Contract Outputs

Location: Kampong Cham \ Kampong Siem Budget Year: 2004

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Kampong Siem, Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030601/04/01 TSO Doul Son Project Type Rural Transport 31,956,300
Veal Sbov 1 202 Laterite road 1.89 [ 1.89 ] Km 12,662,274 3.000 Width (m) 0.200 Earth fill m3 23,931,698
Veal Sbov 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.800 Diameter (m) 5.000 Length (m) 1,100,000
Veal Sbov 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Chonghuk 5 202 Laterite road 0.46 [ 0.46 ] Km 12,662,174 3.000 Width (m) 0.200 Earth fill m3 5,824,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,956,298

Kampong Siem, Han Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030602/04/02 TSO Doul Son Project Type Rural Transport 6,808,300
Moan Haeur 1 201 Earth road 0.14 [ 0.14 ] Km 48,630,714 4.000 Width (m) 1.300 Earth fill m3 6,808,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,808,300
Contract ID 030602/04/03 TSO Doul Son Project Type Irrigation 12,775,000
Hanchey 1 433 Concrete spillway 1.00 [ 1.00 ] Place 12,775,000 6.000 Length (m) 1.500 12,775,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,775,000

Kampong Siem, Kien Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030603/04/01 TSO Doul Son Project Type Rural Domestic Water Supplies 19,131,000
Spean Thmei 1 111 Ring well 1.00 [ 1.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 1,913,100
Boeng Babos 2 111 Ring well 1.00 [ 1.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 1,913,100
Kien Chrey Krau 3 111 Ring well 1.00 [ 1.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 1,913,100
Kien Chrey Knong 4 111 Ring well 2.00 [ 2.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 3,826,200
Preaek Yuon 5 111 Ring well 3.00 [ 3.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 5,739,300
Enteak Nel 6 111 Ring well 2.00 [ 2.00 ] Place 1,913,100 15.000 Depth (m) 1.200 Diameter (m) 3,826,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,131,000

Kampong Siem, Kokor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030604/04/01 TSO Doul Son Project Type Irrigation 18,527,900
Kokor Pir 1 451 Small water gate 1.00 [ 1.00 ] Place 4,446,000 5.500 Length (m) 5.000 Height (m) 4,446,000
Kokor Muoy 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,464,500 0.800 Diameter (m) 6.000 Width (m) 3,464,500
Kokor Muoy 3 410 Earth dam 0.29 [ 0.29 ] Km 36,485,900 11.100 Max. height (m) 1,589.000 Volume (m3) 10,617,397
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,527,897

Kampong Siem, Kaoh Mitt

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030605/04/01 TSO Doul Son Project Type Rural Domestic Water Supplies 28,042,000
Kaoh Paen Ka 1 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Kaoh Paen Kha 2 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Kaoh Paen Kho 3 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Kaoh Prolung 4 111 Ring well 2.00 [ 2.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 4,006,000
Kaoh Dach 5 111 Ring well 2.00 [ 2.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 4,006,000
Kaoh Chas 6 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Kampong Trom Leu 7 111 Ring well 2.00 [ 2.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 4,006,000
Kampong Trom Kraom 8 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Svay Chrum 9 111 Ring well 1.00 [ 1.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 2,003,000
Kaoh Kol 10 111 Ring well 2.00 [ 2.00 ] Place 2,003,000 15.000 Depth (m) 1.200 Diameter (m) 4,006,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,042,000

Kampong Siem, Kaoh Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030606/04/01 TSO Doul Son Project Type Rural Drainage and Flood Protection 22,136,500
Kaoh Roka Knong 1 561 River bank protection 1.00 [ 1.00 ] Place 22,136,500 4.030 Height (m) 70.000 Length (m) 22,136,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,136,500

Kampong Siem, Kaoh Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030607/04/01 TSO Doul Son Project Type Rural Transport 16,001,400
Phum Muoy 1 221 Single cell box culvert 1.00 [ 1.00 ] Place 8,000,000 2.000 Total Span (m) 5.000 Width(m) 8,000,000
Phum Pram 2 223 Triple cell box culvert 1.00 [ 1.00 ] Place 8,001,400 4.500 Total Span (m) 5.000 Width(m) 8,001,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,001,400
Contract ID 030607/04/02 TSO Doul Son Project Type Rural Domestic Water Supplies 8,013,200
Phum Muoy 1 111 Ring well 1.00 [ 1.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 2,003,300
Phum Pir 2 111 Ring well 1.00 [ 1.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 2,003,300
Phum Buon 3 111 Ring well 1.00 [ 1.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 2,003,300
Phum Prampir 4 111 Ring well 1.00 [ 1.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 2,003,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,013,200

Kampong Siem, Kaoh Tontuem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030608/04/01 TSO Doul Son Project Type Rural Domestic Water Supplies 20,033,000
Kaoh Prak Leu 1 111 Ring well 2.00 [ 2.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 4,006,600
Kaoh Prak Kraom 2 111 Ring well 2.00 [ 2.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 4,006,600
Kaoh Prak Knong 3 111 Ring well 5.00 [ 5.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 10,016,500
Kaoh Kok Ka 4 111 Ring well 1.00 [ 1.00 ] Place 2,003,300 15.000 Depth (m) 1.200 Diameter (m) 2,003,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,033,000

Kampong Siem, Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030609/04/01 TSO Doul Son Project Type Rural Transport 25,691,200
Andoung Pou 1 202 Laterite road 0.50 [ 0.50 ] Km 8,476,500 3.000 Width (m) 0.150 Earth fill m3 4,238,250
Trapeang Ruessei 2 202 Laterite road 0.60 [ 0.60 ] Km 8,476,500 3.000 Width (m) 0.150 Earth fill m3 5,085,900
Ampil Chrum 3 202 Laterite road 1.40 [ 1.40 ] Km 8,476,500 3.000 Width (m) 0.150 Earth fill m3 11,867,100
Ampil Chrum 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Trapeang Ruessei 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,691,250

Kampong Siem, Ou Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030610/04/01 TSO Doul Son Project Type Rural Transport 21,285,500
Ampil Kranhanh 1 202 Laterite road 1.50 [ 1.50 ] Km 8,961,720 4.000 Width (m) 0.200 Earth fill m3 13,442,580
Trapeang Kak 2 202 Laterite road 1.29 [ 1.29 ] Km 5,355,000 3.000 Width (m) 0.200 Earth fill m3 6,907,950
Ampil Kranhanh 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 935,000 0.600 Diameter (m) 5.000 Length (m) 935,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,285,530

Kampong Siem, Ro'ang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030611/04/01 TSO Doul Son Project Type Rural Transport 23,618,100
Veal Khsach 1 202 Laterite road 1.90 [ 1.90 ] Km 12,430,600 4.000 Width (m) 0.150 Earth fill m3 23,618,140
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,618,140

Kampong Siem, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030612/04/01 TSO Doul Son Project Type Irrigation 17,217,300
Chheu Teal Srot Leu 1 410 Earth dam 0.27 [ 0.27 ] Km 48,064,000 12.500 Max. height (m) 2,264.000 Volume (m3) 12,977,280
Chheu Teal Srot Leu 2 451 Small water gate 1.00 [ 1.00 ] Place 4,240,000 4.000 Length (m) 3.000 Height (m) 4,240,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,217,280

Kampong Siem, Srak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030613/04/01 TSO Doul Son Project Type Irrigation 19,823,500
Lpeak 1 420 Canal 1.68 [ 1.68 ] Km 10,043,900 1.300 Depth (m) 4,295.000 Volume (m3) 16,823,533
Lpeak 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Width (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,823,533

Kampong Siem, Trean

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030614/04/01 TSO Doul Son Project Type Rural Transport 21,670,000
Ta Khong 1 202 Laterite road 2.40 [ 2.40 ] Km 9,029,167 3.500 Width (m) 0.150 Earth fill m3 21,670,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,670,000

Kampong Siem, Vihear Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030615/04/01 TSO Doul Son Project Type Rural Transport 25,812,000
Pongro 1 202 Laterite road 0.70 [ 0.70 ] Km 14,360,000 4.000 Width (m) 0.150 Earth fill m3 10,052,000
Vihear 2 202 Laterite road 0.40 [ 0.40 ] Km 14,360,000 4.000 Width (m) 0.150 Earth fill m3 5,744,000
Prasat 3 202 Laterite road 0.60 [ 0.60 ] Km 14,360,000 4.000 Width (m) 0.150 Earth fill m3 8,616,000
Pongro 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 6.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,812,000