Contract Outputs
Location: Siem Reap \ Soutr Nikom Budget Year: 2003
Angkor Chum
Angkor Thum
Banteay Srei
Chi Kraeng
Kralanh
Puok
Prasat Bakong
Siem Reab
Soutr Nikom
Srei Snam
Svay Leu
Varin
Soutr Nikom, Chan Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171101/03/01 |
TSO |
Kung Sophat |
Project Type |
Education |
31,412,800 |
| Doun Diev |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
15,706,400 |
8.000 Length (m) |
7.000 Width (m) |
31,412,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,412,800 |
Soutr Nikom, Dam Daek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171102/03/01 |
TSO |
Kung Sophat |
Project Type |
Irrigation |
21,500,000 |
| Trabaek |
1 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
4,300,000 |
4.000 Length (m) |
1.500 Height (m) |
4,300,000 |
| Preah Trapeang |
2 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
4,300,000 |
4.000 Length (m) |
1.500 Height (m) |
4,300,000 |
| Srae Thnong |
3 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
4,300,000 |
4.000 Length (m) |
1.500 Height (m) |
4,300,000 |
| Kouk Roluos |
4 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
4,300,000 |
4.000 Length (m) |
1.500 Height (m) |
4,300,000 |
| Kouk Mon |
5 |
451 |
Small water gate |
1.00 [ 1.00 ] |
Place |
4,300,000 |
4.000 Length (m) |
1.500 Height (m) |
4,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,500,000 |
| Contract ID |
171102/03/02 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
15,680,000 |
| Krasar Tum |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,495,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,485,000 |
| Trabaek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,038,520 |
0.800 Diameter (m) |
5.000 Length (m) |
2,038,520 |
| Bos |
3 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
9,156,480 |
1.500 Total Span (m) |
4.000 Width(m) |
9,156,480 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,680,000 |
Soutr Nikom, Dan Run
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171103/03/01 |
TSO |
Kung Sophat |
Project Type |
Education |
37,787,000 |
| Kouk Chan |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
18,893,500 |
8.000 Length (m) |
7.000 Width (m) |
37,787,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,787,000 |
Soutr Nikom, Kampong Khleang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171104/03/01 |
TSO |
Kung Sophat |
Project Type |
Rural Domestic Water Supplies |
35,739,800 |
| Spean Veaeng |
1 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
11,913,266 |
4.000 Depth (m) |
1,492.000 Volume (m3) |
11,913,266 |
| Chamkar Yuon |
2 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
11,913,267 |
4.000 Depth (m) |
1,492.000 Volume (m3) |
11,913,267 |
| Ta Uor Sa |
3 |
141 |
Pond with no filter |
1.00 [ 1.00 ] |
Place |
11,913,200 |
4.000 Depth (m) |
1,492.000 Volume (m3) |
11,913,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,739,733 |
Soutr Nikom, Kien Sangkae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171105/03/01 |
TSO |
Kung Sophat |
Project Type |
Irrigation |
32,400,000 |
| Thmei |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Thnal Chaek |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Chikeak |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Trapeang Prey |
4 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Doun Lei |
5 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Chrey Khang Tboung |
6 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
6,480,000 |
| Chrey Khang Cheung |
7 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Sala Kakaoh |
8 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Kouk Dei |
9 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,240,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,240,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,400,000 |
Soutr Nikom, Khchas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171106/03/01 |
TSO |
Kung Sophat |
Project Type |
Rural Transport |
6,000,000 |
| Thlat |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,000,000 |
| Contract ID |
171106/03/02 |
TSO |
Kung Sophat |
Project Type |
Rural Domestic Water Supplies |
2,760,000 |
| Kouk Sangkae |
1 |
111 |
Ring well |
2.00 [ 2.00 ] |
Place |
1,380,000 |
7.000 Depth (m) |
1.000 Diameter (m) |
2,760,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,760,000 |
| Contract ID |
171106/03/03 |
TSO |
Kung Sophat |
Project Type |
Irrigation |
19,500,000 |
| Thlat |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
9,750,000 |
2.000 Total span (m) |
4.000 Width (m) |
9,750,000 |
| Thmei |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
9,750,000 |
2.000 Total span (m) |
4.000 Width (m) |
9,750,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,500,000 |
Soutr Nikom, Khnar Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171107/03/01 |
TSO |
Kung Sophat |
Project Type |
Education |
21,000,000 |
| Rumdeng |
1 |
322 |
Brick school with fibro roof |
1.00 [ 1.00 ] |
School room |
21,000,000 |
8.000 Length (m) |
7.000 Width (m) |
21,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,000,000 |
Soutr Nikom, Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171108/03/01 |
TSO |
Kung Sophat |
Project Type |
Education |
37,403,000 |
| Popel Kandal |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
18,701,500 |
8.000 Length (m) |
7.000 Width (m) |
37,403,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,403,000 |
Soutr Nikom, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171109/03/01 |
TSO |
Kung Sophat |
Project Type |
Irrigation |
10,164,000 |
| Bat Dangkao |
1 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
10,164,000 |
2.000 Total span (m) |
4.000 Width (m) |
10,164,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,164,000 |
| Contract ID |
171109/03/02 |
TSO |
Kung Sophat |
Project Type |
Education |
20,340,000 |
| Samraong Khang Tboung |
1 |
322 |
Brick school with fibro roof |
1.00 [ 1.00 ] |
School room |
20,340,000 |
8.000 Length (m) |
7.000 Width (m) |
20,340,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,340,000 |
Soutr Nikom, Ta Yaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
171110/03/01 |
TSO |
Kung Sophat |
Project Type |
Education |
37,350,000 |
| Boeng Vien |
1 |
322 |
Brick school with fibro roof |
2.00 [ 2.00 ] |
School room |
18,675,000 |
8.000 Length (m) |
7.000 Width (m) |
37,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,350,000 |