Contract Outputs

Location: Siem Reap \ Soutr Nikom Budget Year: 2003

Angkor Chum    Angkor Thum    Banteay Srei    Chi Kraeng    Kralanh    Puok    Prasat Bakong    Siem Reab    Soutr Nikom    Srei Snam    Svay Leu    Varin   

Soutr Nikom, Chan Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171101/03/01 TSO Kung Sophat Project Type Education 31,412,800
Doun Diev 1 322 Brick school with fibro roof 2.00 [ 2.00 ] School room 15,706,400 8.000 Length (m) 7.000 Width (m) 31,412,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,412,800

Soutr Nikom, Dam Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171102/03/01 TSO Kung Sophat Project Type Irrigation 21,500,000
Trabaek 1 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 4.000 Length (m) 1.500 Height (m) 4,300,000
Preah Trapeang 2 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 4.000 Length (m) 1.500 Height (m) 4,300,000
Srae Thnong 3 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 4.000 Length (m) 1.500 Height (m) 4,300,000
Kouk Roluos 4 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 4.000 Length (m) 1.500 Height (m) 4,300,000
Kouk Mon 5 451 Small water gate 1.00 [ 1.00 ] Place 4,300,000 4.000 Length (m) 1.500 Height (m) 4,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,500,000
Contract ID 171102/03/02 TSO Kung Sophat Project Type Rural Transport 15,680,000
Krasar Tum 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,495,000 0.600 Diameter (m) 5.000 Length (m) 4,485,000
Trabaek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,038,520 0.800 Diameter (m) 5.000 Length (m) 2,038,520
Bos 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,156,480 1.500 Total Span (m) 4.000 Width(m) 9,156,480
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,680,000

Soutr Nikom, Dan Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171103/03/01 TSO Kung Sophat Project Type Education 37,787,000
Kouk Chan 1 322 Brick school with fibro roof 2.00 [ 2.00 ] School room 18,893,500 8.000 Length (m) 7.000 Width (m) 37,787,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,787,000

Soutr Nikom, Kampong Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171104/03/01 TSO Kung Sophat Project Type Rural Domestic Water Supplies 35,739,800
Spean Veaeng 1 141 Pond with no filter 1.00 [ 1.00 ] Place 11,913,266 4.000 Depth (m) 1,492.000 Volume (m3) 11,913,266
Chamkar Yuon 2 141 Pond with no filter 1.00 [ 1.00 ] Place 11,913,267 4.000 Depth (m) 1,492.000 Volume (m3) 11,913,267
Ta Uor Sa 3 141 Pond with no filter 1.00 [ 1.00 ] Place 11,913,200 4.000 Depth (m) 1,492.000 Volume (m3) 11,913,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,739,733

Soutr Nikom, Kien Sangkae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171105/03/01 TSO Kung Sophat Project Type Irrigation 32,400,000
Thmei 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Thnal Chaek 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Chikeak 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Trapeang Prey 4 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Doun Lei 5 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Chrey Khang Tboung 6 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 6,480,000
Chrey Khang Cheung 7 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Sala Kakaoh 8 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Kouk Dei 9 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,240,000 0.600 Diameter (m) 5.000 Width (m) 3,240,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,400,000

Soutr Nikom, Khchas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171106/03/01 TSO Kung Sophat Project Type Rural Transport 6,000,000
Thlat 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,000,000
Contract ID 171106/03/02 TSO Kung Sophat Project Type Rural Domestic Water Supplies 2,760,000
Kouk Sangkae 1 111 Ring well 2.00 [ 2.00 ] Place 1,380,000 7.000 Depth (m) 1.000 Diameter (m) 2,760,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,760,000
Contract ID 171106/03/03 TSO Kung Sophat Project Type Irrigation 19,500,000
Thlat 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 9,750,000 2.000 Total span (m) 4.000 Width (m) 9,750,000
Thmei 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 9,750,000 2.000 Total span (m) 4.000 Width (m) 9,750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,500,000

Soutr Nikom, Khnar Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171107/03/01 TSO Kung Sophat Project Type Education 21,000,000
Rumdeng 1 322 Brick school with fibro roof 1.00 [ 1.00 ] School room 21,000,000 8.000 Length (m) 7.000 Width (m) 21,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,000,000

Soutr Nikom, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171108/03/01 TSO Kung Sophat Project Type Education 37,403,000
Popel Kandal 1 322 Brick school with fibro roof 2.00 [ 2.00 ] School room 18,701,500 8.000 Length (m) 7.000 Width (m) 37,403,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,403,000

Soutr Nikom, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171109/03/01 TSO Kung Sophat Project Type Irrigation 10,164,000
Bat Dangkao 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 10,164,000 2.000 Total span (m) 4.000 Width (m) 10,164,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,164,000
Contract ID 171109/03/02 TSO Kung Sophat Project Type Education 20,340,000
Samraong Khang Tboung 1 322 Brick school with fibro roof 1.00 [ 1.00 ] School room 20,340,000 8.000 Length (m) 7.000 Width (m) 20,340,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,340,000

Soutr Nikom, Ta Yaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 171110/03/01 TSO Kung Sophat Project Type Education 37,350,000
Boeng Vien 1 322 Brick school with fibro roof 2.00 [ 2.00 ] School room 18,675,000 8.000 Length (m) 7.000 Width (m) 37,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,350,000