Contract Outputs

Location: Pursat \ Veal Veaeng Budget Year: 2003

Bakan    Kandieng    Krakor    Phnum Kravanh    Sampov Meas    Veal Veaeng   

Veal Veaeng, Ou Saom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150601/03/01 TSO Sam Sarom Project Type Rural Transport 13,800,000
Ou Saom 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 8,800,000 1.000 Diameter (m) 6.000 Length (m) 8,800,000
Ou Saom 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,800,000

Veal Veaeng, Krapeu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150602/03/01 TSO Sam Sarom Project Type Rural Transport 13,500,000
Krapeu Pir Leu 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 8,500,000 1.000 Diameter (m) 6.000 Length (m) 8,500,000
Krapeu Pir Leu 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000

Veal Veaeng, Anlong Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150603/03/01 TSO Sam Sarom Project Type Rural Transport 14,500,000
Chamkar Chrey Khang Cheung 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Kandal 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 4,500,000 0.600 Diameter (m) 6.000 Length (m) 4,500,000
Kandal 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,000,000 1.000 Diameter (m) 6.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,500,000

Veal Veaeng, Pramaoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150604/03/01 TSO Sam Sarom Project Type Rural Domestic Water Supplies 16,092,000
Stueng Thmei 1 141 Pond with no filter 3.00 [ 3.00 ] Place 5,364,000 3.000 Depth (m) 1,044.000 Volume (m3) 16,092,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,092,000

Veal Veaeng, Thma Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 150605/03/01 TSO Sam Sarom Project Type Rural Transport 13,000,000
Aekakpheap 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,500,000 1.000 Diameter (m) 6.000 Length (m) 6,500,000
Kandal 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 6,500,000 1.000 Diameter (m) 6.000 Length (m) 6,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,000,000