Contract Outputs

Location: Pursat \ Kandieng Budget Year: 2003

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Kandieng, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150201/03/01 TSO Noun Vuthy Project Type Rural Transport 23,450,000
Chey Chumneah 1 202 Laterite road 2.32 [ 2.32 ] Km 9,145,866 3.000 Width (m) 150.000 Earth fill m3 21,254,993
Ou Ba Krang 2 202 Laterite road 0.24 [ 0.24 ] Km 9,145,866 3.000 Width (m) 150.000 Earth fill m3 2,195,008
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,450,000

Kandieng, Banteay Dei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150202/03/01 TSO Noun Vuthy Project Type Rural Transport 19,460,000
Bandoh Sandaek 1 202 Laterite road 0.29 [ 0.29 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 2,397,034
Bandoh Sandaek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Bandoh Sandaek 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Eslam 4 202 Laterite road 0.68 [ 0.68 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 5,719,239
Eslam 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Banteay Dei Leu 6 202 Laterite road 0.35 [ 0.35 ] Km 8,410,646 3.000 Width (m) 150.000 Earth fill m3 2,943,726
Kaev Muni 7 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,459,999

Kandieng, Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150203/03/01 TSO Noun Vuthy Project Type Rural Transport 24,190,000
Stueng Leu 1 231 Wood bridge, 5 tonne standard, concrete abutments 1.00 [ 1.00 ] Place 17,140,000 3.000 Total Span (m) 17.500 Width (m) 17,140,000
Stueng Leu 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 7,050,000 2.000 Total Span (m) 5.000 Width(m) 7,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,190,000

Kandieng, Kanhchor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150204/03/01 TSO Noun Vuthy Project Type Rural Transport 32,550,000
Preaek Trabaek 1 202 Laterite road 1.19 [ 1.19 ] Km 13,040,000 3.000 Width (m) 150.000 Earth fill m3 15,504,560
Pou Andaet 2 202 Laterite road 1.20 [ 1.20 ] Km 13,040,000 3.000 Width (m) 150.000 Earth fill m3 15,648,000
Phlov Luong 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,397,450 0.600 Diameter (m) 5.000 Length (m) 1,397,450
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,550,010

Kandieng, Reang Til

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150205/03/01 TSO Noun Vuthy Project Type Rural Transport 19,490,000
Phum Preaek 1 272 Inland waterway 0.33 [ 0.33 ] Km 24,987,179 5.000 Width (m) 1.000 8,245,769
Kaoh Ta Kaev 2 272 Inland waterway 0.45 [ 0.45 ] Km 24,987,179 5.000 Width (m) 1.000 11,244,231
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,490,000

Kandieng, Srae Sdok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150206/03/01 TSO Noun Vuthy Project Type Domestic Sanitation 7,046,000
Pou 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,523,000 1.500 2.900 7,046,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,046,000
Contract ID 150206/03/02 TSO Noun Vuthy Project Type Rural Transport 27,975,000
Banteay Traok 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,735,000 2.000 Total Span (m) 5.000 Width(m) 8,735,000
Ta Mao Leu 2 211 Single pipe culvert 8.00 [ 8.00 ] Place 1,344,000 0.600 Diameter (m) 5.000 Length (m) 10,752,000
Trang 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,068,000 0.800 Diameter (m) 5.000 Length (m) 4,136,000
Chamreh 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,176,000 0.600 Diameter (m) 5.000 Length (m) 4,352,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,975,000

Kandieng, Svay Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150207/03/01 TSO Noun Vuthy Project Type Rural Transport 23,090,000
Pou Laeung 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Ka Kou 2 202 Laterite road 1.10 [ 1.10 ] Km 9,541,000 3.000 Width (m) 150.000 Earth fill m3 10,456,936
Chreaeng 3 202 Laterite road 1.00 [ 1.00 ] Km 9,541,000 3.000 Width (m) 150.000 Earth fill m3 9,541,000
Phteah Srae 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 1,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,097,936

Kandieng, Sya

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150208/03/01 TSO Noun Vuthy Project Type Domestic Sanitation 7,100,000
Anlong Vil 1 171 Pour flush latrine with double waste tank system 2.00 [ 2.00 ] Latrine room 3,550,000 1.500 2.900 7,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,100,000
Contract ID 150208/03/02 TSO Noun Vuthy Project Type Rural Transport 17,100,000
Anlong Vil 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 0.800 Diameter (m) 12.000 Length (m) 2,600,000
Sya 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Kbal Chheu Puk 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Kbal Chheu Puk 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Trapeang Thma 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Sya 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Thlok 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Prey Srakum 8 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,100,000

Kandieng, Veal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150209/03/01 TSO Noun Vuthy Project Type Rural Drainage and Flood Protection 21,359,800
Veal 1 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 21,359,800 186.000 Length (m) 0.600 Diameter (m) 21,359,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,359,800