoung 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 6.000 Diameter (m) 5.000 Length (m) 1,100,000
Doun Ei 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 8.000 Diameter (m) 5.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Sampov Meas, Kaoh Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150502/03/01 TSO Dou Heng Project Type Rural Transport 28,390,000
Spean 1 223 Triple cell box culvert 1.00 [ 1.00 ] Place 10,500,000 4.500 Total Span (m) 5.000 Width(m) 10,500,000
Spean 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Phteah Pring 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 7,890,000 3.000 Total Span (m) 5.000 Width(m) 7,890,000
Phteah Pring 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Kien 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 5.000 Length (m) 2,500,000
Kien 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,390,000

Sampov Meas, Lolok Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150503/03/01 TSO Dou Heng Project Type Rural Transport 25,795,000
Damnak Ampil 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 19,120,000 3.000 Total Span (m) 22.500 Width (m) 19,120,000
Damnak Ampil 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,960,000 0.600 Diameter (m) 5.000 Length (m) 1,960,000
Damnak Ampil 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,178,750 0.600 Diameter (m) 5.000 Length (m) 4,715,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,795,000

Sampov Meas, Phteah Prey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150504/03/01 TSO Dou Heng Project Type Rural Transport 43,059,000
Dangkear 1 202 Laterite road 3.60 [ 3.60 ] Km 7,611,111 3.000 Width (m) 150.000 Earth fill m3 27,400,000
Dangkear 2 223 Triple cell box culvert 1.00 [ 1.00 ] Place 8,500,000 4.500 Total Span (m) 5.000 Width(m) 8,500,000
Dangkear 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 7,159,000 3.000 Total Span (m) 5.000 Width(m) 7,159,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,059,000

Sampov Meas, Prey Nhi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150505/03/01 TSO Dou Heng Project Type Rural Drainage and Flood Protection 15,814,800
Pralay Thum 1 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 15,814,800 138.000 Length (m) 0.600 Diameter (m) 15,814,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,814,800
Contract ID 150505/03/02 TSO Dou Heng Project Type Rural Transport 3,920,000
Sala Kumru 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,960,000 0.800 Diameter (m) 5.000 Length (m) 3,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,920,000

Sampov Meas, Roleab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150506/03/01 TSO Dou Heng Project Type Rural Transport 31,500,000
Roleab 1 202 Laterite road 3.40 [ 3.40 ] Km 3,382,353 3.000 Width (m) 150.000 Earth fill m3 11,500,000
Roleab 2 222 Double cell box culvert 1.00 [ 1.00 ] Place 10,000,000 3.000 Total Span (m) 5.000 Width(m) 10,000,000
Roleab 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,400,000 0.800 Diameter (m) 5.000 Length (m) 4,800,000
Preaek Tnaot 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.800 Diameter (m) 5.000 Length (m) 2,400,000
Preaek Tnaot 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,500,000

Sampov Meas, Svay at

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150507/03/01 TSO Dou Heng Project Type Rural Transport 18,610,000
Svay at 1 202 Laterite road 0.98 [ 0.98 ] Km 7,129,278 3.000 Width (m) 150.000 Earth fill m3 6,958,175
Ou Sdau 2 202 Laterite road 0.60 [ 0.60 ] Km 7,129,278 3.000 Width (m) 150.000 Earth fill m3 4,291,825
Svay at 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,160,000 0.800 Diameter (m) 5.000 Length (m) 3,160,000
Svay at 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 4,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,610,001

Veal Veaeng, Ou Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150601/03/01 TSO Sam Sarom Project Type Rural Transport 13,800,000
Ou Saom 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 8,800,000 1.000 Diameter (m) 6.000 Length (m) 8,800,000
Ou Saom 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,800,000

Veal Veaeng, Krapeu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150602/03/01 TSO Sam Sarom Project Type Rural Transport 13,500,000
Krapeu Pir Leu 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 8,500,000 1.000 Diameter (m) 6.000 Length (m) 8,500,000
Krapeu Pir Leu 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000

Veal Veaeng, Anlong Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150603/03/01 TSO Sam Sarom Project Type Rural Transport 14,500,000
Chamkar Chrey Khang Cheung 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Kandal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,500,000 0.600 Diameter (m) 6.000 Length (m) 4,500,000
Kandal 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,500,000

Veal Veaeng, Pramaoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150604/03/01 TSO Sam Sarom Project Type Rural Domestic Water Supplies 16,092,000
Stueng Thmei 1 141 Pond with no filter 3.00 [ 3.00 ] Place 5,364,000 3.000 Depth (m) 1,044.000 Volume (m3) 16,092,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,092,000

Veal Veaeng, Thma Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150605/03/01 TSO Sam Sarom Project Type Rural Transport 13,000,000
Aekakpheap 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,500,000 1.000 Diameter (m) 6.000 Length (m) 6,500,000
Kandal 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,500,000 1.000 Diameter (m) 6.000 Length (m) 6,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,000,000