Contract Outputs

Location: Kampong Cham \ Stueng Trang Budget Year: 2004

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Stueng Trang, areaks Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031501/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 21,825,300
Lvea 2 201 Earth road 1.00 [ 1.00 ] Km 8,405,400 4.000 Width (m) 0.300 Earth fill m3 8,405,400
Lvea 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 3,600,000 0.600 Diameter (m) 5.000 Length (m) 7,200,000
Kilou Prampir 4 201 Earth road 0.74 [ 0.74 ] Km 8,405,270 4.000 Width (m) 0.400 Earth fill m3 6,219,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,825,300

Stueng Trang, Dang Kdar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031503/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 25,978,900
Ou Pir 1 201 Earth road 1.00 [ 1.00 ] Km 11,546,222 4.000 Width (m) 0.460 Earth fill m3 11,546,222
Ta Ream 2 201 Earth road 0.70 [ 0.70 ] Km 11,546,222 4.000 Width (m) 0.300 Earth fill m3 8,082,355
Sdau 3 201 Earth road 0.55 [ 0.55 ] Km 11,546,222 4.000 Width (m) 0.300 Earth fill m3 6,350,422
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,979,000

Stueng Trang, Khpob Ta Nguon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031504/04/01 TSO Ten Chan Thuoen Project Type Irrigation 25,590,300
Anlong Samlei 1 420 Canal 0.25 [ 0.25 ] Km 102,361,200 0.600 Depth (m) 4,875.000 Volume (m3) 25,590,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,590,300

Stueng Trang, Me Sar Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031505/04/01 TSO Ten Chan Thuoen Project Type Irrigation 26,832,400
Ou Leu 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 14,368,400 5.500 Total span (m) 2.000 Width (m) 14,368,400
Bos Pou 2 453 Double pipe culvert with gate 2.00 [ 2.00 ] Place 3,600,000 0.600 Diameter (m) 7.000 Width (m) 7,200,000
Bos Pou 3 410 Earth dam 0.52 [ 0.52 ] Km 8,200,000 0.040 Max. height (m) 702.000 Volume (m3) 4,264,000
Ou Leu 4 420 Canal 0.25 [ 0.25 ] Km 4,000,000 0.030 Depth (m) 36.000 Volume (m3) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,832,400

Stueng Trang, Ou Mlu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031506/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 23,555,700
Khtuoy Muoy 1 201 Earth road 0.55 [ 0.55 ] Km 10,515,000 4.000 Width (m) 0.300 Earth fill m3 5,783,250
Khtuoy Pir 2 201 Earth road 0.40 [ 0.40 ] Km 10,515,000 4.000 Width (m) 0.300 Earth fill m3 4,206,000
Khtuoy Buon 3 201 Earth road 1.10 [ 1.10 ] Km 10,515,000 4.000 Width (m) 0.300 Earth fill m3 11,566,500
Khtuoy Bei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,555,750

Stueng Trang, Peam Kaoh Sna

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031507/04/01 TSO Ten Chan Thuoen Project Type Irrigation 27,969,000
Dei Leu 1 410 Earth dam 0.32 [ 0.32 ] Km 43,750,000 0.900 Max. height (m) 2,595.000 Volume (m3) 14,000,000
Dei Leu 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 13,969,000 3.000 Total span (m) 5.500 Width (m) 13,969,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,969,000

Stueng Trang, Preah Andoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031508/04/01 TSO Ten Chan Thuoen Project Type Irrigation 16,859,000
Preah Andoung Muoy 1 420 Canal 0.25 [ 0.25 ] Km 67,436,000 1.000 Depth (m) 4,000.000 Volume (m3) 16,859,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,859,000

Stueng Trang, Preaek Bak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031509/04/01 TSO Ten Chan Thuoen Project Type Irrigation 25,999,900
Preaek Preah Angk 1 410 Earth dam 1.05 [ 1.05 ] Km 20,952,285 12.000 Max. height (m) 3,399.000 Volume (m3) 21,999,899
Preaek Preah Angk 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 2,000,000 0.600 Diameter (m) 6.000 Width (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,999,899

Stueng Trang, Preaek Kak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031510/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 27,768,900
Meakh Muoy 1 201 Earth road 1.00 [ 1.00 ] Km 11,279,500 4.000 Width (m) 0.400 Earth fill m3 11,279,500
Meakh Pir 2 201 Earth road 0.80 [ 0.80 ] Km 11,279,500 4.000 Width (m) 0.400 Earth fill m3 9,023,600
Ou Prampir 3 201 Earth road 0.30 [ 0.30 ] Km 11,279,500 4.000 Width (m) 0.400 Earth fill m3 3,383,850
Ou Prampir 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,104,000 0.600 Diameter (m) 5.000 Length (m) 2,208,000
Ou Prampir 5 213 Triple pipe culvert 1.00 [ 1.00 ] Place 1,874,000 0.600 Diameter (m) 5.000 Length (m) 1,874,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,768,950
Contract ID 031510/04/02 TSO Ten Chan Thuoen Project Type Irrigation 14,518,900
Meakh Muoy 1 453 Double pipe culvert with gate 3.00 [ 3.00 ] Place 4,839,645 0.800 Diameter (m) 6.000 Width (m) 14,518,935
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,518,935

Stueng Trang, Soupheas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031512/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 27,979,100
Soupheas 1 201 Earth road 1.00 [ 1.00 ] Km 13,472,500 4.000 Width (m) 0.650 Earth fill m3 13,472,500
Soupheas 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,527,491 0.600 Diameter (m) 5.000 Length (m) 1,527,491
Pumtuob 3 201 Earth road 0.85 [ 0.85 ] Km 13,472,500 4.000 Width (m) 0.650 Earth fill m3 11,451,625
Pumtuob 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,527,493 0.600 Diameter (m) 5.000 Length (m) 1,527,493
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,979,108

Stueng Trang, Tuol Preah Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031513/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 20,164,800
Doun Tor 1 201 Earth road 0.19 [ 0.19 ] Km 14,480,600 4.000 Width (m) 0.400 Earth fill m3 2,751,314
Doun Tor 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 968,550 0.600 Diameter (m) 5.000 Length (m) 1,937,100
Ta Meung 3 201 Earth road 0.14 [ 0.14 ] Km 14,480,600 4.000 Width (m) 0.400 Earth fill m3 2,085,206
Ta Meung 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 968,550 0.600 Diameter (m) 5.000 Length (m) 968,550
Thum 5 201 Earth road 0.39 [ 0.39 ] Km 14,480,600 4.000 Width (m) 0.400 Earth fill m3 5,661,915
Voat 6 201 Earth road 0.40 [ 0.40 ] Km 14,480,600 4.000 Width (m) 0.400 Earth fill m3 5,792,240
Voat 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 968,600 0.600 Diameter (m) 5.000 Length (m) 968,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,164,925

Stueng Trang, Tuol Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031514/04/01 TSO Ten Chan Thuoen Project Type Rural Transport 17,961,800
Tuol Sambuor 1 201 Earth road 0.80 [ 0.80 ] Km 9,978,800 4.000 Width (m) 0.300 Earth fill m3 7,983,040
Veal Preah 2 201 Earth road 1.00 [ 1.00 ] Km 9,978,800 4.000 Width (m) 0.300 Earth fill m3 9,978,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,961,840