Contract Outputs

Location: Pursat \ Krakor Budget Year: 2003

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Krakor, Anlong Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150301/03/01 TSO Yun Sareth Project Type Rural Transport 27,603,750
Chrolong 1 202 Laterite road 1.50 [ 1.50 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 9,742,500
Thkoul Thum 2 202 Laterite road 2.30 [ 2.30 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 14,938,500
Kandal 3 202 Laterite road 0.45 [ 0.45 ] Km 6,495,000 3.000 Width (m) 150.000 Earth fill m3 2,922,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,603,750

Krakor, Ansa Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150302/03/01 TSO Yun Sareth Project Type Rural Transport 15,444,000
San Sar 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 12,600,000 10.000 Total Span (m) 3.000 Width (m) 12,600,000
Khsach L'et 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,422,000 0.600 Diameter (m) 5.000 Length (m) 2,844,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,444,000
Contract ID 150302/03/02 TSO Yun Sareth Project Type Rural Transport 9,050,000
arang Pruoch 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.600 Diameter (m) 5.000 Length (m) 2,100,000
Thkoul Touch 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,450,000 0.600 Diameter (m) 6.000 Length (m) 2,450,000
arang Pruoch 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 4,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,050,000

Krakor, Boeng Kantuot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150303/03/01 TSO Yun Sareth Project Type Rural Transport 23,200,000
Trapeang Khley 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 11,200,000 7.500 Total Span (m) 3.000 Width (m) 11,200,000
Chochok 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 6,300,000 2.000 Total Span (m) 5.000 Width(m) 6,300,000
Boeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Chochok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Thmei 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,300,000 0.600 Diameter (m) 5.000 Length (m) 2,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,200,000

Krakor, Chheu Tom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150304/03/01 TSO Yun Sareth Project Type Rural Transport 40,958,125
Phteah Chek 1 202 Laterite road 7.38 [ 7.38 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 34,035,625
Chheu Tep 2 202 Laterite road 0.25 [ 0.25 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 1,153,750
Kandal 3 202 Laterite road 1.25 [ 1.25 ] Km 4,615,000 3.000 Width (m) 150.000 Earth fill m3 5,768,750
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,958,125

Krakor, Kampong Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150305/03/01 TSO Yun Sareth Project Type Environmental Management 35,200,000
Phum Muoy 1 365 NREM Extension Building 1.00 [ 1.00 ] Building 35,200,000 12.000 Length (m) 6.500 Width (m) 35,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,200,000

Krakor, Kampong Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150306/03/01 TSO Yun Sareth Project Type Rural Transport 25,048,800
Chek Chau 1 202 Laterite road 2.49 [ 2.49 ] Km 10,080,000 3.000 Width (m) 150.000 Earth fill m3 25,048,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,048,800

Krakor, Kbal Trach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150307/03/01 TSO Yun Sareth Project Type Rural Transport 22,100,000
Trapeang Smach 1 202 Laterite road 1.30 [ 1.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 9,620,000
Totueng 2 202 Laterite road 0.30 [ 0.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 2,220,000
Trapeang Rumdenh 3 202 Laterite road 0.60 [ 0.60 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 4,440,000
Kampong Leu 4 202 Laterite road 0.30 [ 0.30 ] Km 7,400,000 3.000 Width (m) 150.000 Earth fill m3 2,220,000
Trapeang Rumdenh 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Trapeang Rumdenh 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,100,000

Krakor, Ou Sandan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150308/03/01 TSO Yun Sareth Project Type Rural Transport 13,510,040
Krang Thum 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Krang Thum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Krang Thum 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 5.000 Length (m) 2,500,000
Ou Ta Prok 4 202 Laterite road 0.70 [ 0.70 ] Km 11,157,200 3.000 Width (m) 150.000 Earth fill m3 7,810,040
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,510,040
Contract ID 150308/03/02 TSO Yun Sareth Project Type Domestic Sanitation 7,150,000
Ou Ta Prok 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,575,000 1.500 2.900 7,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,150,000

Krakor, Sna Ansa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150309/03/01 TSO Yun Sareth Project Type Rural Transport 22,202,620
Krang Veaeng 1 202 Laterite road 0.73 [ 0.73 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 5,519,063
Veal Vong 2 202 Laterite road 0.95 [ 0.95 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 7,231,875
Sarovoan 3 202 Laterite road 0.45 [ 0.45 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 3,425,625
Beng 4 202 Laterite road 0.50 [ 0.50 ] Km 7,612,500 3.000 Width (m) 150.000 Earth fill m3 3,806,250
Krang Veaeng 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,219,808 0.600 Diameter (m) 5.000 Length (m) 2,219,808
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,202,621

Krakor, Svay Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150310/03/01 TSO Yun Sareth Project Type Rural Transport 22,300,000
Tuol andaet 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,347,500 0.600 Diameter (m) 5.000 Length (m) 4,042,500
Boeng Smok 2 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 14,460,000 3.000 Total Span (m) 7.500 Width (m) 14,460,000
Boeng Smok 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,450,000 1.000 Diameter (m) 5.000 Length (m) 2,450,000
Boeng Smok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,347,500 0.600 Diameter (m) 5.000 Length (m) 1,347,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,300,000

Krakor, Tnaot Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150311/03/01 TSO Yun Sareth Project Type Rural Transport 31,629,600
Tbaeng Chrum 1 221 Single cell box culvert 2.00 [ 2.00 ] Place 9,664,800 2.000 Total Span (m) 5.000 Width(m) 19,329,600
Tbaeng Chrum 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 4,200,000
Chambak Thum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Chambak Thum 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,200,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Chambak Thum 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,100,000 0.800 Diameter (m) 5.000 Length (m) 3,100,000
Choar Mean 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,629,600